CN106130639A CN201610426963.7A CN201610426963A CN106130639A CN 106130639 A CN106130639 A CN 106130639A CN 201610426963 A CN201610426963 A CN 201610426963A CN 106130639 A CN106130639 A CN 106130639A
Authority
CN
China
Prior art keywords
optical
passage
special web
data special
main website
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610426963.7A
Other languages
Chinese (zh)
Inventor
周雅
张元敏
焦晓波
殷志锋
王红玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang University
Original Assignee
Xuchang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang University filed Critical Xuchang University
Priority to CN201610426963.7A priority Critical patent/CN106130639A/en
Publication of CN106130639A publication Critical patent/CN106130639A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/25Arrangements specific to fibre transmission
    • H04B10/2589Bidirectional transmission
    • H04B10/25891Transmission components
    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Landscapes

  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Optical Communication System (AREA)

Abstract

The invention provides a kind of scheduling Data special web that solves and take the method that too much main website number joins resource, can effectively solve the problem that communication port resource is taken by existing network pattern dispatching Data special web construction in a large number.Its core concept is electro-optic conversion, original E1 passage (5) (electric channel) CPOS passage (optical channel) will be replaced by between Communication ray transmission equipment (1) and scheduling Data special web background server (2) in main website, eliminate DDF (3) the jumper connection link in original passage, effectively reduce the quantity of channel failure point, reduce maintenance cost, original E1 passage (5) (electric channel) is made to be changed into CPOS passage (optical channel), substantially increase the speed of information transmission, enhance the property safe and reliable to operation of passage.

Description

Solve scheduling Data special web and take the method that too much main website number joins resource
Technical field
The present invention relates to dispatching automation and power communication correlative technology field, particularly relate to dispatch in Data special web construction Communication port construction field.
Background technology
Along with improving constantly of power network development level, power network schedule automation development trend also advances swiftly unhindered, 110kV and with Data special web is all dispatched at Fast Construction by upper transformer station.In order to further enhance the operational reliability of network, from national grid to Each department electrical network also been proposed scheduling Data special web " biplane " construction scheme, and the most same transformer station at least needs two differences The Way out of scheduling Data special web, so since, along with the development of electrical network, dispatch the communication port number needed for Data special web By growth at double, undoubtedly power telecom network be it is also proposed the highest support and ensure requirement.
Existing scheduling Data special web passage is essentially all based on traditional E1, type of attachment master between main website and substation If point-to-point type, calculate like this, if area power grid has n seat 110kV and above power transformation website, it is necessary in main website and each substation Between at least n bar E1 passage (5) is provided, then according to existing communication network pattern, the communications equipment room at scheduling station needs exist for At least n bar E1 business is landed, and often has an E1 business to land, the E1 branch road in the Communication ray transmission equipment (1) of communications equipment room Plate (4) and DDF (3) just will be taken a road physics wire resources accordingly.If things go on like this, the numeral of communications equipment room Distributing frame (3) will be used for carrying scheduling Data special web business in a large number, and unable carrying operation of power networks other business necessary Information, unless logarithm is joined carries out continuous dilatation, but dilatation will bring again the disappearance of communications equipment room equipment running space, finally Cause important communication equipment to install, and DDF (3) dilatation also needs to design groove position and the clamp dilatation of transmission equipment Etc. problems, required cost is relatively big, and therefore, comprehensive above analysis, scheduling Data special web takies too much main website number and joined resource Become a restriction communication network to develop the problem that must solve, otherwise, also will restrict the step of power network schedule automation development Cut down, and then affect the reliable and stable operation of electrical network.
Summary of the invention
The invention provides a kind of scheduling Data special web that solves and take the method that too much main website number joins resource, can effectively solve The problem that communication port resource is taken by existing network pattern dispatching Data special web construction in a large number.
The solution scheduling Data special web that the present invention provides takies the method that too much main website number joins resource, and its core concept is Electrical-optical is changed, will Communication ray transmission equipment (1) in main website with dispatch between Data special web background server (2) original E1 passage (5) (electric channel) is replaced by CPOS passage (optical channel).
The method that the present invention provides eliminates DDF (3) the jumper connection link in original passage, effectively reduces logical The quantity of trouble point, road, reduces maintenance cost.
The method that the present invention provides makes original E1 passage (5) (electric channel) be changed into CPOS passage (optical channel), significantly Improve the speed of information transmission, enhance the property safe and reliable to operation of passage.
Accompanying drawing explanation
Fig. 1 is that the passage between original main website scheduling Data special web background server (2) and Communication ray transmission equipment (1) connects Connect schematic diagram;
Main website scheduling Data special web background server (2) designed by the solution that Fig. 2 provides for the present invention passes with Communication ray Passage connection diagram between transfer device (1).
Detailed description of the invention
The invention provides a kind of scheduling Data special web that solves and take the method that too much main website number joins resource, its core concept It is electrical-optical conversion, will lead to by original E1 between Communication ray transmission equipment and the scheduling Data special web background server in main website Road (5) (electric channel) is replaced by CPOS passage (optical channel).Passage connection diagram as in figure 2 it is shown, specific implementation method such as Under:
A) increasing by one piece of dedicated optical tributary card (6) on Communication ray transmission equipment, according to the actual requirements, optical interface (9) speed can Elect STM-1, STM-4, STM-16, STM-64 as;
B) hardware configuration corresponding to newly-increased light tributary card (6) is completed by optical transport webmaster, it is ensured that it can normally work;
C) in scheduling Data special web background server (2) one piece of CPOS clamp (7) of upper increase, its optical interface (10) speed Ying Yutong Optical interface (9) speed of the upper dedicated optical tributary card (6) increased of letter optical transmission device (1) keeps consistent;
D) the relevant software and hardware configuration to CPOS clamp (7) is completed;
E) respectively the optical interface (9) of dedicated optical tributary card (6) and the optical interface (10) of CPOS clamp (7) are carried out performance indications Test;
F) optical fiber (8) is utilized by the optical interface (9) of upper for Communication ray transmission equipment (1) the dedicated optical tributary card (6) increased and to dispatch The optical interface (10) of the upper CPOS clamp (7) increased of Data special web background server (2) correctly connects;
G) communication and automated management both sides determine that this connects the distribution site name of each time slot in light path;
H) optical transport webmaster is utilized, the E1 come each substation on master station communication optical transmission device (1) by light intersection clamp Signal cross is to the most special optical interface (9) corresponding to light tributary card (6), and chooses and take time slot accordingly;
I) in main website passage between Communication ray transmission equipment (1) and scheduling Data special web background server (2) complete electricity- The conversion of light.

Claims (2)

1. one kind solves to dispatch Data special web and takies the method that too much main website number joins resource, it is characterised in that: logical by main website Between letter optical transmission device (1) and scheduling Data special web background server (2), original E1 passage (5) is replaced by CPOS passage.
The scheduling Data special web that solves the most according to claim 1 takies the method that too much main website number joins resource, and its feature exists In: comprise the steps:
A) increasing by one piece of dedicated optical tributary card (6) on Communication ray transmission equipment, according to the actual requirements, optical interface (9) speed can Elect STM-1, STM-4, STM-16, STM-64 as;
B) hardware configuration corresponding to newly-increased light tributary card (6) is completed by optical transport webmaster, it is ensured that it can normally work;
C) in scheduling Data special web background server (2) one piece of CPOS clamp (7) of upper increase, its optical interface (10) speed Ying Yutong Optical interface (9) speed of the upper dedicated optical tributary card (6) increased of letter optical transmission device (1) keeps consistent;
D) the relevant software and hardware configuration to CPOS clamp (7) is completed;
E) respectively the optical interface (9) of dedicated optical tributary card (6) and the optical interface (10) of CPOS clamp (7) are carried out performance indications Test;
F) optical fiber (8) is utilized by the optical interface (9) of upper for Communication ray transmission equipment (1) the dedicated optical tributary card (6) increased and to dispatch The optical interface (10) of the upper CPOS clamp (7) increased of Data special web background server (2) correctly connects;
G) communication and automated management both sides determine that this connects the distribution site name of each time slot in light path;
H) optical transport webmaster is utilized, the E1 come each substation on master station communication optical transmission device (1) by light intersection clamp Signal cross is to the most special optical interface (9) corresponding to light tributary card (6), and chooses and take time slot accordingly;
I) in main website passage between Communication ray transmission equipment (1) and scheduling Data special web background server (2) complete electricity- The conversion of light.
CN201610426963.7A 2016-06-14 2016-06-14 Solve scheduling Data special web and take the method that too much main website number joins resource Pending CN106130639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610426963.7A CN106130639A (en) 2016-06-14 2016-06-14 Solve scheduling Data special web and take the method that too much main website number joins resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610426963.7A CN106130639A (en) 2016-06-14 2016-06-14 Solve scheduling Data special web and take the method that too much main website number joins resource

Publications (1)

Publication Number Publication Date
CN106130639A true CN106130639A (en) 2016-11-16

Family

ID=57470555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610426963.7A Pending CN106130639A (en) 2016-06-14 2016-06-14 Solve scheduling Data special web and take the method that too much main website number joins resource

Country Status (1)

Country Link
CN (1) CN106130639A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6778778B1 (en) * 2001-01-11 2004-08-17 Sprint Communications Company, L.P. Arrangement and method for testing fiber optic telecommunications circuits over dense wavelength division multiplexing (DWDM)
CN201690569U (en) * 2009-12-25 2010-12-29 中国移动通信集团公司 Virtual DDF distribution system
CN202679364U (en) * 2011-11-23 2013-01-16 上海市电力公司 Rack-type optical cable resource far-end monitoring station
CN202888963U (en) * 2012-09-29 2013-04-17 上海市电力公司 Automatic communication system for master station control power distribution network
CN104038395A (en) * 2014-06-18 2014-09-10 许昌学院 Method for solving problem that dispatch data private network occupies too many master station digital distribution resources

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6778778B1 (en) * 2001-01-11 2004-08-17 Sprint Communications Company, L.P. Arrangement and method for testing fiber optic telecommunications circuits over dense wavelength division multiplexing (DWDM)
CN201690569U (en) * 2009-12-25 2010-12-29 中国移动通信集团公司 Virtual DDF distribution system
CN202679364U (en) * 2011-11-23 2013-01-16 上海市电力公司 Rack-type optical cable resource far-end monitoring station
CN202888963U (en) * 2012-09-29 2013-04-17 上海市电力公司 Automatic communication system for master station control power distribution network
CN104038395A (en) * 2014-06-18 2014-09-10 许昌学院 Method for solving problem that dispatch data private network occupies too many master station digital distribution resources

Similar Documents

Publication Publication Date Title
CN102710443B (en) A kind of power communication relaying protection business impact analysis method and system thereof
CN104460589B (en) Mobile debugging system with simulation dispatching master station
CN104601383B (en) A kind of power telecom network fault piecewise analysis method
CN102724071A (en) Method and system for power communication failure early warning analysis based on network model and rule models
CN204086628U (en) Based on the intelligent optical fiber distribution frame of eID infotech
CN108092734B (en) Electric power data transmission device, system and detection method
CN103678776B (en) rail vehicle electric wiring engineering design method
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN104468586B (en) Based on the photovoltaic plant remotely intelligently monitoring means of communication of MODBUS agreement
CN111711539A (en) Simulation method for electric power communication SDH optical transmission network
CN113691406B (en) Network quality optimization method and device, storage medium and electronic equipment
CN107070545A (en) Fiber cores remote switch system
CN102723780A (en) Energy management system for distribution network of power system
CN104038395B (en) A kind of scheduling Data special web that solves takies the method that excessive main website number joins resource
CN106130639A (en) Solve scheduling Data special web and take the method that too much main website number joins resource
CN201467146U (en) Transmission network topological structure safety analysis system
CN206820765U (en) A kind of terminal communication access net communication resource model framework
CN104270256B (en) The test device and method of a kind of cross-platform network alarm and incident management
CN105978715A (en) Data access interface uniform management method based on real time data center
CN104701981A (en) Representing method of intelligent substation optical fiber link
CN109583846A (en) A kind of data check method and system for powered communication management system
CN106789159A (en) A kind of power communication important service pass effect analysis system
CN204946131U (en) Track gate inhibition loop network control system
CN109167354B (en) Power grid expected fault parallel analysis and calculation method based on file exchange
CN105977971A (en) Power failure analysis method based on single line diagram of distribution network GIS power grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161116