CN106097712B - A kind of flow-optimized guidance system of traffic - Google Patents

A kind of flow-optimized guidance system of traffic Download PDF

Info

Publication number
CN106097712B
CN106097712B CN201610522142.3A CN201610522142A CN106097712B CN 106097712 B CN106097712 B CN 106097712B CN 201610522142 A CN201610522142 A CN 201610522142A CN 106097712 B CN106097712 B CN 106097712B
Authority
CN
China
Prior art keywords
data
traffic flow
module
magnitude
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610522142.3A
Other languages
Chinese (zh)
Other versions
CN106097712A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shun Tai Transportation Group Co., Ltd.
Original Assignee
Jiangsu Shun Tai Transportation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shun Tai Transportation Group Co Ltd filed Critical Jiangsu Shun Tai Transportation Group Co Ltd
Priority to CN201610522142.3A priority Critical patent/CN106097712B/en
Publication of CN106097712A publication Critical patent/CN106097712A/en
Application granted granted Critical
Publication of CN106097712B publication Critical patent/CN106097712B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0125Traffic data processing

Landscapes

  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)

Abstract

A kind of flow-optimized guidance system of traffic of the present invention, including guidance system and the prediction meanss being connected with guidance system, the prediction meanss include sequentially connected acquisition module, data preprocessing module, data categorization module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, history correlation matrix generation module, predictive factor selection module and forecast model construction module.Precision of prediction of the present invention it is higher and construction prediction model it is more targeted.

Description

A kind of flow-optimized guidance system of traffic
Technical field
The present invention relates to intelligent transportation fields, and in particular to a kind of flow-optimized guidance system of traffic.
Background technique
The magnitude of traffic flow refers to the actual vehicle number for passing through a certain section of road in the unit time, is the weight for describing traffic behavior Want characteristic parameter.The magnitude of traffic flow variation again be one in real time, higher-dimension, non-linear, non-stationary random process, correlative factor Variation may all influence the magnitude of traffic flow of subsequent time.In the related technology, strong about prediction meanss limitation in short-term, prediction essence Spend lower, prediction fails to achieve satisfactory results in real time, and fail to provide the selection of the Real-time Road of people and effectively suggest, from And traffic flow forecasting largely rests on the medium- and long-term forecasting of the magnitude of traffic flow.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of flow-optimized guidance system of traffic.
The purpose of the present invention is realized using following technical scheme:
A kind of flow-optimized guidance system of traffic, it is described to draw including guidance system and the prediction meanss being connected with guidance system Guiding systems are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle destination call data The benchmark being allocated as vehicle route data;The guidance system includes: guidance information storage to the guidance system Corresponding intrument, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
The invention has the benefit that
1, data categorization module and stationarity inspection module are set, the accuracy of data is increased, and makes the prediction of construction Model is more targeted;
2, related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history correlation matrix is arranged to generate Module, predictive factor choose module and forecast model construction module, and wherein predictive factor directly affects precision of prediction, related coefficient It is the index for measuring stochastic variable correlation, can helps to choose instruction of the variable closely related with future position as prediction model Practice sample, chooses multiple related coefficients as predictive factor, eliminate the subjectivity that initial predictive factor is chosen, can increase pre- Precision is surveyed, keeps forecast model construction module more stable and accurate;
3, the space correlation coefficient in related coefficient computing module reflects influence of the accessibility to prediction model of road network, Time correlation coefficient can express the time sequencing of flow sequence, reflect the causality on two sequence times, to improve pre- Survey the efficiency of predictor selection;Due to the Weekly similarity of the magnitude of traffic flow, the history phase of history correlation matrix generation module is introduced Relationship number, is used cooperatively with time correlation coefficient and space correlation coefficient, provides more data for Accurate Prediction and supports.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings, but the embodiment in attached drawing is not constituted to any limit of the invention System, for those of ordinary skill in the art, without creative efforts, can also obtain according to the following drawings Other attached drawings.
Fig. 1 is the connection schematic diagram of each module of prediction meanss of the present invention.
Specific embodiment
The invention will be further described with the following Examples.
Embodiment 1
Referring to Fig. 1, a kind of flow-optimized guidance system of traffic of the present embodiment is connected including guidance system and with guidance system Prediction meanss, the guidance system are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle The benchmark that destination call data are allocated as vehicle route data;The guidance system includes: that guidance information is deposited The guidance system corresponding intrument is stored up, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
Data categorization module and stationarity inspection module is arranged in the present embodiment, increases the accuracy of data, and make to construct Prediction model it is more targeted;Related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history phase relation are set Matrix number generation module, predictive factor choose module and forecast model construction module, eliminate the master that initial predictive factor is chosen The property seen, can increase precision of prediction, keep forecast model construction module more stable and accurate;The present embodiment value L=8, M=3, Precision of prediction improves 1.5% relative to the relevant technologies.
Embodiment 2
Referring to Fig. 1, a kind of flow-optimized guidance system of traffic of the present embodiment is connected including guidance system and with guidance system Prediction meanss, the guidance system are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle The benchmark that destination call data are allocated as vehicle route data;The guidance system includes: that guidance information is deposited The guidance system corresponding intrument is stored up, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
Data categorization module and stationarity inspection module is arranged in the present embodiment, increases the accuracy of data, and make to construct Prediction model it is more targeted;Related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history phase relation are set Matrix number generation module, predictive factor choose module and forecast model construction module, eliminate the master that initial predictive factor is chosen The property seen, can increase precision of prediction, keep forecast model construction module more stable and accurate;The present embodiment value L=9, M=3, Precision of prediction improves 2% relative to the relevant technologies.
Embodiment 3
Referring to Fig. 1, a kind of flow-optimized guidance system of traffic of the present embodiment is connected including guidance system and with guidance system Prediction meanss, the guidance system are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle The benchmark that destination call data are allocated as vehicle route data;The guidance system includes: that guidance information is deposited The guidance system corresponding intrument is stored up, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
Data categorization module and stationarity inspection module is arranged in the present embodiment, increases the accuracy of data, and make to construct Prediction model it is more targeted;Related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history phase relation are set Matrix number generation module, predictive factor choose module and forecast model construction module, eliminate the master that initial predictive factor is chosen The property seen, can increase precision of prediction, keep forecast model construction module more stable and accurate;The present embodiment value L=10, M= 4, precision of prediction improves 2.6% relative to the relevant technologies.
Embodiment 4
Referring to Fig. 1, a kind of flow-optimized guidance system of traffic of the present embodiment is connected including guidance system and with guidance system Prediction meanss, the guidance system are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle The benchmark that destination call data are allocated as vehicle route data;The guidance system includes: that guidance information is deposited The guidance system corresponding intrument is stored up, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
Data categorization module and stationarity inspection module is arranged in the present embodiment, increases the accuracy of data, and make to construct Prediction model it is more targeted;Related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history phase relation are set Matrix number generation module, predictive factor choose module and forecast model construction module, eliminate the master that initial predictive factor is chosen The property seen, can increase precision of prediction, keep forecast model construction module more stable and accurate;The present embodiment value L=11, M= 5, precision of prediction improves 3.2% relative to the relevant technologies.
Embodiment 5
Referring to Fig. 1, a kind of flow-optimized guidance system of traffic of the present embodiment is connected including guidance system and with guidance system Prediction meanss, the guidance system are used to guide vehicle in multi-route, receive vehicle destination call data and by the vehicle The benchmark that destination call data are allocated as vehicle route data;The guidance system includes: that guidance information is deposited The guidance system corresponding intrument is stored up, the guidance information and the route are corresponding.
Preferably, at least one guidance information is completely or partially made of guidance sound.
Preferably, guidance sound used is: the melody of a piece of music or a first scaled-down version;A kind of mechanical equipment or system Specific sound;A kind of biospecific sound;And/or a kind of sound of natural phenomena.
Preferably, characterized in that prediction meanss include sequentially connected acquisition module, data preprocessing module, data point Generic module, stationary test module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, History correlation matrix generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe magnitude of traffic flow of corresponding each period Data and passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met friendship The data of logical actual conditions;
(3) data categorization module, for carrying out classification of type, the class to by the traffic flow data of data prediction Type includes festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction Section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate Xx Magnitude of traffic flow sequence after time delay τ, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested Column pass through stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to it is described to Continue stationary test after examining magnitude of traffic flow sequence to carry out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence Xi With prediction section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij (w), if there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
Preferably, characterized in that prediction meanss further include:
(6) threshold setting module, for setting time delay maximum value L, temporal and spatial correlations coefficient threshold between each section T1With history correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space phase Relationship number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ under τ in different time (τ) ', and calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L be [8, 12], the calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory it is related Sequence is denoted asThe value range of M is [3,5], the history phase Relationship number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2 Choose with the relevant predictive factor of prediction target point, and according to spatial position j and time delay τ progress matrix reconstruction selected by it, Selection principle are as follows:
If ρij(τ) ' > T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow composition for meeting condition is new Sequence and as the first predictive factor, be denoted as X', X'=(x1',x2',...,xp'), wherein p is the friendship for meeting condition Through-current capacity number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ) ' > T1, then the first predictive factor X' can state following matrix form as:
If ρjm(t) > T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y'={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can be stated as Following matrix form:
(10) forecast model construction module, by using the first predictive factor and the second predictive factor as training sample come Predictable section is constructed in the prediction model of the magnitude of traffic flow of subsequent time.
Wherein, in the data preprocessing module, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: In one data update cycle, the threshold range of total traffic flow data in each section is set separately, if certain collected section Total traffic flow data fall in corresponding threshold range, then show that this group of data are reliable, retain this group of data;If collecting Total traffic flow data in certain section fall not in corresponding threshold range, then show that this group of data are unreliable, and picked It removes.
Wherein, the stationary test module includes following submodule:
(1) submodule is examined, for in the same type of magnitude of traffic flow sequence for observing section and prediction section Magnitude of traffic flow sequence carries out stationary test respectively;
(2) continuity check submodule is connect, for the friendship to be tested to stationary test is not passed through with submodule is examined Through-current capacity sequence carries out continuity check, if not meeting continuity, the continuity check submodule uses average interpolation method pair Data carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, is used simultaneously Average interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, it is poor for being carried out to the data after polishing Point processing, and by the data transmission after difference processing to inspection submodule.
Data categorization module and stationarity inspection module is arranged in the present embodiment, increases the accuracy of data, and make to construct Prediction model it is more targeted;Related coefficient computing module, temporal and spatial correlations coefficient matrix generation module, history phase relation are set Matrix number generation module, predictive factor choose module and forecast model construction module, eliminate the master that initial predictive factor is chosen The property seen, can increase precision of prediction, keep forecast model construction module more stable and accurate;The present embodiment value L=12, M= 5, precision of prediction improves 3.5% relative to the relevant technologies.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than the present invention is protected The limitation of range is protected, although explaining in detail referring to preferred embodiment to the present invention, those skilled in the art are answered Work as understanding, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the reality of technical solution of the present invention Matter and range.

Claims (5)

1. a kind of flow-optimized guidance system of traffic, including guidance system and the prediction meanss being connected with guidance system, the guidance System is used to guide the vehicle in multi-route, receives vehicle destination call data and makees the vehicle destination call data The benchmark being allocated for vehicle route data;The guidance system includes: guidance information storage to the guidance system pair Device is answered, the guidance information and the route are corresponding;
The prediction meanss include sequentially connected acquisition module, data preprocessing module, data categorization module, stationary test Module, related coefficient computing module, threshold setting module, temporal and spatial correlations coefficient matrix generation module, history correlation matrix Generation module, predictive factor choose module and forecast model construction module:
(1) acquisition module observes section S for acquiring in road network Si, prediction section SjThe traffic flow data of corresponding each period And passage situation;
(2) data preprocessing module for carrying out data prediction to the traffic flow data, and is rejected and is not met traffic reality The data of border situation;
(3) data categorization module, for carrying out classification of type, the type packet to by the traffic flow data of data prediction Include festivals or holidays traffic flow data, weekend traffic flow data and working day traffic flow data;
(4) stationary test module, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction section SjMagnitude of traffic flow sequence XjStationary test is carried out respectively, examines the auto-correlation function of stationarity are as follows:
Wherein, XxIndicate magnitude of traffic flow sequence to be tested, νiIndicate the mean value of magnitude of traffic flow sequence to be tested, Xx+τIndicate XxWhen Between postpone τ after magnitude of traffic flow sequence, νx+τFor Xx+τMean value, σ2For XxWith Xx+τBetween variance;
When auto-correlation function P (τ) can rapid decay level off to and 0 or fluctuate near 0, then the magnitude of traffic flow sequence to be tested is logical Cross stationary test;When auto-correlation function P (τ) is unable to rapid decay and levels off to 0 or fluctuate near 0, then to described to be tested Magnitude of traffic flow sequence continues stationary test after carrying out calm disposing;
(5) related coefficient computing module, for calculating the observation section S for passing through stationary testiMagnitude of traffic flow sequence XiWith it is pre- Survey section SjMagnitude of traffic flow sequence XjTime correlation coefficient ρ at time delay τij(τ) and space correlation coefficient ρij(w), If there is N number of section in road network S, magnitude of traffic flow sequence Xi=[xi(1),xi(2),...,xi(n)], magnitude of traffic flow sequencexi(t) observation section S is indicatediIn the flow of t moment, xj(t) prediction section S is indicatedjIn t The flow at quarter, t=1,2 ... n, time correlation coefficient ρijThe calculation formula of (τ) are as follows:
Space correlation coefficient ρij(w) calculation formula are as follows:
(6) threshold setting module, for setting the time delay maximum value L between each section, temporal and spatial correlations coefficient threshold T1With go through History correlation coefficient threshold T2
(7) temporal and spatial correlations coefficient matrix generation module, for the time correlation coefficient ρ according to each sectionij(τ) and space correlation system Number ρij(w) each observation section S is constructediWith prediction section SjPostpone the temporal and spatial correlations coefficient matrix ρ (τ) ' under τ in different time, And calculate the temporal and spatial correlations coefficient ρ in each sectionij(τ) ', wherein the value range of i ∈ [1, N] and τ ∈ [0, L], L are [8,12], The calculation formula of temporal and spatial correlations coefficient matrix ρ (τ) ' are as follows:
Temporal and spatial correlations coefficient ρijThe calculation formula of (τ) ' are as follows:
ρij(τ) '=ρij(τ)ρij(w);
(8) history correlation matrix generation module, for generating prediction section SjHistory correlation matrix ρ (t):
Wherein, the nearly M weeks same period and same type of historical traffic are chosen as magnitude of traffic flow sequence XjHistory correlated series, It is denoted asM=1,2 ... the value range of M, M are [3,5], the history phase relation Number ρjm(t) calculation formula are as follows:
(9) predictive factor chooses module, for according to the temporal and spatial correlations coefficient threshold T1With history correlation coefficient threshold T2It chooses To the relevant predictive factor of prediction target point, and matrix reconstruction is carried out according to spatial position j and time delay τ selected by it, chosen Principle are as follows:
If ρij(τ)'>T1, then section S will be observediMagnitude of traffic flow sequence XiThe middle magnitude of traffic flow for meeting condition forms new sequence And as the first predictive factor, it is denoted as X', X'=(x1',x2',...,xp'), wherein p is the magnitude of traffic flow for meeting condition Number, if L1For the maximum value of time delay in the first predictive factor, L1=max τ | τ ∈ [0, L] and ρij(τ)'>T1, then One predictive factor X' can state following matrix form as:
If ρjm(t)>T2, then by all history correlated series X for meeting conditionjm(t) it is used as the second predictive factor, is denoted as Y', Y' ={ y1',y2',...,yq', wherein q is the historical traffic number for the condition that meets, and the second predictive factor Y' can state following square as Formation formula:
(10) forecast model construction module, by constructing the first predictive factor and the second predictive factor as training sample Prediction model of the predictable section in the magnitude of traffic flow of subsequent time.
2. the flow-optimized guidance system of a kind of traffic according to claim 1, characterized in that at least one guidance information Completely or partially it is made of guidance sound.
3. the flow-optimized guidance system of a kind of traffic according to claim 2, characterized in that guidance sound used is: one Sound specific to first melody, a kind of mechanical equipment or system, a kind of biospecific sound and/or a kind of naturally existing The sound of elephant.
4. the flow-optimized guidance system of a kind of traffic according to claim 3, characterized in that the data preprocessing module In, the rule of the data of traffic actual conditions is not met described in rejecting are as follows: within a data update cycle, each road is set separately The threshold range of total traffic flow data of section, if total traffic flow data in certain collected section falls in corresponding threshold value model In enclosing, then shows that this group of data are reliable, retain this group of data;If total traffic flow data in certain collected section is fallen not right In the threshold range answered, then show that this group of data are unreliable, and rejected.
5. the flow-optimized guidance system of a kind of traffic according to claim 4, characterized in that the stationary test module packet Include following submodule:
(1) submodule is examined, for in same type of observation section SiMagnitude of traffic flow sequence XiWith prediction section Sj's Magnitude of traffic flow sequence XjStationary test is carried out respectively;
(2) continuity check submodule is connect, for the traffic flow to be tested to stationary test is not passed through with submodule is examined It measures sequence and carries out continuity check, if not meeting continuity, the continuity check submodule is using average interpolation method to data Carry out polishing;
(3) misarrangement submodule is connect with continuity check submodule, for deleting the data of apparent error, while using average Interpolation method carries out polishing to data;
(4) difference processing submodule, connection misarrangement submodule and inspection submodule, for being carried out at difference to the data after polishing Reason, and by the data transmission after difference processing to inspection submodule.
CN201610522142.3A 2016-06-29 2016-06-29 A kind of flow-optimized guidance system of traffic Active CN106097712B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610522142.3A CN106097712B (en) 2016-06-29 2016-06-29 A kind of flow-optimized guidance system of traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610522142.3A CN106097712B (en) 2016-06-29 2016-06-29 A kind of flow-optimized guidance system of traffic

Publications (2)

Publication Number Publication Date
CN106097712A CN106097712A (en) 2016-11-09
CN106097712B true CN106097712B (en) 2018-12-04

Family

ID=57212323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610522142.3A Active CN106097712B (en) 2016-06-29 2016-06-29 A kind of flow-optimized guidance system of traffic

Country Status (1)

Country Link
CN (1) CN106097712B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110220526B (en) * 2019-05-15 2023-07-04 浙江工业大学之江学院 ANPR vehicle guidance scheme generation method based on path time value
CN110223517B (en) * 2019-06-20 2021-05-18 青岛科技大学 Short-term traffic flow prediction method based on space-time correlation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132981A (en) * 2005-03-08 2008-02-27 通力股份公司 Guidance system
CN101246021A (en) * 2007-12-18 2008-08-20 深圳市同洲电子股份有限公司 Method, equipment and system implementing intelligent navigation
CN102034350A (en) * 2009-09-30 2011-04-27 北京四通智能交通系统集成有限公司 Short-time prediction method and system of traffic flow data
CN104506378A (en) * 2014-12-03 2015-04-08 上海华为技术有限公司 Data flow prediction device and method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101673463B (en) * 2009-09-17 2011-12-14 北京世纪高通科技有限公司 Traffic information predicting method based on time series and device thereof
CN103632542A (en) * 2012-08-27 2014-03-12 国际商业机器公司 Traffic information processing method, device and corresponding equipment
JP2016513805A (en) * 2013-03-15 2016-05-16 キャリパー コーポレイション Lane-level vehicle navigation for vehicle routing and traffic management
CN104899663B (en) * 2015-06-17 2019-02-26 北京奇虎科技有限公司 A kind of data predication method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101132981A (en) * 2005-03-08 2008-02-27 通力股份公司 Guidance system
CN101246021A (en) * 2007-12-18 2008-08-20 深圳市同洲电子股份有限公司 Method, equipment and system implementing intelligent navigation
CN102034350A (en) * 2009-09-30 2011-04-27 北京四通智能交通系统集成有限公司 Short-time prediction method and system of traffic flow data
CN104506378A (en) * 2014-12-03 2015-04-08 上海华为技术有限公司 Data flow prediction device and method

Also Published As

Publication number Publication date
CN106097712A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN104899663B (en) A kind of data predication method and device
CA3101276A1 (en) System and method for real time prediction of water level and hazard level of a dam
CN106157616B (en) A kind of magnitude of traffic flow short-term prediction device
CN110659825A (en) Cash demand prediction method and device for multiple learners of bank outlets
CN105913654B (en) A kind of Intelligent traffic management systems
Deb Nath et al. Modified K-means clustering for travel time prediction based on historical traffic data
CN106097712B (en) A kind of flow-optimized guidance system of traffic
CN106128122A (en) A kind of intelligent traffic lamp
CN106128101B (en) The visualization device of magnitude of traffic flow short-term prediction result
CN106128142B (en) A kind of automobile navigation systems
CN106157615B (en) A kind of traffic flow information management handheld terminal
Beck et al. How managers can deal with complex issues: A semi-quantitative analysis method of causal loop diagrams based on matrices
CN106128102B (en) A kind of traffic jam prior-warning device
CN106128098B (en) A kind of multi-display apparatus that can carry out traffic flow forecasting
CN106128139B (en) A kind of unmanned vehicle of automatic dodging congestion route
CN116188198A (en) Water supply network operation state diagnosis method and computer readable storage medium
CN105957329B (en) A kind of highway information intelligence system
Chowdhury et al. Development of an effective travel time prediction method using modified moving average approach
CN106127353A (en) A kind of optimal route search system
CN105913665B (en) A kind of intelligence zebra stripes guardrail
Azad et al. Application Water Level Prediction Through Seasonal Autoregressive Integrated Moving Average: Red Hills Reservoir Case Study
CN105913678A (en) Long-range navigation system based on traffic flow information
Stecyk Enhancing sustainable development in ASEAN: an integrated assessment of education and health factors
CN114757393B (en) Prediction method and device for project expansion duration of electric power industry
JP2022165537A (en) Information processing device, information processing method, and computer program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181025

Address after: 225000 wee eighteen Road, Gaoyou high tech Industrial Development Zone, Yangzhou, Jiangsu

Applicant after: Jiangsu Shun Tai Transportation Group Co., Ltd.

Address before: No. 372, Zhenhai District, Ningbo, Zhejiang, Zhejiang

Applicant before: Xiao Rui

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant