CN106130701A - HARQ process transmission method and device, base station and terminal in unauthorized frequency range - Google Patents
HARQ process transmission method and device, base station and terminal in unauthorized frequency range Download PDFInfo
- Publication number
- CN106130701A CN106130701A CN201610555039.9A CN201610555039A CN106130701A CN 106130701 A CN106130701 A CN 106130701A CN 201610555039 A CN201610555039 A CN 201610555039A CN 106130701 A CN106130701 A CN 106130701A
- Authority
- CN
- China
- Prior art keywords
- harq process
- transmission
- frequency range
- frame
- harq
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1829—Arrangements specially adapted for the receiver end
- H04L1/1854—Scheduling and prioritising arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1829—Arrangements specially adapted for the receiver end
- H04L1/1864—ARQ related signaling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0003—Two-dimensional division
- H04L5/0005—Time-frequency
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0092—Indication of how the channel is divided
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0096—Indication of changes in allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
Abstract
The invention provides the HARQ process transmission method and device in a kind of unauthorized frequency range, base station and terminal, wherein, HARQ process transmission method includes: the number of times that statistical data transmitting terminal makes each HARQ process miss re-transmission because performing Channel Detection mechanism in unauthorized frequency range, and/or adds up the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal;Miss the number of times of re-transmission, and/or the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal according to each HARQ process, determine each HARQ process transmission priority when retransmitting;When the channel unauthorized frequency range being detected can take every time, according to each HARQ process transmission priority when retransmitting to its allocation of transmission resources.The present invention can avoid HARQ process owing to always taking the problem causing sending data less than channel, reduces the average delay of HARQ process, the handling capacity of beneficially lifting system.
Description
Technical field
The present invention relates to communication technical field, in particular to the HARQ process transmission side in a kind of unauthorized frequency range
HARQ process transmission device in method, a kind of unauthorized frequency range, a kind of base station and a kind of terminal.
Background technology
Along with sharply increasing of message volume, 3GPP mandate frequency spectrum seems and is increasingly not enough to provide higher network to hold
Amount.In order to improve the utilization of frequency spectrum resource further, 3GPP proposes LAA, and (LTE Assisted Access, LTE auxiliary connects
Enter) concept, for by LTE (Long Term Evolution, Long Term Evolution) authorize frequency spectrum help use unauthorized
Frequency spectrum.In order to make the different system harmonious coexistences such as such as Wi-Fi in LTE system and unauthorized frequency range, 3GPP also been proposed LBT
(Listen Before Talk, listem-before-talk) mechanism, to ensure in unauthorized frequency range by the usufructuary mode of competitive channel
Different system use frequency spectrum resource fairness.Wherein, LTE system can be TDD in the working method of unlicensed spectrum
(Time Division Duplexing, time division duplex) pattern, supplementary descending (SDL, Supplemental Downlink) mould
Formula or the pattern of dynamically up-downgoing.
Wherein, the physical layer frame structure of TD-LTE is 10ms, contains the field of two 5ms, and its ascending-descending subframes configures
As shown in table 1:
Table 1
As shown in table 1, for the TDD structure of 5ms downstream-to-upstream change-over period, 1 frame comprises 8 normal sub-frames and 2
Individual special subframe, and 8 normal sub-frames are to be referred to table 1 for up or descending on earth.And 10ms is gone downwards to
The TDD structure of up change-over period, 1 frame comprises 9 normal sub-frames and a special subframe, and 9 normal sub-frames are on earth
Being for the up or descending table 1 that is referred to, each normal sub-frames comprises again 14 symbol (symbol).
HARQ (Hybrid Automatic Repeat Request, hybrid automatic repeat-request) mechanism is in LTE system
Ensure the important component part of transmission reliability, and the HARQ process sequential in different sub-frame configuration ensure that running time-frequency resource is high
Effect utilizes.Traditional HARQ sequential is descending uses asynchronous system, i.e. receiving terminal does not knows the moment that transmission occurs in advance, because of
This needs the HARQ process number of signaling instruction current transmission in asynchronous HARQ.Asynchronous HARQ need not consider what head passed and retransmitted
Sequence problem, therefore agreement define only from sending downlink data to up by PUCCH (Physical Uplink
Control Channel, Physical Uplink Control Channel) sequential relationship of feeding back ACK/NACK, the most as shown in table 2:
Table 2
As shown in table 2, the digital k in form represents: if downlink data transmits in subframe n, then the ACK/ of its correspondence
Nack message will feed back in the subframe that subframe numbers is n+k;If n+k > 9, then explanation should be after current wireless frame
First radio frames subframe numbers be (n+k) %10 subframe in feeding back ACK/nack message (% is complementation symbol);Work as n+k > 19
Time, then feeding back ACK/nack message in the subframe that second radio frames subframe numbers is (n+k) %10 after current wireless frame.
Traditional HARQ sequential is up, and take is synchronous HARQ, and the transmission of a HARQ process and retransmitting has solid
Fixed sequential relationship, due to the generation moment of the previously known transmission of receiving terminal, therefore need not extra signaling to represent HARQ
Process number.Agreement defines two sequential relationships to uplink synchronous HARQ, and one is at PDCCH (Physical from base station
Downlink Control Channel, Physical Downlink Control Channel) it is upper that to send out upstream dispatching instructions the most up to terminal transmission
The sequential relationship of data, another is to send the upstream data sequential relationship to base station feedback ACK/NACK from terminal.Wherein, table
3 give terminal sends upstream data to the sequential relationship of base station feedback ACK/NACK:
Table 3
As shown in table 3, the digital k in form represents: transmit in the subframe that subframe numbers is n if up data, then
ACK/NACK feedback in PHICH (Physical Hybird ARQ Indicator Channel, Physical HARQ Indicator Channel)
Information is transmitted in the subframe that subframe numbers is n+k.If n+k occurs > situation of 9 or n+k > 19, then according to descending HARQ sequential
The processing mode of same condition processes.
Owing to authorizing LTE access system in frequency range can use channel resource at any time, so during HARQ process
Sequence shows good seriality.But owing to unauthorized frequency range introduces LBT mechanism so that LTE system can not be all the time
All busy channel resources, if HARQ mechanism still uses the timing planning authorized in frequency range, then may result in HARQ process
Take in the transmission data moment that sequential specifies and can not transmit data less than channel resource.If a certain HARQ process always goes out
Existing such situation, it will increase the average delay of HARQ process, reduces Consumer's Experience.Concrete problem is as follows:
As it is shown in figure 1, as a example by the configuration #1 of tdd mode, base station is when 0 work song frame busy channel resource of radio frames 1
It is successfully transmitted the data of descending HARQ process 1.And 4 work song frames of the 4 of radio frames 1,5 work song frames and radio frames 2 are not owing to robbing
Account for channel resource, cause sending the downlink data in process 3,4,2.
For ascending HARQ course, equally exist moment of regulation because of can not busy channel and upstream data can not be sent
Situation.As in figure 2 it is shown, equally as a example by TDD configuration #1, terminal sends upstream datas at 2 work song frames of radio frames 1, according to time
Sequence rule, base station should be at the 6 work song frame feeding back ACKs/nack message of radio frames 1, and this sub-frame of uplink is successfully robbed and accounted for letter this moment
Road, upstream data is successfully transmitted.But 3 work song frames of 7 work song frames of radio frames 1 and radio frames 2 are not owing to taking channel
Resource, so upstream data can not be sent.
If always there is above-mentioned situation in some HARQ process, then the time delay of this HARQ process will be very big, respectively
Individual HARQ process resource distributional equity can not be guaranteed, it is also possible to the situation of loss of data occurs, has a strong impact on use
Family is experienced and throughput performance.
Therefore, how it can be avoided that HARQ process always takies can not send data less than channel resource, reduce HARQ
The average delay of process, it is ensured that HARQ process utilizes the fairness of resource to become technical problem urgently to be resolved hurrily.
Summary of the invention
The present invention is based at least one above-mentioned technical problem, it is proposed that the HARQ in a kind of new unauthorized frequency range enters
Journey transmission plan, can avoid HARQ process owing to always taking the problem causing sending data less than channel, reduce
The average delay of HARQ process, it is ensured that utilize the fairness of resource between HARQ process, handling up of beneficially lifting system
Amount.
In view of this, according to the first aspect of the invention, it is proposed that the HARQ process transmission side in a kind of unauthorized frequency range
Method, including: statistical data transmitting terminal makes each HARQ process miss weight because performing Channel Detection mechanism in unauthorized frequency range
Pass number of times, and/or add up each HARQ process from set up receive ACK message to data sending terminal before experienced time
Long;Miss the number of times of re-transmission according to described each HARQ process, and/or described each HARQ process is from setting up to data sending terminal
Receive the duration experienced before ACK message, determine the described each HARQ process transmission priority when retransmitting;?
Detect when the channel of unauthorized frequency range can take, according to the described each HARQ process transmission preferences when retransmitting every time
Level is to its allocation of transmission resources.
In this technical scheme, made because performing Channel Detection mechanism in unauthorized frequency range by statistical data transmitting terminal
Each HARQ process misses the number of times of re-transmission, and/or adds up each HARQ process and receive ACK to data sending terminal and disappear from setting up
The duration experienced before breath, determines each HARQ process transmission priority when retransmitting, and according to the biography determined
Defeated priority come to its allocation of transmission resources so that the HARQ process bigger for missing the number of times of re-transmission, and/or from set up to
Data sending terminal receive the longer HARQ process of the duration experienced before ACK message can by preferential allocation of transmission resources,
And then it can be avoided that HARQ process is owing to always taking the problem causing sending data less than channel, reduces HARQ and enter
The average delay of journey, it is ensured that utilize the fairness of resource between HARQ process, the handling capacity of beneficially lifting system.
Wherein, data sending terminal both can be base station, it is also possible to be terminal.When data sending terminal is base station, HARQ enters
Journey is descending HARQ process;When data sending terminal is terminal, HARQ process is ascending HARQ course.
In technique scheme, it is preferable that the described each HARQ process transmission priority when retransmitting and institute
State each HARQ process and miss the number of times of re-transmission, and/or described each HARQ process receives ACK from foundation to data sending terminal
Experienced before message time grow up to positive correlation.
In this technical scheme, by making the HARQ process transmission priority when retransmitting and HARQ process miss weight
The number of times passed becomes positive correlation so that the HARQ process missing the number of times of re-transmission the most can obtain higher transmission preferences
Level, and then it can be avoided that HARQ process is owing to always taking the problem causing sending data less than channel, reduce
The average delay of HARQ process;Similarly, by make the HARQ process transmission priority when retransmitting and HARQ process from
Foundation grows up to positive correlation when being experienced before receiving ACK message to data sending terminal so that the HARQ that time delay is bigger
Process can obtain higher transmission priority, and then can reduce the average delay of HARQ process.
In any of the above-described technical scheme, it is preferable that in the number of times and the institute that miss re-transmission according to described each HARQ process
State the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal, determine described each
In the case of the HARQ process transmission priority when retransmitting, determine the described each HARQ process biography when retransmitting
The step of defeated priority, specifically includes: the number of times missing re-transmission according to described each HARQ process determines that described HARQ process exists
Transmission priority during re-transmission;When the number of times that multiple HARQ processes miss re-transmission is identical, according to the plurality of HARQ process from
Set up the duration experienced before receiving ACK message to data sending terminal and determine the plurality of HARQ process biography when retransmitting
Defeated priority.
In any of the above-described technical scheme, it is preferable that the HARQ process transmission method in described unauthorized frequency range, also wrap
Include: if arbitrary HARQ process misses the pre-determined number that reaches of the number of times of re-transmission, and/or arbitrary HARQ process is sent out from foundation to data
Sending end receives the duration experienced before ACK message and reaches the first scheduled duration, then give up described arbitrary HARQ process.
In any of the above-described technical scheme, it is preferable that also include: if in the transmission money to described each HARQ course allocation
After source, also has available transfer resource, it is determined whether there is a need to other HARQ process retransmitted;Retransmit if necessary its
Its HARQ process, it is determined that the transmission priority of other HARQ process described, and according to the priority of other HARQ process described,
To its allocation of transmission resources.
In this technical scheme, when after above-mentioned each HARQ course allocation transfer resource, if also having available biography
Defeated resource, then may determine whether other HARQ process that there is a need to retransmit, and is determining other HARQ process that there is a need to retransmit
Time, according to the priority of other HARQ process to its allocation of transmission resources, enabling ensure that transfer resource obtains sufficient profit
With, improve the utilization rate of resource.Wherein, however, it is determined that do not need other HARQ process retransmitted, then can use remaining biography
Defeated resource sets up new HARQ process.
In any of the above-described technical scheme, it is preferable that in the case of described HARQ process is descending HARQ process, according to
The described each HARQ process transmission priority when retransmitting, to the step of its allocation of transmission resources, specifically includes: often
When the secondary down channel unauthorized frequency range being detected can take, the transfer resource of the second scheduled duration that will start from present sub-frame
Distribute to predetermined quantity HARQ process, wherein, if when described present sub-frame started before first non-descending sub frame
Long more than or equal to predetermined value T, then using described predetermined value T as described second scheduled duration;If from the beginning of described present sub-frame
Duration before first non-descending sub frame be less than described predetermined value T, then by described present sub-frame to the most described first non-under
Duration before row subframe is as described second scheduled duration, and wherein, predetermined value T is channel maximum occupation time.
In this technical scheme, owing to the detection of down channel is carried out at descending sub frame, if non-awarding therefore being detected
The down channel of power frequency range be when can take, then the biography of the second scheduled duration that can will start from present sub-frame (i.e. descending sub frame)
Defeated resource distributes to predetermined quantity HARQ process.Wherein, when the determination of the second scheduled duration can take according to channel maximum
Long and continuous print descending sub frame number is determined, if the duration of continuous print descending sub frame is time not up to channel maximum takies
Long, then using the duration of continuous print descending sub frame as the second scheduled duration, if the duration of continuous print descending sub frame is more than channel
Take greatly duration, then using channel maximum occupation time as the second scheduled duration.
In any of the above-described technical scheme, it is preferable that in the case of described HARQ process is ascending HARQ course, according to
The described each HARQ process transmission priority when retransmitting, to the step of its allocation of transmission resources, specifically includes: often
When the secondary up channel unauthorized frequency range being detected can take, by transfer resource distribution corresponding for first sub-frame of uplink afterwards
To continuing to detect the letter of described unauthorized frequency range before the HARQ process that priority is the highest, and second sub-frame of uplink later
Road state;Or when the channel unauthorized frequency range being detected can take every time, by start from first sub-frame of uplink afterwards
The transfer resource that predetermined quantity sub-frame of uplink is corresponding distributes to predetermined quantity HARQ process.
In this technical scheme, owing to the detection of up channel was carried out before sub-frame of uplink, if examine the most every time
The up channel measuring unauthorized frequency range can take, then can be only by transfer resource distribution corresponding for a sub-frame of uplink thereafter
To the HARQ process that priority is the highest, it is required to before taking sub-frame of uplink detect channel status the most every time;Certainly, in inspection every time
Measure the up channel of unauthorized frequency range when can take, it is also possible to by transfer resource corresponding for predetermined quantity sub-frame of uplink thereafter
Distribute to predetermined quantity HARQ process.Wherein, there is two ways to determine the actual number of this predetermined quantity: one is detection
The number of the continuous print sub-frame of uplink after channel idle, the continuous print sub-frame of uplink after channel idle i.e. being detected all is used
Carry out the transmission of HARQ, have 3 sub-frame of uplink after channel idle such as being detected, then these 3 sub-frame of uplink are all used for
Transmission HARQ process;Another kind is the part sub-frame of uplink in the continuous print sub-frame of uplink after channel idle to be detected, such as
3 sub-frame of uplink are had, if front 2 sub-frame of uplink are all not allocated to other user, and on the 3rd after channel idle being detected
Row subframe is allocated to other user, then only take up front 2 sub-frame of uplink to carry out the transmission of HARQ process, and taking
Afterwards, the detection of channel is re-started.
According to the second aspect of the invention, it is also proposed that the HARQ process transmission device in a kind of unauthorized frequency range, including:
Statistic unit, makes each HARQ process wrong because performing Channel Detection mechanism for statistical data transmitting terminal in unauthorized frequency range
Cross the number of times retransmitted, and/or add up what each HARQ process was experienced before foundation receives ACK message to data sending terminal
Duration;Determine unit, for missing the number of times of re-transmission according to described each HARQ process, and/or described each HARQ process from
Set up the duration experienced before receiving ACK message to data sending terminal, determine that described each HARQ process is retransmitting
Time transmission priority;Allocation unit, is used for when the channel that data sending terminal detects unauthorized frequency range can take every time, root
According to the described each HARQ process transmission priority when retransmitting to its allocation of transmission resources.
In this technical scheme, made because performing Channel Detection mechanism in unauthorized frequency range by statistical data transmitting terminal
Each HARQ process misses the number of times of re-transmission, and/or adds up each HARQ process and receive ACK to data sending terminal and disappear from setting up
The duration experienced before breath, determines each HARQ process transmission priority when retransmitting, and according to the biography determined
Defeated priority come to its allocation of transmission resources so that the HARQ process bigger for missing the number of times of re-transmission, and/or from set up to
Data sending terminal receive the longer HARQ process of the duration experienced before ACK message can by preferential allocation of transmission resources,
And then it can be avoided that HARQ process is owing to always taking the problem causing sending data less than channel, reduces HARQ and enter
The average delay of journey, it is ensured that utilize the fairness of resource between HARQ process, the handling capacity of beneficially lifting system.
Wherein, data sending terminal both can be base station, it is also possible to be terminal.When data sending terminal is base station, HARQ enters
Journey is descending HARQ process;When data sending terminal is terminal, HARQ process is ascending HARQ course.
In technique scheme, it is preferable that the described each HARQ process transmission priority when retransmitting and institute
State each HARQ process and miss the number of times of re-transmission, and/or described each HARQ process receives ACK from foundation to data sending terminal
Experienced before message time grow up to positive correlation.
In this technical scheme, by making the HARQ process transmission priority when retransmitting and HARQ process miss weight
The number of times passed becomes positive correlation so that the HARQ process missing the number of times of re-transmission the most can obtain higher transmission preferences
Level, and then it can be avoided that HARQ process is owing to always taking the problem causing sending data less than channel, reduce
The average delay of HARQ process;Similarly, by make the HARQ process transmission priority when retransmitting and HARQ process from
Foundation grows up to positive correlation when being experienced before receiving ACK message to data sending terminal so that the HARQ that time delay is bigger
Process can obtain higher transmission priority, and then can reduce the average delay of HARQ process.
In any of the above-described technical scheme, it is preferable that in the number of times and the institute that miss re-transmission according to described each HARQ process
State the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal, determine described each
In the case of the HARQ process transmission priority when retransmitting, described determine unit specifically for: according to described each
HARQ process is missed the number of times of re-transmission and is determined the described HARQ process transmission priority when retransmitting;Miss in multiple HARQ processes
When the number of times of re-transmission is identical, according to the plurality of HARQ process institute's warp before foundation receives ACK message to data sending terminal
The duration gone through determines the plurality of HARQ process transmission priority when retransmitting.
In any of the above-described technical scheme, it is preferable that the HARQ process transmission device in described unauthorized frequency range, also wrap
Include: processing unit, for described statistic unit count on arbitrary HARQ process miss re-transmission number of times reach pre-determined number,
And/or arbitrary HARQ process from set up receive ACK message to data sending terminal before the duration that experienced reach first and make a reservation for
During duration, give up described arbitrary HARQ process.
In any of the above-described technical scheme, it is preferable that described determine that unit is additionally operable to: if in described allocation unit to described
After each HARQ course allocation transfer resource, also have available transfer resource, it is determined whether there is a need to retransmit other
HARQ process;Other HARQ process retransmitted if necessary, it is determined that the transmission priority of other HARQ process described, and according to
The priority of other HARQ process described, to its allocation of transmission resources.
In this technical scheme, when after above-mentioned each HARQ course allocation transfer resource, if also having available biography
Defeated resource, then may determine whether other HARQ process that there is a need to retransmit, and is determining other HARQ process that there is a need to retransmit
Time, according to the priority of other HARQ process to its allocation of transmission resources, enabling ensure that transfer resource obtains sufficient profit
With, improve the utilization rate of resource.Wherein, however, it is determined that do not need other HARQ process retransmitted, then can use remaining biography
Defeated resource sets up new HARQ process.
In any of the above-described technical scheme, it is preferable that in the case of described HARQ process is descending HARQ process, described
Allocation unit specifically for: when the down channel that described data sending terminal detects unauthorized frequency range can take every time, will be from
The transfer resource of the second scheduled duration that present sub-frame starts distributes to predetermined quantity HARQ process, wherein, if working as from described
The duration that front subframe started before first non-descending sub frame is more than or equal to predetermined value T, then using described predetermined value T as institute
State the second scheduled duration;If the duration started before first non-descending sub frame from described present sub-frame is less than described predetermined value
T, then using the duration before described present sub-frame to described first non-descending sub frame as described second scheduled duration, wherein,
Predetermined value T is channel maximum occupation time.
In this technical scheme, owing to the detection of down channel is carried out at descending sub frame, if non-awarding therefore being detected
The down channel of power frequency range be when can take, then the biography of the second scheduled duration that can will start from present sub-frame (i.e. descending sub frame)
Defeated resource distributes to predetermined quantity HARQ process.Wherein, when the determination of the second scheduled duration can take according to channel maximum
Long and continuous print descending sub frame number is determined, if the duration of continuous print descending sub frame is time not up to channel maximum takies
Long, then using the duration of continuous print descending sub frame as the second scheduled duration, if the duration of continuous print descending sub frame is more than channel
Take greatly duration, then using channel maximum occupation time as the second scheduled duration.
In any of the above-described technical scheme, it is preferable that in the case of described HARQ process is ascending HARQ course, described
Allocation unit specifically for: when the up channel that described data sending terminal detects unauthorized frequency range can take every time, by it
After transfer resource corresponding to first sub-frame of uplink distribute in the HARQ process that priority is the highest, and second later
Continue to detect the channel status of described unauthorized frequency range before row subframe;Or detect unauthorized at described data sending terminal every time
When the up channel of frequency range can take, by corresponding for predetermined quantity the sub-frame of uplink started from first sub-frame of uplink afterwards
Transfer resource distributes to predetermined quantity HARQ process.
In this technical scheme, owing to the detection of up channel was carried out before sub-frame of uplink, if examine the most every time
The up channel measuring unauthorized frequency range can take, then can be only by transfer resource distribution corresponding for a sub-frame of uplink thereafter
To the HARQ process that priority is the highest, it is required to before taking sub-frame of uplink detect channel status the most every time;Certainly, in inspection every time
Measure the up channel of unauthorized frequency range when can take, it is also possible to by transfer resource corresponding for predetermined quantity sub-frame of uplink thereafter
Distribute to predetermined quantity HARQ process.Wherein, there is two ways to determine the actual number of this predetermined quantity: one is detection
The number of the continuous print sub-frame of uplink after channel idle, the continuous print sub-frame of uplink after channel idle i.e. being detected all is used
Carry out the transmission of HARQ, have 3 sub-frame of uplink after channel idle such as being detected, then these 3 sub-frame of uplink are all used for
Transmission HARQ process;Another kind is the part sub-frame of uplink in the continuous print sub-frame of uplink after channel idle to be detected, such as
3 sub-frame of uplink are had, if front 2 sub-frame of uplink are all not allocated to other user, and on the 3rd after channel idle being detected
Row subframe is allocated to other user, then only take up front 2 sub-frame of uplink to carry out the transmission of HARQ process, and taking
Afterwards, the detection of channel is re-started.
By above technical scheme, HARQ process can be avoided to cause less than channel sending number owing to always taking
According to problem, reduce the average delay of HARQ process, it is ensured that between HARQ process, utilize the fairness of resource, be conducive to carrying
The handling capacity of the system of liter.
Accompanying drawing explanation
Fig. 1 shows to continue to use in unauthorized frequency range and authorizes the timing planning in frequency range to cause descending HARQ process not send
Schematic diagram;
Fig. 2 shows to continue to use in unauthorized frequency range and authorizes the timing planning in frequency range to cause ascending HARQ course not send
Schematic diagram;
Fig. 3 shows showing of the HARQ process transmission method in unauthorized frequency range according to first embodiment of the invention
Meaning flow chart;
Fig. 4 shows showing of the HARQ process transmission device in unauthorized frequency range according to first embodiment of the invention
Meaning block diagram;
Fig. 5 shows the schematic block diagram of base station according to an embodiment of the invention;
Fig. 6 shows showing of the HARQ process transmission device in the unauthorized frequency range of second embodiment according to the present invention
Meaning block diagram;
Fig. 7 shows the schematic block diagram of terminal according to an embodiment of the invention;
Fig. 8 shows the schematic flow diagram of the HARQ process transmission method of second embodiment according to the present invention;
Fig. 9 shows that the most descending HARQ process takies the signal of multiple descending sub frame continuously
Figure;
Figure 10 A shows the frame structure schematic diagram of sub-frame of uplink individualism;
Figure 10 B shows the frame structure schematic diagram of sub-frame of uplink continued presence.
Detailed description of the invention
In order to be more clearly understood that the above-mentioned purpose of the present invention, feature and advantage, real with concrete below in conjunction with the accompanying drawings
The present invention is further described in detail by mode of executing.It should be noted that in the case of not conflicting, the enforcement of the application
Feature in example and embodiment can be mutually combined.
Elaborate a lot of detail in the following description so that fully understanding the present invention, but, the present invention also may be used
Implementing to use other to be different from other modes described here, therefore, protection scope of the present invention is not by described below
The restriction of specific embodiment.
Fig. 3 shows showing of the HARQ process transmission method in unauthorized frequency range according to first embodiment of the invention
Meaning flow chart.
As it is shown on figure 3, the HARQ process transmission method in unauthorized frequency range according to first embodiment of the invention, bag
Include:
Step S30, statistical data transmitting terminal makes each HARQ enter because performing Channel Detection mechanism in unauthorized frequency range
Journey misses the number of times of re-transmission, and/or adds up each HARQ process institute's warp before foundation receives ACK message to data sending terminal
The duration gone through.
Step S32, misses the number of times of re-transmission, and/or described each HARQ process is from building according to described each HARQ process
Found the duration experienced before receiving ACK message to data sending terminal, determine that described each HARQ process is when retransmitting
Transmission priority.
Wherein, each HARQ process transmission priority when retransmitting and described each HARQ process miss re-transmission
Number of times, and/or described each HARQ process from set up receive ACK message to data sending terminal before experienced time just grow up to
Dependency relation.
Specifically, by making the HARQ process transmission priority when retransmitting and HARQ process miss the number of times of re-transmission
Become positive correlation so that the HARQ process missing the number of times of re-transmission the most can obtain higher transmission priority, Jin Erneng
Enough avoid HARQ process owing to always taking the problem causing sending data less than channel, reduce the flat of HARQ process
All time delays;Similarly, by making the HARQ process transmission priority when retransmitting send out from foundation to data with HARQ process
Sending end grows up to positive correlation when being experienced before receiving ACK message so that the HARQ process that time delay is bigger can obtain
Higher transmission priority, and then the average delay of HARQ process can be reduced.
Step S34, when the channel unauthorized frequency range being detected can take every time, is entering according to described each HARQ process
Transmission priority when row retransmits is to its allocation of transmission resources.
In this technical scheme, made because performing Channel Detection mechanism in unauthorized frequency range by statistical data transmitting terminal
Each HARQ process misses the number of times of re-transmission, and/or adds up each HARQ process and receive ACK to data sending terminal and disappear from setting up
The duration experienced before breath, determines each HARQ process transmission priority when retransmitting, and according to the biography determined
Defeated priority come to its allocation of transmission resources so that the HARQ process bigger for missing the number of times of re-transmission, and/or from set up to
Data sending terminal receive the longer HARQ process of the duration experienced before ACK message can by preferential allocation of transmission resources,
And then it can be avoided that HARQ process is owing to always taking the problem causing sending data less than channel, reduces HARQ and enter
The average delay of journey, it is ensured that utilize the fairness of resource between HARQ process, the handling capacity of beneficially lifting system.
In any of the above-described technical scheme, it is preferable that in the number of times and the institute that miss re-transmission according to described each HARQ process
State the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal, determine described each
In the case of the HARQ process transmission priority when retransmitting, determine the described each HARQ process biography when retransmitting
The step of defeated priority, specifically includes: the number of times missing re-transmission according to described each HARQ process determines that described HARQ process exists
Transmission priority during re-transmission;When the number of times that multiple HARQ processes miss re-transmission is identical, according to the plurality of HARQ process from
Set up the duration experienced before receiving ACK message to data sending terminal and determine the plurality of HARQ process biography when retransmitting
Defeated priority.
In any of the above-described technical scheme, it is preferable that the HARQ process transmission method in described unauthorized frequency range, also wrap
Include: if arbitrary HARQ process misses the pre-determined number that reaches of the number of times of re-transmission, and/or arbitrary HARQ process is sent out from foundation to data
Sending end receives the duration experienced before ACK message and reaches the first scheduled duration, then give up described arbitrary HARQ process.
In any of the above-described technical scheme, it is preferable that also include: if in the transmission money to described each HARQ course allocation
After source, also has available transfer resource, it is determined whether there is a need to other HARQ process retransmitted;Retransmit if necessary its
Its HARQ process, it is determined that the transmission priority of other HARQ process described, and according to the priority of other HARQ process described,
To its allocation of transmission resources.
In this technical scheme, when after above-mentioned each HARQ course allocation transfer resource, if also having available biography
Defeated resource, then may determine whether other HARQ process that there is a need to retransmit, and is determining other HARQ process that there is a need to retransmit
Time, according to the priority of other HARQ process to its allocation of transmission resources, enabling ensure that transfer resource obtains sufficient profit
With, improve the utilization rate of resource.Wherein, however, it is determined that do not need other HARQ process retransmitted, then can use remaining biography
Defeated resource sets up new HARQ process.
Wherein, the data sending terminal described in such scheme both can be base station, it is also possible to be terminal.Work as data sending terminal
When being base station, HARQ process is descending HARQ process;When data sending terminal is terminal, HARQ process is ascending HARQ course.
Below for ascending HARQ course and descending HARQ process, it is described separately concrete resource allocation process:
1, for descending HARQ process.
When HARQ process is descending HARQ process, above-mentioned steps S34 is carrying out weight according to described each HARQ process
Transmission priority during biography, to the step of its allocation of transmission resources, specifically includes: the descending of unauthorized frequency range detected every time
When channel can take, the transfer resource of the second scheduled duration started from present sub-frame is distributed to predetermined quantity HARQ and enters
Journey, wherein, if the duration started before first non-descending sub frame from described present sub-frame is more than or equal to predetermined value T, then
Using described predetermined value T as described second scheduled duration;If starting before first non-descending sub frame from described present sub-frame
Duration less than described predetermined value T, then using the duration before described present sub-frame to described first non-descending sub frame as institute
Stating the second scheduled duration, wherein, predetermined value T is channel maximum occupation time.
In this technical scheme, owing to the detection of down channel is carried out at descending sub frame, if non-awarding therefore being detected
The down channel of power frequency range be when can take, then the biography of the second scheduled duration that can will start from present sub-frame (i.e. descending sub frame)
Defeated resource distributes to predetermined quantity HARQ process.Wherein, when the determination of the second scheduled duration can take according to channel maximum
Long and continuous print descending sub frame number is determined, if the duration of continuous print descending sub frame is time not up to channel maximum takies
Long, then using the duration of continuous print descending sub frame as the second scheduled duration, if the duration of continuous print descending sub frame is more than channel
Take greatly duration, then using channel maximum occupation time as the second scheduled duration.
2, for ascending HARQ course.
When HARQ process is ascending HARQ course, above-mentioned steps S34 is carrying out weight according to described each HARQ process
Transmission priority during biography, to the step of its allocation of transmission resources, specifically includes: the up of unauthorized frequency range detected every time
When channel can take, transfer resource corresponding for first sub-frame of uplink afterwards is distributed to the HARQ process that priority is the highest,
And before second sub-frame of uplink later, continue to detect the channel status of described unauthorized frequency range;Or it is non-detecting every time
When the channel authorizing frequency range can take, by corresponding for predetermined quantity the sub-frame of uplink started from first sub-frame of uplink afterwards
Transfer resource distributes to predetermined quantity HARQ process.
In this technical scheme, owing to the detection of up channel was carried out before sub-frame of uplink, if examine the most every time
The up channel measuring unauthorized frequency range can take, then can be only by transfer resource distribution corresponding for a sub-frame of uplink thereafter
To the HARQ process that priority is the highest, it is required to before taking sub-frame of uplink detect channel status the most every time;Certainly, in inspection every time
Measure the up channel of unauthorized frequency range when can take, it is also possible to by transfer resource corresponding for predetermined quantity sub-frame of uplink thereafter
Distribute to predetermined quantity HARQ process.Wherein, there is two ways to determine the actual number of this predetermined quantity: one is detection
The number of the continuous print sub-frame of uplink after channel idle, the continuous print sub-frame of uplink after channel idle i.e. being detected all is used
Carry out the transmission of HARQ, have 3 sub-frame of uplink after channel idle such as being detected, then these 3 sub-frame of uplink are all used for
Transmission HARQ process;Another kind is the part sub-frame of uplink in the continuous print sub-frame of uplink after channel idle to be detected, such as
3 sub-frame of uplink are had, if front 2 sub-frame of uplink are all not allocated to other user, and on the 3rd after channel idle being detected
Row subframe is allocated to other user, then only take up front 2 sub-frame of uplink to carry out the transmission of HARQ process, and taking
Afterwards, the detection of channel is re-started.
Fig. 4 shows showing of the HARQ process transmission device in unauthorized frequency range according to first embodiment of the invention
Meaning block diagram.
As shown in Figure 4, the HARQ process transmission device in unauthorized frequency range according to first embodiment of the invention
400, including: statistic unit 402, determine unit 404 and allocation unit 406.
Wherein, statistic unit 402 makes each because performing Channel Detection mechanism for accounting base-station in unauthorized frequency range
Descending HARQ process misses the number of times of re-transmission, and/or adds up each descending HARQ process and receive ACK message to base station from setting up
The duration before experienced;Determine unit 404 for missing the number of times of re-transmission according to described each descending HARQ process, and/or
Described each descending HARQ process from set up receive ACK message to base station before the duration that experienced, determine described each under
The row HARQ process transmission priority when retransmitting;Allocation unit 406 for detecting unauthorized frequency range every time in base station
Channel when can take, according to the described each descending HARQ process transmission priority when retransmitting to its distribution transmission money
Source.
In this technical scheme, by accounting base-station in unauthorized frequency range because perform Channel Detection mechanism and make each under
Row HARQ process misses the number of times of re-transmission, and/or add up each descending HARQ process from set up to base station receive ACK message it
Front experienced duration, determines each descending HARQ process transmission priority when retransmitting, and according to the biography determined
Defeated priority is come to its allocation of transmission resources so that the descending HARQ process bigger for missing the number of times of re-transmission, and/or from building
Founding the longer descending HARQ process of the duration experienced before receiving ACK message to base station can be by preferential distribution transmission money
Source, and then it can be avoided that descending HARQ process is owing to always taking the problem causing sending data less than channel, reduce
The average delay of descending HARQ process, it is ensured that utilize the fairness of resource between descending HARQ process, be conducive to promoting system
The handling capacity of system.
In technique scheme, it is preferable that the described each descending HARQ process transmission priority when retransmitting
With the number of times that described each descending HARQ process misses re-transmission, and/or described each descending HARQ process from set up connect to base station
Experienced before receiving ACK message time grow up to positive correlation.
In this technical scheme, by making the descending HARQ process transmission priority when retransmitting enter with descending HARQ
Journey is missed the number of times of re-transmission and is become positive correlation so that the descending HARQ process missing the number of times of re-transmission the most can obtain higher
Transmission priority, and then it can be avoided that descending HARQ process causes less than channel sending data owing to always taking
Problem, reduces the average delay of descending HARQ process;Similarly, by making the transmission when retransmitting of the descending HARQ process
Priority and descending HARQ process grow up to positive correlation when being experienced before foundation receives ACK message to base station, make
Obtain the bigger descending HARQ process of time delay and can obtain higher transmission priority, and then the flat of descending HARQ process can be reduced
All time delays.
In any of the above-described technical scheme, it is preferable that at the number of times missing re-transmission according to described each descending HARQ process
The duration experienced before foundation receives ACK message to base station with described each descending HARQ process, determines described each
In the case of the descending HARQ process transmission priority when retransmitting, described determine unit 404 specifically for: according to described
The number of times that each descending HARQ process misses re-transmission determines the described descending HARQ process transmission priority when retransmitting;Multiple
When number of times that descending HARQ process misses re-transmission is identical, receive to base station from setting up according to the plurality of descending HARQ process
The duration experienced before ACK message determines the plurality of descending HARQ process transmission priority when retransmitting.
In any of the above-described technical scheme, it is preferable that the descending HARQ process transmission device in described unauthorized frequency range
400, also include: processing unit 408, miss re-transmission for counting on arbitrary descending HARQ process at described statistic unit 402
Number of times reach pre-determined number, and/or arbitrary descending HARQ process from set up receive ACK message to base station before experienced
When duration reaches the first scheduled duration, give up described arbitrary descending HARQ process.
In any of the above-described technical scheme, it is preferable that described determine that unit 404 is additionally operable to: if in described allocation unit 406
To described each descending HARQ course allocation after transfer resource, also has available transfer resource, it is determined whether there is a need to
Other the descending HARQ process retransmitted;Other descending HARQ process retransmitted if necessary, it is determined that other descending HARQ described
The transmission priority of process, and according to the priority of other descending HARQ process described, to its allocation of transmission resources.
In this technical scheme, when after above-mentioned each descending HARQ course allocation transfer resource, if also having available
Transfer resource, then may determine whether to there is a need to other the descending HARQ process retransmitted, determining other that there is a need to retransmit
During descending HARQ process, according to the priority of other descending HARQ process to its allocation of transmission resources, enabling ensure transmission
Resource is fully utilized, and improves the utilization rate of resource.Wherein, however, it is determined that do not need other the descending HARQ retransmitted to enter
Journey, then can use remaining transfer resource to set up new HARQ process.
In any of the above-described technical scheme, it is preferable that described allocation unit 406 specifically for: examine in described base station every time
Measure the down channel of unauthorized frequency range when can take, the transfer resource distribution of the second scheduled duration that will start from present sub-frame
To predetermined quantity descending HARQ process, wherein, if when described present sub-frame started before first non-descending sub frame
Long more than or equal to predetermined value T, then using described predetermined value T as described second scheduled duration;If from the beginning of described present sub-frame
Duration before first non-descending sub frame be less than described predetermined value T, then by described present sub-frame to the most described first non-under
Duration before row subframe is as described second scheduled duration, and wherein, predetermined value T is channel maximum occupation time.
In this technical scheme, owing to the detection of down channel is carried out at descending sub frame, if non-awarding therefore being detected
The down channel of power frequency range be when can take, then the biography of the second scheduled duration that can will start from present sub-frame (i.e. descending sub frame)
Defeated resource distributes to the descending HARQ process of predetermined quantity.Wherein, the determination of the second scheduled duration can account for according to channel maximum
It is determined by duration and continuous print descending sub frame number, if the duration of continuous print descending sub frame not up to channel maximum takies
Duration, then using the duration of continuous print descending sub frame as the second scheduled duration, if the duration of continuous print descending sub frame is more than channel
Maximum occupation time, then using channel maximum occupation time as the second scheduled duration.
Fig. 5 shows the schematic block diagram of base station according to an embodiment of the invention.
As it is shown in figure 5, base station 500 according to an embodiment of the invention, including: in unauthorized frequency range as shown in Figure 4
HARQ process transmission device 400.
Fig. 6 shows showing of the HARQ process transmission device in the unauthorized frequency range of second embodiment according to the present invention
Meaning block diagram.
As shown in Figure 6, according to the HARQ process transmission device in the unauthorized frequency range of second embodiment of the present invention
600, including: statistic unit 602, determine unit 604 and allocation unit 606.
Wherein, statistic unit 602 is used for adding up terminal and makes each because performing Channel Detection mechanism in unauthorized frequency range
Ascending HARQ course misses the number of times of re-transmission, and/or adds up each ascending HARQ course and receive ACK message from setting up to terminal
The duration before experienced;Determine unit 604 for missing the number of times of re-transmission according to described each ascending HARQ course, and/or
Described each ascending HARQ course from set up receive ACK message to terminal before the duration that experienced, determine described each on
The row HARQ process transmission priority when retransmitting;Allocation unit 606 is for unauthorized frequency range being detected in terminal every time
Channel when can take, according to the described each ascending HARQ course transmission priority when retransmitting to its distribution transmission money
Source.
In this technical scheme, made on each because performing Channel Detection mechanism in unauthorized frequency range by statistics terminal
Row HARQ process misses the number of times of re-transmission, and/or add up each ascending HARQ course from set up to terminal receive ACK message it
Front experienced duration, determines each ascending HARQ course transmission priority when retransmitting, and according to the biography determined
Defeated priority is come to its allocation of transmission resources so that the ascending HARQ course bigger for missing the number of times of re-transmission, and/or from building
Founding the longer ascending HARQ course of the duration experienced before receiving ACK message to terminal can be by preferential distribution transmission money
Source, and then it can be avoided that ascending HARQ course is owing to always taking the problem causing sending data less than channel, reduce
The average delay of ascending HARQ course, it is ensured that utilize the fairness of resource between ascending HARQ course, be conducive to promoting system
The handling capacity of system.
In technique scheme, it is preferable that the described each ascending HARQ course transmission priority when retransmitting
With the number of times that described each ascending HARQ course misses re-transmission, and/or described each ascending HARQ course connects from setting up to terminal
Experienced before receiving ACK message time grow up to positive correlation.
In this technical scheme, by making the ascending HARQ course transmission priority when retransmitting enter with ascending HARQ
Journey is missed the number of times of re-transmission and is become positive correlation so that the ascending HARQ course missing the number of times of re-transmission the most can obtain higher
Transmission priority, and then it can be avoided that ascending HARQ course causes less than channel sending data owing to always taking
Problem, reduces the average delay of ascending HARQ course;Similarly, by making the ascending HARQ course transmission when retransmitting
Priority and ascending HARQ course grow up to positive correlation when being experienced before foundation receives ACK message to terminal, make
Obtain the bigger ascending HARQ course of time delay and can obtain higher transmission priority, and then the flat of ascending HARQ course can be reduced
All time delays.
In any of the above-described technical scheme, it is preferable that at the number of times missing re-transmission according to described each ascending HARQ course
The duration experienced before foundation receives ACK message to terminal with described each ascending HARQ course, determines described each
In the case of the ascending HARQ course transmission priority when retransmitting, described determine unit 604 specifically for: according to described
Each ascending HARQ course misses the number of times of re-transmission and determines the described ascending HARQ course transmission priority when retransmitting;Multiple
Ascending HARQ course miss the number of times of re-transmission identical time, receive from setting up to terminal according to the plurality of ascending HARQ course
The duration experienced before ACK message determines the plurality of ascending HARQ course transmission priority when retransmitting.
In any of the above-described technical scheme, it is preferable that the described ascending HARQ course transmitting device in unauthorized frequency range
600, also include: processing unit 608, miss re-transmission for counting on arbitrary ascending HARQ course at described statistic unit 602
Number of times reach pre-determined number, and/or arbitrary ascending HARQ course from set up receive ACK message to terminal before experienced
When duration reaches the first scheduled duration, give up described arbitrary ascending HARQ course.
In any of the above-described technical scheme, it is preferable that described determine that unit 604 is additionally operable to: if in described allocation unit 606
After described each ascending HARQ course is assigned with transfer resource, also has available transfer resource, it is determined whether there is a need to
Other ascending HARQ course retransmitted;Other ascending HARQ course retransmitted if necessary, it is determined that other ascending HARQ described
The transmission priority of process, and according to the priority of other ascending HARQ course described, to its allocation of transmission resources.
In this technical scheme, when after above-mentioned each ascending HARQ course allocation of transmission resources, if also having available
Transfer resource, then may determine whether to there is a need to other ascending HARQ course retransmitted, determining other that there is a need to retransmit
During ascending HARQ course, according to the priority of other ascending HARQ course to its allocation of transmission resources, enabling ensure transmission
Resource is fully utilized, and improves the utilization rate of resource.Wherein, however, it is determined that do not need other ascending HARQ retransmitted to enter
Journey, then can use remaining transfer resource to set up new HARQ process.
In any of the above-described technical scheme, it is preferable that described allocation unit 606 specifically for: examine in described terminal every time
Measure the up channel of unauthorized frequency range when can take, transfer resource corresponding for first sub-frame of uplink afterwards is distributed to excellent
The ascending HARQ course that first level is the highest, and before second sub-frame of uplink later, continue to detect the letter of described unauthorized frequency range
Road state;Or when the up channel that described terminal detects unauthorized frequency range can take every time, by first afterwards
The transfer resource that predetermined quantity sub-frame of uplink that row subframe starts is corresponding distributes to predetermined quantity ascending HARQ course.
In this technical scheme, owing to the detection of up channel was carried out before sub-frame of uplink, if examine the most every time
The up channel measuring unauthorized frequency range can take, then can be only by transfer resource distribution corresponding for a sub-frame of uplink thereafter
To the ascending HARQ course that priority is the highest, it is required to before taking sub-frame of uplink detect channel status the most every time;Certainly, often
When the secondary up channel unauthorized frequency range being detected can take, it is also possible to by transmission corresponding for predetermined quantity sub-frame of uplink thereafter
Resource distributes to predetermined quantity ascending HARQ course.Wherein, there is two ways to determine the actual number of this predetermined quantity: one
Planting is the number continuous print sub-frame of uplink after channel idle being detected, and the continuous print after channel idle i.e. being detected is up
Subframe is all used for carrying out the transmission of ascending HARQ, has 3 sub-frame of uplink, then by these 3 after channel idle such as being detected
Row subframe is all used for transmitting ascending HARQ course;Another kind is the portion in the continuous print sub-frame of uplink after channel idle to be detected
Divide sub-frame of uplink, have 3 sub-frame of uplink after channel idle such as being detected, if front 2 sub-frame of uplink are all not allocated to it
Its user, and the 3rd sub-frame of uplink is allocated to other user, then only take up front 2 sub-frame of uplink to carry out HARQ process
Transmission, and after having taken, re-start the detection of channel.
Fig. 7 shows the schematic block diagram of terminal according to an embodiment of the invention.
As it is shown in fig. 7, terminal 700 according to an embodiment of the invention, including: in unauthorized frequency range as shown in Figure 6
HARQ process transmission device 600.
To sum up, technical scheme is primarily directed to unauthorized frequency range when being used by LTE system, it is proposed that based on
The channel resource allocation method of HARQ process priority, it is to avoid some HARQ processes can not send less than channel because always taking
The problem of data, reduces the average delay of HARQ process, it is ensured that utilize the fairness of resource between HARQ process.Wherein,
Technical scheme is applicable not only to the scene that unauthorized frequency range is used by LTE system in the way of TDD, is also applied for non-
Authorize frequency range in the way of SDL or scene that the mode of dynamically up-downgoing is used by LTE system.
Concrete the most as shown in Figure 8, according to the HARQ process transmission method of second embodiment of the present invention, including:
Step 802, data sending terminal determines the HARQ process needing to be retransmitted.Wherein, data sending terminal can be base station, also
It can be terminal.
Step 804, data sending terminal competitive channel.
Step 806, it may be judged whether seize channel success, the most then perform step 808;Otherwise, competitive channel is continued.
Step 808, adds up time delay T{i} of each HARQ process, and the number of transmissions N led to miss because of LBT mechanism
{i}。
Step 810, it is judged that whether there is the element that size is identical in N{i}, the most then perform step 812;Otherwise, perform
Step 816.
Step 812, compares the element in the T{i} corresponding to the element that size in N{i} is identical, is i.e. having the transmission missed
During the identical HARQ process of number of times, compare the time delay of these HARQ processes.
Step 814, carries out corresponding process descending according to the element size in T{i}.
Step 816, carries out corresponding process descending according to the element size in N{i}.
Step 818, determines the priority of HARQ process, wherein, sorts the most forward according to descending result, and priority is more
Greatly.
Step 820, according to the priority sequence determined to HARQ course allocation channel resource.
Step 822, busy channel transmission HARQ process.After channel occupancy terminates, return step 804.
In the HARQ process transmission method shown in Fig. 8, in order to ensure communication quality, data sending terminal is in unauthorized frequency range
Channel Detection must be carried out, when detecting that this frequency range does not has other different system to use or noise is less before upper transmission data
Can use.When transmitting terminal detects that channel can use, transmitting terminal is according to the time delay of HARQ process and the biography missed because of LBT mechanism
Defeated number of times carries out prioritization, carries out channel resource allocation with priority order from high to low after completing sequence.
Wherein, time delay refer to transmitting terminal after setting up HARQ process to experienced before receiving ACK message time
Between;The number of transmissions missed refers to HARQ process and does not rob in the time that sequential specifies due to LBT mechanism and account for channel resource
Cause can not normally sending the number of times retransmitting data.
The excellent of HARQ process is determined in the time delay of the HARQ process according to statistics and the number of transmissions missed because of LBT mechanism
During first level, first being compared by the number of transmissions that HARQ process is missed because of LBT mechanism, number of times is the biggest, and priority is the highest;If going out
The HARQ process that the number of transmissions that now misses is consistent, then compare their HARQ process delay, and time delay is the biggest, and priority is the highest.
Finally twice result of the comparison is combined, obtain the prioritization of each HARQ process.Other reality in the present invention
Execute in example, it is also possible to according only to the time delay of HARQ process or the number of transmissions that misses because of LBT mechanism to determine the excellent of HARQ process
First level.
Illustrate respectively below for descending HARQ process and ascending HARQ course:
One, descending HARQ process.
1, when needs transmission downlink data, base station carries out Channel Detection, can in the Tms after competition to channel resource
With busy channel.Wherein, statistics HARQ process delay refers to that accounting base-station has sent, but does not receives under ACK feedback
The time delay of row HARQ process;The number of transmissions that statistics HARQ process is missed refers to add up the descending HARQ having received NACK feedback
Process misses the number of times of re-transmission.
2, when Resources allocation, resource is to distribute to the HARQ process that priority is higher in units of subframe.Wherein, exist
When channel idle being detected, multiple descending sub frame can be taken continuously to transmit HARQ process, such as the frame shown in Fig. 9 be tied
Structure, when channel idle being detected, according to the priority of HARQ process, transmits successively in ensuing 6 descending sub frames
HARQ process 3, HARQ process 6, HARQ process 1, HARQ process 5, HARQ process 2, HARQ process 4.Wherein, take continuously many
Individual subframe determines according to channel maximum occupation time and continuous print descending sub frame number, if continuous print descending sub frame time
Long not up to channel maximum occupation time, then can take the multiple descending sub frame of this continuous print, if continuous print descending sub frame time
Long more than channel maximum occupation time, then channel is taken duration and is channel maximum occupation time.
If the channel duration shared by HARQ process that 3 are added up is less than channel maximum holding time T, then met
After the HARQ course allocation resource of condition, the statistics of the HARQ process priority that can try again, with by remaining down channel
Resource dispenses, by that analogy.If the HARQ process not met after Tong Ji, and down channel resources also residue,
Then this resource is not allocated.
If 4 at the end of a Channel holding time, part HARQ process is still had to be not allocated to channel resource,
Then these processes will not obtain any resource, and they will participate in the resource distribution after busy channel next time.
5, HARQ process priority after the busy channel of base station judges separate each time, is independent of each other, every time
Priority result of determination is only used for current channel resource allocation.
6, when the feedback information of some the descending HARQ process received when base station is ACK confirmation, this process
Time delay and the number of transmissions missed then reset.
If 7 present sub-frame directions are up, and descending holding time is not over, then terminate sending out of downlink data
Sending, holding time T resets.
8, when the number of times missing transmission when a descending HARQ process reaches pre-determined number (such as 4 times), then this HARQ is abandoned
The data of process, and the time delay of this descending HARQ process and the number of transmissions missed are reset.
9, the feedback timing planning of HARQ process still can adopt TD-LTE system in mandate frequency range in mandate frequency range
In descending HARQ timing planning.
Two, ascending HARQ course.
1, when needs transmission upstream data, terminal carries out Channel Detection, when channel idle being detected, sends to base station
Upstream data.Owing to the maximum holding time of up channel is 1ms, and according to the seriality of sub-frame of uplink and detection mode,
Resource distribution mode is broadly divided into following two:
Mode one: as shown in Figure 10 A, when sub-frame of uplink individualism, is the most all non-sub-frame of uplink, then enters according to HARQ
The priority of journey, by channel resource allocation to the highest ascending HARQ course of priority.
Mode two: as shown in Figure 10 B, when sub-frame of uplink continued presence, the detection mode of up channel has two kinds: a kind of
It is to detect before each sub-frame of uplink, determines whether to transmit HARQ process on this sub-frame of uplink according to testing result;
Another kind be robbed before any one sub-frame of uplink wherein and account for channel resource after, if remaining up son after this subframe
Frame, follow-up Channel Detection of can no longer doing, direct busy channel, until running into descending sub frame or base station by follow-up up son
Frame is distributed to other user and is used.
Wherein, when doing Channel Detection before each sub-frame of uplink, however, it is determined that up channel can be taken, then will letter
Road resource distributes to the ascending HARQ course that priority is the highest;When the channel detection process before any one sub-frame of uplink is robbed
When accounting for direct busy channel on channel resource and n later continuous sub-frame of uplink, this n+1 sub-frame of uplink can be divided
More much higher HARQ process of dispensing priority.
2, in the HARQ timing planning of TD-LTE, ascending HARQ is to synchronize, and it is fixing for i.e. sending and retransmit sequential,
And in the present invention, by carrying out Resources allocation thus according to priority, the sequential that therefore upstream data sends and retransmits is not fixing
, the most in the inventive solutions, ascending HARQ is asynchronous transmission.
3, the ascending HARQ course time delay of statistics refers to that adding up terminal has sent, but does not receives the upper of ACK feedback
The time delay of row HARQ process;The number of transmissions that statistics HARQ misses refers to add up the ascending HARQ course having received NACK feedback
Miss the number of times of re-transmission.
If the 4 HARQ number of processes sums less than continuous sub-frame of uplink carrying out prioritization, then give qualified
After HARQ course allocation resource, the statistics of the HARQ process priority that tries again, remaining uplink channel resources is dispensed,
By that analogy.If the HARQ process not met after Tong Ji, channel resource also has residue, then these resources are not carried out point
Join.
If at the end of 5 Channel holding times, part ascending HARQ course is still had to be not allocated to channel money
Source, these processes will not obtain any resource.They will participate in the resource distribution after busy channel next time.
6, HARQ process priority after terminal busy channel judges separate each time, is independent of each other, every time
Priority result of determination is only used for current channel resource allocation.
7, when the feedback information of some ascending HARQ course that terminal receives is ACK confirmation, this process
Time delay and the number of transmissions missed then reset.
8, when the number of times missing transmission when an ascending HARQ course reaches pre-determined number (such as 4 times), then this HARQ is abandoned
The data of process, and the time delay of this ascending HARQ course and the number of transmissions missed are reset.
9, the feedback timing planning of HARQ process still can adopt TD-LTE system in mandate frequency range in mandate frequency range
In ascending HARQ timing planning.
Technical scheme being described in detail above in association with accompanying drawing, the present invention proposes a kind of new unauthorized frequency range
On HARQ process transmission scheme, HARQ process can be avoided to cause less than channel sending data owing to always taking
Problem, reduces the average delay of HARQ process, it is ensured that utilize the fairness of resource between HARQ process, is conducive to promoting system
The handling capacity of system.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (16)
1. the HARQ process transmission method in a unauthorized frequency range, it is characterised in that including:
Statistical data transmitting terminal makes each HARQ process miss re-transmission because performing Channel Detection mechanism in unauthorized frequency range
Number of times, and/or add up the duration that each HARQ process was experienced before foundation receives ACK message to data sending terminal;
Miss the number of times of re-transmission according to described each HARQ process, and/or described each HARQ process is from setting up to data transmission
Termination receives the duration experienced before ACK message, determines the described each HARQ process transmission priority when retransmitting;
When the channel unauthorized frequency range being detected can take every time, according to the described each HARQ process biography when retransmitting
Defeated priority is to its allocation of transmission resources.
HARQ process transmission method in unauthorized frequency range the most according to claim 1, it is characterised in that described each
The HARQ process transmission priority when retransmitting and described each HARQ process miss the number of times of re-transmission, and/or described often
Individual HARQ process grows up to positive correlation when being experienced before foundation receives ACK message to data sending terminal.
HARQ process transmission method in unauthorized frequency range the most according to claim 2, it is characterised in that according to described
Each HARQ process miss the number of times of re-transmission and described each HARQ process from set up to data sending terminal receive ACK message it
Front experienced duration, in the case of determining the described each HARQ process transmission priority when retransmitting, determines described
The step of each HARQ process transmission priority when retransmitting, specifically includes:
The number of times missing re-transmission according to described each HARQ process determines the described HARQ process transmission priority when retransmitting;
When the number of times that multiple HARQ processes miss re-transmission is identical, according to the plurality of HARQ process from setting up to data sending terminal
Receive the duration experienced before ACK message and determine the plurality of HARQ process transmission priority when retransmitting.
HARQ process transmission method in unauthorized frequency range the most according to claim 1, it is characterised in that also include:
If arbitrary HARQ process misses the pre-determined number that reaches of the number of times of re-transmission, and/or arbitrary HARQ process is from setting up to data
Transmitting terminal receives the duration experienced before ACK message and reaches the first scheduled duration, then give up described arbitrary HARQ process.
HARQ process transmission method in unauthorized frequency range the most according to claim 1, it is characterised in that also include:
If after the transfer resource to described each HARQ course allocation, also has available transfer resource, it is determined whether have
Need other HARQ process retransmitted;
Other HARQ process retransmitted if necessary, it is determined that the transmission priority of other HARQ process described, and according to described
The priority of other HARQ process, to its allocation of transmission resources.
HARQ process transmission method in unauthorized frequency range the most according to any one of claim 1 to 5, its feature exists
In, in the case of described HARQ process is descending HARQ process, according to the described each HARQ process biography when retransmitting
Defeated priority, to the step of its allocation of transmission resources, specifically includes:
When the down channel unauthorized frequency range being detected can take every time, by the second scheduled duration of starting from present sub-frame
Transfer resource distributes to predetermined quantity HARQ process, wherein,
If the duration started before first non-descending sub frame from described present sub-frame is more than or equal to predetermined value T, then by institute
State predetermined value T as described second scheduled duration;
If the duration started before first non-descending sub frame from described present sub-frame is less than described predetermined value T, then by described
Duration before present sub-frame extremely described first non-descending sub frame is as described second scheduled duration, and wherein, predetermined value T is letter
Road maximum occupation time.
HARQ process transmission method in unauthorized frequency range the most according to any one of claim 1 to 5, its feature exists
In, in the case of described HARQ process is ascending HARQ course, according to the described each HARQ process biography when retransmitting
Defeated priority, to the step of its allocation of transmission resources, specifically includes:
When the up channel unauthorized frequency range being detected can take every time, by transmission corresponding for first sub-frame of uplink afterwards
It is described unauthorized that resource continues detection before distributing to the HARQ process that priority is the highest, and second sub-frame of uplink later
The channel status of frequency range;Or
When the channel unauthorized frequency range being detected can take every time, the predetermined number that will start from first sub-frame of uplink afterwards
The transfer resource that amount sub-frame of uplink is corresponding distributes to predetermined quantity HARQ process.
8. the HARQ process transmission device in a unauthorized frequency range, it is characterised in that including:
Statistic unit, makes each HARQ to enter because performing Channel Detection mechanism for statistical data transmitting terminal in unauthorized frequency range
Journey misses the number of times of re-transmission, and/or adds up each HARQ process institute's warp before foundation receives ACK message to data sending terminal
The duration gone through;
Determining unit, for missing the number of times of re-transmission according to described each HARQ process, and/or described each HARQ process is from building
Found the duration experienced before receiving ACK message to data sending terminal, determine that described each HARQ process is when retransmitting
Transmission priority;
Allocation unit, for when the channel that data sending terminal detects unauthorized frequency range can take every time, according to described each
The HARQ process transmission priority when retransmitting is to its allocation of transmission resources.
HARQ process transmission device in unauthorized frequency range the most according to claim 8, it is characterised in that described each
The HARQ process transmission priority when retransmitting and described each HARQ process miss the number of times of re-transmission, and/or described often
Individual HARQ process grows up to positive correlation when being experienced before foundation receives ACK message to data sending terminal.
HARQ process transmission device in unauthorized frequency range the most according to claim 9, it is characterised in that according to institute
State each HARQ process to miss the number of times of re-transmission and described each HARQ process and receive ACK message from setting up to data sending terminal
The duration before experienced, in the case of determining the described each HARQ process transmission priority when retransmitting, described really
Cell specifically for:
The number of times missing re-transmission according to described each HARQ process determines the described HARQ process transmission priority when retransmitting;
When the number of times that multiple HARQ processes miss re-transmission is identical, according to the plurality of HARQ process from setting up to data sending terminal
Receive the duration experienced before ACK message and determine the plurality of HARQ process transmission priority when retransmitting.
HARQ process transmission device in 11. unauthorized frequency ranges according to claim 8, it is characterised in that also include:
Processing unit, for described statistic unit count on arbitrary HARQ process miss re-transmission number of times reach predetermined time
Number, and/or arbitrary HARQ process from set up receive ACK message to data sending terminal before the duration that experienced to reach first pre-
Time the longest, give up described arbitrary HARQ process.
HARQ process transmission device in 12. unauthorized frequency ranges according to claim 8, it is characterised in that described determine
Unit is additionally operable to:
If after transfer resource, also having available transfer resource in described allocation unit to described each HARQ course allocation,
Then determine whether other HARQ process that there is a need to retransmit;
Other HARQ process retransmitted if necessary, it is determined that the transmission priority of other HARQ process described, and according to described
The priority of other HARQ process, to its allocation of transmission resources.
13. according to Claim 8 to the HARQ process transmission device in the unauthorized frequency range according to any one of 12, and its feature exists
In, in the case of described HARQ process is descending HARQ process, described allocation unit specifically for: at described data sending terminal
Detect when the down channel of unauthorized frequency range can take, the transmission money of the second scheduled duration that will start from present sub-frame every time
Predetermined quantity HARQ process is distributed in source, wherein,
If the duration started before first non-descending sub frame from described present sub-frame is more than or equal to predetermined value T, then by institute
State predetermined value T as described second scheduled duration;
If the duration started before first non-descending sub frame from described present sub-frame is less than described predetermined value T, then by described
Duration before present sub-frame extremely described first non-descending sub frame is as described second scheduled duration, and wherein, predetermined value T is letter
Road maximum occupation time.
14. according to Claim 8 to the HARQ process transmission device in the unauthorized frequency range according to any one of 12, and its feature exists
In, in the case of described HARQ process is ascending HARQ course, described allocation unit specifically for:
When the up channel that described data sending terminal detects unauthorized frequency range can take every time, by up for first afterwards
Transfer resource corresponding to subframe continues before distributing to the HARQ process that priority is the highest, and second sub-frame of uplink later
Detect the channel status of described unauthorized frequency range;Or the up channel of unauthorized frequency range detected at described data sending terminal every time
When can take, transfer resource corresponding for predetermined quantity the sub-frame of uplink started from first sub-frame of uplink afterwards is distributed to
Predetermined quantity HARQ process.
15. 1 kinds of base stations, it is characterised in that including: in the unauthorized frequency range as according to any one of claim 8 to 13
HARQ process transmission device.
16. 1 kinds of terminals, it is characterised in that including: non-as according to any one of claim 8,9,10,11,12 and 14 is awarded
HARQ process transmission device in power frequency range.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610555039.9A CN106130701B (en) | 2016-07-14 | 2016-07-14 | HARQ process transmission method and device, base station and terminal in unauthorized frequency range |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610555039.9A CN106130701B (en) | 2016-07-14 | 2016-07-14 | HARQ process transmission method and device, base station and terminal in unauthorized frequency range |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106130701A true CN106130701A (en) | 2016-11-16 |
CN106130701B CN106130701B (en) | 2019-08-02 |
Family
ID=57284221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610555039.9A Active CN106130701B (en) | 2016-07-14 | 2016-07-14 | HARQ process transmission method and device, base station and terminal in unauthorized frequency range |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106130701B (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106452685A (en) * | 2016-12-08 | 2017-02-22 | 珠海市魅族科技有限公司 | Uplink HARQ (Hybrid Automatic Repeat Request) feedback method and device for TDD (Time Division Duplexing) system |
WO2018099201A1 (en) * | 2016-11-29 | 2018-06-07 | 华为技术有限公司 | Method for scheduling and allocating resources, and communication device |
WO2018103289A1 (en) * | 2016-12-08 | 2018-06-14 | 珠海市魅族科技有限公司 | Method and device for feeding back downlink harq of tdd system |
