CN106141412A - A kind of nozzle throat auxiliary mould and welding method thereof - Google Patents

A kind of nozzle throat auxiliary mould and welding method thereof Download PDF

Info

Publication number
CN106141412A
CN106141412A CN201610686229.4A CN201610686229A CN106141412A CN 106141412 A CN106141412 A CN 106141412A CN 201610686229 A CN201610686229 A CN 201610686229A CN 106141412 A CN106141412 A CN 106141412A
Authority
CN
China
Prior art keywords
inner housing
supporting tool
connecting tooling
shell body
nozzle throat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610686229.4A
Other languages
Chinese (zh)
Inventor
徐丹
张亚夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Sanjiang Aerospace Group Hongyang Electromechanical Co Ltd
Original Assignee
Hubei Sanjiang Aerospace Group Hongyang Electromechanical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Sanjiang Aerospace Group Hongyang Electromechanical Co Ltd filed Critical Hubei Sanjiang Aerospace Group Hongyang Electromechanical Co Ltd
Priority to CN201610686229.4A priority Critical patent/CN106141412A/en
Publication of CN106141412A publication Critical patent/CN106141412A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/02Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating by means of a press ; Diffusion bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/26Auxiliary equipment

Abstract

The invention provides a kind of nozzle throat auxiliary mould and welding method thereof, nozzle throat auxiliary mould is applied at nozzle throat, and described nozzle throat includes: shell body and be arranged on the inner housing within described shell body;Described nozzle throat auxiliary mould includes: supporting tool is arranged on the end of described inner housing, is used for supporting described inner housing;Connecting tooling is connected with described supporting tool;Utilize vacuum pressure diffusion welding machine that described inner housing is welded with described shell body so that inner housing is connected with shell body;When welding, auxiliary mould is utilized to be supported by inner housing, it is to avoid inner housing and shell body deform at high temperature under high pressure;The material of described inner housing is copper, the material of described shell body is rustless steel, so, utilize vacuum pressure diffusion welding machine welding oxygen-free copper and steel part, inner housing is made to realize being reliably connected with the contact interface generation atom phase counterdiffusion of shell body, fundamentally solve weld seam hidden danger, improve product quality and service life.

