CN106112518A - Pipeline increases valve or the installation method of equipment online and installs accessory - Google Patents

Pipeline increases valve or the installation method of equipment online and installs accessory Download PDF

Info

Publication number
CN106112518A
CN106112518A CN201610692034.0A CN201610692034A CN106112518A CN 106112518 A CN106112518 A CN 106112518A CN 201610692034 A CN201610692034 A CN 201610692034A CN 106112518 A CN106112518 A CN 106112518A
Authority
CN
China
Prior art keywords
tee
blind plate
valve
bell jar
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610692034.0A
Other languages
Chinese (zh)
Inventor
朱国财
朱培贤
王彪
李锴
高云龙
谢卫红
刘康
黄益华
龙伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Decolo (wuxi) Fluid Control Co Ltd
Original Assignee
Decolo (wuxi) Fluid Control Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decolo (wuxi) Fluid Control Co Ltd filed Critical Decolo (wuxi) Fluid Control Co Ltd
Priority to CN201610692034.0A priority Critical patent/CN106112518A/en
Publication of CN106112518A publication Critical patent/CN106112518A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/002Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units stationary whilst being composed

Abstract

The present invention relates to a kind of pipeline increase valve or the installation method of equipment online and install accessory, feature is, including procedure below: four tee Ts are divided into upper and lower two parts to be wrapped in outside pipeline by (1), and weld;(2) flap type is installed on the top of tee T;(3) closed rig is installed at four tee Ts, and holes at the conduit positions that tee T lumen is corresponding;(4) bypass duct is installed on the flap type at the first, the 4th tee T;(5) installing stopper valve module at second, third tee T, and use plug valve assembly to be isolated by the pipeline at second, third tee T;(6) installation targets valve at the pipeline between second, third tee T;(7) remove the plug valve assembly at second, third tee T, change blind plate assembly to close the lumen of second, third tee T;(8) bell jar body and flap type are removed.The present invention can quickly increase valve or other equipment, does not affect medium supply.

Description

Pipeline increases valve or the installation method of equipment online and installs accessory
Technical field
The present invention relates to a kind of pipeline increase valve or the installation method of equipment online and accessory is installed, belong to pipeline construction Equipment technical field.
Background technology
When industrial pipeline needs to increase valve, the pipeline of operation generally requires and quits work, and causes downstream user to be stopped simultaneously Only run, cause unnecessary loss to system user.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of pipeline increases valve or equipment online Installation method and install accessory, can quickly increase valve or other equipment, not affect medium supply.
The technical scheme provided according to the present invention, a kind of pipeline increases the installation method of valve or equipment online, and feature is, Including following workflow:
(1) welding tee pipe:
First tee T, the second tee T, the 3rd tee T and the 4th tee T are divided into up and down along supervisor's longitudinal center line Tee T top and tee T bottom, be wrapped in outside pipeline respectively by tee T top and tee T bottom, with pipeline respectively Welding;After installing, the first tee T, the second tee T are positioned at the left side of pipeline valve location to be increased, the 3rd tee T, 4th tee T is positioned at the right side of pipeline valve location to be increased;
(2) flap type is installed:
It is respectively mounted flap type at the upper flange of the first tee T, the second tee T, the 3rd tee T and the 4th tee T, Install flap type to remain off;
(3) closed rig is installed at four tee Ts, and at the conduit positions that the lumen of four tee Ts is corresponding Hole;
(4) bypass duct is installed:
After closing flap type, it is respectively welded installation shunt valve in the upper flat plate valve upper surface of the first tee T and the 4th tee T Road;
(5) installing stopper valve module at the second tee T and the 3rd tee T, and use plug valve assembly by the second tee T and Pipeline at three tee Ts is isolated;
(6) installation targets valve or equipment:
After completing the operation of step (5), cut the pipeline between the second tee T, the 3rd tee T, installation targets valve or set Standby;Now the flap type at the first tee T and the 4th tee T is opened;
(7) remove the plug valve assembly at the second tee T and the 3rd tee T, change blind plate assembly, use blind plate module enclosure the Two tee Ts and the lumen of the 3rd tee T;
(8) bell jar body and flap type are removed:
After blind plate puts in place, remove the bell jar body at the first tee T, the second tee T, the 3rd tee T, the 4th tee T and Flap type, completes construction.
Further, described closed rig is installed on the valve flange upper surface of flap type, and closed boring sets Standby drilling rod, boring dish, sealed packing and the seal for pipe joints plug including being arranged in bell jar body, the lower surface of bell jar body is passed through Sealing ring and flange bolt nut are installed on the valve flange upper surface of flap type, and drilling rod is stretched into bell jar by the top of bell jar body Body interior, sets sealed packing between drilling rod and bell jar body, the bottom of drilling rod arranges boring dish, and the upper end of drilling rod is that power is defeated Enter end.
Further, the process that described closed rig carries out holing is: rotate after drilling rod input power, band Dynamic boring wire rod quality rotates, and outside pipeline, tee T lumen corresponding position carries out perforate, after perforate completes, exits boring dish extremely In bell jar chamber body, turn off flap type;So operation, completes the boring at four tee Ts.
Further, described plug valve assembly includes being arranged in bell jar body seal for pipe joints plug, sealed packing, sealing Circle, push rod, rotating shaft and piston body, push rod is stretched into bell jar body interior by the top of bell jar body, between push rod and bell jar body Arranging seal for pipe joints plug and sealed packing, the lower end of push rod connects piston body by rotating shaft, and sealing ring is installed in the outside of piston body, The bottom peace roller of piston body, arranges stopper slot, keeps the directional-rotation of piston body in the lower rotary shaft side of push rod.
Further, the concrete operations of described step (5) are: bypass duct construction after, open the first tee T and Flap type at 4th tee T, allows medium pass through from bypass duct;Close the flat board at the second tee T and the 3rd tee T After valve, take closed rig, installing stopper valve module apart;After installing stopper valve module, open the second tee T the 3rd tee T The flap type at place, piston body is entered the bottom of pipeline, by the bottom guide effect of roller, makes by push rod from bell jar chamber body Piston body slides to left side or right side automatically, and the rotational angle of piston body is limited by push rod lower limit groove, sealing ring and pipeline After contact internal walls, it is achieved the closing isolation of pipeline internal medium;Piston body at second tee T slides to upstream side, the 3rd tee T The piston body at place slides to downstream.
Further, described blind plate assembly includes being arranged in bell jar body body blind plate, blind plate push rod, blind plate sealing Circle, sealed packing and seal for pipe joints plug, blind plate push rod is stretched into bell jar body interior, blind plate push rod and clock by the top of bell jar body Arranging seal for pipe joints plug and sealed packing between cover body, the lower end of blind plate push rod uses screw thread to be connected with blind plate, at blind plate Outside arranges blind plate sealing circle.
Further, the concrete steps of described step (7): after target valve or equipment install, will be lived by push rod Cock body returns bell jar body interior, closes the flap type at the second tee T, the 3rd tee T;Then by plug valve assembly from flat board After on valve, side flange disintegrates, changing plug valve assembly is blind plate assembly;By the bell jar body of blind plate assembly by sealing gasket and bolt Nut is installed on end face of flange on the upside of flap type, opens lower flat plate valve, by blind plate push rod, blind plate is advanced tee T Lumen, after blind plate puts in place, rotates blind plate push rod, makes blind plate push rod disintegrate with blind plate;Blind plate at second tee T is installed and is put in place After, carry out the blind plate installation of the 3rd tee T position, finally carry out the construction at the first tee T, the 4th tee T Time.
Further, during described step (7) construction, after closing the flap type at the first tee T, the 4th three-way valve, remove Bypass duct.
Further, after described step (8) removes bell jar body and flap type, at the upper flange of each tee T Sealing gasket and lumen flange are installed, tight a bolt and nut.
A kind of pipeline increases the installation accessory of valve online, and feature is: include bell jar body, installing drill in bell jar body Aperture member, plug valve structure or blind plate structure;
Described boring assemblies includes drilling rod, boring dish, sealed packing and seal for pipe joints plug, and the lower surface of bell jar body is by sealing Circle and flange bolt nut are installed on the valve flange upper surface of flap type, and drilling rod is stretched into bell jar body by the top of bell jar body Inside, sets sealed packing between drilling rod and bell jar body, the bottom of drilling rod arranges boring dish, and the upper end of drilling rod is power input End;
Described plug valve structure includes seal for pipe joints plug, sealed packing, sealing ring, push rod, rotating shaft and piston body, and push rod is by bell jar originally Bell jar body interior is stretched on the top of body, arranges seal for pipe joints plug and sealed packing, under push rod between push rod and bell jar body Holding and connect piston body by rotating shaft, sealing ring is installed in the outside of piston body, the bottom peace roller of piston body, turns in the bottom of push rod Axle side arranges stopper slot, keeps the directional-rotation of piston body;
Described blind plate structure includes blind plate, blind plate push rod, blind plate sealing circle, sealed packing and seal for pipe joints plug, blind plate push rod by Bell jar body interior is stretched on the top of bell jar body, arranges seal for pipe joints plug and seal disc between blind plate push rod and bell jar body Root, the lower end of blind plate push rod uses screw thread to be connected with blind plate, arranges blind plate sealing circle in the outside of blind plate.
Pipeline of the present invention increase online valve installation method and install accessory, can quickly increase valve or other Equipment, does not affect medium supply.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of welding tee pipe on pipeline.
Fig. 2 is the schematic diagram installing flap type at tee T upper flange.
Fig. 3 is the schematic diagram using closed rig that pipeline carries out at three through hole lumens perforate.
Fig. 4 is the schematic diagram installing bypass duct.
Fig. 5 is the schematic diagram of installing stopper valve module in two tee Ts in inner side.
Fig. 6 is to cut open middle part pipeline installation targets valve or the schematic diagram of equipment.
Fig. 7 is to remove plug valve assembly to be replaced by the schematic diagram of blind plate assembly.
Fig. 8 is to remove bell jar accessory and the schematic diagram of flap type.
Fig. 9 is to install lumen flange and the schematic diagram of sealing gasket.
Label in figure: during tee T A, B, C, D, aperture a, boring cutting area b, tee T top 1, tee T are responsible for axially Heart line 2, tee T bottom 3, flap type 4, handwheel 5, flashboard 6, boring dish 7, bell jar body 8, sealed packing 9, drilling rod 10, rotating shaft 11, roller 12, piston body 13, sealing ring 14, seal for pipe joints plug 15, push rod 16, stopper slot 17, blind plate push rod 18, blind plate 19, blind Plate sealing ring 20, nut 21, bolt 22, lumen flange 23, sealing gasket 24, pipeline 25, bypass duct 26, target valve or equipment 27。
Detailed description of the invention
Below in conjunction with concrete accompanying drawing, the invention will be further described.
Pipeline of the present invention increases the installation method of valve or equipment online, including following workflow:
(1) welding tee pipe:
As it is shown in figure 1, by four tee Ts A, B, C, D, the supervisor's longitudinal center line about 2 along tee T is divided on tee T Portion 1 and tee T bottom 3, be installed on pipeline 25 by tee T top 1 and tee T bottom 3 and design position, be wrapped in pipe respectively Outside road 25, it is respectively welded with pipeline 25;After installing, tee T A, B are positioned at the left side of pipeline 25 valve location to be increased, Tee T C, D are positioned at the right side of pipeline 25 valve location to be increased.
(2) flap type is installed:
As in figure 2 it is shown, be respectively mounted flap type 4 at the upper flange of tee T A, B, C, D, install flap type 4 and keep Closed mode, waits hole to be drilled;Described flap type 4 can be opened flashboard 6 by handwheel 5 and realize opening and closing.
(3) closed rig is installed:
As it is shown on figure 3, described closed rig is installed on the valve flange upper surface of flap type 4, closed rig Including the drilling rod 10 being arranged in bell jar body 8, boring dish 7, sealed packing 9, seal for pipe joints plug 15 etc., bell jar body 8 times End face is installed on the valve flange upper surface of flap type 4 by sealing ring and flange bolt nut, and drilling rod 10 is by bell jar body 8 It is internal that bell jar body 8 is stretched on top, sets sealed packing 9 and seal for pipe joints plug 15 between drilling rod 10 and bell jar body 8, drilling rod 10 Bottom arranges boring dish 7, and the upper end of drilling rod 10 is power intake, can connect motor or reductor equal power device;
Automatically rotate after drilling rod 10 input power, drive boring dish 7 milling cutter to rotate, tee T lumen correspondence portion outside pipeline 25 Position carries out perforate, after perforate completes, exits boring dish 7(drilling rod 10 top and is provided with aperture a, realize carrying of drilling rod 10 by aperture a Rise and exit) in bell jar body 8 inner chamber, turn off flap type 4, prevent medium from leaking;So operation, is respectively completed four threeways Boring at pipe;In Fig. 3, shadow region b is boring cutting area.
(4) bypass duct is installed:
As shown in Figure 4, after closing flap type 4, it is respectively welded installation shunt valve in upper flat plate valve 4 upper surface of tee T A and D Road 26.
(5) installing stopper valve module:
After bypass duct 26 construction, open the flap type 4 at tee T A and D, allow medium pass through from bypass duct 26;Inspection Look into after confirming to close the flap type 4 at tee T B and C, take the boring dish 7 within closed rig apart, be replaced by plug valve Assembly.As it is shown in figure 5, plug valve assembly include being arranged in bell jar body 8 seal for pipe joints plug 15, sealed packing 9, sealing ring 14, push rod 16, rotating shaft 11 and piston body 13, it is internal that push rod 16 is stretched into bell jar body 8 by the top of bell jar body 8, push rod 16 with Arranging seal for pipe joints plug 15 and sealed packing 9 between bell jar body 8, the lower end of push rod 16 connects piston body 13 by rotating shaft 11, Sealing ring 14 is installed in the outside of piston body 13, the bottom peace roller 12 of piston body 13, sets in lower rotary shaft 11 side of push rod 16 Put stopper slot 17, keep the directional-rotation of piston body 13;
When starting to construct, opening the flap type 4 at tee T B, C, piston body 13 is entered from bell jar body 8 inner chamber by push rod 16 The bottom of pipeline 25, due to the bottom guide effect of roller 12, piston body 13 slides to left side automatically (herein for upstream to break away Dynamic), the rotational angle of piston body 13 is limited by push rod 16 lower limit groove 17, and therefore piston body 13 can be accurately positioned, close After the contact internal walls of seal 14 and pipeline 25, it is possible to achieve the closing isolation of medium in pipeline 25;With the most contrary, tee T C The plug valve installation direction at place, for pushing downstream to, mainly prevents medium from flowing backwards.
(6) installation targets valve or equipment:
As shown in Figure 6, the plug valve assembly at tee T B, C is installed after putting in place, and cutting pipeline 25 between tee T B, C is installed Target valve or equipment 27;Now guaranteeing that the flap type 4 of bypass duct 26 is opened, plug valve is correctly closed and is put in place.Consider before cutting Media type and middle part residual stress, as poisonous and harmful medium, it is contemplated that before construction, install small-sized pressure release drain valve in advance.
(7) plug valve assembly is removed, replacing blind plate assembly:
After target valve or equipment 27 install, by push rod 16, piston body 13 is return bell jar body 8 inside, close threeway Flap type 4 at pipe B, C;Then by plug valve assembly on flap type 4 side flange disintegrate after, change plug valve assembly be blind plate group Part;As it is shown in fig. 7, described blind plate assembly include being arranged in bell jar body 8 blind plate 19, blind plate push rod 18, blind plate sealing circle 20, sealed packing 9 and seal for pipe joints plug 15, it is internal that blind plate push rod 18 is stretched into bell jar body 8 by the top of bell jar body 8, blind plate Arranging seal for pipe joints plug 15 and sealed packing 9 between push rod 18 and bell jar body 8, the lower end of blind plate push rod 18 uses screw thread with blind Plate 19 connects, it is simple to blind plate 19 disintegrates after putting in place, and the centrally disposed female thread in blind plate 19 upper surface, outside blind plate push rod 18 lower end is arranged Screw thread, rotates blind plate push rod 18 and can realize the disintegration of blind plate 19 and blind plate push rod 18;In the outside of described blind plate 19, blind plate is set Sealing ring 20, realizes the sealing between blind plate 19 and tee T lumen sidewall after compression.
During Specific construction, after having assembled blind plate push rod 18 and blind plate 19, by bell jar body 8 by sealing gasket and bolt spiral shell Mother is installed on end face of flange on the upside of flap type 4, opens lower flat plate valve 4, by blind plate push rod 18, blind plate 19 is advanced tee T Lumen, after putting in place, rotate blind plate push rod 18, make blind plate push rod 18 disintegrate with blind plate 19.Blind plate 19 at tee T B is installed to After Wei, carry out blind plate 19 installation at tee T location of C;When finally carrying out the construction at tee T A, D, during construction, note After meaning closes the flap type 4 at tee T A, D, remove bypass duct 26.
(8) bell jar accessory and flap type are removed:
As shown in Figure 8, after blind plate 19 puts in place, remove the bell jar accessory at three-way valve A, B, C, D and flap type.Consider safe because of Element, can install sealing gasket 24 and lumen flange 23 after the dismounting of each position flap type immediately, and tight a bolt 22 nut 21(such as Fig. 9 Shown in).
(9) completion detection:
Construction terminates, and in detection everywhere, whether at flange seal and commissure leaks.
The operation principle of the present invention is: pipeline upstream and downstream installs four tee Ts altogether, be respectively used to outside bypass interface and Inner side isolation closed interface.Each tee T cuts apart into upper and lower two halves from channel middle, facilitates and welds envelope after duct wraps Close;Tee T lumen flange installs flat board isolating valve, for isolating isolation and the replacing instrument of construction accessory and medium.Flap type Top installation bell shape accessory, accessory possesses boring, installs plug valve and exit plug valve, the function of installation blind plate.Flap type After opening, above-mentioned boring, plug valve is installed and exits plug valve, the operation such as blind plate is installed implements step by step.Complete closedown respectively of constructing is put down Plate valve, it is ensured that medium does not leaks.Change instrument simultaneously, complete each operation.Final flap type and the bell shape accessory removed, installation three Logical flange, completes construction.

Claims (10)

1. pipeline increases an installation method for valve or equipment online, it is characterized in that, including following workflow:
(1) welding tee pipe:
By the first tee T (A), the second tee T (B), the 3rd tee T (C) and the 4th tee T (D) along supervisor's axial centre Line is divided into tee T top (1) and tee T bottom (3) up and down, tee T top (1) and tee T bottom (3) is wrapped respectively It is rolled in pipeline (25) outside, is respectively welded with pipeline (25);After installing, the first tee T (A), the second tee T (B) position In the left side of pipeline (25) valve location to be increased, the 3rd tee T (C), that the 4th tee T (D) is positioned at pipeline (25) is to be increased The right side of valve location;
(2) flap type is installed:
Upper flange at the first tee T (A), the second tee T (B), the 3rd tee T (C) and the 4th tee T (D) is punished Flap type (4) is not installed, installs flap type (4) and remain off;
(3) closed rig is installed at four tee Ts, and in pipeline (25) position corresponding to the lumen of four tee Ts The place of putting holes;
(4) bypass duct is installed:
After closing flap type (4), weld respectively in upper flat plate valve (4) upper surface of the first tee T (A) and the 4th tee T (D) Connect installation bypass duct (26);
(5) at the second tee T (B) and the 3rd tee T (C) place installing stopper valve module, and use plug valve assembly by the second threeway The pipeline (25) at pipe (B) and the 3rd tee T (C) place is isolated;
(6) installation targets valve or equipment:
After completing the operation of step (5), cut the pipeline (25) between the second tee T (B), the 3rd tee T (C), mesh is installed Mark valve or equipment (27);Now the flap type (4) at the first tee T (A) and the 4th tee T (D) place is opened;
(7) remove the second tee T (B) and the plug valve assembly at the 3rd tee T (C) place, change blind plate assembly, use blind plate assembly Close the second tee T (B) and the lumen of the 3rd tee T (C);
(8) bell jar body and flap type are removed:
After blind plate (19) puts in place, remove the first tee T (A), the second tee T (B), the 3rd tee T (C), the 4th tee T (D) the bell jar body at place and flap type, completes construction.
2. pipeline as claimed in claim 1 increases the installation method of valve or equipment online, it is characterized in that: described closed brill Hole equipment is installed on the valve flange upper surface of flap type (4), and closed rig includes being arranged in bell jar body (8) Drilling rod (10), boring dish (7), sealed packing (9) and seal for pipe joints plug (15), sealing ring is passed through in the lower surface of bell jar body (8) With the valve flange upper surface that flange bolt nut is installed on flap type (4), drilling rod (10) is stretched into by the top of bell jar body (8) Bell jar body (8) is internal, sets sealed packing (9) between drilling rod (10) and bell jar body (8), and the bottom of drilling rod (10) arranges boring Dish (7), the upper end of drilling rod (10) is power intake.
3. pipeline as claimed in claim 2 increases the installation method of valve or equipment online, it is characterized in that: described closed brill The process that hole equipment carries out holing is: rotate after drilling rod (10) input power, drives boring dish (7) milling cutter to rotate, at pipe Outside, road (25) tee T lumen corresponding position carries out perforate, after perforate completes, exits boring dish (7) interior to bell jar body (8) In chamber, turn off flap type (4);So operation, completes the boring at four tee Ts.
4. pipeline as claimed in claim 1 increases the installation method of valve or equipment online, it is characterized in that: described plug valve assembly Including the seal for pipe joints plug (15) being arranged in bell jar body (8), sealed packing (9), sealing ring (14), push rod (16), rotating shaft (11) and piston body (13), it is internal that push rod (16) is stretched into bell jar body (8) by the top of bell jar body (8), push rod (16) and clock Arranging seal for pipe joints plug (15) and sealed packing (9) between cover body (8), the lower end of push rod (16) is connected by rotating shaft (11) lives Cock body (13), outside installation sealing ring (14) of piston body (13), bottom peace roller (12) of piston body (13), in push rod (16) Lower rotary shaft (11) side stopper slot (17) is set, keep the directional-rotation of piston body (13).
5. pipeline as claimed in claim 4 increases the installation method of valve or equipment online, it is characterized in that: described step (5) Concrete operations be: bypass duct (26) construction after, open the first tee T (A) and the flat board at the 4th tee T (D) place Valve (4), allows medium pass through from bypass duct (26);Close the second tee T (B) and the flap type (4) at the 3rd tee T (C) place After, take closed rig, installing stopper valve module apart;After installing stopper valve module, open the second tee T (B) the 3rd tee T (C) flap type (4) at place, piston body (13) enters the bottom of pipeline (25) by push rod (16) from bell jar body (8) inner chamber, by The bottom guide effect of roller (12), make piston body (13) automatically slide to left side or right side, the rotational angle of piston body (13) by Push rod (16) lower limit groove (17) limits, after the contact internal walls of sealing ring (14) and pipeline (25), it is achieved be situated between in pipeline (25) The closing isolation of matter;The piston body (13) at the second tee T (B) place slides to upstream side, the piston body at the 3rd tee T (C) place (13) downstream is slided to.
6. pipeline as claimed in claim 1 increases the installation method of valve or equipment online, it is characterized in that: described blind plate assembly Including the blind plate (19) being arranged in bell jar body (8) body, blind plate push rod (18), blind plate sealing circle (20), sealed packing (9) With seal for pipe joints plug (15), it is internal that blind plate push rod (18) is stretched into bell jar body (8) by the top of bell jar body (8), blind plate push rod (18) and arrange seal for pipe joints plug (15) and sealed packing (9) between bell jar body (8), the lower end of blind plate push rod (18) uses spiral shell Stricture of vagina is connected with blind plate (19), arranges blind plate sealing circle (20) in the outside of blind plate (19).
7. pipeline as claimed in claim 6 increases the installation method of valve or equipment online, it is characterized in that: described step (7) Concrete steps: after target valve or equipment (27) install, by push rod (16), piston body (13) is return bell jar body (8) internal, close the second tee T (B), the flap type (4) at the 3rd tee T (C) place;Then by plug valve assembly from flap type (4), after upper side flange disintegrates, changing plug valve assembly is blind plate assembly;By the bell jar body (8) of blind plate assembly by sealing gasket and Bolt and nut is installed on flap type (4) upside end face of flange, opens lower flat plate valve (4), by blind plate push rod (18) by blind plate (19) advance the lumen of tee T, after blind plate (19) puts in place, rotate blind plate push rod (18), make blind plate push rod (18) and blind plate (19) disintegrate;The blind plate (19) at the second tee T (B) place is installed after putting in place, carries out the blind plate of the 3rd tee T (C) position (19) installation, when finally carrying out the construction at the first tee T (A), the 4th tee T (D) place.
8. pipeline as claimed in claim 1 increases the installation method of valve or equipment online, it is characterized in that: described step (7) During construction, after closing the flap type (4) at the first tee T (A), the 4th three-way valve (D) place, remove bypass duct (26).
9. pipeline as claimed in claim 1 increases the installation method of valve or equipment online, it is characterized in that: in described step (8), after removing bell jar body and flap type, sealing gasket (24) and lumen flange are installed at the upper flange of each tee T (23), tight a bolt (22) and nut (21).
10. pipeline increases an installation accessory for valve or equipment online, it is characterized in that: include bell jar body (8), at bell jar originally Installing drill aperture member, plug valve structure or blind plate structure in body (8);
Described boring assemblies includes drilling rod (10), boring dish (7), sealed packing (9) and seal for pipe joints plug (15), bell jar body (8) lower surface is installed on the valve flange upper surface of flap type (4) by sealing ring and flange bolt nut, drilling rod (10) by It is internal that bell jar body (8) is stretched on the top of bell jar body (8), sets sealed packing (9) between drilling rod (10) and bell jar body (8), The bottom of drilling rod (10) arranges boring dish (7), and the upper end of drilling rod (10) is power intake;
Described plug valve structure include seal for pipe joints plug (15), sealed packing (9), sealing ring (14), push rod (16), rotating shaft (11) and Piston body (13), it is internal that push rod (16) is stretched into bell jar body (8) by the top of bell jar body (8), push rod (16) and bell jar body (8) arranging seal for pipe joints plug (15) and sealed packing (9) between, the lower end of push rod (16) connects piston body by rotating shaft (11) (13), sealing ring (14) is installed in the outside of piston body (13), and bottom peace roller (12) of piston body (13), under push rod (16) Portion's rotating shaft (11) side arranges stopper slot (17), keeps the directional-rotation of piston body (13);
Described blind plate structure includes that blind plate (19), blind plate push rod (18), blind plate sealing circle (20), sealed packing (9) and pipeline are close Blocking (15), it is internal that blind plate push rod (18) is stretched into bell jar body (8) by the top of bell jar body (8), blind plate push rod (18) and clock Arranging seal for pipe joints plug (15) and sealed packing (9) between cover body (8), the lower end of blind plate push rod (18) uses screw thread and blind plate (19) connect, blind plate sealing circle (20) is set in the outside of blind plate (19).
CN201610692034.0A 2016-08-18 2016-08-18 Pipeline increases valve or the installation method of equipment online and installs accessory Pending CN106112518A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610692034.0A CN106112518A (en) 2016-08-18 2016-08-18 Pipeline increases valve or the installation method of equipment online and installs accessory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610692034.0A CN106112518A (en) 2016-08-18 2016-08-18 Pipeline increases valve or the installation method of equipment online and installs accessory

Publications (1)

Publication Number Publication Date
CN106112518A true CN106112518A (en) 2016-11-16

Family

ID=57278732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610692034.0A Pending CN106112518A (en) 2016-08-18 2016-08-18 Pipeline increases valve or the installation method of equipment online and installs accessory

Country Status (1)

Country Link
CN (1) CN106112518A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001235088A (en) * 2000-02-22 2001-08-31 Osaka Gas Co Ltd Gas interrupting construction method
CN201455346U (en) * 2009-05-04 2010-05-12 沈阳工业大学 Novel non-stop transporting electrical tapping machine with voltage
CN101876389A (en) * 2009-10-15 2010-11-03 上海煤气第一管线工程有限公司 Bag-type blockage non-stop construction technique for fuel gas cast iron pipe and its special clip tee joint
CN201988759U (en) * 2011-02-09 2011-09-28 歌山建设集团有限公司 Non-stop pipeline tapping machine
CN103016893A (en) * 2011-09-21 2013-04-03 中国建筑第七工程局有限公司 Hot tapping plugging construction method of long natural gas delivery pipeline
CN103629470A (en) * 2013-12-12 2014-03-12 上海海长骄机电工程有限公司 Pipeline nonstop-transmission holing and plugging system and process method thereof
CN103775736A (en) * 2014-01-15 2014-05-07 天津大学 Plugging device for no stoppage of transmission of underwater oil transmission pipelines under pressure and hole- forming plugging device
CN103912758B (en) * 2014-04-22 2016-01-27 钊田 A kind of on-line production expansion duct closing type device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001235088A (en) * 2000-02-22 2001-08-31 Osaka Gas Co Ltd Gas interrupting construction method
CN201455346U (en) * 2009-05-04 2010-05-12 沈阳工业大学 Novel non-stop transporting electrical tapping machine with voltage
CN101876389A (en) * 2009-10-15 2010-11-03 上海煤气第一管线工程有限公司 Bag-type blockage non-stop construction technique for fuel gas cast iron pipe and its special clip tee joint
CN201988759U (en) * 2011-02-09 2011-09-28 歌山建设集团有限公司 Non-stop pipeline tapping machine
CN103016893A (en) * 2011-09-21 2013-04-03 中国建筑第七工程局有限公司 Hot tapping plugging construction method of long natural gas delivery pipeline
CN103629470A (en) * 2013-12-12 2014-03-12 上海海长骄机电工程有限公司 Pipeline nonstop-transmission holing and plugging system and process method thereof
CN103775736A (en) * 2014-01-15 2014-05-07 天津大学 Plugging device for no stoppage of transmission of underwater oil transmission pipelines under pressure and hole- forming plugging device
CN103912758B (en) * 2014-04-22 2016-01-27 钊田 A kind of on-line production expansion duct closing type device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵彦刚: "大口径油气管道带压不停输开孔机的开发研究", 《中国优秀硕士学位论文全文数据库》 *

Similar Documents

Publication Publication Date Title
KR101403700B1 (en) Knife stopping water valve
CN203750282U (en) Water purifying plant capable of automatically cutting off raw water and clean water
JP6829792B2 (en) Uninterrupted flow method and equipment
CN206230053U (en) Punching device under pressure
CN106112518A (en) Pipeline increases valve or the installation method of equipment online and installs accessory
CN101260960A (en) Natural gas filter
JP4733501B2 (en) Fluid equipment installation device
CN109798384B (en) Valve body of polyethylene ball valve
CN205968161U (en) Pipeline increases installation of valve or equipment on line and assists utensil
JP5183234B2 (en) Water control body installation device
CN203395497U (en) Saddle type bypass leakage-proof device capable of drilling in presence of gas
CN212004473U (en) Filtering ball valve
CN203236100U (en) Argon conveying protection device of manual argon tungsten-arc welding
CN102466056A (en) Ball valve
JP4642522B2 (en) Infinite water control body installation device for existing fluid pipes
CN202629149U (en) Ball valve
CN205282107U (en) Detecting system seal tightness test end cap is revealed to reactor upper portion subassembly
CN220361746U (en) Pipeline dredging device of circulating water pressure transmitter
CN204784980U (en) Magnetic drive ne -leakage valve
CN203940174U (en) The high pressure perforator with built-in hydraulic fluid chamber
CN103423501B (en) Gas safety valve
CN211649094U (en) Waterproof sealing butterfly valve
CN213117527U (en) Pneumatic butt-clamping soft sealing butterfly valve
CN220600458U (en) Electric ventilation butterfly valve
CN203743447U (en) Stop valve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116