CN106120510A - A kind of construction method slowing down hot-mixed bitumen pavement crack - Google Patents

A kind of construction method slowing down hot-mixed bitumen pavement crack Download PDF

Info

Publication number
CN106120510A
CN106120510A CN201610701543.5A CN201610701543A CN106120510A CN 106120510 A CN106120510 A CN 106120510A CN 201610701543 A CN201610701543 A CN 201610701543A CN 106120510 A CN106120510 A CN 106120510A
Authority
CN
China
Prior art keywords
asphalt
seam
construction method
joint filler
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610701543.5A
Other languages
Chinese (zh)
Other versions
CN106120510B (en
Inventor
邹进忠
范春华
吉永海
万路
张吉敏
何正学
张书林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI GUOCHUANG HI-TECH MATERIAL Co Ltd
Original Assignee
HUBEI GUOCHUANG HI-TECH MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI GUOCHUANG HI-TECH MATERIAL Co Ltd filed Critical HUBEI GUOCHUANG HI-TECH MATERIAL Co Ltd
Priority to CN201610701543.5A priority Critical patent/CN106120510B/en
Publication of CN106120510A publication Critical patent/CN106120510A/en
Application granted granted Critical
Publication of CN106120510B publication Critical patent/CN106120510B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints

Abstract

The invention provides a kind of construction method slowing down hot-mixed bitumen pavement crack, step includes: when the asphalt that paves carries out seam, first the afterbody at the asphalt that paves spreads one layer of fine aggregate, compacting, joint filler is bonded on fine aggregate, then completes seam at the joint filler another side asphalt that continues to pave.Described joint filler includes: modified pitch, compound rubber asphalt, polysulfide, polyurethane rubber and Compound rubber thereof, one or more in organic silicon rubber.The form of construction work using soft seam makes road surface have splendid high temperature performance and the ability of external force resistance deformation;The deformation of soft seam road pavement has well retinue property, can eliminate the seam of asphalt on microcosmic;Effectively slow down the generation of pavement crack, reduce road surface cost, the service life on prolongation road surface.

Description

A kind of construction method slowing down hot-mixed bitumen pavement crack
Technical field
The present invention relates to road engineering technical field, slow down executing of hot-mixed bitumen pavement crack particularly to a kind of Work method.
Background technology
Asphalt through thermoplastic elastomer modified mix with building stones build the road after, being heated has soft elasticity, catches a cold to have and mould Rigidity, so modified asphalt concrete is apparent for jointless construction unlike cement pavement construction.During practice of construction, due to temperature Degree difference and the existence of time difference, all seam on microcosmic.So the job specfication of bituminous paving requires: seam is tight, it is flat to connect Suitable;The longitudinal joint of levels should stagger 150mm (hot seam) or more than 300-400mm (cold joint), adjacent two width and levels Transverse joint all should misplace more than 1m (be all dislocation seam);The surface layer transverse joint of highway and Class I highway should use Vertical carvel joint, layers below can use the mitre that nature rolls, and also can make step-lap laminated when bitumen layer is thicker.Other etc. Each layer of level highway all can use mitre, as shown in Figure 1.
Conventional pitch concrete pavement construction belongs to the hard seam between compound and compound: divide hot seam and cold joint Seam, longitudinal joint and transverse joint.Temperature difference and time difference make seam have tiny vestige to follow, so the surface layer of highway is general Use construction continuously, ensure that road surface is uniform as far as possible;Even so, the change of the factor such as such as weather has to stop work and understand Produce chill seam.Municipal administration bituminous concrete pave night can not operation, laterally longitudinally all can have chill seam, if the most strictly pressing Construct according to specification, the most high-visible seam in length and breadth;Even if standard construction, bituminous paving is subject to for a long time To car load, temperature stress, ultraviolet irradiate, gradually produce various disease, including crack rut, loose, gather around bag, settle Deng.Wherein to run up to winter low temperature the most in addition easy to crack for bituminous paving internal stress, it may appear that permanent cracks.Crack is The disease that bituminous paving is most common, the most easily occurs and produces the earliest.The appearance in crack makes the seriality of bituminous paving impaired, impact Road-ability;Rainwater snow water can ooze under crack, and then it is steady to affect roadbed, causes bigger pavement damage to reduce Colophonium The service life on road surface.Can only, to extending the bituminous paving life-span, to carry out road surface and support by closure crack the most repeatedly at present Protect remedial measure.But casting glue quality is uneven, and crash rate is more than 85%.Thus increase maintenance work amount, increase Maintenance costs.How asphalt road surface, make pavement life with the ten of projected life years, 20 years the most Tong Bu, slow down road The generation of facial cleft seam, reduce maintenance of surface remedying is to reduce road surface cost, the key extending the service life on road surface.
Summary of the invention
In view of this, the invention provides a kind of construction method slowing down hot-mixed bitumen pavement crack, the method The internal stress of modified pitch road can be eliminated, effectively slow down the generation of pavement crack.
The invention provides a kind of construction method slowing down hot-mixed bitumen pavement crack, step includes: pave drip When blue or green compound carries out seam, first the afterbody at the asphalt that paves spreads one layer of fine aggregate, and compacting is bonding by joint filler On fine aggregate, then complete seam at the joint filler another side asphalt that continues to pave;Described joint filler includes: change Property Colophonium, compound rubber asphalt, polysulfide, polyurethane rubber and Compound rubber thereof, one or more in organic silicon rubber.
The invention has the beneficial effects as follows: asphalt end passes through fine aggregate filleting, fills up the pit of coarse aggregate, then leads to Crossing thin layer joint filler makes asphalt bank each other squeeze and bonding, it is achieved the soft seam of asphalt.Use soft The form of construction work of seam makes road surface have fabulous high temperature performance and the ability of external force resistance deformation, and the deformation of soft seam road pavement has Well retinue property, eliminates the internal stress of modified pitch road, can eliminate the seam of asphalt, effectively slow down road on microcosmic The generation of facial cleft seam, reduces road surface cost, the service life on prolongation road surface.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of laterally hard several pattern of seam, wherein, a be mitre, b be that stairstepping seam, c are for flushing Seam;
Fig. 2 is the schematic diagram of horizontal several pattern of soft seam, wherein, a be mitre, b be that stairstepping seam, c are for flushing Seam.
Detailed description of the invention
The invention provides a kind of construction method slowing down hot-mixed bitumen pavement crack, step includes: pave drip When blue or green compound carries out seam, first the afterbody at the asphalt that paves spreads one layer of fine aggregate, and compacting is bonding by joint filler On fine aggregate, then complete seam at the joint filler another side asphalt that continues to pave;Described joint filler includes: change Property Colophonium, compound rubber asphalt, polysulfide, polyurethane rubber and Compound rubber thereof, one or more in organic silicon rubber.
The form of construction work using soft seam makes road surface have fabulous high temperature performance and the ability of external force resistance deformation, soft seam Road pavement deformation has well retinue property, can select the joint filler of different qualities according to demand, compound rubber asphalt Cost performance is the highest;Belong to hot-working asphalt material.The modified pitch compound rubber asphalt cost that compares is to be exceeded 10-20 times;Also Belong to hot-working asphalt material.Organic silicon rubber is generation chemical reaction after monomer alkoxyl silicone mixes with firming agent, cross-linking agent, makes Component becomes the material of the self-molding of solid-state from liquid, has good ageing-resistant, a uvioresistant, good caking property, tough Property and ductility, expensive because of it, it is commonly used in the construction of airfield runway.Polysulfide, polyurethane rubber and compound rubber thereof Glue falls within room temperture rubber vulcanization, has excellent resistance to ultraviolet, resistance to fuel oil and resistance to weathering energy, has the pliable and tough spy of excellence Property, expensive because of it, it is commonly used in the construction of airfield runway.
Preferably, described fine aggregate nominal maximum aggregate size is less than or equal to 2.36mm, and the thickness of described joint filler is 2- 4mm.Soft seam caliper retinue's property of road pavement deformation when 2-4mm is optimal, is conducive to extending pavement life.
More preferably, bonding described joint filler after the 500-2000m asphalt that often paves, can effectively eliminate drip The internal stress of blue or green road, slows down the generation of pavement crack, extends the service life on road surface.
It is bonded on fine aggregate it is further preferred that joint filler is rolled at 120-160 DEG C.The asphalt of heat Pave before stopping, while hot fine aggregate being spread in section compacting, joint filler closely knit rolling on compound afterbody fine aggregate By closing, joint filler is made to be connected with bituminous paving tightr.
Preferably, described seam includes carvel joint, mitre, stairstepping seam.
Preferably, described modified pitch includes pouring in Colophonium, high-viscosity asphalt, high-elastic asphalt, high-ductility high-viscosity asphalt Plant or several.
Preferably, in one embodiment of the invention, described compound rubber asphalt proportioning is: by percentage to the quality, Asphalt 17%;Building asphalt 5%;Compatilizer 25%;SBS 4%;Natural rubber powder 25%;Epoxy resin 2%;Pulvis Talci 21.5%;Stabilizer 0.5%.
A kind of executing of hot-mixed bitumen pavement crack is slowed down below in conjunction with what the present invention was provided by specific embodiment Work method is further described.The embodiments described below is exemplary, be only used for explain the present invention, and it is not intended that Limitation of the present invention.
Experimental technique in following embodiment, if no special instructions, is conventional method.Reality used in following embodiment Test material if no special instructions, be market and be commercially available.
Embodiment 1
Present embodiments providing a kind of construction method slowing down hot-mixed bitumen pavement crack, its step includes: stand After paving hot-mix asphalt mixture 1000m, carry out seam: under conditions of paved asphalt temperature is 140 DEG C, at its tail Portion's section, uniformly spreads the fine aggregate that a thin layer nominal maximum aggregate size is 2.36mm, compacting, then joint filler rolling is bonded in On fine aggregate, forming soft seam, the thickness of bonding joint filler layer is 3mm, then continues stand at joint filler another side Black top compound completes soft seam, and the rest may be inferred, the 1000m asphalt that often paves, spread fine aggregate roll, bonding described in connect Seam material 3mm is until completing road surface, and described joint filler is high viscous high wurtzilite.
Though by the present embodiment construction method lay bituminous paving in use by car load, temperature stress, Ultraviolet irradiate, but do not occur crack rut, loose, gather around bag, sedimentation etc., effectively slow down the generation of permanent cracks.
Embodiment 2
Present embodiments providing a kind of construction method slowing down hot-mixed bitumen pavement crack, its step includes: stand After paving Warm-Mix Bitumen Mixture 500m, carry out seam: under conditions of paved asphalt temperature is 120 DEG C, at its tail Portion's section, uniformly spreads the fine aggregate that a thin layer nominal maximum aggregate size is 2.36mm, compacting, then joint filler rolling is bonded in On fine aggregate, forming soft seam, the thickness of bonding joint filler layer is 4mm, then continues stand at joint filler another side Black top compound completes soft seam, and the rest may be inferred, the 500m asphalt that often paves, spread fine aggregate roll, bonding described in connect Seam material 4mm is until completing road surface, and described joint filler is compound rubber asphalt.
Concrete, described compound rubber asphalt proportioning is as follows: by percentage to the quality, asphalt 17%;Building asphalt 5%;Compatilizer 25%;SBS 4%;Natural rubber powder 25%;Epoxy resin 2%;Pulvis Talci 21.5%;Stabilizer 0.5%.This reality Executing compatilizer described in example is furfural extract oil.
Though by the present embodiment construction method lay bituminous paving in use by car load, temperature stress, Ultraviolet irradiate, but do not occur crack rut, loose, gather around bag, sedimentation etc., effectively slow down the generation of permanent cracks.
Embodiment 3
Present embodiments providing a kind of construction method slowing down hot-mixed bitumen pavement crack, its step includes: stand After paving hot-mix asphalt mixture 2000m, carry out seam: under conditions of paved asphalt temperature is 160 DEG C, at its tail Portion's section, uniformly spreads the fine aggregate that a thin layer nominal maximum aggregate size is 1.18mm, compacting, then joint filler rolling is bonded in On fine aggregate, forming soft seam, the thickness of bonding joint filler layer is 2mm, then continues stand at joint filler another side Black top compound completes soft seam, and the rest may be inferred, the 2000m asphalt that often paves, spread fine aggregate roll, bonding described in connect Seam material 2mm is until completing road surface, and described joint filler is organic silicon rubber.
Though by the present embodiment construction method lay bituminous paving in use by car load, temperature stress, Ultraviolet irradiate, but do not occur crack rut, loose, gather around bag, sedimentation etc., effectively slow down the generation of permanent cracks.
Embodiment 4
Present embodiments providing a kind of construction method slowing down hot-mixed bitumen pavement crack, its step includes: stand After paving hot-mix asphalt mixture 1400m, carry out seam: under conditions of paved asphalt temperature is 150 DEG C, at its tail Portion's section, uniformly spreads the fine aggregate that a thin layer nominal maximum aggregate size is 2.36mm, compacting, then joint filler is bonded in thin collection Material above, forms soft seam, and the thickness of bonding joint filler layer is 3.5mm, then continues stand at joint filler another side Black top compound completes soft seam, and the rest may be inferred, the 1400m asphalt that often paves, spread fine aggregate roll, bonding described in connect Seam material 3.5mm is until completing road surface, and described joint filler is combined or bonding with high-elastic asphalt 2:1 for pouring Colophonium.
Though by the present embodiment construction method lay bituminous paving in use by car load, temperature stress, Ultraviolet irradiate, but do not occur crack rut, loose, gather around bag, sedimentation etc., effectively slow down the generation of permanent cracks.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (7)

1. the construction method slowing down hot-mixed bitumen pavement crack, it is characterised in that: step includes: the Colophonium that paves mixes When conjunction material carries out seam, first the afterbody at the asphalt that paves spreads one layer of fine aggregate, and joint filler is bonded in carefully by compacting On gathering materials, then complete seam at the joint filler another side asphalt that continues to pave;Described joint filler includes: modified drip Green grass or young crops, compound rubber asphalt, polysulfide, polyurethane rubber and Compound rubber thereof, one or more in organic silicon rubber.
Slow down the construction method in hot-mixed bitumen pavement crack the most as claimed in claim 1, it is characterised in that: described carefully The nominal maximum aggregate size that gathers materials is 2.36mm, and the thickness of described joint filler is 2-4mm.
Slow down the construction method in hot-mixed bitumen pavement crack the most as claimed in claim 2, it is characterised in that: often pave Bonding described joint filler after 500-2000m asphalt.
4. the construction method slowing down hot-mixed bitumen pavement crack described in claim 3, it is characterised in that: in 120- At 160 DEG C, joint filler is bonded on fine aggregate.
Slow down the construction method in hot-mixed bitumen pavement crack the most as claimed in claim 1, it is characterised in that connect described in: Seam includes carvel joint, mitre, stairstepping seam.
Slow down the construction method in hot-mixed bitumen pavement crack the most as claimed in claim 1, it is characterised in that change described in: Property Colophonium includes pouring one or more in Colophonium, high-viscosity asphalt, high-elastic asphalt, high-ductility high-viscosity asphalt.
Slow down the construction method in hot-mixed bitumen pavement crack the most as claimed in claim 1, it is characterised in that: described multiple Closing rubber asphalt proportioning is: by percentage to the quality, asphalt 17%;Building asphalt 5%;Compatilizer 25%;SBS 4%; Natural rubber powder 25%;Epoxy resin 2%;Pulvis Talci 21.5%;Stabilizer 0.5%.
CN201610701543.5A 2016-08-22 2016-08-22 A kind of construction method slowing down hot-mixed bitumen pavement crack Active CN106120510B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610701543.5A CN106120510B (en) 2016-08-22 2016-08-22 A kind of construction method slowing down hot-mixed bitumen pavement crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610701543.5A CN106120510B (en) 2016-08-22 2016-08-22 A kind of construction method slowing down hot-mixed bitumen pavement crack

Publications (2)

Publication Number Publication Date
CN106120510A true CN106120510A (en) 2016-11-16
CN106120510B CN106120510B (en) 2019-09-03

Family

ID=57279615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610701543.5A Active CN106120510B (en) 2016-08-22 2016-08-22 A kind of construction method slowing down hot-mixed bitumen pavement crack

Country Status (1)

Country Link
CN (1) CN106120510B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142810A (en) * 2017-05-23 2017-09-08 济南汇通联合市政工程有限责任公司 A kind of high-viscosity bitumen modifier asphalt paving construction method
CN115368061A (en) * 2022-07-12 2022-11-22 天津鑫路桥建设工程有限公司 Cold-joint continuous paving asphalt, production process and paving process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146206A (en) * 1992-11-13 1994-05-27 Takeo Inaba Pavement body of bridge face and continuous pavement construction method of bridge face
CN101831186A (en) * 2010-04-20 2010-09-15 上海大学 Road surface crack sealing and mending tape and preparation and construction process thereof
CN102121222A (en) * 2011-01-06 2011-07-13 耿志军 Method for treating seams between cement concrete pavement and asphalt concrete pavement and between asphalt concrete pavements
CN103334368A (en) * 2013-06-17 2013-10-02 中铁四局集团有限公司 Longitudinal cold joint construction method for large-area asphalt pavement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146206A (en) * 1992-11-13 1994-05-27 Takeo Inaba Pavement body of bridge face and continuous pavement construction method of bridge face
CN101831186A (en) * 2010-04-20 2010-09-15 上海大学 Road surface crack sealing and mending tape and preparation and construction process thereof
CN102121222A (en) * 2011-01-06 2011-07-13 耿志军 Method for treating seams between cement concrete pavement and asphalt concrete pavement and between asphalt concrete pavements
CN103334368A (en) * 2013-06-17 2013-10-02 中铁四局集团有限公司 Longitudinal cold joint construction method for large-area asphalt pavement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142810A (en) * 2017-05-23 2017-09-08 济南汇通联合市政工程有限责任公司 A kind of high-viscosity bitumen modifier asphalt paving construction method
CN115368061A (en) * 2022-07-12 2022-11-22 天津鑫路桥建设工程有限公司 Cold-joint continuous paving asphalt, production process and paving process

Also Published As

Publication number Publication date
CN106120510B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN104652217A (en) Modified emulsified asphalt fiber synchronous pavement surface dressing construction method
CN102704366A (en) High-performance rubberized asphalt composite seal coat and construction method thereof
CN207749370U (en) A kind of novel railway sub-grade surface structure
CN103215875A (en) Differential-settlement-based anti-fatigue asphalt pavement
CN110499692A (en) One kind pouring into formula composite pavement construction method
CN207259961U (en) A kind of Reflection Cracking type heavy traffic drainage pavement paving structure
CN106336545A (en) Hot mixed asphalt mixture seam plaster for alleviating pavement cracks and preparation method thereof
Zhao et al. A summary of cold patch material for asphalt pavements
CN106120510A (en) A kind of construction method slowing down hot-mixed bitumen pavement crack
CN204224946U (en) A kind of composite type heat mixes heat paving ultrathin overlay paving structure
CN103334365B (en) The paving structure of a kind of fast quick-recovery road surface and bridge floor function and paving method
CN108360327A (en) A kind of permanent seal cooling advanced composite material (ACM) road structure and construction method
Hanson Construction and performance of an ultrathin bonded hot-mix asphalt wearing course
CN205115945U (en) Double -deck synchronous surface dressing stress absorption structure
CN108301276A (en) A kind of long-life tencel concrete road surface structure and construction method
CN105040544B (en) Large Longitudinal Slope section anti-rutting asphalt pavement structure
CN202323706U (en) Repair structure for epoxy asphalt pavement pit slot
CN103225249B (en) Pour into the method that formula repairs the shallow craterlet of bituminous epoxy Steel Bridge Deck
CN103321121B (en) A kind of Perpetual Pavements Structural based on uniform settlement
CN202509361U (en) High-performance rubber asphalt composite seal coat
CN108978388A (en) A kind of anti-passage salt tolerant erosion composite block material tube panel of assembled and construction technology
CN104926202A (en) bituminous mixture
CN203360966U (en) Pavement structure capable of quickly recovering road and bridge surface functions
CN102433836A (en) Composite material for repairing epoxy asphalt paved pothole and preparation method thereof
CN104480826A (en) Asphalt pavement with waterproof stress layer and construction method and application of asphalt pavement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method to slow down cracks of hot mix asphalt pavement

Effective date of registration: 20210623

Granted publication date: 20190903

Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd.

Pledgor: HUBEI GUOCHUANG HI-TECH MATERIAL Co.,Ltd.

Registration number: Y2021420000044

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220623

Granted publication date: 20190903

Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd.

Pledgor: HUBEI GUOCHUANG HI-TECH MATERIAL Co.,Ltd.

Registration number: Y2021420000044

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method to slow down cracks in hot mix asphalt pavement

Effective date of registration: 20220628

Granted publication date: 20190903

Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd.

Pledgor: HUBEI GUOCHUANG HI-TECH MATERIAL Co.,Ltd.

Registration number: Y2022420000198

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230629

Granted publication date: 20190903

Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd.

Pledgor: HUBEI GUOCHUANG HI-TECH MATERIAL Co.,Ltd.

Registration number: Y2022420000198

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Construction Method for Reducing Cracks in Hot Mix Asphalt Mixture Pavement

Effective date of registration: 20230630

Granted publication date: 20190903

Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd.

Pledgor: HUBEI GUOCHUANG HI-TECH MATERIAL Co.,Ltd.

Registration number: Y2023420000283