CN106124903A - 一种特高压直流融冰装置升流升压试验系统 - Google Patents
一种特高压直流融冰装置升流升压试验系统 Download PDFInfo
- Publication number
- CN106124903A CN106124903A CN201610568232.6A CN201610568232A CN106124903A CN 106124903 A CN106124903 A CN 106124903A CN 201610568232 A CN201610568232 A CN 201610568232A CN 106124903 A CN106124903 A CN 106124903A
- Authority
- CN
- China
- Prior art keywords
- input
- outfan
- current
- connects
- flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Testing Relating To Insulation (AREA)
- Testing Of Individual Semiconductor Devices (AREA)
Abstract
本发明公开了一种特高压直流融冰装置升流升压试验系统,包括过载保护期,所述过载保护器的输出端连接有多相调压器的输入端,多相调压器的输出端连接有第一转换器的输入端,第一转换器的输出端连接有升流选择器和升压选择器的输入端,所述升流选择器的输出端连接有第一升流器和第二升流器的输入端。本发明中,该系统可通过升流调节器和升压调节器对输入至实验输出箱的电流和电压进行调节;该系统增加了第二升流器和第二升压器,在某一个器件损坏时,通过选择器可选择备用器件代替使用,在对系统内设备维修时,不至于导致整个系统陷入瘫痪无法使用;该系统设置了散热装置,增加其散热性能,减慢电器因高温老化的速度。
Description
技术领域
本发明涉及升流升压试验系统技术领域,尤其涉及一种特高压直流融冰装置升流升压试验系统。
背景技术
特高压直流融冰装置为特高压输电线路应对冰灾提供了有效融冰手段,但由于特高压直流融冰装置带线路实际运行时需要电源容量大,且特高压输电线路为重要的输电通道,特高压直流融冰装置建成后很难利用实际的特高压线路进行调试试验,故特高压直流融冰装置试验系统设计为特高压直流融冰装置研制中重要的一环。因此,开展特高压直流融冰装置升流、升压试验系统研究,具有重要的理论和技术价值。
国内、外少数高校和科研单位对输电线路直流融冰装置升流、升压试验系统进行了研究,装置具有容量小、输出电流小等特点,仅满足500kV及以下直流融冰装置调试,且装置内升流升压器在工作时时会产生大量的,若不及时散热可能会导致元器件的损毁,但只整个系统无法使用,为此我们设计出一种特高压直流融冰装置升流升压试验系统,来解决上述问题。
发明内容
本发明的目的是为了解决现有技术中存在的缺点,而提出的一种特高压直流融冰装置升流升压试验系统。
为了实现上述目的,本发明采用了如下技术方案:
一种特高压直流融冰装置升流升压试验系统,包括过载保护期,所述过载保护器的输出端连接有多相调压器的输入端,多相调压器的输出端连接有第一转换器的输入端,第一转换器的输出端连接有升流选择器和升压选择器的输入端,所述升流选择器的输出端连接有第一升流器和第二升流器的输入端,且第一升流器和第二升流器均设置有升流散热装置,第一升流器和第二升流器的输出端连接有升流调节器的输入端,升流调节器的输出端连接有升流试验装置的输入端,升流试验装置的输出端连接有实验输出箱的输入端,所述升压选择器的输出端连接有第一升压器和第二升压器的输入端,且第一升压器和第二升压器均设置有升压散热装置,第一升压器和第二升压器的输出端连接有升压调节器的输入端,升压调节器的输出端连接有升压试验装置的输入端,升压试验装置的输出端连接有实验输出箱的输入端。
优选的,所述过载保护器为KV过流过压保护器。
优选的,所述多相调压器为六相感应调压器。
优选的,所述过载保护器的输入端连接有KV交流电。
优选的,所述第一转换器为升流升压选择转换器。
优选的,所述第二升流器和第二升压器均为备用器件。
与现有技术相比,本发明的有益效果是:
1、可有效实现试验系统电压多相数输出要求,可实现特高压直流融冰装置输出直流电流;可实现特高压直流融冰装置输出直流电压,解决特高压直流融冰装置调试中大电流和高电压试验要求;
2、该系统可通过升流调节器和升压调节器对输入至实验输出箱的电流和电压进行调节;
3、该系统增加了设置了第一升流器、第二升流器和第一升压器、第二升压器,在某一个器件损坏时,通过选择器可选择备用器件代替使用,在对系统内设备维修时,不至于导致整个系统陷入瘫痪无法使用;
4、该系统在第一升流器和第二升流器、第一升压器和第二升压器之间均设置了散热装置,增加其散热性能,减慢电器因高温老化的速度。
附图说明
图1为本发明提出的一种特高压直流融冰装置升流升压试验系统的结构示意图。
图中:1过载保护器、2多相调压器、3第一转换器、4升流选择器、5升压选择器、6第一升流器、7第二升流器、8升流散热装置、9升流调节器、10升流试验装置、11第一升压器、12升压散热装置、13升压调节器、14第二升压器、15升压试验装置、16实验输出箱。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。
参照图1,一种特高压直流融冰装置升流升压试验系统,包括过载保护期1,过载保护器1为10KV过流过压保护器,过载保护器1的输入端连接有10KV交流电,过载保护器1的输出端连接有多相调压器2的输入端,多相调压器2为六相感应调压器,多相调压器2的输出端连接有第一转换器3的输入端,第一转换器3为升流升压选择转换器,第一转换器3的输出端连接有升流选择器4和升压选择器5的输入端,升流选择器4的输出端连接有第一升流器6和第二升流器7的输入端,且第一升流器6和第二升流器7均设置有升流散热装置8,第一升流器6和第二升流器7的输出端连接有升流调节器9的输入端,升流调节器9的输出端连接有升流试验装置10的输入端,升流试验装置10的输出端连接有实验输出箱16的输入端,升压选择器5的输出端连接有第一升压器11和第二升压器13的输入端,且第一升压器11和第二升压器13均设置有升压散热装置12,第一升压器11和第二升压器13的输出端连接有升压调节器14的输入端,第二升流器7和第二升压器14均为备用器件,升压调节器14的输出端连接有升压试验装置15的输入端,升压试验装置15的输出端连接有实验输出箱16的输入端。
本发明在使用时,过载保护器1为本发明特高压融冰装置升流升压试验系统提供限流与限压保护,多向调节器2将10kV交流变压为六相0-15kV交流输出。第一转换器3将输出的电压根据升流或升压试验进行选择后输出。进行升流试验时,升流选择器4选择使用第一升流器6或者第二升流器7工作,且通过升流散热装置8对其进行散热,通过升流调节器9对输出电流进行调整;升流试验装置10将输出的电压进行均压处理后输出;进行升压试验时,工作步骤与升流实验相同。本发明为特高压直流融冰装置建成后调试提供了一种可靠、经济、有效的升流、升压试验系统。该系统增加了设置了第一升流器6、第二升流器7和第一升压器11、第二升压器14,在某一个器件损坏时,通过选择器可选择备用器件代替使用,在对系统内设备维修时,不至于导致整个系统陷入瘫痪无法使用;该系统在第一升流器6和第二升流器7、第一升压器11和第二升压器14之间均设置了散热装置,增加其散热性能,减慢电器因高温老化的速度。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (6)
1.一种特高压直流融冰装置升流升压试验系统,包括过载保护期(1),其特征在于,所述过载保护器(1)的输出端连接有多相调压器(2)的输入端,多相调压器(2)的输出端连接有第一转换器(3)的输入端,第一转换器(3)的输出端连接有升流选择器(4)和升压选择器(5)的输入端,所述升流选择器(4)的输出端连接有第一升流器(6)和第二升流器(7)的输入端,且第一升流器(6)和第二升流器(7)均设置有升流散热装置(8),第一升流器(6)和第二升流器(7)的输出端连接有升流调节器(9)的输入端,升流调节器(9)的输出端连接有升流试验装置(10)的输入端,升流试验装置(10)的输出端连接有实验输出箱(16)的输入端,所述升压选择器(5)的输出端连接有第一升压器(11)和第二升压器(13)的输入端,且第一升压器(11)和第二升压器(13)均设置有升压散热装置(12),第一升压器(11)和第二升压器(13)的输出端连接有升压调节器(14)的输入端,升压调节器(14)的输出端连接有升压试验装置(15)的输入端,升压试验装置(15)的输出端连接有实验输出箱(16)的输入端。
2.根据权利要求1所述的一种特高压直流融冰装置升流升压试验系统,其特征在于,所述过载保护器(1)为10KV过流过压保护器。
3.根据权利要求1所述的一种特高压直流融冰装置升流升压试验系统,其特征在于,所述多相调压器(2)为六相感应调压器。
4.根据权利要求1所述的一种特高压直流融冰装置升流升压试验系统,其特征在于,所述过载保护器(1)的输入端连接有10KV交流电。
5.根据权利要求1所述的一种特高压直流融冰装置升流升压试验系统,其特征在于,所述第一转换器(3)为升流升压选择转换器。
6.根据权利要求1所述的一种特高压直流融冰装置升流升压试验系统,其特征在于,所述第二升流器(7)和第二升压器(13)均为备用器件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610568232.6A CN106124903A (zh) | 2016-07-19 | 2016-07-19 | 一种特高压直流融冰装置升流升压试验系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610568232.6A CN106124903A (zh) | 2016-07-19 | 2016-07-19 | 一种特高压直流融冰装置升流升压试验系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106124903A true CN106124903A (zh) | 2016-11-16 |
Family
ID=57289568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610568232.6A Pending CN106124903A (zh) | 2016-07-19 | 2016-07-19 | 一种特高压直流融冰装置升流升压试验系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106124903A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2332765C1 (ru) * | 2006-12-13 | 2008-08-27 | ООО "Электроавтоматика" | Система телеизмерения гололедно-ветровой нагрузки |
CN101546896A (zh) * | 2008-03-29 | 2009-09-30 | 国网南京自动化研究院 | 一种融冰的方法及其所使用的装置 |
CN202631662U (zh) * | 2012-06-01 | 2012-12-26 | 湖南省电力公司科学研究院 | 模拟输电线路覆冰试验装置 |
CN203930043U (zh) * | 2014-06-27 | 2014-11-05 | 国家电网公司 | 一种数字化电能计量装置校准设备 |
CN204009055U (zh) * | 2014-08-25 | 2014-12-10 | 海盐新跃电器有限公司 | 一种带隔离的多用户电能表校验装置 |
CN104714138A (zh) * | 2015-04-10 | 2015-06-17 | 国家电网公司 | 特高压直流融冰装置升流升压试验系统 |
CN104734101A (zh) * | 2015-04-10 | 2015-06-24 | 国家电网公司 | 特高压直流融冰装置高压大电流变流系统结构 |
CN105281369A (zh) * | 2015-11-13 | 2016-01-27 | 北京天诚同创电气有限公司 | 风电场的拓扑结构、升压控制方法、装置及系统 |
KR101599267B1 (ko) * | 2013-09-05 | 2016-03-04 | 한국전력공사 | 송전선로 빙설 제거장치 |
-
2016
- 2016-07-19 CN CN201610568232.6A patent/CN106124903A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2332765C1 (ru) * | 2006-12-13 | 2008-08-27 | ООО "Электроавтоматика" | Система телеизмерения гололедно-ветровой нагрузки |
CN101546896A (zh) * | 2008-03-29 | 2009-09-30 | 国网南京自动化研究院 | 一种融冰的方法及其所使用的装置 |
CN202631662U (zh) * | 2012-06-01 | 2012-12-26 | 湖南省电力公司科学研究院 | 模拟输电线路覆冰试验装置 |
KR101599267B1 (ko) * | 2013-09-05 | 2016-03-04 | 한국전력공사 | 송전선로 빙설 제거장치 |
CN203930043U (zh) * | 2014-06-27 | 2014-11-05 | 国家电网公司 | 一种数字化电能计量装置校准设备 |
CN204009055U (zh) * | 2014-08-25 | 2014-12-10 | 海盐新跃电器有限公司 | 一种带隔离的多用户电能表校验装置 |
CN104714138A (zh) * | 2015-04-10 | 2015-06-17 | 国家电网公司 | 特高压直流融冰装置升流升压试验系统 |
CN104734101A (zh) * | 2015-04-10 | 2015-06-24 | 国家电网公司 | 特高压直流融冰装置高压大电流变流系统结构 |
CN105281369A (zh) * | 2015-11-13 | 2016-01-27 | 北京天诚同创电气有限公司 | 风电场的拓扑结构、升压控制方法、装置及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103915808B (zh) | 基于电压源型换流器的直流融冰装置及其控制方法 | |
EP2999075B1 (en) | Power supply with surge voltage protection | |
US6888709B2 (en) | Electromagnetic transient voltage surge suppression system | |
CN203813384U (zh) | 基于电压源型换流器的直流融冰装置 | |
CN104882912B (zh) | 直流输电系统和组装该系统的方法 | |
CN105531787A (zh) | 直流断路器的试验装置及其试验方法 | |
CN102623941B (zh) | 一种10kv农网配电线路直流融冰装置 | |
CN110161288A (zh) | 一种输出交直流复合电压的直流支撑电容器测试装置 | |
CN104578170B (zh) | 火电机组辅机变频器高低电压穿越装置 | |
CN201017254Y (zh) | 高压速调管装置专用直流恒压恒流电源 | |
CN106124903A (zh) | 一种特高压直流融冰装置升流升压试验系统 | |
Li-Nan et al. | A switching-on control strategy of the DC-SSPC for the capacitive loads | |
Tang et al. | Study on operational tests for FACTS thyristor valves | |
CN104422858A (zh) | 一种高压交-直流试验电路及其试验方法 | |
Bhattacharya | Wide-band Gap (WBG) WBG devices enabled MV power converters for utility applications—Opportunities and challenges | |
CN202513531U (zh) | 一种10kV农网配电线路直流融冰装置 | |
CN104714138B (zh) | 特高压直流融冰装置升流升压试验系统 | |
CN204479685U (zh) | 特高压直流融冰装置升流升压试验系统 | |
Ismagilov et al. | High-Efficiency Transformer-Rectifier Unit: Design and Experimental Studies | |
CN102487192B (zh) | 一种直流换流阀合成试验大电流保护退出装置 | |
US20120293892A1 (en) | Power protection circuit | |
CN111327069B (zh) | 一种柔直工程中的交流耗能装置 | |
CN204012741U (zh) | 一种电力输送系统 | |
CN103457486A (zh) | 具有防雷击防浪涌功能的调压调流直流电源 | |
CN210327018U (zh) | 一种10kV直取12V设备保护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |
|
RJ01 | Rejection of invention patent application after publication |