CN106101207A - Harvester control method and device - Google Patents

Harvester control method and device Download PDF

Info

Publication number
CN106101207A
CN106101207A CN201610398432.1A CN201610398432A CN106101207A CN 106101207 A CN106101207 A CN 106101207A CN 201610398432 A CN201610398432 A CN 201610398432A CN 106101207 A CN106101207 A CN 106101207A
Authority
CN
China
Prior art keywords
acquisition
harvester
acquisition target
time
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610398432.1A
Other languages
Chinese (zh)
Other versions
CN106101207B (en
Inventor
考明军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Neusoft Corp
Original Assignee
Neusoft Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neusoft Corp filed Critical Neusoft Corp
Priority to CN201610398432.1A priority Critical patent/CN106101207B/en
Publication of CN106101207A publication Critical patent/CN106101207A/en
Application granted granted Critical
Publication of CN106101207B publication Critical patent/CN106101207B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Radar Systems Or Details Thereof (AREA)

Abstract

The invention discloses a kind of harvester control method and device.nullThe method includes: when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target,Record each acquisition target respectively and complete the time needed for acquisition process,The time needed for acquisition process is completed according to each acquisition target,Will be unable to complete the acquisition target of acquisition process in current collection period,It is reassigned to the enough acquisition targets of capacity remaining time and completes the harvester of acquisition process,In completing the collection period after redistributing,Multiple harvesters are acquired processing according to the acquisition target redistributed,Thus using the time capacity of harvester as acquisition capacity,Required time is gathered as the consumption to acquisition capacity using acquisition target is completed,Acquisition target is dynamically assigned to the harvester that acquisition capacity is enough,Equalize the collection pressure of each harvester,Achieve the purpose avoiding harvester acquisition capacity not enough.

