CN106120575A - A kind of external application material improves the method for bridge sealing off and covering anchorage district durability - Google Patents

A kind of external application material improves the method for bridge sealing off and covering anchorage district durability Download PDF

Info

Publication number
CN106120575A
CN106120575A CN201610642605.XA CN201610642605A CN106120575A CN 106120575 A CN106120575 A CN 106120575A CN 201610642605 A CN201610642605 A CN 201610642605A CN 106120575 A CN106120575 A CN 106120575A
Authority
CN
China
Prior art keywords
sealing
external application
covering anchorage
application material
district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610642605.XA
Other languages
Chinese (zh)
Inventor
朱尔玉
宋浩
李宇杰
朱力
盛琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201610642605.XA priority Critical patent/CN106120575A/en
Publication of CN106120575A publication Critical patent/CN106120575A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of method that external application material improves bridge sealing off and covering anchorage district durability, be applied to beams of concrete, girder steel, the reinforcing of steel reinforced concrete combination beam sealing off and covering anchorage district durability.The method of this raising bridge sealing off and covering anchorage district durability, by being affixed on beams of concrete, girder steel, surface, steel reinforced concrete combination beam sealing off and covering anchorage district outside external application material, prevents the generation of sealing off and covering anchorage district endurance issues, makes up the deficiency of present stage sealing off and covering anchorage district endurance issues prophylactico-therapeutic measures.Utilize that be made with material contracting with heat or elastomeric material or asphalt material for main material, antiseepage, easy construction, the material that is prone to processing, strange land workability good that bridge sealing off and covering anchorage district is protected; can be good at preventing and treating the problems such as the bridge sealing off and covering anchorage district anchor head burn into anchor lower prestress wire bundles rust that causes due to ice and snow, rainwater, corrosive medium etc., improve the durability in bridge sealing off and covering anchorage district.

Description

A kind of external application material improves the method for bridge sealing off and covering anchorage district durability
Technical field
This patent relates to a kind of method that external application material improves bridge sealing off and covering anchorage district durability, is applied to beams of concrete, steel Beam, the reinforcing of steel reinforced concrete combination beam sealing off and covering anchorage district durability, specifically, it is simply that beams of concrete, girder steel, steel will be affixed on outside external application material Surface, mixed combination beam sealing off and covering anchorage district, it is to avoid it directly contacts with ice and snow, rainwater, corrosive medium etc., improves the durability in sealing off and covering anchorage district, belongs to In technical field of bridge engineering.
Background technology
At present, in the construction of prestressed structure, more employing post stretching prestressed reinforcement of tensioning.Either concrete Beam, girder steel or steel reinforced concrete combination beam, prestressed strand is required for anchoring at beam-ends.In beams of concrete, due to cement Mortar sealing off and covering anchorage, adds the leakiness of concrete itself, and rainwater, ice and snow, corrosive medium etc. penetrate into sealing off and covering anchorage district, easily cause anchorage Corrosion and the corrosion of anchor lower prestress steel bundle;In girder steel, prestressing force generally applies in the way of external prestressing, at beam-ends Anchored by anchor block or anchor plate.Steel bundle and anchor head are exposed in the middle of air, it is difficult to carry out permanently effective protection, more Easily there is corrosion and the corrosion of anchor lower prestress steel bundle of anchor head;Steel reinforced concrete combination beam then combines beams of concrete and girder steel sealing off and covering anchorage district Existing problem, the endurance issues in sealing off and covering anchorage district is the most prominent.
Consulting existing document to understand, the major measure of present stage bridge sealing off and covering anchorage district durability protection includes: at bridge sealing off and covering anchorage District's surface spraying coating, in sealing off and covering anchorage district brushing antirust paint, anchor head irrigate butter or oiliness sealing wax etc..Coating is exposed to air In, being affected by various factors, durability is very poor;Brushing antirust paint can lose protective effect because of the peeling of concrete;In anchor head The perfusion material such as butter or oiliness sealing wax adds workload, it is difficult to guaranteeing the density of perfusion, this is the most to a certain extent Cause the endurance issues in bridge sealing off and covering anchorage district.In view of this, inventor, according to theory analysis and practical experience, goes out from economy Send out, carry out studying, developing, finally produce this patent.
Summary of the invention
This patent is to be solved be technical problem is that: provide a kind of external application material to improve the side of bridge sealing off and covering anchorage district durability Method, by being affixed on beams of concrete, girder steel, surface, steel reinforced concrete combination beam sealing off and covering anchorage district outside external application material, prevents and treats because of ice dissolution, rainwater The anchor head burn into anchor lower prestress wire bundles rust etc. that infiltration, corrosive medium etc. cause affects the problem of sealing off and covering anchorage district durability, makes up The deficiency of present stage sealing off and covering anchorage district endurance issues prophylactico-therapeutic measures.
This patent solves its technical problem and be the technical scheme is that
A kind of external application material improves the method for bridge sealing off and covering anchorage district durability, including beams of concrete 1-1, girder steel 2-1, steel reinforced concrete Combination beam 3-1, external application material 1-2, external application material 2-2, external application material 3-2;It is characterized in that: be affixed on outside external application material 1-2 Surface, beams of concrete 1-1 sealing off and covering anchorage district;Or with being affixed on surface, girder steel 2-1 sealing off and covering anchorage district outside external application material 2-2;Or with external application material 3-2 It is affixed on outward surface, steel reinforced concrete combination beam 3-1 sealing off and covering anchorage district;Bridge sealing off and covering anchorage district and ice and snow, rainwater, corrosive medium is avoided by above measure Deng directly contact, reach to improve the purpose of bridge sealing off and covering anchorage district durability.
Described a kind of external application material improves the method for bridge sealing off and covering anchorage district durability, it is characterised in that: external application material 1-2 Can be the rectangular thin plate processed by material contracting with heat or elastomeric material or asphalt material, the thickness D of external application material 1-21= 5mm~40mm, length H1=0.2m~10m, width B1=0.2m~10m;External application material 2-2 can be by material contracting with heat or rubber The rectangular thin plate that glue material or asphalt material process, the thickness D of external application material 2-22=5mm~40mm, length H2=0.2m ~10m, width B2=0.2m~10m;External application material 3-2 can be by material contracting with heat or elastomeric material or asphalt material processing The rectangular thin plate become, the thickness D of external application material 3-23=5mm~40mm, length H3=0.2m~10m, width B3=0.2m~ 10m。
The advantage of this patent is: due to this patent have employed this kind of antiseepage of external application material, easy construction, be prone to processing, different Bridge sealing off and covering anchorage district is protected by the ground good material of workability, it is possible to well prevents and treats ice and snow, rainwater, corrosive medium etc. and makes The problems such as the bridge sealing off and covering anchorage district anchor head burn into anchor lower prestress wire bundles rust become, improve the durability in bridge sealing off and covering anchorage district.
Accompanying drawing explanation
The external application material external application schematic diagram in Fig. 1 beams of concrete sealing off and covering anchorage district
The external application material plane figure in Fig. 2 beams of concrete sealing off and covering anchorage district
The external application material side figure in Fig. 3 beams of concrete sealing off and covering anchorage district
The external application material external application schematic diagram in Fig. 4 girder steel sealing off and covering anchorage district
The external application material plane figure in Fig. 5 girder steel sealing off and covering anchorage district
The external application material side figure in Fig. 6 girder steel sealing off and covering anchorage district
The external application material external application schematic diagram in Fig. 7 steel reinforced concrete combination beam sealing off and covering anchorage district
The external application material plane figure in Fig. 8 steel reinforced concrete combination beam sealing off and covering anchorage district
The external application material side figure in Fig. 9 steel reinforced concrete combination beam sealing off and covering anchorage district
In figure: 1-1-beams of concrete;1-2-external application material;1-3-prestressed strand anchorage point;2-1-girder steel;Outside 2-2- Patch material;2-3-prestressed strand anchorage point;3-1-steel reinforced concrete combination beam;3-2-external application material;3-3-prestressed strand anchors Position.
Detailed description of the invention
Embodiment one
One span is the concrete box girder of 32m, and during completing for use, sealing off and covering anchorage district is due to ice and snow, rainwater, corrosive medium Deng infiltration, the phenomenons such as anchor head burn into anchor lower prestress wire bundles rust occur.Application one external application material improves bridge sealing off and covering anchorage Beams of concrete sealing off and covering anchorage district is protected, as shown in Figure 1 by the method for district's durability.It is embodied as step:
Step 1 selects thickness to be 15mm according to the size in beams of concrete 1-1 sealing off and covering anchorage district, a length of 1.5m, width are The external application material 1-2 of 0.3m.External application material 1-2 is to be the flexible rectangular thin plate that main material processes by asphalt material, always Count 3 pieces, as shown in Figure 2 and Figure 3.
Cleared up, polish in surface, beams of concrete 1-1 sealing off and covering anchorage district by step 2, it is ensured that surface, beams of concrete 1-1 sealing off and covering anchorage district is put down Whole, clean, it is beneficial to the stickup of external application material 1-2.
Step 3 as base treatment agent, then uses flame to add at beams of concrete 1-1 sealing off and covering anchorage district external coating adhesive bitument primer Hot device, by the way of hot melt, will be affixed on outside external application material 1-2 on surface, beams of concrete 1-1 sealing off and covering anchorage district successively.
External application material 1-2 seam crossing is checked and processes by step 4, it is ensured that between external application material 1-2, external application material 1- It is completely embedded, firmly between 2 and beams of concrete 1-1 sealing off and covering anchorage district.
Pass through above step so that external application material is tightly outer is affixed on beams of concrete sealing off and covering anchorage district outer surface, ice and snow, rainwater, corruption Erosion medium etc. directly cannot contact with beams of concrete sealing off and covering anchorage district, thus improves the durability in beams of concrete sealing off and covering anchorage district.
Embodiment two
Certain girder steel prestressing force arranges the cloth bundle mode using external pre-stress bundle, carries out the anchoring of steel bundle in girder steel end. Anchor head and anchor lower prestress steel bundle can be had a negative impact by ice and snow, rainwater, corrosive medium etc., cause under anchor head burn into anchor pre- Stress wire bundles rust.Girder steel sealing off and covering anchorage district is protected by a kind of method applying external application material to improve bridge sealing off and covering anchorage district durability Protect, as shown in Figure 4.It is embodied as step:
Step 1 selects thickness to be 12mm according to the size of girder steel 2-1 anchorage zone, a length of 2m, width are 0.3m's External application material 2-2.External application material 2-2 is the flexible rectangular thin plate processed for main material with asphalt material, one side with Self-adhesion sizing material, amounts to 2 pieces, as shown in Figure 5, Figure 6.
Surface, girder steel 2-1 sealing off and covering anchorage district is cleared up and polishes by step 2, it is ensured that girder steel 2-1 sealing off and covering anchorage district dry tack free, whole Clean, it is beneficial to the stickup of external application material 2-2.
Step 3 tear off external application material 2-2 with from viscose material one side sealing coat, girder steel will be affixed on outside external application material 2-2 On surface, 2-1 sealing off and covering anchorage district.
External application material 2-2 seam crossing is checked and processes by sealing compound by step 4, it is ensured that external application material 2-2 it Between, be completely embedded, firmly between external application material 2-2 and girder steel 2-1 sealing off and covering anchorage district.
Pass through above step so that external application material is tightly outer to be affixed on surface, beams of concrete sealing off and covering anchorage district, ice and snow, rainwater, corruption Erosion medium etc. directly cannot contact with girder steel sealing off and covering anchorage district, be effectively guaranteed anchor head not by burn into anchor lower prestress reinforcing bar not by Corrosion, thus improve the durability in girder steel sealing off and covering anchorage district.
Embodiment three
It is 40m steel reinforced concrete combination beam sealing off and covering anchorage end in a span, due to the invading from sealing off and covering anchorage district of ice and snow, rainwater, corrosive medium etc. Enter, cause anchor head burn into anchor lower prestress wire bundles rust.A kind of external application material is applied to improve the side of bridge sealing off and covering anchorage district durability Sealing off and covering anchorage district is protected by method, as shown in Figure 7.It is embodied as step:
Step 1 selects thickness to be 12mm according to the size of steel reinforced concrete combination beam 3-1 anchorage zone, a length of 2m, width are The external application material 3-2 of 0.3m.External application material 3-2 is the flexible square processed for main material with asphalt material and elastomeric material Shape thin plate, one side, with self-adhesion sizing material, amounts to 3 pieces, as shown in Figure 8, Figure 9.
Cleared up, polish in surface, steel reinforced concrete combination beam 3-1 sealing off and covering anchorage district by step 2, it is ensured that steel reinforced concrete combination beam 3-1 sealing off and covering anchorage district table Face is dried, neatly, be beneficial to the stickup of external application material 3-2.
Step 3 tear off external application material 3-2 with from viscose material one side sealing coat, steel reinforced concrete will be affixed on outside external application material 3-2 On surface, combination beam 3-1 sealing off and covering anchorage district.
External application material 3-2 seam crossing is checked and processes by sealing compound by step 4, it is ensured that external application material 3-2 it Between, be completely embedded, firmly between external application material 3-2 and steel reinforced concrete combination beam 3-1 sealing off and covering anchorage district.
Pass through above step so that external application material is tightly outer to be affixed on surface, steel reinforced concrete combination beam sealing off and covering anchorage district, ice and snow, rainwater, Corrosive mediums etc. directly cannot contact with steel reinforced concrete combination beam sealing off and covering anchorage district, thus improves the durability in steel reinforced concrete combination beam sealing off and covering anchorage district.
Above-described specific implementation method, is illustrated purpose, technical scheme and the beneficial effect of this patent.Institute It is emphasized that the foregoing is only specific implementation of the patent example, can not be used for limiting the scope of this patent.All Within the spirit of this patent and principle, any amendment, equivalent or the improvement etc. made, should be included in the protection of this patent Within the scope of.
In sum, this patent provides a kind of method that external application material improves bridge sealing off and covering anchorage district durability, it is achieved that Protection and raising to bridge sealing off and covering anchorage district durability.This patent has novelty, practicality, meets patent requirements, therefore carries in accordance with the law Go out patent application.

Claims (2)

1. the method improving bridge sealing off and covering anchorage district durability with external application material, including beams of concrete (1-1), girder steel (2-1), steel Mixed combination beam (3-1), external application material (1-2), external application material (2-2), external application material (3-2);It is characterized in that: use external application material (1-2) surface, beams of concrete (1-1) sealing off and covering anchorage district it is affixed on outside;Or with being affixed on girder steel (2-1) sealing off and covering anchorage district table outside external application material (2-2) Face;Or with being affixed on surface, steel reinforced concrete combination beam (3-1) sealing off and covering anchorage district outside external application material (3-2);Bridge sealing off and covering anchorage is avoided by above measure District directly contacts with ice and snow, rainwater, corrosive medium etc., reaches to improve the purpose of bridge sealing off and covering anchorage district durability.
A kind of external application material the most according to claim 1 improves the method for bridge sealing off and covering anchorage district durability, it is characterised in that: External application material (1-2) can be the rectangular thin plate processed by material contracting with heat or elastomeric material or asphalt material, external application material (1-2) thickness D1=5mm~40mm, length H1=0.2m~10m, width B1=0.2m~10m;External application material (2-2) is permissible It is the rectangular thin plate processed by material contracting with heat or elastomeric material or asphalt material, the thickness D of external application material (2-2)2=5mm ~40mm, length H2=0.2m~10m, width B2=0.2m~10m;External application material (3-2) can be by material contracting with heat or rubber The rectangular thin plate that material or asphalt material process, the thickness D of external application material (3-2)3=5mm~40mm, length H3=0.2m ~10m, width B3=0.2m~10m.
CN201610642605.XA 2016-08-08 2016-08-08 A kind of external application material improves the method for bridge sealing off and covering anchorage district durability Pending CN106120575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610642605.XA CN106120575A (en) 2016-08-08 2016-08-08 A kind of external application material improves the method for bridge sealing off and covering anchorage district durability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610642605.XA CN106120575A (en) 2016-08-08 2016-08-08 A kind of external application material improves the method for bridge sealing off and covering anchorage district durability

Publications (1)

Publication Number Publication Date
CN106120575A true CN106120575A (en) 2016-11-16

Family

ID=57255945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610642605.XA Pending CN106120575A (en) 2016-08-08 2016-08-08 A kind of external application material improves the method for bridge sealing off and covering anchorage district durability

Country Status (1)

Country Link
CN (1) CN106120575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335165A (en) * 2020-03-04 2020-06-26 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05132964A (en) * 1991-07-17 1993-05-28 Kobe Steel Ltd Anti-corrosive treatment of marine concrete construction
DE10201800A1 (en) * 2002-01-17 2003-08-14 Helmut Oetinger Renovation method for concrete drain or sewer using corrosion resistant coating, comprises fixing anchors in concrete surface before applying coating material
CN203393616U (en) * 2013-08-07 2014-01-15 中铁十三局集团第五工程有限公司 Shrinkage-free cement mortar sealing anchor head applied to water conservancy box beam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05132964A (en) * 1991-07-17 1993-05-28 Kobe Steel Ltd Anti-corrosive treatment of marine concrete construction
DE10201800A1 (en) * 2002-01-17 2003-08-14 Helmut Oetinger Renovation method for concrete drain or sewer using corrosion resistant coating, comprises fixing anchors in concrete surface before applying coating material
CN203393616U (en) * 2013-08-07 2014-01-15 中铁十三局集团第五工程有限公司 Shrinkage-free cement mortar sealing anchor head applied to water conservancy box beam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牛斌: "铁路混凝土梁的体外预应力加固", 铁道建筑, pages 7 - 11 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335165A (en) * 2020-03-04 2020-06-26 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof
CN111335165B (en) * 2020-03-04 2021-11-16 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof

Similar Documents

Publication Publication Date Title
CN201459603U (en) Epoxy modified asphalt concrete steel bridge deck pavement structure
KR101105490B1 (en) The construction method of concrete surface's reinforce
CN106436777A (en) Subway station skin waterproof structure and construction method thereof
CN203782563U (en) Assembling type modified PU (Polyurethane) bridge deck pavement structure
CN106122612B (en) A kind of water-tight corrosion-proof construction method of power station pressure pipeline
CN106120575A (en) A kind of external application material improves the method for bridge sealing off and covering anchorage district durability
CN203808543U (en) Concrete column fast reinforcing FRP strengthening part
CN203960812U (en) Hydraulic concrete structure shrinkage joint embedded water stop band repair structure
CN206289521U (en) A kind of outer patch material construction for improving bridge sealing off and covering anchorage area durability
CN205476577U (en) Carbon cloth reinforced structure of concrete T roof beam
CN202293023U (en) Grouting and sealing cover of post-tensioned prestressing pipeline
CN106012873A (en) Rear pre-stress duct grouting cavity repairing technique
CN203373739U (en) Prestress centrifugal corrosion resistant hollow square pile
CN201254693Y (en) Guarding system for railway steel bridge deck
CN206268634U (en) A kind of power station pressure pipeline water-tight corrosion-proof structure
JP5727708B2 (en) Reinforced coating method for concrete structure surface, reinforced coating structure for concrete structure, and reinforced concrete structure
CN101551049A (en) A method for reinforcing overhead concrete pipeline
CN109811656A (en) A kind of making bilayer SMA pitch steel box girder bridge face waterproof and anticorrosion construction technology
CN203742001U (en) Waterproof and reinforcing structure based on high-toughness and high-strength epoxy resin
CN203361135U (en) Adapter protection structure of corrosion-resistant hollow square pile
CN208717756U (en) A kind of device reinforced for bridge pier drying and watering cycle area
CN204039864U (en) Concrete structure above a kind of gap be applied in bridge or road
CN206289520U (en) A kind of outer patch material construction for improving bridge durability
CN103334426A (en) Anti-corrosion hollow square pile end head connecting device
CN206553919U (en) A kind of highway bridge waterproof layer device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161116

WD01 Invention patent application deemed withdrawn after publication