CN106112599B - It is a kind of can precise perpendicularity installation frock clamp - Google Patents

It is a kind of can precise perpendicularity installation frock clamp Download PDF

Info

Publication number
CN106112599B
CN106112599B CN201610665094.3A CN201610665094A CN106112599B CN 106112599 B CN106112599 B CN 106112599B CN 201610665094 A CN201610665094 A CN 201610665094A CN 106112599 B CN106112599 B CN 106112599B
Authority
CN
China
Prior art keywords
mounting disc
fixing axle
substrate
axial direction
erecting bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610665094.3A
Other languages
Chinese (zh)
Other versions
CN106112599A (en
Inventor
王德年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jingyan Technology Development Co ltd
Original Assignee
Jingyan (dongguan) Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingyan (dongguan) Science And Technology Development Co Ltd filed Critical Jingyan (dongguan) Science And Technology Development Co Ltd
Priority to CN201610665094.3A priority Critical patent/CN106112599B/en
Publication of CN106112599A publication Critical patent/CN106112599A/en
Application granted granted Critical
Publication of CN106112599B publication Critical patent/CN106112599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/02Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
    • B23Q3/06Work-clamping means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jigs For Machine Tools (AREA)

Abstract

The present invention relates to it is a kind of can precise perpendicularity installation frock clamp, including substrate, it is provided with fixing axle in the middle part of the left end of the substrate, fixing axle side wall is evenly arranged with four L-type pillars in the axial direction, four L-type pillars are evenly arranged in fixing axle surrounding, so that four L-type pillars are uniform to the support force of fixing axle, the bottom end of every L-type pillar is both provided with mounting disc, mounting disc is uniformly arranged in the axial direction there are four location hole, four location holes are evenly distributed on the surrounding of mounting disc, corresponding mounting disc is tightly locked on existing vertical operation panel by screw by four equally distributed location holes, and corresponding mounting disc uniform force, by four mounting disc uniform stressed performances on four L-type pillars so that substrate uniform force.The installation function of high right angle setting precision may be implemented in the present invention, and without manually often reprocessing, without manually reinstalling, processing element precision is higher, and work efficiency is high.

Description

It is a kind of can precise perpendicularity installation frock clamp
Technical field
The present invention relates to tooling and fixture technical field, specifically it is a kind of can precise perpendicularity installation frock clamp.
Background technology
Frock clamp usually requires higher installation accuracy when mounted, wherein installation accuracy include be horizontally mounted precision and Right angle setting precision etc., when existing frock clamp carries out right angle setting after processing, stress when due to installation is not Uniformly often cause the relatively low situation of right angle setting precision to occur, is processed in the process to directly result in frock clamp use The low situation of precision, it is therefore desirable to often reprocess or reinstall, working efficiency is low.
Invention content
To solve the above-mentioned problems, the present invention provides it is a kind of can precise perpendicularity installation frock clamp, can solve existing There is frock clamp in right angle setting since discontinuity leads to the lower problem of right angle setting precision, may be implemented high vertical The installation function of installation accuracy, without manually often reprocessing, without manually reinstalling, processing element precision is higher, work effect Rate is high.
To achieve the goals above, the present invention is realized using following technical scheme:It is a kind of can precise perpendicularity installation work The left end middle part of clamps, including substrate, the substrate is provided with fixing axle, and fixing axle side wall is evenly arranged in the axial direction Four L-type pillars, four L-type pillars are evenly arranged in fixing axle surrounding, so that support of four L-type pillars to fixing axle Power is uniform, and the bottom end of every L-type pillar is both provided with mounting disc, and mounting disc is uniformly arranged in the axial direction there are four location hole, Four location holes are evenly distributed on the surrounding of mounting disc, will corresponding mounting disc by screw by four equally distributed location holes It is tightly locked on existing vertical operation panel, and corresponding mounting disc uniform force, passes through four installations on four L-type pillars Disk uniform stressed performance is so that substrate uniform force;It is welded with support shaft, the right side of support shaft in the middle part of the right end of the substrate End is provided with erecting bed, and support shaft plays the role of supporting in the middle part of erecting bed, there are four erecting bed is uniformly arranged in the axial direction Mounting hole, for stablizing the part processed needed for installation on four mounting holes being uniformly arranged, the left end of erecting bed is along axis side To being evenly arranged with four positioning columns, and the left side of positioning column and the left side of mounting disc are in the same plane, and four fixed Position column left end is uniformly resisted against on existing vertical operation panel, since four positioning columns are evenly arranged in erecting bed surrounding, four The effect of positioning column even support erecting bed surrounding reaches this by way of substrate uniform force, erecting bed uniform stressed Invent higher right angle setting precision.
As a preferred technical solution of the present invention, the positioning column be Z-type structure, and four positioning columns with four pacify Dress forms interlaced distribution mode between hole, and interlaced distribution mode makes erecting bed can be always during mounting post Uniform force is kept, right angle setting precision is enhanced.
As a preferred technical solution of the present invention, the left end of the positioning column is located at the surface of corresponding L-type pillar, Since positioning column left end is all tightly abutted against with the mounting disc left end of corresponding L-type pillar on existing vertical operation panel, positioning column Support effect can be improved by being located at same orientation with corresponding L-type pillar, and when installation is more uniformly stressed.
When work, corresponding mounting disc is tightly locked at by screw by four equally distributed location holes first existing On vertical operation panel, and corresponding mounting disc uniform force, pass through four mounting disc uniform stressed performances on four L-type pillars So that substrate uniform force;Four positioning columns are also stood tightly against while mounting disc is mounted on existing vertical operation panel On existing vertical operation panel, since four positioning columns are evenly arranged in erecting bed surrounding, four positioning column even support peaces The effect for filling platform surrounding reaches the higher vertical peace of the present invention by way of substrate uniform force, erecting bed uniform stressed Precision is filled, solves existing frock clamp in right angle setting since discontinuity leads to the lower difficulty of right angle setting precision Topic, without manually often reprocessing, without manually reinstalling, processing element precision is higher, and work efficiency is high.
The beneficial effects of the invention are as follows:Compared with prior art, the present invention solves existing frock clamp in right angle setting Since discontinuity leads to the lower problem of right angle setting precision, the installation function of high right angle setting precision is realized, is not necessarily to It manually often reprocesses, without manually reinstalling, processing element precision is higher, and work efficiency is high.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the full sectional view of the present invention;
Fig. 3 is the right view of the present invention.
Specific implementation mode
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, tie below Conjunction is specifically illustrating, and the present invention is further explained.
As shown in Figure 1, Figure 2, Figure 3 shows, it is a kind of can precise perpendicularity installation frock clamp, including substrate 1, the substrate 1 It is provided with fixing axle 2 in the middle part of left end, 2 side wall of fixing axle is evenly arranged with four L-type pillars 3, four L-type pillars in the axial direction 3 are evenly arranged in 2 surrounding of fixing axle, so that four L-type pillars 3 are uniform to the support force of fixing axle 2, every L-type pillar 3 Bottom end be both provided with mounting disc 4, mounting disc 4 is uniformly arranged in the axial direction there are four location hole, and four location holes uniformly divide Cloth mounting disc 4 surrounding, by four equally distributed location holes by screw will corresponding mounting disc 4 be tightly locked at it is existing On vertical operation panel, and 4 uniform force of corresponding mounting disc, pass through four 4 uniform stresseds of mounting disc on four L-type pillars It can be so that 1 uniform force of substrate;It is welded with support shaft 5 in the middle part of the right end of the substrate 1, the right end of support shaft 5 is provided with Erecting bed 6, support shaft 5 play the role of supporting the middle part of erecting bed 6, and erecting bed 6 is uniformly arranged that there are four installations in the axial direction Hole, for stablizing the part processed needed for installation on four mounting holes being uniformly arranged, the left end of erecting bed 6 is equal in the axial direction It is even to be provided with four positioning columns 7, and the left side of positioning column 7 and the left side of mounting disc 4 are in the same plane, four positioning 7 left end of column is uniformly resisted against on existing vertical operation panel, since four positioning columns 7 are evenly arranged in 6 surrounding of erecting bed, four The effect of 7 even support erecting bed of positioning column, 6 surrounding is reached by way of 1 uniform force of substrate, 6 uniform stressed of erecting bed To the higher right angle setting precision of the present invention.
The positioning column 7 is Z-type structure, and forms interlaced distribution between four positioning columns 7 and four mounting holes Mode, interlaced distribution mode make erecting bed 6 that can remain uniform force during mounting post, enhance vertical peace Fill precision.
The left end of the positioning column 7 is located at the surface of corresponding L-type pillar 3, due to 7 left end of positioning column and corresponding L-type branch 4 left end of mounting disc of column 3 is all tightly abutted against on existing vertical operation panel, and positioning column 7 is located at same with corresponding L-type pillar 3 Orientation can improve support effect, and when installation is more uniformly stressed.
When work, corresponding mounting disc 4 is tightly locked at by screw by four equally distributed location holes first existing Have on vertical operation panel, and 4 uniform force of corresponding mounting disc, passes through four 4 uniform stresseds of mounting disc on four L-type pillars Performance is so that 1 uniform force of substrate;Four positioning columns 7 while mounting disc 4 is mounted on existing vertical operation panel It is tightly abutted against on existing vertical operation panel, since four positioning columns 7 are evenly arranged in 6 surrounding of erecting bed, four positioning columns 7 The effect of 6 surrounding of even support erecting bed reaches the present invention by way of 1 uniform force of substrate, 6 uniform stressed of erecting bed Higher right angle setting precision solves existing frock clamp in right angle setting since discontinuity causes right angle setting smart Lower problem is spent, without manually often reprocessing, without manually reinstalling, processing element precision is higher, and work efficiency is high, reaches Purpose is arrived.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the description in above embodiments and description only illustrates the present invention Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these change and change Into all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent It defines.

Claims (1)

1. it is a kind of can precise perpendicularity installation frock clamp, it is characterised in that:Including substrate (1), in the left end of the substrate (1) Portion is provided with fixing axle (2), and fixing axle (2) side wall is evenly arranged with four L-type pillars (3), every L-type pillar in the axial direction (3) bottom end is both provided with mounting disc (4), and the mounting disc (4) is circle, and mounting disc (4) is evenly arranged in the axial direction Four location holes;It is welded with support shaft (5) in the middle part of the right end of the substrate (1), the right end of support shaft (5) is provided with erecting bed (6), the erecting bed (6) is circle, and erecting bed (6) is uniformly arranged in the axial direction there are four mounting hole, a left side for erecting bed (6) End is evenly arranged with four positioning columns (7), and the left side position of the left side of positioning column (7) and mounting disc (4) in the axial direction In on same plane;The positioning column (7) is Z-type structure, and is formed between four positioning columns (7) and four mounting holes and mutually handed over Wrong distribution mode;The left end of the positioning column (7) is located at the surface of corresponding L-type pillar (3).
CN201610665094.3A 2016-08-12 2016-08-12 It is a kind of can precise perpendicularity installation frock clamp Active CN106112599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610665094.3A CN106112599B (en) 2016-08-12 2016-08-12 It is a kind of can precise perpendicularity installation frock clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610665094.3A CN106112599B (en) 2016-08-12 2016-08-12 It is a kind of can precise perpendicularity installation frock clamp

Publications (2)

Publication Number Publication Date
CN106112599A CN106112599A (en) 2016-11-16
CN106112599B true CN106112599B (en) 2018-09-21

Family

ID=57258050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610665094.3A Active CN106112599B (en) 2016-08-12 2016-08-12 It is a kind of can precise perpendicularity installation frock clamp

Country Status (1)

Country Link
CN (1) CN106112599B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103639761A (en) * 2013-11-28 2014-03-19 无锡市航鹄科技有限公司 High-efficiency drilling location device
CN203779165U (en) * 2014-04-15 2014-08-20 广东文灿压铸有限公司 Clamp structure
CN203993252U (en) * 2014-07-21 2014-12-10 中船动力有限公司 Diesel engine cylinder cover slant hole drilling frock
CN204195301U (en) * 2014-09-05 2015-03-11 天津市汇晶丰精密机械有限公司 Cylinder cover slant hole secondary process frock
CN205927951U (en) * 2016-08-12 2017-02-08 岳西县恒意机械有限公司 Frock clamp that can accurate perpendicular installation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4163096B2 (en) * 2003-11-27 2008-10-08 富士重工業株式会社 Wing girder assembly jig

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103639761A (en) * 2013-11-28 2014-03-19 无锡市航鹄科技有限公司 High-efficiency drilling location device
CN203779165U (en) * 2014-04-15 2014-08-20 广东文灿压铸有限公司 Clamp structure
CN203993252U (en) * 2014-07-21 2014-12-10 中船动力有限公司 Diesel engine cylinder cover slant hole drilling frock
CN204195301U (en) * 2014-09-05 2015-03-11 天津市汇晶丰精密机械有限公司 Cylinder cover slant hole secondary process frock
CN205927951U (en) * 2016-08-12 2017-02-08 岳西县恒意机械有限公司 Frock clamp that can accurate perpendicular installation

Also Published As

Publication number Publication date
CN106112599A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN109318010A (en) Fixed cell, fixed device and process equipment based on magnetorheological fluid
CN106112599B (en) It is a kind of can precise perpendicularity installation frock clamp
CN205927951U (en) Frock clamp that can accurate perpendicular installation
CN217551114U (en) High-chromium cast iron composite roll manufacturing device suitable for centrifugal casting
CN103231363A (en) Operational type table-surface parallel robot
CN106078254B (en) A kind of frock clamp that can be accurately installed on inclined-plane
CN205437872U (en) Control rod car adds clamping apparatus
CN104139267A (en) Welding tooling for load switch or breaker casing assembly
CN203570648U (en) Center-adjustable bearing body structure
CN106041572B (en) It is a kind of can accurate degree installation frock clamp
CN106078567B (en) A kind of frock clamp carrying out accurate movement
CN207858355U (en) A kind of big end cap clamping tool of automobile
CN205927952U (en) Frock clamp that can accurate horizontal installation
CN105729183A (en) Loading and clamping clamp for bearing processing
CN218534275U (en) Clamp stable in clamping
CN108098010B (en) Vertical hole drilling device of swash plate for bridge construction
CN102274996B (en) Multi-angle drilling jig
CN106271740B (en) The processing tool and processing method of rudder
CN220020865U (en) Coil winding structure of high-voltage transformer
CN220278791U (en) A installation dismounting device for chip production facility manipulator bearing
CN210857949U (en) Novel external protection scaffold for building
CN203843992U (en) Aluminum mold embedded part fixed mounting mechanism
CN104175138B (en) The frock of the processing oblique installing hole of thrust block
CN217621209U (en) Connecting structure of template and movable pedestal
CN218946714U (en) Partition plate for automobile welding heavy-load double-sided rotary table

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180806

Address after: 523000 F, Chang Shi Science and Technology Park, 56 Li Fa Xing FA Road, Wu Sha community, Changan Town, Dongguan, Guangdong

Applicant after: GIAN (DONGGUAN) TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 246001 Anhui Anqing Yuexi County, Yunnan Province, Yun Yun Township Village (County Economic Development Zone)

Applicant before: YUEXI HENGYI MACHINERY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 516000 Floor 1-9, Unit 1, Building 1, Zone D, Qunyi Intelligent Manufacturing Industrial Park, South of Sanhe Avenue, Tonghu Town, Zhongkai High-tech Zone, Huizhou City, Guangdong Province

Patentee after: Guangdong Jingyan Technology Development Co.,Ltd.

Address before: 523000 F, Chang Shi Science and Technology Park, 56 Li Fa Xing FA Road, Wu Sha community, Changan Town, Dongguan, Guangdong

Patentee before: GIAN (DONGGUAN) TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP03 Change of name, title or address