Description

Harvester control method and device
Technical field
The present invention relates to data processing field, in particular it relates to a kind of harvester control method and device.
Background technology
Harvester, is according to monitoring needs, acquisition target carries out the instrument of data acquisition corresponding with acquisition index.Its In, acquisition target can be data base, middleware, etc..
At present, generally use trunking mode that acquisition target is carried out data acquisition.When building harvester cluster, for each Harvester sets connected acquisition target.Each harvester carries out data acquisition to respective acquisition target respectively.
But, fixing acquisition target is set for harvester, the problem that harvester acquisition capacity is not enough easily occurs.
Summary of the invention
It is an object of the invention to provide a kind of harvester control method and device, to realize equalizing the collection pressure of each harvester Power, it is to avoid the problem that harvester acquisition capacity is not enough.
In one aspect of the embodiment of the present invention, it is provided that a kind of harvester control method.The method includes: adopt multiple When storage carries out the acquisition process of current collection period to respective acquisition target, record each acquisition target respectively and complete to gather Time needed for process, wherein, the collection period of the plurality of harvester is identical;Acquisition process is completed according to each acquisition target The required time, will be unable to complete the acquisition target of acquisition process in current collection period, be reassigned to hold remaining time Measure the most described acquisition target and complete the harvester of acquisition process, wherein, described remaining time capacity equal to the harvester cycle with The acquisition target having distributed to described harvester completes the difference of the time needed for acquisition process;Completing adopting after redistributing In the collection cycle, the plurality of harvester is acquired processing according to the acquisition target redistributed.
Alternatively, the described time completed according to each acquisition target needed for acquisition process, will be unable to currently gathering week Complete the acquisition target of acquisition process in phase, be reassigned to the most described acquisition target of capacity remaining time and complete acquisition process Harvester include: for each harvester, it is judged that distribute to needed for all acquisition targets of this harvester complete acquisition process Time sum, if more than collection period;In the case of more than collection period, reject from the acquisition target of this harvester Go out part acquisition target, make the residue acquisition target of this harvester complete the time sum needed for acquisition process less than gathering week Phase;By disallowable go out described part acquisition target be reassigned to capacity remaining time the most described part acquisition target and complete The harvester gathered.
Alternatively, the described time completed according to each acquisition target needed for acquisition process, will be unable to currently gathering week Complete the acquisition target of acquisition process in phase, be reassigned to the most described acquisition target of capacity remaining time and complete acquisition process Harvester include: calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process;By described The all acquisition targets of multiple harvesters complete the time sum needed for acquisition process divided by collection period, obtain the harvester estimated Number N, N is positive integer;For each acquisition target of the plurality of harvester, complete acquisition process institute according to this acquisition target The time needed, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets completed to adopt The harvester of collection;In the case of there is also the acquisition target do not redistributed, the acquisition target also do not redistributed is completed Time sum needed for acquisition process, divided by collection period, obtains harvester number M estimated, and M is positive integer;Go back for each The acquisition target do not redistributed, completes the time needed for acquisition process according to this acquisition target, is again divided by this acquisition target In M+1 harvester of dispensing, remaining time, capacity enough this acquisition targets completed the harvester of collection.
Alternatively, the described time completed according to each acquisition target needed for acquisition process, will be unable to currently gathering week Complete the acquisition target of acquisition process in phase, be reassigned to the most described acquisition target of capacity remaining time and complete acquisition process Harvester include: calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process;Calculate institute The number stating multiple harvester is with collection period long-pending;Needed for all acquisition targets of the plurality of harvester complete acquisition process Time sum, less than number and the collection period of the plurality of harvester long-pending in the case of, for each harvester, it is judged that The all acquisition targets distributing to this harvester complete the time sum needed for acquisition process, if more than collection period;Greatly In the case of collection period, from the acquisition target of this harvester, eliminate part acquisition target, make the residue of this harvester Acquisition target completes the time sum needed for acquisition process less than collection period;By disallowable go out described part acquisition target weight It is newly assigned to the harvester that capacity remaining time the most described part acquisition target completes to gather;Own at the plurality of harvester Acquisition target completes the time sum needed for acquisition process, more than number and the feelings amassed of collection period of the plurality of harvester Under condition, all for the plurality of harvester acquisition targets are completed the time sum needed for acquisition process divided by collection period, obtain Harvester number N estimated, N is positive integer;For each acquisition target of the plurality of harvester, complete according to this acquisition target Become the time needed for acquisition process, this acquisition target be reassigned in N+1 harvester, remaining time capacity enough this is adopted Collection object completes the harvester gathered;In the case of there is also the acquisition target do not redistributed, by also do not redistribute Acquisition target completes the time sum needed for acquisition process divided by collection period, obtains harvester number M estimated, and M is the most whole Number;For each acquisition target also do not redistributed, complete the time needed for acquisition process according to this acquisition target, this is adopted Collection object is reassigned in M+1 harvester, and remaining time, capacity enough this acquisition targets completed the harvester of collection.
Alternatively, described method also includes: in the case of the number deficiency of the harvester added, according to default notice Strategy sends and notifies manually to add harvester, or, make described notification triggers server automatically add harvester.
Alternatively, the described time completed according to each acquisition target needed for acquisition process, will be unable to currently gathering week Complete the acquisition target of acquisition process in phase, be reassigned to the most described acquisition target of capacity remaining time and complete acquisition process Harvester include: will be unable to complete the acquisition target of acquisition process in current collection period, according to completing acquisition process institute The time size sequence needed;When redistributing, the acquisition target that the time needed for acquisition process is maximum, distribution have been selected every time To the harvester that capacity remaining time is maximum.
In another aspect of the embodiment of the present invention, it is provided that a kind of harvester controls device.This device includes: the time is remembered Record module, is configured to when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, respectively Recording each acquisition target to complete the time needed for acquisition process, wherein, the collection period of the plurality of harvester is identical.Distribution Module, is configured to complete the time needed for acquisition process according to each acquisition target, will be unable in current collection period complete Become the acquisition target of acquisition process, be reassigned to the most described acquisition target of capacity remaining time and complete the collection of acquisition process Device, wherein, described remaining time, capacity completed to gather equal to harvester cycle and the acquisition target having distributed to described harvester The difference of the time needed for process.Acquisition module, is configured in completing the collection period after redistributing, and the plurality of adopts Storage is acquired processing according to the acquisition target redistributed.
Alternatively, described distribution module includes: first judges submodule, is configured to for each harvester, it is judged that point All acquisition targets of this harvester of dispensing complete the time sum needed for acquisition process, if more than collection period.Distribution is picked Except submodule, be configured to described first judge that submodule is judged to more than collection period in the case of, adopting from this harvester Collection object eliminates part acquisition target, makes the residue acquisition target of this harvester complete the time sum needed for acquisition process Less than collection period.First distribution adjusts submodule, is configured to be rejected, by described distribution, the described portion that submodule eliminates Acquisition target is divided to be reassigned to the harvester that capacity remaining time the most described part acquisition target completes to gather.
Alternatively, described distribution module includes: time and calculating sub module, is configured to calculate the plurality of harvester institute Acquisition target is had to complete the time sum needed for acquisition process.First quantity calculating sub module, is configured to adopt the plurality of The all acquisition targets of storage complete the time sum needed for acquisition process divided by collection period, obtain harvester number N estimated, N is positive integer.Second distribution adjusts submodule, is configured to each acquisition target for the plurality of harvester, according to this Acquisition target completes the time needed for acquisition process, is reassigned in N+1 harvester by this acquisition target, and remaining time holds Amount enough this acquisition targets complete the harvester gathered.Second quantity calculating sub module, is configured to the most again divide there is also In the case of the acquisition target joined, the time sum needed for the acquisition target also do not redistributed is completed acquisition process is divided by adopting In the collection cycle, obtaining harvester number M estimated, M is positive integer.3rd distribution adjusts submodule, is configured to go back for each The acquisition target do not redistributed, completes the time needed for acquisition process according to this acquisition target, is again divided by this acquisition target In M+1 harvester of dispensing, remaining time, capacity enough this acquisition targets completed the harvester of collection.
Alternatively, described distribution module includes: time and calculating sub module, is configured to calculate the plurality of harvester institute Acquisition target is had to complete the time sum needed for acquisition process.Planimeter operator module, is configured to calculate the plurality of collection The number of device is with collection period long-pending.First judges submodule, is configured at all acquisition targets of the plurality of harvester complete Become the time sum needed for acquisition process, less than the number of the plurality of harvester and collection period long-pending in the case of, for Each harvester, it is judged that all acquisition targets distributing to this harvester complete the time sum needed for acquisition process, if big In collection period.Submodule is rejected in distribution, is configured to judge that submodule judges the situation more than collection period described first Under, from the acquisition target of this harvester, eliminate part acquisition target, make the residue acquisition target of this harvester complete to gather Time sum needed for process is less than collection period.First distribution adjust submodule, be configured by disallowable go out described part Acquisition target is reassigned to the harvester that capacity remaining time the most described part acquisition target completes to gather.First quantity meter Operator module, is configured to complete the time sum needed for acquisition process at all acquisition targets of the plurality of harvester, is more than The number of the plurality of harvester and collection period long-pending in the case of, complete to adopt by all for the plurality of harvester acquisition targets Time sum needed for collection process, divided by collection period, obtains harvester number N estimated, and N is positive integer.Second distribution adjusts Submodule, is configured to each acquisition target for the plurality of harvester, completes acquisition process institute according to this acquisition target The time needed, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets completed to adopt The harvester of collection.Second quantity calculating sub module, is configured in the case of there is also the acquisition target do not redistributed, will The acquisition target also do not redistributed completes the time sum needed for acquisition process divided by collection period, obtains the harvester estimated Number M, M is positive integer.3rd distribution adjusts submodule, is configured to for each acquisition target also do not redistributed, root Complete the time needed for acquisition process according to this acquisition target, this acquisition target is reassigned in M+1 harvester, during residue Between capacity enough this acquisition targets complete the harvester that gathers.
Alternatively, described device also includes: notification module, is configured in the not enough feelings of the number of the harvester added Under condition, send according to default notification strategy and notify manually to add harvester, or, make described notification triggers server automatic Add harvester.
Alternatively, described distribution module includes: sorting sub-module, is configured to will be unable to complete in current collection period The acquisition target of acquisition process, according to the time size sequence completed needed for acquisition process.Select distribution sub module, be configured to When redistributing, select the acquisition target that time needed for acquisition process is maximum every time, distribute to capacity remaining time Big harvester.
By technique scheme, adopt owing to respective acquisition target being carried out current collection period at multiple harvesters When collection processes, record each acquisition target respectively and complete the time needed for acquisition process, complete to gather according to each acquisition target Time needed for process, will be unable to complete the acquisition target of acquisition process in current collection period, when being reassigned to residue Between the most described acquisition target of capacity complete the harvester of acquisition process, thus using the time capacity of harvester as gathering energy Power, using acquisition target is completed gather required time as the consumption to acquisition capacity, be dynamically assigned to adopt by acquisition target The harvester that collection ability is enough, has equalized the collection pressure of each harvester, it is achieved that avoid the mesh that harvester acquisition capacity is not enough 's.
Other features and advantages of the present invention will be described in detail in detailed description of the invention part subsequently.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and constitutes the part of description, with following tool Body embodiment is used for explaining the present invention together, but is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is according to the implementation environment schematic diagram shown in an exemplary embodiment.
Fig. 2 is the flow chart according to a kind of harvester control method shown in one example embodiment of the present invention.
Fig. 3 is the flow chart of a kind of harvester control method illustrated in accordance with an alternative illustrative embodiment of the present invention.
Fig. 4 is the flow chart of a kind of harvester control method illustrated in accordance with a further exemplary embodiment of the present invention.
Fig. 5 is the flow chart according to a kind of harvester control method shown in another exemplary embodiment of the present invention.
Fig. 6 is the block diagram controlling device 600 according to a kind of harvester shown in one example embodiment of the present invention.
Fig. 7 is the block diagram that a kind of harvester illustrated in accordance with an alternative illustrative embodiment of the present invention controls device.
Fig. 8 is the block diagram that a kind of harvester illustrated in accordance with a further exemplary embodiment of the present invention controls device.
Fig. 9 is the block diagram controlling device according to a kind of harvester shown in another exemplary embodiment of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the detailed description of the invention of the present invention is described in detail.It should be appreciated that this place is retouched The detailed description of the invention stated is merely to illustrate and explains the present invention, is not limited to the present invention.
Fig. 1 is according to the implementation environment schematic diagram shown in an exemplary embodiment.In this implementation environment, use cluster side Formula carries out data acquisition to acquisition target.Harvester is connected with the acquisition target distributing to this harvester, is also connected with server. Wherein, different acquisition targets may be in identical or different equipment.Acquisition target such as can include data base, centre Part, etc..Different acquisition targets and harvester, set up different data transmission channels by different threads.Wherein, each The collection period of harvester is identical.The acquisition index of the different acquisition object of same type can be identical, it is also possible to different.In phase In the case of the acquisition index difference of the different acquisition object of type, can by harvester is acquired index allocation, Harvester is made to be acquired processing according to the acquisition index of configuration.
It is understood that implementation environment shown in Fig. 1 is only used for the method that the signal embodiment of the present invention provides, it is not intended that Restriction to the embodiment of the present invention.
Fig. 2 is the flow chart according to a kind of harvester control method shown in one example embodiment of the present invention.The party Method can apply to server shown in Fig. 1.The method may include that
In step 210, when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, Record each acquisition target respectively and complete the time needed for acquisition process.
It should be noted that each harvester is when each collection period is initial, corresponding respective acquisition target, opens respectively The thread of dynamic respective numbers is acquired processing parallel.If a collection period terminates, the thread of this collection period is not yet Complete acquisition process, then this thread proceeds acquisition process, and next collection period starts again new thread and carries out next simultaneously The acquisition process of collection period.Therefore, no matter whether harvester can complete a certain acquisition target in a collection period Acquisition process, can record and obtain this acquisition target and complete the time needed for acquisition process.Wherein, acquisition process can include Data acquisition and data report.
It should be noted that each acquisition target completes the time needed for acquisition process, can adopt according to one or more The time that acquisition target that the storage cycle is recorded, each completes acquisition process actually used obtains.Such as, each collection is right As the time needed for completing acquisition process can obtain according to the meansigma methods of the time that multiple harvester cycles are recorded.
In a step 220, complete the time needed for acquisition process according to each acquisition target, will be unable to currently gathering week Complete the acquisition target of acquisition process in phase, be reassigned to the most described acquisition target of capacity remaining time and complete acquisition process Harvester, wherein, described remaining time, capacity was complete with the acquisition target distributing to described harvester equal to the harvester cycle The difference of the time needed for one-tenth acquisition process.
Such as, in a kind of possible embodiment, in order to reduce the generation of the capacity fragment of harvester, this step can be by The acquisition target of acquisition process cannot be completed, according to the big float of the time needed for completing acquisition process in current collection period Sequence, when redistributing, in the acquisition target also do not redistributed, has selected time needed for acquisition process maximum every time Acquisition target, distributes to the harvester of capacity maximum remaining time.
In step 230, in completing the collection period after redistributing, the plurality of harvester is according to redistributing Acquisition target be acquired process.
It is understood that when multiple harvesters are acquired processing according to the acquisition target redistributed, Ke Yiji Whether continuous multiple harvesters are acquired processing according to the acquisition target redistributed, thus have enough to multiple harvesters The newly assigned acquisition target of acquisition capacity counterweight completes acquisition process and is estimated, and circulates successively, thus realizes acquisition target It is dynamically assigned to the purpose of the enough harvesters of acquisition capacity.
Visible, due to the embodiment of the present invention using the time capacity of harvester as acquisition capacity, acquisition target will be completed Acquisition target, as the consumption to acquisition capacity, is dynamically assigned to the harvester that acquisition capacity is enough by collection required time, Equalize the collection pressure of each harvester, it is achieved that avoid the purpose that harvester acquisition capacity is not enough.
Fig. 3 is the flow chart of a kind of harvester control method illustrated in accordance with an alternative illustrative embodiment of the present invention.Should Method can apply to server shown in Fig. 1.The method may include that
In the step 310, when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, Record each acquisition target respectively and complete the time needed for acquisition process.
In step 320, for each harvester, it is judged that all acquisition targets distributing to this harvester complete at collection Time sum needed for reason, if more than collection period.
In step 321, in the case of more than collection period, from the acquisition target of this harvester, eliminate part adopt Collection object, makes the residue acquisition target of this harvester complete the time sum needed for acquisition process less than collection period.
Such as, when selecting the part acquisition target eliminated, 0/1 knapsack problem can be translated into.That is, by dynamically Planning algorithm selects the part acquisition target eliminated, thus ensures to maximize the acquisition capacity of harvester, weeds out described The time loss of part acquisition target.
In step 322, by disallowable go out described part acquisition target be reassigned to the enough institutes of capacity remaining time State the harvester that part acquisition target completes to gather.
Such as, when the harvester that selection capacity remaining time is enough, greedy algorithm can be used, the collection that will select Object according to time loss maximum allocated to the maximum harvester of capacity remaining time.
In a step 330, in completing the collection period after redistributing, the plurality of harvester is according to redistributing Acquisition target be acquired process.
In this embodiment, for each harvester, carry out whether this harvester has enough acquisition capacity to complete it The judgement of the acquisition process of acquisition target, such that it is able to only for not having the harvester of enough acquisition capacity, again divide Join, redistribute efficiency higher.
Fig. 4 is the flow chart of a kind of harvester control method illustrated in accordance with a further exemplary embodiment of the present invention.Should Method can apply to server shown in Fig. 1.The method may include that
In step 410, when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, Record each acquisition target respectively and complete the time needed for acquisition process.
At step 420, calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process.
In step 421, the time sum needed for all for the plurality of harvester acquisition targets are completed acquisition process is removed With collection period, obtaining harvester number N estimated, N is positive integer.
In step 422, for each acquisition target of the plurality of harvester, complete at collection according to this acquisition target Time needed for reason, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets were complete Become the harvester gathered.
Such as, in a kind of possible embodiment, in order to reduce the generation of the capacity fragment of harvester, this step can be by All acquisition targets of the plurality of harvester, according to the time size sequence completed needed for acquisition process, redistribute every time Time, in the acquisition target also do not redistributed, select the acquisition target that the time needed for acquisition process is maximum, distributed to The maximum harvester of capacity remaining time in N+1 harvester.
In step 423, in the case of there is also the acquisition target do not redistributed, the collection that will also do not redistribute Object completes the time sum needed for acquisition process divided by collection period, obtains harvester number M estimated, and M is positive integer.
In step 424, for each acquisition target also do not redistributed, acquisition process is completed according to this acquisition target The required time, being reassigned in M+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets completed The harvester gathered.
Such as, in a kind of possible embodiment, in order to reduce the generation of the capacity fragment of harvester, this step can be by All acquisition targets also do not redistributed, according to the time size sequence completed needed for acquisition process, when redistributing every time, In the acquisition target also do not redistributed, select the acquisition target that the time needed for acquisition process is maximum, distributed to M+1 The maximum harvester of capacity remaining time in individual harvester.
In step 430, in completing the collection period after redistributing, the plurality of harvester is according to redistributing Acquisition target be acquired process.
In this embodiment, it is contemplated that in a collection period, each is acquired place respectively to different acquisition object The thread of reason, is carried out by CPU burst, it is known that in the case of calculating resource is worst, all threads may sequentially perform ability Completing acquisition process, therefore, it can by all for multiple harvesters acquisition targets being completed the time sum needed for acquisition process Divided by collection period, estimate out calculating resource worst in the case of required minimum harvester number, therefore, by will be all Acquisition target is re-assigned to estimate in the harvester of number, can fully equalize the collection pressure of each harvester, it is to avoid gather Device acquisition capacity is not enough, it is to avoid acquisition capacity is superfluous.
Fig. 5 is the flow chart according to a kind of harvester control method shown in another exemplary embodiment of the present invention.Should Method can apply to server shown in Fig. 1.The method may include that
In step 510, when multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, Record each acquisition target respectively and complete the time needed for acquisition process.
Such as, in an initial condition, all acquisition targets can be evenly distributed to each harvester, first collection It is acquired processing according to the acquisition target of mean allocation in cycle, and records each acquisition target respectively and complete acquisition process Time.
In step 520, calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process.
In step 521, the number calculating the plurality of harvester is with collection period long-pending.
In step 522, complete the time sum needed for acquisition process at all acquisition targets of the plurality of harvester, little In the case of the number of the plurality of harvester with the long-pending of collection period, for each harvester, it is judged that distribute to this collection All acquisition targets of device complete the time sum needed for acquisition process, if more than collection period.
In step 523, in the case of more than collection period, from the acquisition target of this harvester, eliminate part adopt Collection object, makes the residue acquisition target of this harvester complete the time sum needed for acquisition process less than collection period.
In step 524, by disallowable go out described part acquisition target be reassigned to the enough institutes of capacity remaining time State the harvester that part acquisition target completes to gather.
In step 525, the time sum needed for acquisition process is completed at all acquisition targets of the plurality of harvester, greatly In the case of the number of the plurality of harvester with the long-pending of collection period, all for the plurality of harvester acquisition targets are completed Time sum needed for acquisition process, divided by collection period, obtains harvester number N estimated, and N is positive integer.
In step 526, for each acquisition target of the plurality of harvester, complete at collection according to this acquisition target Time needed for reason, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets were complete Become the harvester gathered;
In step 527, in the case of there is also the acquisition target do not redistributed, the collection that will also do not redistribute Object completes the time sum needed for acquisition process divided by collection period, obtains harvester number M estimated, and M is positive integer.
In step 528, for each acquisition target also do not redistributed, complete acquisition process according to this acquisition target The required time, being reassigned in M+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets completed The harvester gathered.
Wherein, in the case of the number deficiency of the harvester added, it is also possible to send logical according to default notification strategy Know manually to add harvester, or, make described notification triggers server automatically add harvester.Wherein, notice plan is preset Can be slightly that manually interpolation or server add automatically.In the case of artificial interpolation, preset in notification strategy and can also wrap Include name of contact person, contact method etc..
It is understood that after the reallocation, the acquisition target that one or more harvesters are distributed can become Change, accordingly, it would be desirable to the corresponding relation between harvester and the acquisition target distributing to it is carried out record, in order to redistributing Next collection period afterwards, continues whether harvester is had enough acquisition capacity and carries out the acquisition target distributing to it Assessment.
In step 530, in completing the collection period after redistributing, the plurality of harvester is according to redistributing Acquisition target be acquired process.
In this embodiment, by all for multiple harvesters acquisition targets are completed time sum needed for acquisition process with Collection period comparison, thus can either determine that existing harvester acquisition capacity summation be enough to the collection of all acquisition targets During process, only for not having the harvester of enough acquisition capacity, redistribute, improve and redistribute efficiency, again can When determining the acquisition process that existing harvester acquisition capacity has been not enough to all acquisition targets certainly, estimate out enough adopting Storage carries out redistributing of all acquisition targets, such that it is able to fully equalize the collection pressure of each harvester, it is to avoid gather Device acquisition capacity is not enough.
Fig. 6 is the block diagram controlling device 600 according to a kind of harvester shown in one example embodiment of the present invention.This dress Put and can be configured at server shown in Fig. 1.This device may include that time logging modle 610, distribution module 620 and gathers Module 630.
This time logging modle 610, can be configured to currently adopt respective acquisition target at multiple harvesters During the acquisition process in collection cycle, record each acquisition target respectively and complete the time needed for acquisition process.
This distribution module 620, can be configured to complete the time needed for acquisition process, by nothing according to each acquisition target Method completes the acquisition target of acquisition process in current collection period, is reassigned to the most described collection of capacity remaining time right As completing the harvester of acquisition process, wherein, capacity described remaining time equal to the harvester cycle with distributed to described collection The acquisition target of device completes the difference of the time needed for acquisition process.
This acquisition module 630, can be configured in completing the collection period after redistributing, the plurality of collection Device is acquired processing according to the acquisition target redistributed.
Visible, due to the embodiment of the present invention using the time capacity of harvester as acquisition capacity, acquisition target will be completed Acquisition target, as the consumption to acquisition capacity, is dynamically assigned to the harvester that acquisition capacity is enough by collection required time, Equalize the collection pressure of each harvester, it is achieved that avoid the purpose that harvester acquisition capacity is not enough.
In a kind of possible embodiment, again can divide only for not having the harvester of enough acquisition capacity Join, redistribute efficiency higher.Specifically, seeing Fig. 7, Fig. 7 is illustrated in accordance with an alternative illustrative embodiment of the present invention Plant harvester and control the block diagram of device.This device can be configured at server shown in Fig. 1.In this embodiment, distribute module 620 May include that the first judgement submodule 621, can be configured to for each harvester, it is judged that distribute to the institute of this harvester Acquisition target is had to complete the time sum needed for acquisition process, if more than collection period.Submodule 622 is rejected in distribution, permissible Be configured to described first judge that submodule is judged to more than collection period in the case of, pick from the acquisition target of this harvester Remove out part acquisition target, make the residue acquisition target of this harvester complete the time sum needed for acquisition process less than gathering week Phase.First distribution adjusts submodule 623, can be configured to adopt the described part eliminated by described distribution rejecting submodule Collection object is reassigned to the harvester that capacity remaining time the most described part acquisition target completes to gather.
In alternatively possible embodiment, it is contemplated that in a collection period, each is respectively to different acquisition object It is acquired the thread processed, carries out by CPU burst, it is known that in the case of calculating resource is worst, all thread order are held Row just can complete acquisition process, therefore, it can by all for multiple harvesters acquisition targets are completed needed for acquisition process time Between sum divided by collection period, estimate out calculating resource worst in the case of required minimum harvester number, by by institute There is acquisition target to be re-assigned to estimate in the harvester of number, can fully equalize the collection pressure of each harvester, it is to avoid adopt Storage acquisition capacity is not enough, it is to avoid acquisition capacity is superfluous.Specifically, seeing Fig. 8, Fig. 8 is another exemplary according to the present invention A kind of harvester shown in embodiment controls the block diagram of device.This device can be configured at server shown in Fig. 1.This embodiment In, described distribution module 620 includes: time and calculating sub module 624, can be configured to calculate the plurality of harvester and own Acquisition target completes the time sum needed for acquisition process.First quantity calculating sub module 625, can be configured to described many The all acquisition targets of individual harvester complete time sum needed for acquisition process divided by collection period, obtain the harvester estimated Number N, N are positive integer.Second distribution adjusts submodule 626, can be configured to each collection for the plurality of harvester Object, completes the time needed for acquisition process according to this acquisition target, and this acquisition target is reassigned to N+1 harvester In, remaining time, capacity enough this acquisition targets completed the harvester of collection.Second quantity calculating sub module 627, can be joined It is set to, in the case of there is also the acquisition target do not redistributed, the acquisition target also do not redistributed be completed acquisition process Required time sum, divided by collection period, obtains harvester number M estimated, and M is positive integer.3rd distribution adjusts submodule 628, can be configured to for each acquisition target also do not redistributed, needed for completing acquisition process according to this acquisition target Time, this acquisition target is reassigned in M+1 harvester, remaining time, capacity enough this acquisition targets completed to gather Harvester.
In conjunction with the embodiment that above two is possible, can either determine that existing harvester acquisition capacity summation be enough to During the acquisition process of all acquisition targets, only for not having the harvester of enough acquisition capacity, redistribute, improve weight New allocative efficiency, can determine that existing harvester acquisition capacity has been not enough to the acquisition process of all acquisition targets certainly again Time, estimate enough harvesters and carry out redistributing of all acquisition targets.Specifically, seeing Fig. 9, Fig. 9 is according to this A kind of harvester shown in another exemplary embodiment of invention controls the block diagram of device.This device can be configured at shown in Fig. 1 Server.In this embodiment, described distribution module 620 may include that time and calculating sub module 624, is configured to calculate The all acquisition targets of the plurality of harvester complete the time sum needed for acquisition process.Planimeter operator module 6241, is joined It is set to the number calculating the plurality of harvester with collection period long-pending.First judges submodule 621, is configured to described many The all acquisition targets of individual harvester complete the time sum needed for acquisition process, less than number and the collection of the plurality of harvester Cycle long-pending in the case of, for each harvester, it is judged that all acquisition targets distributing to this harvester complete acquisition process Required time sum, if more than collection period.Submodule 622 is rejected in distribution, is configured to judge submodule described first Block judges, more than in the case of collection period, to eliminate part acquisition target, make this collection from the acquisition target of this harvester The residue acquisition target of device completes the time sum needed for acquisition process less than collection period.First distribution adjusts submodule 623, Be configured by disallowable go out described part acquisition target be reassigned to capacity remaining time the most described part acquisition target Complete the harvester gathered.First quantity calculating sub module 625, is configured at all acquisition targets of the plurality of harvester complete Become the time sum needed for acquisition process, more than the number of the plurality of harvester and collection period long-pending in the case of, by institute State all acquisition targets of multiple harvester and complete the time sum needed for acquisition process divided by collection period, obtain the collection estimated Device number N, N is positive integer.Second distribution adjusts submodule 626, is configured to each collection for the plurality of harvester Object, completes the time needed for acquisition process according to this acquisition target, and this acquisition target is reassigned to N+1 harvester In, remaining time, capacity enough this acquisition targets completed the harvester of collection.Second quantity calculating sub module 627, is configured to In the case of there is also the acquisition target do not redistributed, needed for the acquisition target also do not redistributed is completed acquisition process Time sum divided by collection period, obtain harvester number M estimated, M is positive integer.3rd distribution adjusts submodule 628, It is configured to, for each acquisition target also do not redistributed, complete the time needed for acquisition process according to this acquisition target, Being reassigned in M+1 harvester by this acquisition target, remaining time, capacity enough this acquisition targets completed the collection of collection Device.
In order to add harvester in time when harvester deficiency, as it is shown in figure 9, this device can also include: notification module 640, it is configured in the case of the number deficiency of the harvester added, sends notice with person who happens to be on hand for an errand according to default notification strategy Work adds harvester, or, make described notification triggers server automatically add harvester.
In order to reduce the generation of the capacity fragment of harvester, as it is shown in figure 9, described distribution module 620 may include that sequence Submodule 6201, can be configured to the acquisition target that will be unable to complete acquisition process in current collection period, according to completing Time size sequence needed for acquisition process.Select distribution sub module 6202, when being configured to redistribute, selected every time The acquisition target that time needed for acquisition process is maximum, distributes to the harvester of capacity maximum remaining time.
The preferred embodiment of the present invention is described in detail above in association with accompanying drawing, but, the present invention is not limited to above-mentioned reality Execute the detail in mode, in the technology concept of the present invention, technical scheme can be carried out multiple letter Monotropic type, these simple variant belong to protection scope of the present invention.
It is further to note that each the concrete technical characteristic described in above-mentioned detailed description of the invention, at not lance In the case of shield, can be combined by any suitable means.In order to avoid unnecessary repetition, the present invention to various can The compound mode of energy illustrates the most separately.
Additionally, combination in any can also be carried out between the various different embodiment of the present invention, as long as it is without prejudice to this The thought of invention, it should be considered as content disclosed in this invention equally.

Claims (12)

1. a harvester control method, it is characterised in that including:
When multiple harvesters carry out the acquisition process of current collection period to respective acquisition target, record each collection respectively Object completes the time needed for acquisition process, and wherein, the collection period of the plurality of harvester is identical;
Complete the time needed for acquisition process according to each acquisition target, will be unable to complete acquisition process in current collection period Acquisition target, be reassigned to the most described acquisition target of capacity remaining time and complete the harvester of acquisition process, wherein, institute State needed for capacity remaining time completes acquisition process equal to harvester cycle and the acquisition target having distributed to described harvester The difference of time;
In completing the collection period after redistributing, the plurality of harvester is adopted according to the acquisition target redistributed Collection processes.
Method the most according to claim 1, it is characterised in that described complete acquisition process according to each acquisition target needed for Time, will be unable to complete the acquisition target of acquisition process in current collection period, be reassigned to remaining time capacity foot The harvester that enough described acquisition targets complete acquisition process includes:
For each harvester, it is judged that distribute to all acquisition targets of this harvester complete the time needed for acquisition process it With, if more than collection period;
In the case of more than collection period, from the acquisition target of this harvester, eliminate part acquisition target, make this collection The residue acquisition target of device completes the time sum needed for acquisition process less than collection period;
By disallowable go out described part acquisition target to be reassigned to capacity remaining time the most described part acquisition target complete Become the harvester gathered.
Method the most according to claim 1, it is characterised in that described complete acquisition process according to each acquisition target needed for Time, will be unable to complete the acquisition target of acquisition process in current collection period, be reassigned to remaining time capacity foot The harvester that enough described acquisition targets complete acquisition process includes:
Calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process;
All for the plurality of harvester acquisition targets are completed the time sum needed for acquisition process divided by collection period, obtain pre- Harvester number N estimated, N is positive integer;
For each acquisition target of the plurality of harvester, complete the time needed for acquisition process according to this acquisition target, will This acquisition target is reassigned in N+1 harvester, and remaining time, capacity enough this acquisition targets completed the harvester of collection;
In the case of there is also the acquisition target do not redistributed, the acquisition target also do not redistributed is completed acquisition process Required time sum, divided by collection period, obtains harvester number M estimated, and M is positive integer;
For each acquisition target also do not redistributed, complete the time needed for acquisition process according to this acquisition target, should Acquisition target is reassigned in M+1 harvester, and remaining time, capacity enough this acquisition targets completed the harvester of collection.
Method the most according to claim 1, it is characterised in that described complete acquisition process according to each acquisition target needed for Time, will be unable to complete the acquisition target of acquisition process in current collection period, be reassigned to remaining time capacity foot The harvester that enough described acquisition targets complete acquisition process includes:
Calculate all acquisition targets of the plurality of harvester and complete the time sum needed for acquisition process;
The number calculating the plurality of harvester is with collection period long-pending;
The time sum needed for acquisition process is completed, less than the plurality of harvester at all acquisition targets of the plurality of harvester Number and collection period long-pending in the case of, for each harvester, it is judged that distribute to all acquisition targets of this harvester Complete the time sum needed for acquisition process, if more than collection period;
In the case of more than collection period, from the acquisition target of this harvester, eliminate part acquisition target, make this collection The residue acquisition target of device completes the time sum needed for acquisition process less than collection period;
By disallowable go out described part acquisition target to be reassigned to capacity remaining time the most described part acquisition target complete Become the harvester gathered;
The time sum needed for acquisition process is completed, more than the plurality of harvester at all acquisition targets of the plurality of harvester Number and collection period long-pending in the case of, all for the plurality of harvester acquisition targets are completed needed for acquisition process time Between sum divided by collection period, obtain harvester number N estimated, N is positive integer;
For each acquisition target of the plurality of harvester, complete the time needed for acquisition process according to this acquisition target, will This acquisition target is reassigned in N+1 harvester, and remaining time, capacity enough this acquisition targets completed the harvester of collection;
In the case of there is also the acquisition target do not redistributed, the acquisition target also do not redistributed is completed acquisition process Required time sum, divided by collection period, obtains harvester number M estimated, and M is positive integer;
For each acquisition target also do not redistributed, complete the time needed for acquisition process according to this acquisition target, should Acquisition target is reassigned in M+1 harvester, and remaining time, capacity enough this acquisition targets completed the harvester of collection.
5. according to the method described in claim 3 or 4, it is characterised in that described method also includes:
In the case of the number deficiency of the harvester added, send notice according to default notification strategy so that artificial interpolation is adopted Storage, or, make described notification triggers server automatically add harvester.
Method the most according to claim 1, it is characterised in that described complete acquisition process according to each acquisition target needed for Time, will be unable to complete the acquisition target of acquisition process in current collection period, be reassigned to remaining time capacity foot The harvester that enough described acquisition targets complete acquisition process includes:
Will be unable to complete the acquisition target of acquisition process in current collection period, big according to the time needed for completing acquisition process Little sequence;
When redistributing, select the acquisition target that the time needed for acquisition process is maximum every time, distributed to remaining time and hold The harvester that amount is maximum.
7. a harvester controls device, it is characterised in that including:
Time logging modle, is configured to carry out respective acquisition target at the collection of current collection period at multiple harvesters During reason, record each acquisition target respectively and complete the time needed for acquisition process, wherein, the collection period of the plurality of harvester Identical;
Distribution module, is configured to complete the time needed for acquisition process according to each acquisition target, will be unable to gather current Complete the acquisition target of acquisition process in cycle, be reassigned to the most described acquisition target of capacity remaining time and complete at collection The harvester of reason, wherein, described remaining time, capacity was equal to harvester cycle and the acquisition target having distributed to described harvester Complete the difference of time needed for acquisition process;
Acquisition module, is configured in completing the collection period after redistributing, and the plurality of harvester is according to again dividing The acquisition target joined is acquired processing.
Device the most according to claim 7, it is characterised in that described distribution module includes:
First judges submodule, is configured to for each harvester, it is judged that all acquisition targets distributing to this harvester are complete Become the time sum needed for acquisition process, if more than collection period;
Distribution reject submodule, be configured to described first judge that submodule is judged to more than collection period in the case of, from this The acquisition target of harvester eliminates part acquisition target, needed for making the residue acquisition target of this harvester complete acquisition process Time sum less than collection period;
First distribution adjusts submodule, is configured to be rejected, by described distribution, the described part acquisition target that submodule eliminates It is reassigned to the harvester that capacity remaining time the most described part acquisition target completes to gather.
Device the most according to claim 7, it is characterised in that described distribution module includes:
Time and calculating sub module, be configured to calculate needed for all acquisition targets of the plurality of harvester complete acquisition process Time sum;
First quantity calculating sub module, needed for being configured to all for the plurality of harvester acquisition targets are completed acquisition process Time sum, divided by collection period, obtains harvester number N estimated, and N is positive integer;
Second distribution adjusts submodule, is configured to each acquisition target for the plurality of harvester, right according to this collection As completing the time needed for acquisition process, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity was enough This acquisition target completes the harvester gathered;
Second quantity calculating sub module, is configured to, in the case of there is also the acquisition target do not redistributed, will also not weigh Newly assigned acquisition target completes the time sum needed for acquisition process divided by collection period, obtains harvester number M estimated, M is positive integer;
3rd distribution adjusts submodule, is configured to for each acquisition target also do not redistributed, according to this acquisition target Completing the time needed for acquisition process, be reassigned in M+1 harvester by this acquisition target, remaining time, capacity enough should Acquisition target completes the harvester gathered.
Device the most according to claim 7, it is characterised in that described distribution module includes:
Time and calculating sub module, be configured to calculate needed for all acquisition targets of the plurality of harvester complete acquisition process Time sum;
Planimeter operator module, is configured to the number calculating the plurality of harvester with collection period long-pending;
First judges submodule, is configured to complete the time needed for acquisition process at all acquisition targets of the plurality of harvester Sum, less than number and the collection period of the plurality of harvester long-pending in the case of, for each harvester, it is judged that distribute to All acquisition targets of this harvester complete the time sum needed for acquisition process, if more than collection period;
Submodule is rejected in distribution, in the case of being configured to judge that submodule judges more than collection period described first, from this The acquisition target of harvester eliminates part acquisition target, needed for making the residue acquisition target of this harvester complete acquisition process Time sum less than collection period;
First distribution adjust submodule, be configured by disallowable go out described part acquisition target be reassigned to remaining time hold Measure the harvester that the most described part acquisition target completes to gather;
First quantity calculating sub module, is configured to needed for all acquisition targets of the plurality of harvester complete acquisition process Time sum, more than number and the collection period of the plurality of harvester long-pending in the case of, the plurality of harvester is owned Acquisition target completes the time sum needed for acquisition process divided by collection period, obtains harvester number N estimated, and N is the most whole Number;
Second distribution adjusts submodule, is configured to each acquisition target for the plurality of harvester, right according to this collection As completing the time needed for acquisition process, being reassigned in N+1 harvester by this acquisition target, remaining time, capacity was enough This acquisition target completes the harvester gathered;
Second quantity calculating sub module, is configured to, in the case of there is also the acquisition target do not redistributed, will also not weigh Newly assigned acquisition target completes the time sum needed for acquisition process divided by collection period, obtains harvester number M estimated, M is positive integer;
3rd distribution adjusts submodule, is configured to for each acquisition target also do not redistributed, according to this acquisition target Completing the time needed for acquisition process, be reassigned in M+1 harvester by this acquisition target, remaining time, capacity enough should Acquisition target completes the harvester gathered.
11. according to the device described in claim 9 or 10, it is characterised in that described device also includes:
Notification module, is configured to, in the case of the number deficiency of the harvester added, send according to default notification strategy Notify manually to add harvester, or, make described notification triggers server automatically add harvester.
12. devices according to claim 7, it is characterised in that described distribution module includes:
Sorting sub-module, is configured to the acquisition target that will be unable to complete acquisition process in current collection period, according to completing Time size sequence needed for acquisition process;
Select distribution sub module, when being configured to redistribute every time, maximum the adopting of the time needed for having selected acquisition process Collection object, distributes to the harvester of capacity maximum remaining time.
CN201610398432.1A 2016-06-03 2016-06-03 Collector control method and device Active CN106101207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610398432.1A CN106101207B (en) 2016-06-03 2016-06-03 Collector control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610398432.1A CN106101207B (en) 2016-06-03 2016-06-03 Collector control method and device

Publications (2)

Publication Number Publication Date
CN106101207A true CN106101207A (en) 2016-11-09
CN106101207B CN106101207B (en) 2019-07-12

Family

ID=57227350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610398432.1A Active CN106101207B (en) 2016-06-03 2016-06-03 Collector control method and device

Country Status (1)

Country Link
CN (1) CN106101207B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287783A (en) * 2018-01-02 2018-07-17 浪潮通用软件有限公司 A kind of collecting method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1756190A (en) * 2004-09-30 2006-04-05 北京航空航天大学 Distributed performance data acquisition method
CN101895428A (en) * 2010-07-27 2010-11-24 中兴通讯股份有限公司 Acquisition system and acquisition point distribution method
CN102215132A (en) * 2011-06-16 2011-10-12 奥维通信股份有限公司 Embedded SNMP (Simple Network Management Protocol) management end data collecting device, system and method based on database
CN103188101A (en) * 2011-12-31 2013-07-03 成都勤智数码科技股份有限公司 Distributed type collection scheduling method and device
CN103384205A (en) * 2012-05-02 2013-11-06 中国科学院计算机网络信息中心 Massive alarming data parallel acquisition system, device and method
CN104901898A (en) * 2015-06-08 2015-09-09 东软集团股份有限公司 Load balancing method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1756190A (en) * 2004-09-30 2006-04-05 北京航空航天大学 Distributed performance data acquisition method
CN101895428A (en) * 2010-07-27 2010-11-24 中兴通讯股份有限公司 Acquisition system and acquisition point distribution method
CN102215132A (en) * 2011-06-16 2011-10-12 奥维通信股份有限公司 Embedded SNMP (Simple Network Management Protocol) management end data collecting device, system and method based on database
CN103188101A (en) * 2011-12-31 2013-07-03 成都勤智数码科技股份有限公司 Distributed type collection scheduling method and device
CN103384205A (en) * 2012-05-02 2013-11-06 中国科学院计算机网络信息中心 Massive alarming data parallel acquisition system, device and method
CN104901898A (en) * 2015-06-08 2015-09-09 东软集团股份有限公司 Load balancing method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨超: "基于IP网管的SLA性能采集系统的设计与实现", 《中国优秀期刊全文库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287783A (en) * 2018-01-02 2018-07-17 浪潮通用软件有限公司 A kind of collecting method and device

Also Published As

Publication number Publication date
CN106101207B (en) 2019-07-12

Similar Documents

Publication Publication Date Title
CN107015892A (en) A kind of method for testing pressure, device and system
CN105516347B (en) A kind of method and device of the load balancing allotment of streaming media server
CN103502944B (en) Virutal machine memory method of adjustment and equipment
CN107026900B (en) Shooting task allocation method and device
CN107800756A (en) A kind of load-balancing method and load equalizer
CN106101276A (en) A kind of cluster load balancing method and device
CN110350609A (en) The charging management method and system of AGV, equipment and storage medium
CN107835262A (en) A kind of streaming media server dynamical load distribution method
CN103853614A (en) Workload distribution device and workload distribution method thereof
CN109871328A (en) A kind of method for testing software and device
CN105204948B (en) Virtual machine physical memory configuration method and device
CN106383668A (en) Information storage method, storage management device and client
CN106101207A (en) Harvester control method and device
CN109889370A (en) A kind of network equipment location determining method, device and computer readable storage medium
CN105138408A (en) Virtual machine migration method and device based on Open Stack
CN109284229A (en) A kind of dynamic adjusting method and relevant device based on QPS
CN109460946A (en) The distribution system of acquisition tasks and electric energy metered system based on domestic operating system
CN106657399A (en) Background server selection method and device realized based on middleware
CN103117959A (en) Resource redistribution method and information collection device and resource management device
CN108228348A (en) Resources of virtual machine allocation schedule method, apparatus, storage medium and equipment
CN106162747B (en) A kind of method and device of load balancing
WO2020082518A1 (en) Method and device for identifying bandwidth demand burst
JP6780532B2 (en) Network service transmission control methods, devices and controllers
CN110083506A (en) The method and device of cluster resource amount optimization
CN108495318A (en) Multiple cell PCI Intelligent planning methods based on MR data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant