CN106121103A - a curtain wall - Google Patents
a curtain wall Download PDFInfo
- Publication number
- CN106121103A CN106121103A CN201610484962.8A CN201610484962A CN106121103A CN 106121103 A CN106121103 A CN 106121103A CN 201610484962 A CN201610484962 A CN 201610484962A CN 106121103 A CN106121103 A CN 106121103A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- elastic member
- keel
- connecting plate
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑领域,特别涉及一种幕墙。The invention relates to the field of construction, in particular to a curtain wall.
背景技术Background technique
幕墙是建筑物的外墙护围,是现代大型和高层建筑常用的带有装饰效果的轻质墙体。Curtain wall is the outer wall enclosure of a building, and it is a light-weight wall with decorative effect commonly used in modern large-scale and high-rise buildings.
现有的幕墙多采用明框结构,一般通过矩形管作为龙骨,幕墙板安装在龙骨的顶面或底面,并通过龙骨进行固定,这样的结构使幕墙板不能遮挡住龙骨,龙骨裸露在外面,影响幕墙的外观。为了使幕墙板能够将龙骨遮挡住,使用者将多块幕墙板对齐并采用连接角码固定在龙骨上。Most of the existing curtain walls adopt the exposed frame structure. Generally, rectangular tubes are used as the keel. The curtain wall panels are installed on the top or bottom of the keel and fixed through the keel. This structure prevents the curtain wall panels from covering the keel, and the keel is exposed outside. Affects the appearance of the curtain wall. In order for the curtain wall panels to cover the keel, the user aligns multiple curtain wall panels and fixes them on the keel with connecting corners.
在实现本发明的过程中,发明人发现现有技术至少存在以下问题:In the process of realizing the present invention, the inventor finds that there are at least the following problems in the prior art:
由于幕墙板和龙骨采用连接角码进行固定,使得幕墙板的四个角与龙骨均为刚性连接,且采用连接角码进行固定时,幕墙板和龙骨之间没有调节的空间,由于幕墙板的四个角不能保证位于同一个平面内,这会使幕墙板安装时,容易发生形变或破裂,为了不影响幕墙的安全性,发生形变或破裂的幕墙板需要替换,替换幕墙板会增加了幕墙的使用成本。Since the curtain wall panel and the keel are fixed by connecting corners, the four corners of the curtain wall panel and the keel are all rigidly connected, and when the connection corners are used for fixing, there is no room for adjustment between the curtain wall panel and the keel. The four corners cannot be guaranteed to be in the same plane, which will cause the curtain wall panels to be easily deformed or broken during installation. In order not to affect the safety of the curtain wall, the deformed or cracked curtain wall panels need to be replaced. Replacement of the curtain wall panels will increase the use cost.
发明内容Contents of the invention
为了解决现有技术中幕墙板容易发生形变或破裂的问题,本发明实施例提供了一种幕墙。所述技术方案如下:In order to solve the problem that the curtain wall panel is easily deformed or broken in the prior art, the embodiment of the present invention provides a curtain wall. Described technical scheme is as follows:
本发明提供了一种幕墙,包括幕墙板和龙骨,所述幕墙还包括:第一连接组件和连接板,所述连接板固定在所述幕墙板的背面的顶角处,所述龙骨为空心结构,所述龙骨上对应所述连接板的位置开设有缺口,所述连接板位于所述缺口内,所述第一连接组件包括:第一连杆、第一弹性件、第二弹性件和第一锁紧件,所述第一连杆的第一端穿过所述龙骨安装在所述连接板上,且所述第一连杆与所述连接板平行布置,所述第一弹性件套装在所述第一连杆上,且所述第一弹性件的一端抵在所述龙骨的内壁上,所述第一弹性件的另一端抵在所述连接板上,所述第一锁紧件安装在所述连杆的第二端上,所述第二弹性件套装在所述第一连杆上,且所述第二弹性件的一端抵在所述第一锁紧件上,所述第二弹性件的另一端抵在所述龙骨的外壁上,所述第一弹性件和所述第二弹性件的初始状态均为压缩状态。The present invention provides a curtain wall, comprising a curtain wall panel and a keel, the curtain wall also includes: a first connecting assembly and a connecting plate, the connecting plate is fixed at the top corner of the back of the curtain wall panel, and the keel is hollow structure, a notch is opened on the keel corresponding to the position of the connecting plate, and the connecting plate is located in the notch, and the first connecting assembly includes: a first connecting rod, a first elastic member, a second elastic member and The first locking member, the first end of the first connecting rod passes through the keel and is installed on the connecting plate, and the first connecting rod is arranged parallel to the connecting plate, and the first elastic member Fitted on the first connecting rod, and one end of the first elastic member is against the inner wall of the keel, the other end of the first elastic member is against the connecting plate, and the first lock The tightening member is installed on the second end of the connecting rod, the second elastic member is sleeved on the first connecting rod, and one end of the second elastic member is against the first locking member, The other end of the second elastic member abuts against the outer wall of the keel, and the initial states of the first elastic member and the second elastic member are both in a compressed state.
具体地,所述连接板上设置有螺纹孔,所述第一连杆的第一端上设置有外螺纹,所述连杆通过螺纹与所述连接板连接。Specifically, a threaded hole is provided on the connecting plate, an external thread is provided on the first end of the first connecting rod, and the connecting rod is connected to the connecting plate through threads.
具体地,所述第一锁紧件为螺母,所述第一连杆上设置有与所述螺母相配合的外螺纹。Specifically, the first locking member is a nut, and the first connecting rod is provided with an external thread matched with the nut.
具体地,所述第一弹性件为蝶簧或弹簧。Specifically, the first elastic member is a butterfly spring or a spring.
具体地,所述第二弹性件为蝶簧或弹簧。Specifically, the second elastic member is a butterfly spring or a spring.
具体地,所述龙骨的内壁上设置有第一限位套筒,所述第一弹性件位于所述第一限位套筒内。Specifically, a first limiting sleeve is provided on the inner wall of the keel, and the first elastic member is located in the first limiting sleeve.
具体地,所述第一弹性件与所述龙骨的内壁之间设置有第一垫片。Specifically, a first gasket is provided between the first elastic member and the inner wall of the keel.
具体地,所述第二弹性件与所述锁紧件之间设置有第二垫片。Specifically, a second washer is disposed between the second elastic member and the locking member.
具体地,所述龙骨为矩形框结构。Specifically, the keel is a rectangular frame structure.
具体地,所述幕墙还包括第二连接组件,所述第二连接组件的结构与所述第一连接组件的结构相同,所述第二连接组件的第二连杆的第一端穿过所述龙骨安装在所述连接板的底面上,所述第二连杆与所述连接板垂直布置。Specifically, the curtain wall further includes a second connection assembly, the structure of the second connection assembly is the same as that of the first connection assembly, and the first end of the second connecting rod of the second connection assembly passes through the The keel is installed on the bottom surface of the connecting plate, and the second connecting rod is vertically arranged with the connecting plate.
本发明提供的技术方案带来的有益效果是:本发明提供了一种幕墙,幕墙板与龙骨通过连接组件连接,通过调节第一锁紧件在第一连杆上的位置可以调整幕墙板每个顶角相对于龙骨的距离,从而保证安装在龙骨上的幕墙板的四个角能够受力均匀且位于同一平面内,进而避免幕墙板发生形变或破裂,同时,连接组件的第一弹性件的两端分别抵在龙骨的内壁和连接板上,将连接组件的第二弹性件的两端分别抵在锁紧件和龙骨的外壁上,通过第一弹性件和第二弹性件吸收由幕墙板至龙骨上的载荷,通过第一弹性件和第二弹性件能够实现缓冲的效果,防止幕墙板与龙骨发生刚性冲击,从而避免幕墙板的四角因受力不均而发生形变或破裂。The beneficial effect brought by the technical solution provided by the present invention is: the present invention provides a curtain wall, the curtain wall panel and the keel are connected through a connecting assembly, and the curtain wall panel can be adjusted by adjusting the position of the first locking member on the first connecting rod. The distance between the top corners and the keel, so as to ensure that the four corners of the curtain wall panel installed on the keel can be stressed evenly and in the same plane, so as to avoid deformation or rupture of the curtain wall panel. At the same time, the first elastic member of the connecting component The two ends of the two ends of the keel are respectively pressed against the inner wall of the keel and the connecting plate, and the two ends of the second elastic part of the connection assembly are respectively pressed against the locking part and the outer wall of the keel, and the curtain wall is absorbed by the first elastic part and the second elastic part. The load from the panel to the keel can be cushioned by the first elastic member and the second elastic member to prevent rigid impact between the curtain wall panel and the keel, thereby avoiding deformation or cracking of the four corners of the curtain wall panel due to uneven force.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.
图1是本发明实施例提供的幕墙的结构示意图。Fig. 1 is a schematic structural diagram of a curtain wall provided by an embodiment of the present invention.
具体实施方式detailed description
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
实施例Example
本发明实施例提供了一种幕墙,如图1所示,该幕墙包括幕墙板1、龙骨2、第一连接组件3和连接板4,连接板4固定在幕墙板1的背面的顶角处,龙骨2为空心结构,龙骨2上对应连接板4的位置开设有缺口4a,连接板4位于缺口4a内,第一连接组件3包括:连杆3a、第一弹性件3b、第二弹性件3c和销紧件3d,连杆3a的第一端穿过龙骨2安装在连接板4上,且连杆3a与连接板4平行布置,第一弹性件3b套装在连杆3a上,且第一弹性件3b的一端抵在龙骨2的内壁上,第一弹性件3b的另一端抵在连接板4的侧壁上,锁紧件3d安装在连杆3a的第二端上,第二弹性件3c套装在连杆3a上,且第二弹性件3c的一端抵在锁紧件3d上,第二弹性件3c的另一端抵在龙骨2的外侧壁上,第一弹性件3b和第二弹性件3c的初始状态均为压缩状态。在本实施例中,第一连接组件3可以为多个,多个第一连接组件3能够均匀地分担由连接板4传递至龙骨2上的力。The embodiment of the present invention provides a curtain wall, as shown in Figure 1, the curtain wall includes a curtain wall panel 1, a keel 2, a first connecting assembly 3 and a connecting plate 4, and the connecting plate 4 is fixed at the top corner of the back of the curtain wall panel 1 , the keel 2 is a hollow structure, a notch 4a is opened on the keel 2 corresponding to the position of the connecting plate 4, the connecting plate 4 is located in the notch 4a, the first connecting assembly 3 includes: a connecting rod 3a, a first elastic member 3b, a second elastic member 3c and pin 3d, the first end of the connecting rod 3a passes through the keel 2 and is installed on the connecting plate 4, and the connecting rod 3a is arranged in parallel with the connecting plate 4, the first elastic member 3b is sleeved on the connecting rod 3a, and the second One end of an elastic member 3b abuts against the inner wall of the keel 2, the other end of the first elastic member 3b abuts against the side wall of the connecting plate 4, the locking member 3d is installed on the second end of the connecting rod 3a, and the second elastic Part 3c is sleeved on the connecting rod 3a, and one end of the second elastic part 3c is against the locking part 3d, and the other end of the second elastic part 3c is against the outer wall of the keel 2, and the first elastic part 3b and the second The initial state of the elastic member 3c is a compressed state. In this embodiment, there may be multiple first connecting components 3 , and the multiple first connecting components 3 can evenly share the force transmitted from the connecting plate 4 to the keel 2 .
具体地,连接板4上设置有螺纹孔,连杆3a的第一端上设置有外螺纹,连杆3a通过螺纹与连接板4连接。通过螺纹连接的方式能够方便将第一连接组件3安装在连接板4上。Specifically, the connecting plate 4 is provided with threaded holes, the first end of the connecting rod 3a is provided with external threads, and the connecting rod 3a is connected to the connecting plate 4 through threads. The first connecting assembly 3 can be conveniently installed on the connecting plate 4 by means of threaded connection.
具体地,锁紧件3d可以为螺母,连杆3a上设置有与螺母相配合的外螺纹。锁紧件3d采用螺母,可以提高锁紧件3d的通用性,降低锁紧件3d的成本。Specifically, the locking member 3d may be a nut, and the connecting rod 3a is provided with an external thread matched with the nut. The locking part 3d adopts a nut, which can improve the versatility of the locking part 3d and reduce the cost of the locking part 3d.
具体地,第一弹性件3b可以为蝶簧。蝶簧能够较好的承受负载,在承受负载变形后,储蓄一定的势能。蝶簧的数量可以为多个,且蝶簧的数量可以根据具体情况进行调整。此外,在其他实施例中,该第一弹性件3b还可以为弹簧。Specifically, the first elastic member 3b may be a butterfly spring. The belleville spring can bear the load better, and after being deformed under the load, it saves a certain amount of potential energy. The number of disc springs can be multiple, and the number of disc springs can be adjusted according to specific conditions. In addition, in other embodiments, the first elastic member 3b can also be a spring.
具体地,第二弹性件3c可以为蝶簧。蝶簧能够较好的承受负载,在承受负载变形后,储蓄一定的势能。蝶簧的数量可以为多个,且蝶簧的数量可以根据具体情况进行调整。此外,在其他实施例中,该第二弹性件3c还可以为弹簧。Specifically, the second elastic member 3c may be a butterfly spring. The belleville spring can bear the load better, and after being deformed under the load, it saves a certain amount of potential energy. The number of disc springs can be multiple, and the number of disc springs can be adjusted according to specific conditions. In addition, in other embodiments, the second elastic member 3c can also be a spring.
具体地,龙骨2的内壁上可以设置有第一限位套筒2a,第一弹性件3b位于第一限位套筒2a内。该第一限位套筒2a能够限定第一弹性件3b的位置,防止第一弹性件3b移位。Specifically, a first limiting sleeve 2a may be provided on the inner wall of the keel 2, and the first elastic member 3b is located in the first limiting sleeve 2a. The first limiting sleeve 2a can limit the position of the first elastic member 3b to prevent the displacement of the first elastic member 3b.
此外,龙骨2的外壁上也可以设置第二限位套筒2b,第二弹性件3c位于第二限位套筒2b内。该第二限位套筒2b能够限定第二弹性件3c的位置,防止第二弹性件3c移位。In addition, a second limiting sleeve 2b may also be provided on the outer wall of the keel 2, and the second elastic member 3c is located in the second limiting sleeve 2b. The second limiting sleeve 2b can limit the position of the second elastic member 3c and prevent the second elastic member 3c from being displaced.
具体地,第一弹性件3b与龙骨2的内壁之间设置有第一垫片5。第一垫片5能够调整第一弹性件3b的压缩量,使该压缩量能够缓冲由连接板4传递过来的载荷,从而保证龙骨2不会受到较大的冲击力。此外,第一垫片5能够避免第一弹性件3b与龙骨2接触而发生磨损。Specifically, a first gasket 5 is provided between the first elastic member 3b and the inner wall of the keel 2 . The first washer 5 can adjust the compression amount of the first elastic member 3b, so that the compression amount can buffer the load transmitted by the connecting plate 4, so as to ensure that the keel 2 will not receive a large impact force. In addition, the first washer 5 can prevent the first elastic member 3b from being worn due to contact with the keel 2 .
具体地,第二弹性件3c与锁紧件3d之间设置有第二垫片6。第二垫片6能够调整第二弹性件3c的压缩量,使该压缩量能够缓冲由连接板4传递过来的载荷,从而保证锁紧件3d不会受到较大的作用力。此外,第二垫片6能够避免第二弹性件3c与锁紧件3d接触而发生磨损。Specifically, a second washer 6 is disposed between the second elastic member 3c and the locking member 3d. The second gasket 6 can adjust the compression amount of the second elastic member 3c, so that the compression amount can buffer the load transmitted by the connecting plate 4, so as to ensure that the locking member 3d will not be subjected to a large force. In addition, the second washer 6 can prevent the second elastic member 3c from being worn due to contact with the locking member 3d.
具体地,该幕墙还可以包括第二连接组件7,第二连接组件7的结构与第一连接组件3的结构相同,第二连接组件7的第二连杆7a的第一端穿过龙骨2安装在连接板4的底面上,且第二连杆7a与连接板4垂直布置。具体地,第二连接组件7包括第二连杆7a、第三弹性件7b、第四弹性件7c和第二锁紧件7d,第三弹性件7b套装在第二连杆7a上,且第三弹性件7b的一端抵在龙骨2的内壁上,第三弹性件7b的另一端抵在连接板4的底面上,第二锁紧件7d安装在第二连杆7a的第二端上,第四弹性件7c套装在第二连杆7a上,且第四弹性件7c的一端抵在第二锁紧件7d上,第四弹性件7c的另一端抵在龙骨2的底面外壁上。由于幕墙板1安装在龙骨2上,且幕墙板1的自重较大,因此,通过第二连接组件7能够分担由连接板4传递过来的竖直载荷,防止幕墙板1因自重较大而有向下移位的趋势。其中,第二连接组件7可以为多个,多个第二连接组件7能够均匀地分担由连接板4传递过来的竖直载荷。Specifically, the curtain wall can also include a second connection assembly 7, the structure of the second connection assembly 7 is the same as that of the first connection assembly 3, and the first end of the second link 7a of the second connection assembly 7 passes through the keel 2 It is installed on the bottom surface of the connecting plate 4 , and the second connecting rod 7 a is vertically arranged with the connecting plate 4 . Specifically, the second connection assembly 7 includes a second connecting rod 7a, a third elastic member 7b, a fourth elastic member 7c and a second locking member 7d, the third elastic member 7b is sleeved on the second connecting rod 7a, and the second One end of the three elastic parts 7b is against the inner wall of the keel 2, the other end of the third elastic part 7b is against the bottom surface of the connecting plate 4, and the second locking part 7d is installed on the second end of the second connecting rod 7a, The fourth elastic piece 7c is sleeved on the second connecting rod 7a, and one end of the fourth elastic piece 7c abuts against the second locking piece 7d, and the other end of the fourth elastic piece 7c abuts against the bottom outer wall of the keel 2 . Because the curtain wall panel 1 is installed on the keel 2, and the dead weight of the curtain wall panel 1 is relatively large, the vertical load transmitted by the connecting plate 4 can be shared through the second connecting assembly 7, so as to prevent the curtain wall panel 1 from being damaged due to its large self-weight. downward shifting trend. Wherein, there may be multiple second connecting assemblies 7 , and the multiple second connecting assemblies 7 can evenly share the vertical load transmitted by the connecting plate 4 .
具体地,龙骨2可以为矩形框结构。矩形框结构能够保证龙骨2具有良好的受力能力,且能够将幕墙板1稳定的固定在龙骨2上。Specifically, the keel 2 can be a rectangular frame structure. The rectangular frame structure can ensure that the keel 2 has a good force bearing capacity, and can stably fix the curtain wall panel 1 on the keel 2 .
本发明实施例提供了一种幕墙,幕墙板与龙骨通过连接组件连接,通过调节第一锁紧件在第一连杆上的位置可以调整幕墙板每个顶角相对于龙骨的距离,从而保证安装在龙骨上的幕墙板的四个角能够受力均匀且位于同一平面内,进而避免幕墙板发生形变或破裂,同时,连接组件的第一弹性件的两端分别抵在龙骨的内壁和连接板上,将连接组件的第二弹性件的两端分别抵在锁紧件和龙骨的外壁上,通过第一弹性件和第二弹性件吸收由幕墙板至龙骨上的载荷,通过第一弹性件和第二弹性件能够实现缓冲的效果,防止幕墙板与龙骨发生刚性冲击,从而避免幕墙板的四角因受力不均而发生形变或破裂。The embodiment of the present invention provides a curtain wall. The curtain wall panel and the keel are connected through a connecting component. By adjusting the position of the first locking member on the first connecting rod, the distance between each corner of the curtain wall panel relative to the keel can be adjusted, thereby ensuring The four corners of the curtain wall panel installed on the keel can be evenly stressed and located in the same plane, thereby preventing the curtain wall panel from being deformed or broken. On the board, press the two ends of the second elastic part of the connection assembly against the outer wall of the locking part and the keel respectively, and absorb the load from the curtain wall panel to the keel through the first elastic part and the second elastic part, and through the first elastic The first piece and the second elastic piece can achieve the effect of cushioning and prevent the rigid impact between the curtain wall panel and the keel, so as to prevent the four corners of the curtain wall panel from being deformed or broken due to uneven force.
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within range.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610484962.8A CN106121103B (en) | 2016-06-28 | 2016-06-28 | Curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610484962.8A CN106121103B (en) | 2016-06-28 | 2016-06-28 | Curtain wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106121103A true CN106121103A (en) | 2016-11-16 |
| CN106121103B CN106121103B (en) | 2018-10-02 |
Family
ID=57267438
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610484962.8A Active CN106121103B (en) | 2016-06-28 | 2016-06-28 | Curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106121103B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110714562A (en) * | 2019-11-28 | 2020-01-21 | 宋寒冰 | An easy-to-install building curtain wall structure |
| CN111395609A (en) * | 2020-04-22 | 2020-07-10 | 深圳市方大建科集团有限公司 | UHPC curtain wall system |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002206300A (en) * | 2001-01-09 | 2002-07-26 | Shin Nikkei Co Ltd | Curtain wall structure |
| JP2002371658A (en) * | 2001-06-14 | 2002-12-26 | Shin Nikkei Co Ltd | Structure of joint between vertical frame and horizontal frame of curtain wall |
| CN201082981Y (en) * | 2007-09-11 | 2008-07-09 | 武汉凌云建筑装饰工程有限公司 | Glass curtain wall connecting structure based on hollow glass |
| CN202706283U (en) * | 2012-07-06 | 2013-01-30 | 杭州万全环保工程有限公司 | Installing system of back-bolt type stone material |
| CN203373879U (en) * | 2013-06-08 | 2014-01-01 | 江河创建集团股份有限公司 | Replaceable back-groove-fixed type stone curtain wall |
| CN205046721U (en) * | 2015-09-21 | 2016-02-24 | 衢州圣荣电子科技有限公司 | Movable curtain wall construction |
| CN205822534U (en) * | 2016-06-28 | 2016-12-21 | 綦家昕 | a curtain wall |
-
2016
- 2016-06-28 CN CN201610484962.8A patent/CN106121103B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002206300A (en) * | 2001-01-09 | 2002-07-26 | Shin Nikkei Co Ltd | Curtain wall structure |
| JP2002371658A (en) * | 2001-06-14 | 2002-12-26 | Shin Nikkei Co Ltd | Structure of joint between vertical frame and horizontal frame of curtain wall |
| CN201082981Y (en) * | 2007-09-11 | 2008-07-09 | 武汉凌云建筑装饰工程有限公司 | Glass curtain wall connecting structure based on hollow glass |
| CN202706283U (en) * | 2012-07-06 | 2013-01-30 | 杭州万全环保工程有限公司 | Installing system of back-bolt type stone material |
| CN203373879U (en) * | 2013-06-08 | 2014-01-01 | 江河创建集团股份有限公司 | Replaceable back-groove-fixed type stone curtain wall |
| CN205046721U (en) * | 2015-09-21 | 2016-02-24 | 衢州圣荣电子科技有限公司 | Movable curtain wall construction |
| CN205822534U (en) * | 2016-06-28 | 2016-12-21 | 綦家昕 | a curtain wall |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110714562A (en) * | 2019-11-28 | 2020-01-21 | 宋寒冰 | An easy-to-install building curtain wall structure |
| CN110714562B (en) * | 2019-11-28 | 2021-05-04 | 深圳市华城建筑科技有限公司 | An easy-to-install building curtain wall structure |
| CN111395609A (en) * | 2020-04-22 | 2020-07-10 | 深圳市方大建科集团有限公司 | UHPC curtain wall system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106121103B (en) | 2018-10-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2017181406A1 (en) | Vibration-damping structure for dropped ceiling system | |
| CN205224330U (en) | Multilayer coincide friction damper | |
| CN106121103B (en) | Curtain wall | |
| CN209245148U (en) | The vibration and noise reducing structure of vacuum pump | |
| CN102979181A (en) | Intelligent shock isolation and absorption nickel-titanium alloy supporting seat for large-span spatial structure (net rack) | |
| CN106763397A (en) | The resonance free peak vibration isolator and its damping module of a kind of L-type resistance arm | |
| CN205822534U (en) | a curtain wall | |
| CN101555712A (en) | Replaceable unit curtain wall panel system | |
| CN203977609U (en) | A kind of energy consumer stage by stage | |
| KR101560975B1 (en) | Hybrid damper for building structure | |
| CN206093365U (en) | Multicavity room buffering shock attenuation formula robot base | |
| CN212957096U (en) | Antidetonation heat preservation wall | |
| CN209082795U (en) | A kind of floor support plate steel frame | |
| CN205276581U (en) | Antidetonation curtain | |
| CN110190534A (en) | A kind of damping device for distribution automation controlling terminal | |
| CN204937531U (en) | A kind of angular plane surface lever loading device | |
| CN106275395B (en) | A kind of unmanned plane buffer gear | |
| CN206268352U (en) | A kind of resonance free peak vibration isolator and its damping module | |
| CN207364074U (en) | A kind of captive screw mounting structure | |
| CN210461377U (en) | High-strength spherical outside surface bearing | |
| CN208884883U (en) | A kind of panel structure for public domain cylinder | |
| CN214833875U (en) | Building curtain wall steel constructs frame construction | |
| CN210212795U (en) | Unmanned aerial vehicle engine damping device | |
| CN209459049U (en) | A shock-absorbing base for outdoor patio heaters | |
| CN106402240B (en) | A kind of resonance free peak vibration isolator and its damping module |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20220601 Address after: 430000, No.9, Wuxian Road, Fenghuangshan Industrial Park, Caidian District, Wuhan City, Hubei Province Patentee after: CSCEC CURTAIN WALL CO.,LTD. Address before: 430051 room 2103, building 3, Zhaolin Jinhua Haoting, No. 18, Hanqiao Road, Hanyang District, Wuhan City, Hubei Province Patentee before: Qi Jia Xin |
|
| TR01 | Transfer of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20250819 Granted publication date: 20181002 |
|
| PP01 | Preservation of patent right |