CN106121240A - A kind of point of storehouse slip casting method - Google Patents

A kind of point of storehouse slip casting method Download PDF

Info

Publication number
CN106121240A
CN106121240A CN201610776427.XA CN201610776427A CN106121240A CN 106121240 A CN106121240 A CN 106121240A CN 201610776427 A CN201610776427 A CN 201610776427A CN 106121240 A CN106121240 A CN 106121240A
Authority
CN
China
Prior art keywords
mortar
gap
filleting
slip casting
rubber tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610776427.XA
Other languages
Chinese (zh)
Inventor
王书奎
王书金
王松洲
王永利
王书洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Glad Rong Ji In Shenyang Builds Engineering Co Ltd
Original Assignee
Glad Rong Ji In Shenyang Builds Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Glad Rong Ji In Shenyang Builds Engineering Co Ltd filed Critical Glad Rong Ji In Shenyang Builds Engineering Co Ltd
Priority to CN201610776427.XA priority Critical patent/CN106121240A/en
Publication of CN106121240A publication Critical patent/CN106121240A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of point storehouse slip casting method.A kind of point of storehouse slip casting method, comprises the following steps;(1) CGMJM VI high intensity slurry is poured in agitator.(2), before jointing, component and concrete surface should be cleaned out.(3) along within member bottom section gap gradually being filled in diameter 20mm rubber tube one end outside gap bottom prefabricated components.(4) jointing trowel is used first component and concrete floor face to be moistened before hooking filleting.(5) hook filleting gap is slowly extracted out filling in the rubber tube in gap bottom prefabricated components from the other end after completing.(6), after rubber tube is extracted out, one little filleting mortar is taken by tight for conveying end closure.The present invention be directed to a kind of construction technology of straight screw sleeve connection slip casting member bottom section gap plugging, there is the advantages such as simple and efficient, the energy-conserving and environment-protective of constructing operation.

Description

A kind of point of storehouse slip casting method
Technical field
The present invention relates to a kind of point storehouse slip casting method.
Background technology
Bottom existing structural member, during mortar depositing construction, the general method using plank sheathing and sealing strip to paste carries out pre- Member bottom section slip casting gap plugging processed, unsecured bigger component disposably completes slip casting.And there is slip casting seam bottom prefabricated components Mortar seepage, the problem that unsecured bigger component disposably completes slip casting is there is when gap bad sealing, component slip casting.The most above-mentioned Method employs during being not suitable for modern construction.
Along with the development of modern society, industrialization fabricated construction is increasingly becoming the inevitable development of modern architecture and becomes Gesture.Therefore a kind of point storehouse slip casting method it is badly in need of.
Summary of the invention
The deficiency existed for prior art, the technical problem to be solved is to provide one can solve component note Spillage problem during slurry and the one point storehouse slip casting method of engineering structure safety and construction quality can be ensured.
The present invention has adopted the following technical scheme that:
A kind of point of storehouse slip casting method, it is characterised in that: comprise the following steps;
(1) CGMJM-VI high intensity slurry is poured in agitator, add water while stirring.By weight, mixing water must for mixing water Must add after weighing, after amount of water to 80% stirs 3~4 minutes, add 20% remaining water be again stirred for 2 minutes.
(2) before jointing, component and concrete surface should be cleaned out, and must not have broken concrete and the stone of activity, Ensure that component striking surfaces is in wetting state and without obvious hydrops state simultaneously.
(3) along diameter 20mm rubber tube one end is gradually filled in outside gap bottom prefabricated components member bottom section gap it In.
(4) use jointing trowel to hook before filleting first component and concrete floor face to be moistened, will be from one end when hooking embedding mortar Starting, mortar outer surface is concordant with outside prefabricated components, and the most tightly to forbid being interrupted.To the length prefabricated structure more than 2m Needing to carry out point storehouse when hooking filleting gap bottom part to process, point storehouse mortar is vertical with external surface of structural member, and its width cannot be greater than 30mm, 2 jointing trowels are utilized firmly to extrude mortar to inner side during constructing operation, tight to ensure point storehouse.
(5) hook filleting gap is slowly extracted out filling in the rubber tube in gap bottom prefabricated components from the other end after completing.
(6), after rubber tube is extracted out, extract position filleting mortar out and can leave a conveying end, take one little filleting mortar by it Closure is tight.
As a kind of preferred version, in described step (1), batched water deviation must accurately ensure within 0.1kg.
As another kind of preferred version, in described step (1), amount of water must be according to confiding a technological secret of providing with product Bright book or examining report calculate.
As another preferred version, in described step (3), fill in the degree of depth outside rubber tube and be advisable with 10mm, maximum deep Degree must not exceed 15mm.
The invention has the beneficial effects as follows: fabricated construction member bottom section slip casting joint seal construction technology of the present invention is for reinforcing bar A kind of construction technology of sleeve connection slip casting member bottom section gap plugging, in work progress, uses jointing trowel first before hooking filleting Component and concrete floor face being moistened, when hooking embedding mortar from the beginning of one end, mortar outer surface is concordant with outside prefabricated components, And the most tightly to forbid being interrupted.To needing when hooking filleting gap bottom the length prefabricated components more than 2m to carry out a point storehouse process, point Storehouse mortar is vertical with external surface of structural member, and its width cannot be greater than 30mm, utilizes 2 jointing trowels to exert oneself to inner side during constructing operation Extruding mortar, tight to ensure point storehouse.There is the advantages such as simple and efficient, the energy-conserving and environment-protective of constructing operation.Use this construction technology can With spillage problem during effective solution component slip casting, it also is able to ensure engineering structure safety and construction quality simultaneously.
Accompanying drawing explanation
Fig. 1 is CGMJM-VI high intensity size performance parameter list of the present invention.
Fig. 2 is construction flow chart of the present invention.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings.
A kind of point of storehouse slip casting method, it is characterised in that: comprise the following steps;
One, material prepares:
(1), 20kg packed CGMJM-VI high intensity slurry, its presetting period when 20 DEG C is 3 hours 40 minutes, at the beginning of when 35 DEG C The solidifying time is 2 hours.CGMJM-VI high intensity size performance parameter list is shown in accompanying drawing 1.
(2), drinking water, mix and stir mortar water and should use drinking water, when using other water source, should meet that " concrete mixes and stirs Water supply standard " regulation of (JGJ63).
Two, construction equipment prepares.
The on-ground weigher (claiming water, weighing to use) of (1) 100 kg;
(2) mercurial thermometer and surface thermometer;
(3) 200ml graduated cylinder;
(4) volume 200-300L agitator;
(5) rotating speed is not less than the impact brill formula mortar mixer of 120 revs/min;
(6) it is filled with water and uses bucket;
(7) length 3 rice diameter 20mm rubber tube;
(8) jointing trowel.
Three, construction technology process and key points for operation: construction flow chart is shown in accompanying drawing 2.
(1) preparation joint seal mortar: CGMJM-VI high intensity slurry is poured in agitator, adds water while stirring.Mixing water By weight, amount of water must according to provide with product confide a technological secret description or examining report calculates, mixing water must Must add after weighing, accurately must assure that within 0.1kg.Add remaining after amount of water to 80% stirs 3~4 minutes again 20% water is stirred for 2 minutes.
(2) bottom prefabricated components gap cleaning: before jointing, component and concrete surface should be cleaned out, must not have greasy dirt, Float the foreign material such as ash, paste, wood flour and there is no broken concrete and the stone etc. of activity, ensureing that component striking surfaces is in simultaneously Wetting state and without obvious hydrops state.
(3) add rubber strip in gap: bottom prefabricated components outside gap by diameter 20mm rubber tube from one end to separately Within member bottom section gap is gradually filled in one end, filling in the degree of depth and be advisable with 10mm outside rubber tube, depth capacity must not exceed 15mm。
(4) mortar hooks embedding joint seal: uses jointing trowel first component and concrete floor face to be moistened before hooking filleting, hooks embedding sand Will be from the beginning of one end during slurry, mortar outer surface is concordant with outside prefabricated components, and the most tightly to forbid being interrupted.Big to length Needing to carry out point storehouse when hooking filleting gap bottom the prefabricated components of 2m to process, point storehouse mortar is vertical with external surface of structural member, its width Cannot be greater than 30mm, during constructing operation, utilize 2 jointing trowels firmly to extrude mortar to inner side, tight to ensure point storehouse..
(5) rubber strip is removed: hook after filleting gap completes slow from the other end by filling in the rubber tube in gap bottom prefabricated components Slow extraction.
(6) rubber strip is boxed out closure: after rubber tube is extracted out, extracts position filleting mortar out and can leave a conveying end, takes one Little filleting mortar is blocked tightly.
Construction precautions
1, CGMJM-VI high intensity slurry temperature higher than 25 DEG C time, should be stored in ventilations, be dried, cool place at, in work progress It should be noted that avoid sunlight to irradiate for a long time.
2, CGMJM-VI high intensity slurry must use, if temperature is too high or mistake in the environment of temperature 5 DEG C~40 DEG C Forbid time low to use.
3, mortar mixing water water temperature should control below 20 DEG C, must not exceed 25 DEG C, the most now takes and first use.
4, filleting mortar is forbidden add any additive or outer-penetrating agent.
5, the filleting mortar storage period stirred must not be long, should be finished within 30 minutes as far as possible.
6, when Clear Days Summer is constructed, owing to sunlight irradiates, prefabricated components surface temperature can be far above temperature, if its When surface temperature is higher than 30 DEG C, cooling measure should be taked in advance.
7, bottom prefabricated components, gap is forbidden its water seasoning before hooking embedding mortar initial set after hooking embedding completing.
Fabricated construction member bottom section slip casting joint seal construction technology of the present invention is at the bottom of straight screw sleeve connection slip casting component A kind of construction technology of portion's gap plugging, in work progress, uses jointing trowel first by component and concrete floor before hooking filleting Face moistens, and when hooking embedding mortar from the beginning of one end, mortar outer surface is concordant with outside prefabricated components, and between the most tightly forbidding Disconnected.To needing when hooking filleting gap bottom the length prefabricated components more than 2m to carry out a point storehouse process, point storehouse mortar and external surface of structural member Vertically, its width cannot be greater than 30mm, utilizes 2 jointing trowels firmly to extrude mortar to inner side during constructing operation, to ensure to divide Storehouse is tight.There is the advantages such as simple and efficient, the energy-conserving and environment-protective of constructing operation.This construction technology is used can effectively to solve component note Spillage problem during slurry, also is able to ensure engineering structure safety and construction quality simultaneously.
Will also be appreciated that in the case of without departing substantially from the design of the disclosure, said structure and method can be made Change and modifications, and it will be further understood that such design is intended to be covered by claim below.

Claims (4)

1. one kind of point of storehouse slip casting method, it is characterised in that: comprise the following steps;
(1) CGMJM-VI high intensity slurry is poured in agitator, add water while stirring;By weight, mixing water must for mixing water Must add after weighing, after amount of water to 80% stirs 3~4 minutes, add 20% remaining water be again stirred for 2 minutes;
(2) before jointing, component and concrete surface should be cleaned out, and must not have broken concrete and the stone of activity, simultaneously Ensure that component striking surfaces is in wetting state and without obvious hydrops state;
(3) along within member bottom section gap gradually being filled in diameter 20mm rubber tube one end outside gap bottom prefabricated components;
(4) use jointing trowel to hook before filleting first component and concrete floor face to be moistened, when hooking embedding mortar will from the beginning of one end, Mortar outer surface is concordant with outside prefabricated components, and the most tightly to forbid being interrupted;To at the bottom of the length prefabricated components more than 2m Needing to carry out point storehouse when portion hooks filleting gap to process, point storehouse mortar is vertical with external surface of structural member, and its width cannot be greater than 30mm, construction 2 jointing trowels are utilized firmly to extrude mortar to inner side during operation, tight to ensure point storehouse;
(5) hook filleting gap is slowly extracted out filling in the rubber tube in gap bottom prefabricated components from the other end after completing;
(6), after rubber tube is extracted out, extract position filleting mortar out and can leave a conveying end, take one little filleting mortar and blocked Tightly.
One the most according to claim 1 divides storehouse slip casting method, it is characterised in that: batched water deviation in described step (1) Must accurately ensure within 0.1kg.
One the most according to claim 1 divides storehouse slip casting method, it is characterised in that: in described step (1), amount of water must root According to provide with product confide a technological secret description or examining report calculates.
One the most according to claim 1 divides storehouse slip casting method, it is characterised in that: in described step (3), fill in outside rubber tube Entering the degree of depth to be advisable with 10mm, depth capacity must not exceed 15mm.
CN201610776427.XA 2016-08-31 2016-08-31 A kind of point of storehouse slip casting method Pending CN106121240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610776427.XA CN106121240A (en) 2016-08-31 2016-08-31 A kind of point of storehouse slip casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610776427.XA CN106121240A (en) 2016-08-31 2016-08-31 A kind of point of storehouse slip casting method

Publications (1)

Publication Number Publication Date
CN106121240A true CN106121240A (en) 2016-11-16

Family

ID=57272379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610776427.XA Pending CN106121240A (en) 2016-08-31 2016-08-31 A kind of point of storehouse slip casting method

Country Status (1)

Country Link
CN (1) CN106121240A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836817A (en) * 2017-04-24 2017-06-13 无锡市华灿化工有限公司 A kind of floor is whole to pour one-shot forming construction method
CN107447655A (en) * 2017-07-28 2017-12-08 北京城建道桥建设集团有限公司 Grouting behind shaft or drift lining bar shaped point storehouse for overlarge area bearing plate deadens and its divides storehouse method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821978A (en) * 2016-03-24 2016-08-03 天津住宅集团建设工程总承包有限公司 Semi-bedding and semi-grouting vertical connection construction method of prefabricated wall plate

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821978A (en) * 2016-03-24 2016-08-03 天津住宅集团建设工程总承包有限公司 Semi-bedding and semi-grouting vertical connection construction method of prefabricated wall plate

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
周可璋等: ""钢筋套筒灌浆现场施工研究"", 《四川水泥》 *
张斌等: ""装配式建筑混凝土接缝密封解决方案"", 《中国住宅设施》 *
杨海文等: ""装配式结构安装施工技术"", 《建筑技术》 *
浙江省火电建设公司: ""CGM-JM二次灌浆施工方案"", 《HTTP://WWW.DOCIN.COM/TOUCH_NEW/PREVIEW_NEW.DO?ID=717205150》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836817A (en) * 2017-04-24 2017-06-13 无锡市华灿化工有限公司 A kind of floor is whole to pour one-shot forming construction method
CN107447655A (en) * 2017-07-28 2017-12-08 北京城建道桥建设集团有限公司 Grouting behind shaft or drift lining bar shaped point storehouse for overlarge area bearing plate deadens and its divides storehouse method
CN107447655B (en) * 2017-07-28 2023-06-02 北京城建道桥建设集团有限公司 Bin separation method for rear grouting strip bin separation resistance of oversized bearing plate

Similar Documents

Publication Publication Date Title
KR100913572B1 (en) Manufacture method of high strength grouting components which can automatically control to gel time and construction methods.
CN106639973A (en) Grouting structure and grouting method for ground surface ultra-deep hole double liquid slurry grouting
CN104119101A (en) Cast-in-place light-weight foamed concrete construction technique
CN102518216A (en) Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN107718266B (en) A kind of air guide of connection chamber and pressure benefit paste-making method for sleeve grouting connection
CN106121240A (en) A kind of point of storehouse slip casting method
CN109537894B (en) Grouting construction method for assembled wall
CN104343325B (en) A kind of building door window frame and the method for blocking in hole gap
CN208105803U (en) A kind of pointer suitable for plain brick wall
CN104453257A (en) Mortar spreading bucket and mortar spreading method using same
CN106760080A (en) Rearmounted concrete heat-insulating Curtainwall connector and construction method
CN113943130A (en) Formula and grouting process of shield tunnel timed-setting wall-grouting material
CN106082766A (en) A kind of water conservation for wet shotcreting viscosifies additive
JP2000054794A (en) Filling method for cavity part and grout used therefor
JP6755743B2 (en) Manufacturing method of fluidized soil cement
CN107459324A (en) A kind of shield anti-stratum settlement housing packing material and preparation method thereof
CN207525751U (en) A kind of hydraulic engineering grouting construction device
CN103352722B (en) Cemented filling close to back processing technology for goaf at barren rock filling background
CN106801482B (en) A kind of converter station firewall construction technology
CN204663015U (en) Paving ash bucket
JP5861937B2 (en) Filling method of filler
CN104895525B (en) A kind of gas drive formula grouting method
CN209585433U (en) A kind of prefabricated components
CN207672849U (en) A kind of sand aerated concrete plank of built-in line box line pipe
CN208668750U (en) A kind of wire casing interstitital texture of hollow brick wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication