CN106121246A - Reinforcing bar binding flowing water technique - Google Patents

Reinforcing bar binding flowing water technique Download PDF

Info

Publication number
CN106121246A
CN106121246A CN201610478050.XA CN201610478050A CN106121246A CN 106121246 A CN106121246 A CN 106121246A CN 201610478050 A CN201610478050 A CN 201610478050A CN 106121246 A CN106121246 A CN 106121246A
Authority
CN
China
Prior art keywords
reinforcing bar
colligation
wallboard
parts
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610478050.XA
Other languages
Chinese (zh)
Inventor
姜绍杰
张宗军
唐云刚
姚大伟
王健
吴丁华
陈长林
杨超
董超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Anhui Hailong Construction Industry Co Ltd
Original Assignee
ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI HAILONG BUILDING INDUSTRY Co Ltd filed Critical ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Priority to CN201610478050.XA priority Critical patent/CN106121246A/en
Publication of CN106121246A publication Critical patent/CN106121246A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Abstract

The present invention relates to reinforcing bar production field, be a kind of reinforcing bar binding flowing water technique that is relatively big for existing reinforcing bar binding task difficulty height, labor intensity and that provide.First pass through BIM technology and the reinforcing bar in drawing is automatically generated reinforcing bar material table, and the reinforcing bar material table generated is imported steel bar numerical control hoop bending machine, reinforcing bar semi-finished product are transported to reinforcing bar semi-finished product dispensing district by conveyer belt and carry out dispensing by digital control hoop bender press-type count control sawing sheet;Reinforcing bar semi-finished product are distributed to wallboard side column parts colligation station and wallboard back timber parts colligation station by dispensing flat car by material respectively that prepare, complete wallboard side column parts and the colligation of wallboard back timber parts by the ironworker that pricks of each colligation station;The wallboard back timber parts completed and wallboard side column parts are placed on platform for lining and are completed the assembled work of reinforcing steel bars of wallboards cage by assembled work.The present invention has heightened working performance;Greatly heighten machining accuracy, reduce the loss waste of reinforcing bar;Effectively simplify the technological requirement of building field reinforcing bar binding.

Description

Reinforcing bar binding flowing water technique
Technical field
The invention belongs to reinforcing bar production field, particularly relate to a kind of reinforcing bar binding flowing water technique.
Background technology
The following problem that the work of the reinforcing bar module of existing building engineering presently, there are:
A. steel bar meter makes extensive, and reinforcing bar binding task difficulty is higher;
B. steel bar meter make efficiency is extremely low, and error is bigger;
C. mechanization degree is extremely low, and labor intensity is bigger;
D. the integrating skills of workman is required higher, manpower shortage.
Summary of the invention
A kind of reinforcing bar that is relatively big for existing reinforcing bar binding task difficulty height, labor intensity and that provide is provided Colligation flowing water technique.
To achieve these goals, the technical solution used in the present invention is:
Reinforcing bar binding flowing water technique, comprises the steps:
Step one, first passes through BIM technology and the reinforcing bar in drawing automatically generates reinforcing bar material table, and led by the reinforcing bar material table of generation Enter steel bar numerical control hoop bending machine, digital control hoop bender press-type count control sawing sheet, form reinforcing bar semi-finished product;
Reinforcing bar semi-finished product in step one are transported to reinforcing bar semi-finished product dispensing district by conveyer belt by step 2, and dispensing assistant director press Steel reinforcement cage numbering carries out dispensing;
Reinforcing bar semi-finished product are distributed to wallboard side column parts by the material prepared in step 2 by dispensing flat car by step 3 respectively Colligation station and wallboard back timber parts colligation station, complete wallboard side column parts and wallboard top by the bundle ironworker of each colligation station The colligation of beam parts;
The wallboard back timber parts completed in step 3 and wallboard side column parts are placed on platform for lining and are completed by assembled work by step 4 The assembled work of reinforcing steel bars of wallboards cage, is then transported to deposit position and deposits.
The present invention has the advantage that compared with conventional art
1. replace manually significantly having liberated labor intensity with machinery, heightened working performance;
2. controlled by the blanking of numerical control device, greatly heightened machining accuracy, reduce the loss waste of reinforcing bar;
The most effectively simplify the technological requirement of building field reinforcing bar binding, numerous and diverse type transfer steel bar meter to essence specially type single Metallization processes, improves construction quality;
4. lower the professional skill requirement to bar bender, be effectively improved the problem that building field recruitment is difficult.
Accompanying drawing explanation
Fig. 1 is the process chart of the present invention.
Detailed description of the invention
Below in conjunction with embodiment, the present invention will be further described.
Embodiment
Reinforcing bar binding flowing water technique as shown in Figure 1, comprises the steps:
Step one, first passes through BIM technology and the reinforcing bar in drawing automatically generates reinforcing bar material table, and led by the reinforcing bar material table of generation Enter steel bar numerical control hoop bending machine, digital control hoop bender press-type count control sawing sheet, form reinforcing bar semi-finished product;
Reinforcing bar semi-finished product in step one are transported to reinforcing bar semi-finished product dispensing district by conveyer belt by step 2, and dispensing assistant director press Steel reinforcement cage numbering carries out dispensing;
Reinforcing bar semi-finished product are distributed to wallboard side column parts by the material prepared in step 2 by dispensing flat car by step 3 respectively Colligation station and wallboard back timber parts colligation station, complete wallboard side column parts and wallboard top by the bundle ironworker of each colligation station The colligation of beam parts;
The wallboard back timber parts completed in step 3 and wallboard side column parts are placed on platform for lining and are completed by assembled work by step 4 The assembled work of reinforcing steel bars of wallboards cage, is then transported to deposit position and deposits.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description The principle of invention, without departing from the spirit and scope of the present invention, the simple change of those ordinary skill in the art Within being all protection scope of the present invention with replacement.

Claims (1)

1. reinforcing bar binding flowing water technique, it is characterised in that comprise the steps:
Step one, first passes through BIM technology and the reinforcing bar in drawing automatically generates reinforcing bar material table, and led by the reinforcing bar material table of generation Enter steel bar numerical control hoop bending machine, digital control hoop bender press-type count control sawing sheet, form reinforcing bar semi-finished product;
Reinforcing bar semi-finished product in step one are transported to reinforcing bar semi-finished product dispensing district by conveyer belt by step 2, and dispensing assistant director press Steel reinforcement cage numbering carries out dispensing;
Reinforcing bar semi-finished product are distributed to wallboard side column parts by the material prepared in step 2 by dispensing flat car by step 3 respectively Colligation station and wallboard back timber parts colligation station, complete wallboard side column parts and wallboard top by the bundle ironworker of each colligation station The colligation of beam parts;
The wallboard back timber parts completed in step 3 and wallboard side column parts are placed on platform for lining and are completed by assembled work by step 4 The assembled work of reinforcing steel bars of wallboards cage, is then transported to deposit position and deposits.
CN201610478050.XA 2016-06-28 2016-06-28 Reinforcing bar binding flowing water technique Pending CN106121246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610478050.XA CN106121246A (en) 2016-06-28 2016-06-28 Reinforcing bar binding flowing water technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610478050.XA CN106121246A (en) 2016-06-28 2016-06-28 Reinforcing bar binding flowing water technique

Publications (1)

Publication Number Publication Date
CN106121246A true CN106121246A (en) 2016-11-16

Family

ID=57266050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610478050.XA Pending CN106121246A (en) 2016-06-28 2016-06-28 Reinforcing bar binding flowing water technique

Country Status (1)

Country Link
CN (1) CN106121246A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108513548A (en) * 2018-03-30 2018-09-07 深圳市君盈建筑科技有限公司 The prefabricated processing method of reinforcing bar

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101001706A (en) * 2003-07-03 2007-07-18 Sms迪马格股份公司 Device for producing a hot-rolled thermal strip, especially made of strip-type continuous casting material
CN201012451Y (en) * 2007-02-12 2008-01-30 熊光仪 Cold rolling rib reinforcement metal rolling and straightening integrated product line
CN103455907A (en) * 2013-09-24 2013-12-18 济钢集团有限公司 Iron and steel enterprise in-coming logistics management system based on internet of things and achievement method
CN104131708A (en) * 2014-07-06 2014-11-05 曾润洪 Method for manufacturing and distributing reinforced concrete members which are made of reinforced concrete and used for bridge, culvert and channel
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101001706A (en) * 2003-07-03 2007-07-18 Sms迪马格股份公司 Device for producing a hot-rolled thermal strip, especially made of strip-type continuous casting material
CN201012451Y (en) * 2007-02-12 2008-01-30 熊光仪 Cold rolling rib reinforcement metal rolling and straightening integrated product line
CN103455907A (en) * 2013-09-24 2013-12-18 济钢集团有限公司 Iron and steel enterprise in-coming logistics management system based on internet of things and achievement method
CN104131708A (en) * 2014-07-06 2014-11-05 曾润洪 Method for manufacturing and distributing reinforced concrete members which are made of reinforced concrete and used for bridge, culvert and channel
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李兴龙: "BIM快速优化统计钢筋技术在润城第二大道项目中的应用", 《土木建筑工程信息技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108513548A (en) * 2018-03-30 2018-09-07 深圳市君盈建筑科技有限公司 The prefabricated processing method of reinforcing bar

Similar Documents

Publication Publication Date Title
CN104384358B (en) Diel mold changing systems and method
CN105436895B (en) A kind of Full-automatic aluminum template Intelligent welding production line
CN104816202B (en) Flexible Manufacture production line based on Digit Control Machine Tool
CN203875612U (en) Automatic production system for container bottom cross beam
CN104314310A (en) BIM (building information modeling)-based block standardized construction method
CN103466122A (en) Distributing device used before automatic packing of beverage bottles
CN106185161A (en) A kind of sheet material automatic sorting and palletizing system
CN104325231B (en) Steel pipe bundle combining structure component automatic assembling welder
CN104308447A (en) Automatic overturning device for linear steel tube bundle structural components
CN102848496A (en) Die changing device
CN204621701U (en) Based on the Flexible Manufacture production line of Digit Control Machine Tool
CN106121246A (en) Reinforcing bar binding flowing water technique
CN104353937A (en) Automatic assembling and welding device for straight steel pipe bundles
CN104400430A (en) Automatic production process and device of steel pipe bundle combined structural component
CN204977823U (en) Quick laser inkjet printer of multichannel
CN107309698A (en) A kind of Digit Control Machine Tool self-feeding circulatory system
CN103706734A (en) Stirrup manufacturing device for steel reinforcement cage
CN107378613A (en) A kind of new construction and its manufacturing process of carrier bar chip cleaner
CN204735897U (en) A frame set is to anchor clamps that is used for high pressure notes steam turbine group to prepare
CN204235053U (en) Yi word pattern steel pipe bundle structural elements automatic turning device
CN204209494U (en) U-shaped steel pipe orientation turns materials device
CN204160093U (en) A kind of casing connecting spool welds quick group to instrument
CN205437579U (en) New forms of energy car battery frame assembly welding jig
CN211588339U (en) Special processing equipment for long and large bent reinforcing steel bars of frame box bridge
CN104325346A (en) Directional transfer device for U-shaped steel tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116