CN108242970A (en) * | 2016-12-26 | 2018-07-03 | 上海诺基亚贝尔股份有限公司 | The feedback method and equipment of unlicensed transmission based on resource units |
WO2018170840A1 (en) * | 2017-03-23 | 2018-09-27 | Panasonic Intellectual Property Corporation Of America | Method, apparatus and system |
WO2018171686A1 (en) * | 2017-03-24 | 2018-09-27 | 华为技术有限公司 | Data transmission method and related device |
CN108702255A (en) * | 2018-06-01 | 2018-10-23 | 北京小米移动软件有限公司 | Control the method and device of mixed automatic retransfer feedback |
WO2018223508A1 (en) * | 2017-06-08 | 2018-12-13 | 华为技术有限公司 | Transmission method, device and system |
CN109150421A (en) * | 2017-06-28 | 2019-01-04 | 华为技术有限公司 | A kind of method and terminal device of repetition transmission |
CN109314614A (en) * | 2018-08-23 | 2019-02-05 | 北京小米移动软件有限公司 | Hybrid automatic repeat-request feedback method and device, user equipment and base station |
CN110535555A (en) * | 2019-03-28 | 2019-12-03 | 中兴通讯股份有限公司 | A kind of method, apparatus and computer readable storage medium of determining transmission priority |
WO2020034203A1 (en) * | 2018-08-17 | 2020-02-20 | Oppo广东移动通信有限公司 | Signal transmission method, terminal device and network device |
CN110875804A (en) * | 2018-09-04 | 2020-03-10 | 成都华为技术有限公司 | Method and device for sending and receiving feedback information |
WO2020052501A1 (en) * | 2018-09-15 | 2020-03-19 | 华为技术有限公司 | Information sending and receiving method, and communication device |
CN111277376A (en) * | 2018-12-26 | 2020-06-12 | 维沃移动通信有限公司 | Hybrid automatic repeat request response transmission method and device |
CN111316587A (en) * | 2018-03-28 | 2020-06-19 | 华为技术有限公司 | Hybrid automatic repeat request method, network equipment and terminal |
CN111585713A (en) * | 2019-02-15 | 2020-08-25 | 华为技术有限公司 | Codebook processing method and device |
CN112019308A (en) * | 2019-05-29 | 2020-12-01 | 成都鼎桥通信技术有限公司 | HARQ transmission method and device |
WO2021163858A1 (en) * | 2020-02-17 | 2021-08-26 | Oppo广东移动通信有限公司 | Process selection method and terminal device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130195054A1 (en) * | 2012-02-01 | 2013-08-01 | Qualcomm Incorporated | Method and apparatus for white space operation by a mobile entity |
CN104812032A (en) * | 2015-04-10 | 2015-07-29 | 宇龙计算机通信科技(深圳)有限公司 | Method and device for using DRX in non-authorized frequency band |
CN105187173A (en) * | 2015-09-08 | 2015-12-23 | 魅族科技(中国)有限公司 | Data retransmission method for non-authorized frequency spectrums, and device |
CN105706389A (en) * | 2013-11-04 | 2016-06-22 | 高通股份有限公司 | Soft buffer management |
-
2016
- 2016-07-14 CN CN201610555039.9A patent/CN106130701B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130195054A1 (en) * | 2012-02-01 | 2013-08-01 | Qualcomm Incorporated | Method and apparatus for white space operation by a mobile entity |
CN105706389A (en) * | 2013-11-04 | 2016-06-22 | 高通股份有限公司 | Soft buffer management |
CN104812032A (en) * | 2015-04-10 | 2015-07-29 | 宇龙计算机通信科技(深圳)有限公司 | Method and device for using DRX in non-authorized frequency band |
CN105187173A (en) * | 2015-09-08 | 2015-12-23 | 魅族科技(中国)有限公司 | Data retransmission method for non-authorized frequency spectrums, and device |
Non-Patent Citations (1)
Title |
---|
姜戬等: "基于优先级的混合自动请求重传方法", 《计算机工程》 * |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018099201A1 (en) * | 2016-11-29 | 2018-06-07 | 华为技术有限公司 | Method for scheduling and allocating resources, and communication device |
CN106452685A (en) * | 2016-12-08 | 2017-02-22 | 珠海市魅族科技有限公司 | Uplink HARQ (Hybrid Automatic Repeat Request) feedback method and device for TDD (Time Division Duplexing) system |
WO2018103289A1 (en) * | 2016-12-08 | 2018-06-14 | 珠海市魅族科技有限公司 | Method and device for feeding back downlink harq of tdd system |
CN108242970A (en) * | 2016-12-26 | 2018-07-03 | 上海诺基亚贝尔股份有限公司 | The feedback method and equipment of unlicensed transmission based on resource units |
CN108242970B (en) * | 2016-12-26 | 2021-03-02 | 上海诺基亚贝尔股份有限公司 | Resource unit-based feedback method and device for unlicensed transmission |
WO2018170840A1 (en) * | 2017-03-23 | 2018-09-27 | Panasonic Intellectual Property Corporation Of America | Method, apparatus and system |
WO2018171686A1 (en) * | 2017-03-24 | 2018-09-27 | 华为技术有限公司 | Data transmission method and related device |
WO2018223508A1 (en) * | 2017-06-08 | 2018-12-13 | 华为技术有限公司 | Transmission method, device and system |
CN109150421B (en) * | 2017-06-28 | 2023-03-10 | 华为技术有限公司 | Method and terminal equipment for repeated transmission |
CN109150421A (en) * | 2017-06-28 | 2019-01-04 | 华为技术有限公司 | A kind of method and terminal device of repetition transmission |
CN111316587A (en) * | 2018-03-28 | 2020-06-19 | 华为技术有限公司 | Hybrid automatic repeat request method, network equipment and terminal |
CN108702255B (en) * | 2018-06-01 | 2021-04-27 | 北京小米移动软件有限公司 | Method and device for controlling hybrid automatic repeat request (HARQ) feedback |
WO2019227476A1 (en) * | 2018-06-01 | 2019-12-05 | 北京小米移动软件有限公司 | Hybrid automatic repeat feedback method and device |
CN108702255A (en) * | 2018-06-01 | 2018-10-23 | 北京小米移动软件有限公司 | Control the method and device of mixed automatic retransfer feedback |
US11646831B2 (en) | 2018-06-01 | 2023-05-09 | Beijing Xiaomi Mobile Software Co., Ltd. | Hybrid automatic repeat feedback method and device |
WO2020034203A1 (en) * | 2018-08-17 | 2020-02-20 | Oppo广东移动通信有限公司 | Signal transmission method, terminal device and network device |
US11723078B2 (en) | 2018-08-17 | 2023-08-08 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Signal transmission method, terminal device and network device |
US11432342B2 (en) | 2018-08-17 | 2022-08-30 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Signal transmission method, terminal device and network device |
US11876625B2 (en) | 2018-08-23 | 2024-01-16 | Beijing Xiaomi Mobile Software Co., Ltd. | Hybrid automatic repeat request feedback method and apparatus, user equipment, and base station |
WO2020037616A1 (en) * | 2018-08-23 | 2020-02-27 | 北京小米移动软件有限公司 | Hybrid automatic retransmission request feedback method and device, and user equipment and base station |
CN109314614B (en) * | 2018-08-23 | 2022-03-01 | 北京小米移动软件有限公司 | Hybrid automatic repeat request feedback method and device, user equipment and base station |
CN109314614A (en) * | 2018-08-23 | 2019-02-05 | 北京小米移动软件有限公司 | Hybrid automatic repeat-request feedback method and device, user equipment and base station |
CN110875804A (en) * | 2018-09-04 | 2020-03-10 | 成都华为技术有限公司 | Method and device for sending and receiving feedback information |
CN110875804B (en) * | 2018-09-04 | 2021-04-09 | 成都华为技术有限公司 | Method and device for sending and receiving feedback information |
US11968047B2 (en) | 2018-09-04 | 2024-04-23 | Huawei Technologies Co., Ltd. | Method and apparatus for sending feedback information, and method and apparatus for receiving feedback information |
WO2020052501A1 (en) * | 2018-09-15 | 2020-03-19 | 华为技术有限公司 | Information sending and receiving method, and communication device |
CN111277376A (en) * | 2018-12-26 | 2020-06-12 | 维沃移动通信有限公司 | Hybrid automatic repeat request response transmission method and device |
CN111585713B (en) * | 2019-02-15 | 2021-10-26 | 华为技术有限公司 | Codebook processing method and device |
CN111585713A (en) * | 2019-02-15 | 2020-08-25 | 华为技术有限公司 | Codebook processing method and device |
WO2020192624A1 (en) * | 2019-03-28 | 2020-10-01 | 中兴通讯股份有限公司 | Transmission priority determination method and apparatus, and computer readable storage medium |
CN110535555A (en) * | 2019-03-28 | 2019-12-03 | 中兴通讯股份有限公司 | A kind of method, apparatus and computer readable storage medium of determining transmission priority |
CN112019308A (en) * | 2019-05-29 | 2020-12-01 | 成都鼎桥通信技术有限公司 | HARQ transmission method and device |
CN112019308B (en) * | 2019-05-29 | 2023-06-16 | 成都鼎桥通信技术有限公司 | HARQ transmission method and device |
WO2021163858A1 (en) * | 2020-02-17 | 2021-08-26 | Oppo广东移动通信有限公司 | Process selection method and terminal device |
Also Published As
Publication number | Publication date |
---|---|
CN106130701B (en) | 2019-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106130701B (en) | HARQ process transmission method and device, base station and terminal in unauthorized frequency range | |
CN105873225B (en) | Resource scheduling method in unlicensed frequency band, base station and licensed assisted access node | |
CN102131297B (en) | Method and equipment for allocating uplink resource | |
TWI406581B (en) | Channel allocation method, wireless communication system, base station device and user terminal | |
CN108566673B (en) | Wireless communication system and method for wireless communication in wireless communication system | |
CN101771513B (en) | Method and apparatus for improving ack/nack bundling | |
CN106452691B (en) | Communication method and device for carrier aggregation system | |
CN110536464A (en) | A kind of transmission method, device, communication node and medium | |
CN105356967A (en) | Data processing method, base station and terminal | |
CN107332646A (en) | HARQ-ACK sending method and device | |
CN105191201B (en) | A kind of control channel resource allocation methods and device | |
CN107295696A (en) | Channel access method, device, UE and base station | |
CN107295677B (en) | Feedback method and device for performing idle channel assessment | |
CN103313380A (en) | Uplink scheduling method and equipment | |
CN106559906A (en) | Data transmission method, the sending method of configured information and device | |
CN112584555A (en) | Data transmission method, terminal and RAN (radio Access network) equipment | |
CN107370576A (en) | A kind of method and device for determining hybrid automatic repeat-request feedback sequential | |
CN102104961A (en) | Method, system and device for using competitive resources | |
CN109314988A (en) | Uplink data transmission method, device, equipment and system | |
CN105790897A (en) | Method and equipment for hybrid automatic repeat request (HARQ) | |
CN101730245B (en) | Method, system and device for activating SPS under condition of losing PDSSH | |
CN106130702A (en) | A kind of hybrid automatic repeat request process processing method, equipment and communication system | |
CN109219135A (en) | A kind of uplink scheduling method and device | |
CN108352942A (en) | Method, terminal and the base station of information transmission | |
CN104349475B (en) | A kind of method and apparatus of the cross-carrier scheduling of TDD-FDD |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |