CN106112413A - The preparation technology of bolt - Google Patents

The preparation technology of bolt Download PDF

Info

Publication number
CN106112413A
CN106112413A CN201610718467.9A CN201610718467A CN106112413A CN 106112413 A CN106112413 A CN 106112413A CN 201610718467 A CN201610718467 A CN 201610718467A CN 106112413 A CN106112413 A CN 106112413A
Authority
CN
China
Prior art keywords
bolt
bar material
temperature
furnace
preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610718467.9A
Other languages
Chinese (zh)
Inventor
胡伦波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO JINDING FASTENERS CO Ltd
Original Assignee
NINGBO JINDING FASTENERS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO JINDING FASTENERS CO Ltd filed Critical NINGBO JINDING FASTENERS CO Ltd
Priority to CN201610718467.9A priority Critical patent/CN106112413A/en
Publication of CN106112413A publication Critical patent/CN106112413A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention discloses the preparation technology of bolt, it is characterised in that include following step: 1) casting bar material;2) the bar material after casting does pickling processes;3) according to the line footpath requirement of bolt, to bar material, it takes out line, so that described bar material is retracted to the line footpath needed for bolt;4) cold-forging forming: the shaping of bolt head uses cold-heading plastic working;5) screw thread process: bolt thread processing uses cold working, makes the threaded blank in the range of certain diameter by thread rolling plate, filament plate pressure makes screw forming;6) surface processes.The production efficiency of bolt of the present invention is greatly improved, and the scrappage of bolt is significantly reduced, and the surface strength of bolt is also greatly improved.

Description

The preparation technology of bolt
Technical field
The present invention relates to fastener areas, more specifically, relate to the preparation technology of bolt.
Background technology
Bolt, be can't do without when neutralizing in the middle of commercial production manufacture at daily life, and bolt is also referred to as the rice of industry. The utilization of visible bolt is extensively.The operation strategies of bolt has: electronic product, engineering goods, digital product, power equipment, machine Electromechanical product.Boats and ships, vehicle, hydraulic engineering, even chemical experiment are also used bolt.Anyway it is that super many places are the most useful Arrive bolt.The special precision bolt used above such as digital product.DVD, it is miniature that photographing unit, glasses, clock and watch, electronics etc. use Bolt;The general bolt of TV, electric product, musical instrument, furniture etc.;Large-sized bolt, spiral shell is then used as engineering, building, bridge Cap;Traffic tool, aircraft, electric car, automobile etc. then sized by bolt using.Vital task industrially born by bolt, a strategic point There is industry on ball, then the function of bolt is the most important.
In prior art generally there is bolt production efficiency lowly in the preparation technology of bolt, the defect that defect rate is high.
Summary of the invention
For the deficiencies in the prior art, the invention provides the preparation technology of bolt.
The present invention is achieved through the following technical solutions: the preparation technology of bolt, it is characterised in that includes following Step:
1) casting bar material;
2) the bar material after casting does pickling processes;
3) according to the line footpath requirement of bolt, to bar material, it takes out line, so that described bar material is retracted to the line footpath needed for bolt;
4) cold-forging forming: the shaping of bolt head uses cold-heading plastic working;
5) screw thread process: bolt thread processing uses cold working, makes the threaded blank in the range of certain diameter pass through thread rolling plate, Screw forming is made by filament plate pressure;
6) surface processes: bolt a) is put into preheating furnace and preheats 4 ~ 6 hours, preheating furnace furnace temperature 500-750 DEG C;B) by step a Bolt be placed in the salt bath furnace of 700-720 DEG C insulation within 3 ~ 5 hours, quench;C) by the bolt in step b in temperature it is It is tempered under conditions of 190-220 DEG C, then insulation 30-50 minute;D) little at the tempering furnace inside holding 10 ~ 12 of 350 ~ 400 DEG C again Time after, air cooling is to room temperature;E) bolt in step d is carried out surface granosealing.
In technique scheme, in described step 6), preheating time is 5 hours, and preheating temperature is 600 DEG C.
In technique scheme, the salt bath furnace of described step 6) salt temperature be 710 DEG C, temperature retention time is 4 hours.
There is advantages that the production efficiency of bolt of the present invention is greatly improved, and the scrappage of bolt Being significantly reduced, the surface strength of bolt is also greatly improved.
Detailed description of the invention
Below the present invention is described in further detail: the preparation technology of bolt, it is characterised in that include following step Rapid:
1) casting bar material;
2) the bar material after casting does pickling processes;
3) according to the line footpath requirement of bolt, to bar material, it takes out line, so that described bar material is retracted to the line footpath needed for bolt;
4) cold-forging forming: the shaping of bolt head uses cold-heading plastic working;
5) screw thread process: bolt thread processing uses cold working, makes the threaded blank in the range of certain diameter pass through thread rolling plate, Screw forming is made by filament plate pressure;
6) surface processes: bolt a) is put into preheating furnace and preheats 4 ~ 6 hours, preheating furnace furnace temperature 500-750 DEG C;B) by step a Bolt be placed in the salt bath furnace of 700-720 DEG C insulation within 3 ~ 5 hours, quench;C) by the bolt in step b in temperature it is It is tempered under conditions of 190-220 DEG C, then insulation 30-50 minute;D) little at the tempering furnace inside holding 10 ~ 12 of 350 ~ 400 DEG C again Time after, air cooling is to room temperature;E) bolt in step d is carried out surface granosealing.
In described step 6), preheating time is 5 hours, and preheating temperature is 600 DEG C.
The salt bath furnace of described step 6) salt temperature be 710 DEG C, temperature retention time is 4 hours.

Claims (3)

1. the preparation technology of bolt, it is characterised in that include following step:
1) casting bar material;
2) the bar material after casting does pickling processes;
3) according to the line footpath requirement of bolt, to bar material, it takes out line, so that described bar material is retracted to the line footpath needed for bolt;
4) cold-forging forming: the shaping of bolt head uses cold-heading plastic working;
5) screw thread process: bolt thread processing uses cold working, makes the threaded blank in the range of certain diameter pass through thread rolling plate, Screw forming is made by filament plate pressure;
6) surface processes: bolt a) is put into preheating furnace and preheats 4 ~ 6 hours, preheating furnace furnace temperature 500-750 DEG C;B) by step a Bolt be placed in the salt bath furnace of 700-720 DEG C insulation within 3 ~ 5 hours, quench;C) by the bolt in step b in temperature it is It is tempered under conditions of 190-220 DEG C, then insulation 30-50 minute;D) little at the tempering furnace inside holding 10 ~ 12 of 350 ~ 400 DEG C again Time after, air cooling is to room temperature;E) bolt in step d is carried out surface granosealing.
Bolt Technology for Heating Processing the most according to claim 1, it is characterised in that in described step 6), preheating time is 5 little Time, preheating temperature is 600 DEG C.
Bolt Technology for Heating Processing the most according to claim 1, it is characterised in that: the salt bath furnace of described step 6) salt bath Temperature is 710 DEG C, and temperature retention time is 4 hours.
CN201610718467.9A 2016-08-25 2016-08-25 The preparation technology of bolt Pending CN106112413A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610718467.9A CN106112413A (en) 2016-08-25 2016-08-25 The preparation technology of bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610718467.9A CN106112413A (en) 2016-08-25 2016-08-25 The preparation technology of bolt

Publications (1)

Publication Number Publication Date
CN106112413A true CN106112413A (en) 2016-11-16

Family

ID=57275041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610718467.9A Pending CN106112413A (en) 2016-08-25 2016-08-25 The preparation technology of bolt

Country Status (1)

Country Link
CN (1) CN106112413A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544186A (en) * 2018-03-28 2018-09-18 徐州东鑫铸造有限公司 A kind of screw production technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544186A (en) * 2018-03-28 2018-09-18 徐州东鑫铸造有限公司 A kind of screw production technology

Similar Documents

Publication Publication Date Title
CN101890618B (en) Processing method of high-strength bolts
CN101549449B (en) Processing technology for high-strength large hexagon head bolt used for steel structure
CN103009011B (en) Processing method for stainless steel high-strength bolt
CN107695631A (en) A kind of processing and forming technology of screw
CN104152919A (en) Technology for manufacturing bolt
CN104625617B (en) A kind of high-strength bolt production technology
CN105112624A (en) Heat treatment process of steel forgings
CN107345290B (en) A kind of manufacturing method of TC4 titanium alloy thin wall ring
CN104259770A (en) Bolt machining process
CN104227358A (en) Production technology for nut special for commercial vehicle
CN111363893A (en) Manufacturing process of ultrahigh-strength fastener
CN104308459A (en) Nut processing process
CN103231217A (en) Production method of bolts
CN107716840B (en) Production process of ring forging
CN106112413A (en) The preparation technology of bolt
CN102248370B (en) Method for producing precise linear guide slide seat for machining center
CN110340617A (en) A kind of anti-corrosion and high strength hex bolts production technology
CN107414012A (en) A kind of cold-heading molding technique of big hexagon head bolt
CN104313258B (en) A kind of spanner quenching method
CN101972794B (en) Manufacture technology of High-strength non-magnetic thick-wall titanium alloy seamless tube
CN111014539A (en) Method for matching conductivity of aluminum alloy forging with longitudinal yield strength
CN105880925A (en) Outer hexagonal bolt machining process
CN107598484A (en) A kind of rust resistance and corrosion resistance Elements of Space Grid Truss bolt processing technic featuring
CN104625604A (en) Production technology of extremely flat nuts
CN107363481A (en) A kind of cold-heading molding technique of rack bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161116