Description

A kind of nozzle throat auxiliary mould and welding method thereof
Technical field
The invention belongs to wind tunnel technique field, particularly relate to a kind of nozzle throat auxiliary mould and welding method thereof.
Background technology
In wind tunnel experiment, jet pipe is requisite experimental facilities, and predominantly wind tunnel experiment provides air-flow real to ensure Test and can be smoothed out.
At present, the version of nozzle throat generally comprises two kinds: the first is spiro connection structure, i.e. two ends use sealing ring Mode seals, and the shortcoming of this kind of structure is to seal to coordinate surface accuracy to require height, assembling inconvenience, and sealing ring is at High Temperature High Pressure shape Under state the most aging;The second is melting welding structure, will the left and right flange of jet pipe be welded into one with housing, and the shortcoming of this kind of structure is During different-metal material welding, such as: copper and stainless steel welded time, there is certain welding hidden danger.
Based on this, need a kind of novel nozzle throat auxiliary mould and welding method thereof at present badly, to solve prior art In the problems referred to above.
Summary of the invention
The problem existed for prior art, embodiments provides a kind of nozzle throat auxiliary mould and welding thereof Method, is used for solving nozzle throat weld seam changeableness when welding in prior art, there is welding hidden danger and service life is short Technical problem.
The present invention provides a kind of nozzle throat auxiliary mould, applies at nozzle throat, and described nozzle throat includes: shell body And it is arranged on the inner housing within described shell body;
Described nozzle throat auxiliary mould includes:
Supporting tool, described supporting tool is arranged on the end of described inner housing, is used for supporting described inner housing;
Connecting tooling, described connecting tooling is connected with described supporting tool.
In such scheme, described inner housing utilizes vacuum pressure diffusion welding machine to weld with described shell body.
In such scheme, described supporting tool includes:
First supporting tool, described first supporting tool is arranged on one end of described inner housing;
Second supporting tool, described second supporting tool is arranged on the other end of described inner housing.
In such scheme, described connecting tooling includes:
First connecting tooling, the first junction phase of one end of described first connecting tooling and described first supporting tool Even, the other end of described first connecting tooling is connected with the first junction of described second supporting tool;
Second connecting tooling, the second junction phase of one end of described second connecting tooling and described first supporting tool Even, the other end of described second connecting tooling is connected with the second junction of described second supporting tool;
3rd connecting tooling, one end of described 3rd connecting tooling and the 3rd junction phase of described first supporting tool Even, the other end of described 3rd connecting tooling is connected with the 3rd junction of described second supporting tool;
4th connecting tooling, one end of described 4th connecting tooling and the 4th junction phase of described first supporting tool Even, the other end of described 4th connecting tooling is connected with the 4th junction of described second supporting tool.
The present invention also provides for the welding method of a kind of nozzle throat auxiliary mould, is applied on nozzle throat auxiliary mould, Described nozzle throat includes: shell body and be arranged on the inner housing within described shell body;Described method includes:
The inner housing of described nozzle throat is docked with described shell body;
Supporting tool is arranged on the end of described inner housing;
Described connecting tooling is connected with described supporting tool;
Utilize welding machine that described inner housing is welded with described shell body.
In such scheme, when utilizing welding machine that described inner housing is welded with described shell body, the welding of described welding machine Temperature is 800~970 DEG C;The welding pressure of described welding machine is 10~13.7MPa.
In such scheme, described supporting tool includes: the first supporting tool and the second supporting tool;Wherein, work will be supported Dress is arranged on the end of described inner housing and specifically includes:
Described first supporting tool is arranged on one end of described inner housing;
Described second supporting tool is arranged on the other end of described inner housing.
In such scheme, described connecting tooling includes: the first connecting tooling, the second connecting tooling, the 3rd connecting tooling and 4th connecting tooling;Wherein, described connecting tooling be connected with described supporting tool specifically include:
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool.
In such scheme, after utilizing welding machine to weld described inner housing with described shell body, described method also includes: Described nozzle throat is incubated 20~30min.
In such scheme, described welding machine specifically includes vacuum pressure diffusion welding machine.
The invention provides a kind of nozzle throat auxiliary mould and welding method thereof, described auxiliary mould is applied at jet pipe larynx Road, described nozzle throat includes: shell body and be arranged on the inner housing within described shell body;Described nozzle throat auxiliary mould Including: supporting tool, described supporting tool is arranged on the end of described inner housing, is used for supporting described inner housing;Connecting tooling, Described connecting tooling is connected with described supporting tool;Wherein, utilize vacuum pressure diffusion welding machine to described inner housing with described outside Housing welds so that described inner housing is connected with described shell body;When welding, auxiliary mould is utilized to be supported by inner housing Get up, it is to avoid inner housing and shell body deform at high temperature under high pressure;The material of described inner housing is copper, the material of described shell body For rustless steel, so, utilizing vacuum pressure diffusion welding machine welding oxygen-free copper and steel part, make inner housing and shell body contacts boundary Face occurs atom phase counterdiffusion to realize being reliably connected, and fundamentally solves weld seam hidden danger, improves product quality and use Life-span.
Accompanying drawing explanation
Overall structure when Fig. 1 is connected with nozzle throat for the nozzle throat auxiliary mould that the embodiment of the present invention one provides is shown It is intended to;
The front view of the inner housing that Fig. 2 provides for the embodiment of the present invention one;
The welding method schematic flow sheet of the nozzle throat auxiliary mould that Fig. 3 provides for the embodiment of the present invention two.
Detailed description of the invention
In order to fundamentally solve the weld seam hidden danger of nozzle throat, improving product quality and service life, the present invention carries Having supplied a kind of nozzle throat auxiliary mould, applied at nozzle throat, described nozzle throat includes: shell body and be arranged on described outside The inner housing of enclosure interior;Described nozzle throat auxiliary mould includes: supporting tool, and described supporting tool is arranged on described inner shell The end of body, is used for supporting described inner housing;Connecting tooling, described connecting tooling is connected with described supporting tool.
Below by drawings and the specific embodiments, technical scheme is described in further detail.
Embodiment one
The present embodiment provides a kind of nozzle throat auxiliary mould, applies at nozzle throat, as it is shown in figure 1, described jet pipe larynx Road includes: inner housing 1, shell body 2;Described auxiliary mould includes: supporting tool and connecting tooling;Wherein, described inner housing 1 Front view is as shown in Figure 2;
It is internal that described inner housing 1 is arranged on described shell body 2;Described supporting tool is arranged on the end of described inner housing 1, For supporting described inner housing 1;Described connecting tooling is connected with described supporting tool;Wherein, vacuum pressure diffusion welding machine is utilized Described inner housing 1 is welded with described shell body 2 so that described inner housing 1 is connected with described shell body 2.
Further, inner housing 1 docks with shell body 2 assembling for convenience, and described inner housing 1 includes two sections.Inner housing 1 With shell body 2 to connecting after, the profile (diameter of bore) of described inner housing 1, the profile (outside diameter) of shell body 2, end face All it is reserved with allowance, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing 1 diameter of bore For 1mm, shell body 2 diameter, inner housing 1 are 3~5mm with the allowance of shell body 2 end face, it is therefore preferable to 4mm;In described Housing 1 endoporus two ends axiality is 0.015mm, and shell body 2 both ends of the surface are 0.02mm with the perpendicularity of inner housing 1 endoporus.
Here, the inwall of described inner housing 1 is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Here, during because utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing 1 and shell Body 2 deforms because of High Temperature High Pressure, sees Fig. 1, and described supporting tool includes: the first supporting tool 3 and the second supporting tool 4, described First supporting tool 3 is arranged on one end of described inner housing 1;, described second supporting tool 4 is arranged on the another of described inner housing 1 One end.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: first connecting tooling the 5, second connecting tooling 6, the 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling 5 is connected with the first junction of described first supporting tool 3, and described first even First junction of the other end and described second supporting tool 4 that connect frock 5 is connected;
One end of described second connecting tooling 6 is connected with the second junction of described first supporting tool 3, and described second even Second junction of the other end and described second supporting tool 4 that connect frock is connected;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool 3, and the described 3rd even 3rd junction of the other end and described second supporting tool 4 that connect frock is connected;
4th connecting tooling, the 4th junction phase of one end of described 4th connecting tooling and described first supporting tool 3 Even, the other end of described 4th connecting tooling is connected with the 4th junction of described second supporting tool 4.
Here, when utilizing vacuum pressure diffusion welding machine that described inner housing 1 is welded with described shell body 2, described very The welding temperature of pneumatics power diffusion welding machine is 800~970 DEG C, and preferred weld temperature is 850~950 DEG C, preferred weld temperature spot It it is 890 DEG C;The welding pressure of described vacuum pressure diffusion welding machine is 10~13.7MPa, and preferred weld pressure is 11~13MPa, Preferred weld pressure spot is 12.8MPa.After welding is complete, also needing nozzle throat is incubated 20~30min, the preferably time is 20min。
After welding, described nozzle throat through ultrasound examination, all to air-tightness, weld seam that watertightness is relevant, weldering Seam quality is satisfied by I level weld seam requirement in the requirement of steel melting welding head and defect rank GB/T12469.Cooling water channel is carried out The 5MPa water pressure test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, in 5min ne-leakage and Deformation.Through vacuum leak hunting, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
The nozzle throat auxiliary mould that the present embodiment provides, when the mode using vacuum diffusion welding realizes inside and outside nozzle throat During the welding of housing unlike material, it is to avoid inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, extend jet pipe larynx The service life in road.
Embodiment two
Corresponding to embodiment one, present embodiments provide the welding method of a kind of nozzle throat auxiliary mould, such as Fig. 3 institute Show, said method comprising the steps of:
Step 310, docks the inner housing of described nozzle throat with described shell body.
In this step, described nozzle throat includes: shell body and be arranged on the inner housing within described shell body;Described auxiliary Assistant engineer's dress is applied on nozzle throat, and inner housing docks with shell body assembling for convenience, and described inner housing includes two sections, described Inner housing is arranged on inside shell body;Supporting tool is arranged on the end of described inner housing, is used for supporting described inner housing;Connect Frock is connected with described supporting tool.
After inner housing and shell body are to connecting, the profile (diameter of bore) of described inner housing, the profile of shell body, end face All it is reserved with allowance, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing diameter of bore is 1mm, shell body diameter, inner housing are 3~5mm with the allowance of shell body end face, it is therefore preferable to 4mm;Described inner housing Endoporus two ends axiality is 0.015mm, and shell body both ends of the surface are 0.02mm with the perpendicularity of inner housing endoporus.
Here, the inwall of described inner housing is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Step 311, is arranged on the end of described inner housing by supporting tool.
In this step, when utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing is with outer Housing deforms because of High Temperature High Pressure, and supporting tool is arranged on the end of described inner housing.Seeing Fig. 1, described supporting tool includes: First supporting tool and the second supporting tool, described first supporting tool is arranged on one end of described inner housing;, described second Support frock is arranged on the other end of described inner housing.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: the first connecting tooling, the second connecting tooling, 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool.
Step 312, utilizes welding machine to weld described inner housing with described shell body.
In this step, when described inner housing dock with described shell body complete after, after auxiliary mould installs, profit With vacuum pressure diffusion welding machine, described inner housing is welded with described shell body, the welding of described vacuum pressure diffusion welding machine Temperature is 800~970 DEG C, and preferred weld temperature is 850~950 DEG C, and preferred weld temperature spot is 890 DEG C;Described vacuum pressure The welding pressure of diffusion welding machine is 10~13.7MPa, and preferred weld pressure is 11~13MPa, and preferred weld pressure spot is 12.8MPa.After welding is complete, also needing nozzle throat is incubated 20~30min, the preferably time is 20min.
After welding, described auxiliary mould is removed, described nozzle throat through ultrasound examination, all with air-tightness, The weld seam that watertightness is relevant, weldquality is satisfied by I level weld seam requirement in GB/T12469.Cooling water channel carries out 5MPa hydraulic pressure examination Test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, ne-leakage and deformation in 5min.Through vacuum Leak detection, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
The welding method of the nozzle throat auxiliary mould that the present embodiment provides, when the mode using vacuum diffusion welding realizes spray During the welding of pipe venturi inner and outer shell unlike material, it is to avoid inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, prolong Grow the service life of nozzle throat.
Embodiment three
During actual application, utilize nozzle throat auxiliary mould and the nozzle throat of embodiment two offer that embodiment one provides When auxiliary mould welding method is welded, idiographic flow is as follows:
First, the inner housing of described nozzle throat is docked with described shell body.Described nozzle throat includes: shell body and It is arranged on the inner housing within described shell body;Described auxiliary mould is applied on nozzle throat, specifically, and inner shell for convenience Body docks with shell body assembling, and described inner housing includes two sections, and described inner housing is arranged on inside shell body;Supporting tool is installed In the end of described inner housing, it is used for supporting described inner housing;Connecting tooling is connected with described supporting tool.Described inner housing 1 Front view as shown in Figure 2.
After inner housing and shell body are to connecting, the profile of described inner housing, the profile of shell body, end face are all reserved with and add Spare time measures, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing diameter of bore is 1mm, shell body Diameter, inner housing are 3~5mm with the allowance of shell body end face, it is therefore preferable to 4mm;Described inner housing endoporus two ends are same Axle degree is 0.015mm, and shell body both ends of the surface are 0.02mm with the perpendicularity of inner housing endoporus.
Here, the inwall of described inner housing is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Here, during because utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing and shell Body deforms because of High Temperature High Pressure, and supporting tool is arranged on the end of described inner housing.Seeing Fig. 1, described supporting tool includes: the One supporting tool and the second supporting tool, described first supporting tool is arranged on one end of described inner housing;, described second supports Frock is arranged on the other end of described inner housing.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: the first connecting tooling, the second connecting tooling, 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool
When described inner housing dock with described shell body complete after, after auxiliary mould installs, utilize Vacuum Pressure Described inner housing is welded by power diffusion welding machine with described shell body, and the welding temperature of described vacuum pressure diffusion welding machine is 890℃;The welding pressure of described vacuum pressure diffusion welding machine is 12.8MPa.After welding is complete, also need nozzle throat is protected Temperature 20min.
After welding, described auxiliary mould is removed, described nozzle throat through ultrasound examination, all with air-tightness, The weld seam that watertightness is relevant, weldquality is satisfied by I level weld seam requirement in GB/T12469.Cooling water channel carries out 5MPa hydraulic pressure examination Test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, ne-leakage and deformation in 5min.Through vacuum Leak detection, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
Nozzle throat auxiliary mould and the nozzle throat of embodiment two offer that the present embodiment employing embodiment one provides are auxiliary Assistant engineer fills welding method, when utilizing the welding that the mode of vacuum diffusion welding realizes nozzle throat inner and outer shell unlike material, it is to avoid Inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, extend the service life of nozzle throat.
Embodiment four
During actual application, when nozzle throat auxiliary mould is welded by the method utilizing embodiment two to provide, specifically flow Journey is as follows:
First, the inner housing of described nozzle throat is docked with described shell body.Described nozzle throat includes: shell body and It is arranged on the inner housing within described shell body;Described auxiliary mould is applied on nozzle throat, specifically, and inner shell for convenience Body docks with shell body assembling, and described inner housing includes two sections, and described inner housing is arranged on inside shell body;Supporting tool is installed In the end of described inner housing, it is used for supporting described inner housing;Connecting tooling is connected with described supporting tool.Described inner housing 1 Front view as shown in Figure 2.
After inner housing and shell body are to connecting, the profile of described inner housing, the profile of shell body, end face are all reserved with and add Spare time measures, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing diameter of bore is 1mm, shell body Diameter, inner housing are 3~5mm with the allowance of shell body end face, it is therefore preferable to 4mm;Described inner housing endoporus two ends are same Axle degree is 0.015mm, and shell body both ends of the surface are 0.02mm with the perpendicularity of inner housing endoporus.
Here, the inwall of described inner housing is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Here, during because utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing and shell Body deforms because of High Temperature High Pressure, and supporting tool is arranged on the end of described inner housing.Seeing Fig. 1, described supporting tool includes: the One supporting tool and the second supporting tool, described first supporting tool is arranged on one end of described inner housing;, described second supports Frock is arranged on the other end of described inner housing.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: the first connecting tooling, the second connecting tooling, 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool
When described inner housing dock with described shell body complete after, after auxiliary mould installs, utilize Vacuum Pressure Described inner housing is welded by power diffusion welding machine with described shell body, and the welding temperature of described vacuum pressure diffusion welding machine is 830℃;The welding pressure of described vacuum pressure diffusion welding machine is 10.5MPa.After welding is complete, also need nozzle throat is protected Temperature 25min.
After welding, described auxiliary mould is removed, described nozzle throat through ultrasound examination, all with air-tightness, The weld seam that watertightness is relevant, weldquality is satisfied by I level weld seam requirement in GB/T12469.Cooling water channel carries out 5MPa hydraulic pressure examination Test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, ne-leakage and deformation in 5min.Through vacuum Leak detection, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
The present embodiment is under the support of nozzle throat auxiliary mould, when the mode using vacuum diffusion welding realizes nozzle throat During the welding of inner and outer shell unlike material, it is to avoid inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, extend spray The service life of pipe venturi.
Embodiment five
During actual application, when nozzle throat auxiliary mould is welded by the method utilizing embodiment two to provide, specifically flow Journey is as follows:
First, the inner housing of described nozzle throat is docked with described shell body.Described nozzle throat includes: shell body and It is arranged on the inner housing within described shell body;Described auxiliary mould is applied on nozzle throat, specifically, and inner shell for convenience Body docks with shell body assembling, and described inner housing includes two sections, and described inner housing is arranged on inside shell body;Supporting tool is installed In the end of described inner housing, it is used for supporting described inner housing;Connecting tooling is connected with described supporting tool.Described inner housing 1 Front view as shown in Figure 2.
After inner housing and shell body are to connecting, the profile of described inner housing, the profile of shell body, end face are all reserved with and add Spare time measures, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing diameter of bore is 1mm, shell body Diameter, inner housing are 3~5mm with the allowance of shell body end face, it is therefore preferable to 4mm;Described inner housing endoporus two ends are same Axle degree is 0.015mm, and shell body both ends of the surface are 0.02mm with the perpendicularity of inner housing endoporus.
Here, the inwall of described inner housing is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Here, during because utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing and shell Body deforms because of High Temperature High Pressure, and supporting tool is arranged on the end of described inner housing.Seeing Fig. 1, described supporting tool includes: the One supporting tool and the second supporting tool, described first supporting tool is arranged on one end of described inner housing;, described second supports Frock is arranged on the other end of described inner housing.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: the first connecting tooling, the second connecting tooling, 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool
When described inner housing dock with described shell body complete after, after auxiliary mould installs, utilize Vacuum Pressure Described inner housing is welded by power diffusion welding machine with described shell body, and the welding temperature of described vacuum pressure diffusion welding machine is 960℃;The welding pressure of described vacuum pressure diffusion welding machine is 12.0MPa.After welding is complete, also need nozzle throat is protected Temperature 26min.
After welding, described auxiliary mould is removed, described nozzle throat through ultrasound examination, all with air-tightness, The weld seam that watertightness is relevant, weldquality is satisfied by I level weld seam requirement in GB/T12469.Cooling water channel carries out 5MPa hydraulic pressure examination Test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, ne-leakage and deformation in 5min.Through vacuum Leak detection, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
The present embodiment is under the support of nozzle throat auxiliary mould, when the mode using vacuum diffusion welding realizes nozzle throat During the welding of inner and outer shell unlike material, it is to avoid inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, extend spray The service life of pipe venturi.
Embodiment six
During actual application, when nozzle throat auxiliary mould is welded by the method utilizing embodiment two to provide, specifically flow Journey is as follows:
First, the inner housing of described nozzle throat is docked with described shell body.Described nozzle throat includes: shell body and It is arranged on the inner housing within described shell body;Described auxiliary mould is applied on nozzle throat, specifically, and inner shell for convenience Body docks with shell body assembling, and described inner housing includes two sections, and described inner housing is arranged on inside shell body;Supporting tool is installed In the end of described inner housing, it is used for supporting described inner housing;Connecting tooling is connected with described supporting tool.Described inner housing 1 Front view as shown in Figure 2.
After inner housing and shell body are to connecting, the profile of described inner housing, the profile of shell body, end face are all reserved with and add Spare time measures, to ensure the precision of follow-up digital control processing.Wherein, the allowance of described inner housing diameter of bore is 1mm, shell body Diameter, inner housing are 3~5mm with the allowance of shell body end face, it is therefore preferable to 4mm;Described inner housing endoporus two ends are same Axle degree is 0.015mm, and shell body both ends of the surface are 0.02mm with the perpendicularity of inner housing endoporus.
Here, the inwall of described inner housing is provided with tank gusset (cooling water channel), enters with the air-flow to nozzle throat Row cooling, its intensity of cooling increases along with the increase of cooling water channel.
Here, during because utilizing vacuum pressure diffusion welding machine that nozzle throat is welded, in order to avoid inner housing and shell Body deforms because of High Temperature High Pressure, and supporting tool is arranged on the end of described inner housing.Seeing Fig. 1, described supporting tool includes: the One supporting tool and the second supporting tool, described first supporting tool is arranged on one end of described inner housing;, described second supports Frock is arranged on the other end of described inner housing.
In order to consolidate supporting tool, seeing Fig. 1, described connecting tooling includes: the first connecting tooling, the second connecting tooling, 3rd connecting tooling and the 4th connecting tooling;Wherein,
One end of described first connecting tooling is connected with the first junction of described first supporting tool, by described first The other end of connecting tooling is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, by described second The other end of connecting tooling is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, by the described 3rd The other end of connecting tooling is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, by the described 4th The other end of connecting tooling is connected with the 4th junction of described second supporting tool
When described inner housing dock with described shell body complete after, after auxiliary mould installs, utilize Vacuum Pressure Described inner housing is welded by power diffusion welding machine with described shell body, and the welding temperature of described vacuum pressure diffusion welding machine is 940℃;The welding pressure of described vacuum pressure diffusion welding machine is 10.5MPa.After welding is complete, also need nozzle throat is protected Temperature 21min.
After welding, described auxiliary mould is removed, described nozzle throat through ultrasound examination, all with air-tightness, The weld seam that watertightness is relevant, weldquality is satisfied by I level weld seam requirement in GB/T12469.Cooling water channel carries out 5MPa hydraulic pressure examination Test, ne-leakage and deformation in 5min;The inner chamber of inner housing 1 does the 7.5MPa water pressure test, ne-leakage and deformation in 5min.Through vacuum Leak detection, described nozzle throat is pressurize 5min when pressure is less than 10Pa, and leak rate is less than 0.01Pa.L/S.
The present embodiment is under the support of nozzle throat auxiliary mould, when the mode using vacuum diffusion welding realizes nozzle throat During the welding of inner and outer shell unlike material, it is to avoid inner housing and shell body deformation, it is to avoid the welding hidden danger of weld seam, extend spray The service life of pipe venturi.
The above, only presently preferred embodiments of the present invention, be not intended to limit protection scope of the present invention, all Any amendment, equivalent and the improvement etc. made within the spirit and principles in the present invention, should be included in the protection of the present invention Within the scope of.

Claims (10)

1. a nozzle throat auxiliary mould, applies at nozzle throat, it is characterised in that described nozzle throat includes: shell body And it is arranged on the inner housing within described shell body;
Described nozzle throat auxiliary mould includes:
Supporting tool, described supporting tool is arranged on the end of described inner housing, is used for supporting described inner housing;
Connecting tooling, described connecting tooling is connected with described supporting tool.
2. nozzle throat auxiliary mould as claimed in claim 1, it is characterised in that described inner housing utilizes with described shell body Vacuum pressure diffusion welding machine welds.
3. nozzle throat auxiliary mould as claimed in claim 1, it is characterised in that described supporting tool includes:
First supporting tool, described first supporting tool is arranged on one end of described inner housing;
Second supporting tool, described second supporting tool is arranged on the other end of described inner housing.
4. nozzle throat auxiliary mould as claimed in claim 1, it is characterised in that described connecting tooling includes:
First connecting tooling, one end of described first connecting tooling is connected with the first junction of described first supporting tool, institute First junction of the other end and described second supporting tool of stating the first connecting tooling is connected;
Second connecting tooling, one end of described second connecting tooling is connected with the second junction of described first supporting tool, institute Second junction of the other end and described second supporting tool of stating the second connecting tooling is connected;
3rd connecting tooling, one end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, institute 3rd junction of the other end and described second supporting tool of stating the 3rd connecting tooling is connected;
4th connecting tooling, one end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, institute 4th junction of the other end and described second supporting tool of stating the 4th connecting tooling is connected.
5. a welding method for nozzle throat auxiliary mould, is applied on the nozzle throat auxiliary mould described in claim 1, It is characterized in that, described nozzle throat includes: shell body and be arranged on the inner housing within described shell body;Described method bag Include:
The inner housing of described nozzle throat is docked with described shell body;
Supporting tool is arranged on the end of described inner housing;
Described connecting tooling is connected with described supporting tool;
Utilize welding machine that described inner housing is welded with described shell body.
6. welding method as claimed in claim 5, it is characterised in that utilize welding machine that described inner housing is entered with described shell body During row welding, the welding temperature of described welding machine is 800~970 DEG C;The welding pressure of described welding machine is 10~13.7MPa.
7. welding method as claimed in claim 5, it is characterised in that described supporting tool includes: the first supporting tool and the Two supporting tools;Wherein, the end that supporting tool is arranged on described inner housing specifically includes:
Described first supporting tool is arranged on one end of described inner housing;
Described second supporting tool is arranged on the other end of described inner housing.
8. welding method as claimed in claim 5, it is characterised in that described connecting tooling includes: the first connecting tooling, second Connecting tooling, the 3rd connecting tooling and the 4th connecting tooling;Wherein, described connecting tooling is connected specifically with described supporting tool Including:
One end of described first connecting tooling is connected with the first junction of described first supporting tool, connects described first The other end of frock is connected with the first junction of described second supporting tool;
One end of described second connecting tooling is connected with the second junction of described first supporting tool, connects described second The other end of frock is connected with the second junction of described second supporting tool;
One end of described 3rd connecting tooling is connected with the 3rd junction of described first supporting tool, connects the described 3rd The other end of frock is connected with the 3rd junction of described second supporting tool;
One end of described 4th connecting tooling is connected with the 4th junction of described first supporting tool, connects the described 4th The other end of frock is connected with the 4th junction of described second supporting tool.
9. welding method as claimed in claim 4, it is characterised in that utilize welding machine that described inner housing is entered with described shell body After row welding, described method also includes: described nozzle throat is incubated 20~30min.
10. welding method as claimed in claim 9, it is characterised in that described welding machine specifically includes vacuum pressure diffusion welding machine.
CN201610686229.4A 2016-08-17 2016-08-17 A kind of nozzle throat auxiliary mould and welding method thereof Pending CN106141412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610686229.4A CN106141412A (en) 2016-08-17 2016-08-17 A kind of nozzle throat auxiliary mould and welding method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610686229.4A CN106141412A (en) 2016-08-17 2016-08-17 A kind of nozzle throat auxiliary mould and welding method thereof

Publications (1)

Publication Number Publication Date
CN106141412A true CN106141412A (en) 2016-11-23

Family

ID=57330371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610686229.4A Pending CN106141412A (en) 2016-08-17 2016-08-17 A kind of nozzle throat auxiliary mould and welding method thereof

Country Status (1)

Country Link
CN (1) CN106141412A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109848498A (en) * 2019-03-08 2019-06-07 任耀文 A kind of complexity rectangular nozzle integral welding method
CN114211204A (en) * 2021-12-21 2022-03-22 北京星航机电装备有限公司 Gamma-shaped half-section end ring and superplastic forming method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3768256A (en) * 1969-08-14 1973-10-30 Messerschmitt Boelkow Blohm Thrust gas generator having a combustion chamber and thrust nozzle regeneratively cooled by a liquid
CN101148000A (en) * 2006-09-21 2008-03-26 航天材料及工艺研究所 High temperature alloy complex groove structure panel and flange liquid phase diffusion connecting method
CN101633081A (en) * 2008-12-29 2010-01-27 北京智创联合科技有限公司 Manufacturing of composite sandwich nozzle by dynamic pressurizing transient liquid phase diffusion welding
CN101704160A (en) * 2009-12-03 2010-05-12 西安交通大学 Heterogeneous metal connecting method for tungsten, copper and alloy thereof
CN103537789A (en) * 2013-11-05 2014-01-29 什邡市明日宇航工业股份有限公司 Discharge plasma diffusion welding manufacture method for Laval nozzles
CN203696227U (en) * 2014-01-20 2014-07-09 常德翔宇设备制造有限公司 Tool for special-shaped spray pipe diffusion welding with bidirectional bulging
CN206029008U (en) * 2016-08-17 2017-03-22 湖北三江航天红阳机电有限公司 Spray tube throat auxiliary fixtures

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3768256A (en) * 1969-08-14 1973-10-30 Messerschmitt Boelkow Blohm Thrust gas generator having a combustion chamber and thrust nozzle regeneratively cooled by a liquid
CN101148000A (en) * 2006-09-21 2008-03-26 航天材料及工艺研究所 High temperature alloy complex groove structure panel and flange liquid phase diffusion connecting method
CN101633081A (en) * 2008-12-29 2010-01-27 北京智创联合科技有限公司 Manufacturing of composite sandwich nozzle by dynamic pressurizing transient liquid phase diffusion welding
CN101704160A (en) * 2009-12-03 2010-05-12 西安交通大学 Heterogeneous metal connecting method for tungsten, copper and alloy thereof
CN103537789A (en) * 2013-11-05 2014-01-29 什邡市明日宇航工业股份有限公司 Discharge plasma diffusion welding manufacture method for Laval nozzles
CN203696227U (en) * 2014-01-20 2014-07-09 常德翔宇设备制造有限公司 Tool for special-shaped spray pipe diffusion welding with bidirectional bulging
CN206029008U (en) * 2016-08-17 2017-03-22 湖北三江航天红阳机电有限公司 Spray tube throat auxiliary fixtures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109848498A (en) * 2019-03-08 2019-06-07 任耀文 A kind of complexity rectangular nozzle integral welding method
CN114211204A (en) * 2021-12-21 2022-03-22 北京星航机电装备有限公司 Gamma-shaped half-section end ring and superplastic forming method thereof

Similar Documents

Publication Publication Date Title
CN102950351B (en) Hydrogen peroxide thrust chamber body portion diffusion brazing manufacture method
CN206029008U (en) Spray tube throat auxiliary fixtures
CN101706350A (en) Device for testing airtightness of weld joint on ship surface and using method thereof
CN113500279B (en) ODS-FeCrAl alloy cladding tube fuel rod end plug resistance welding process
CN106141412A (en) A kind of nozzle throat auxiliary mould and welding method thereof
CN202726326U (en) Heat exchanger pipe plate and heat exchange pipe butt-jointing structure
CN112338452B (en) Processing method of ground test device for spraying liquid
CN105414782A (en) Isolated layer surfacing method of dissimilar steel welding joint
CN105215565A (en) The docking calculation that the nuclear power generating equipment low-alloy steel of limited space and stainless steel are taken over
CN109108515A (en) A kind of installation method of steamer oil pipe
CN108856971A (en) Penstock combines steel sleeve single side butt weld technologies for steel
CN102513657A (en) Argon arc welding method for pipe welding and auxiliary device used in method
CN103537772B (en) Airtight welding method for metal shell and end-sealing glass
CN102601487B (en) Method for welding water outlet nozzles on nuclear power hanging basket
CN109883713B (en) Process spray pipe capable of reducing axial thermal stress
CN206191076U (en) Pressurized cabin pipeline crossing cabin flange of high thermal resistance
CN207687550U (en) A kind of bellows and flange connection for type metal expansion joint
CN105108281A (en) Welding process for oil pipe of main transformer of electric locomotive
CN1075757C (en) Resistor clot welding process of vacuum sucker with inner pressure container
CN104889544A (en) Stainless steel cavity preheating transmission cavity welding process
CN202655773U (en) Back surface argon filling device for welding of stainless steel pipe of boiler
CN208757550U (en) A kind of outer coil pipe antiseep stiffening device of reaction kettle
CN205641613U (en) Water heater inner bag inner end cap
CN203115140U (en) Flange gate valve
CN204341738U (en) A kind of tank container with concentrated heating arrangement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123