CN106091704A - Device for aluminium melting furnace fume afterheat preheating aluminium - Google Patents

Device for aluminium melting furnace fume afterheat preheating aluminium Download PDF

Info

Publication number
CN106091704A
CN106091704A CN201610384394.4A CN201610384394A CN106091704A CN 106091704 A CN106091704 A CN 106091704A CN 201610384394 A CN201610384394 A CN 201610384394A CN 106091704 A CN106091704 A CN 106091704A
Authority
CN
China
Prior art keywords
aluminium
flue gas
cover
melting furnace
fume afterheat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610384394.4A
Other languages
Chinese (zh)
Inventor
黄朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Xiongchuan Machinery Sale Co Ltd
Original Assignee
Hefei Xiongchuan Machinery Sale Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Xiongchuan Machinery Sale Co Ltd filed Critical Hefei Xiongchuan Machinery Sale Co Ltd
Priority to CN201610384394.4A priority Critical patent/CN106091704A/en
Publication of CN106091704A publication Critical patent/CN106091704A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/001Extraction of waste gases, collection of fumes and hoods used therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/001Extraction of waste gases, collection of fumes and hoods used therefor
    • F27D17/002Details of the installations, e.g. fume conduits or seals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a kind of device for aluminium melting furnace fume afterheat preheating aluminium.Including the work platforms moved for aluminium, described work platforms being fixed with flue gas cover, the entrance point of described flue gas cover is provided with the first cover door, and the port of export is provided with the second cover door;Upper surface one end of described flue gas cover is provided with out gas tank, and one end is provided with inlet box, described in box structure of giving vent to anger for bucket shape, bottom is provided with the second mesh, and described inlet box structure is down that bucket shape, bottom are provided with the first mesh;The bottom, both sides of described flue gas cover is respectively equipped with flap, and described flue gas cover two medial surface is respectively equipped with the fixing seat of fixing deflection plate.The present invention is by being used for preheating aluminium by the fume afterheat of aluminium melting furnace, and design device, the big gas approach of this device and little exhanst gas outlet make the temperature of flue gas sufficiently be absorbed by aluminium, quickly reduce flue-gas temperature, while improving energy utilization rate, improve the service efficiency of aluminium melting furnace.

Description

Device for aluminium melting furnace fume afterheat preheating aluminium
Technical field
The invention belongs to aluminium melting furnace field, particularly relate to a kind of device for aluminium melting furnace fume afterheat preheating aluminium.
Background technology
Aluminium melting furnace is a kind of novel high-efficiency and energy-saving stove developed according to aluminum smelting technology, and it can meet aluminum melting well In technique: alloy composition requires tight, producing discontinuous, single heat size is bigger waits requirement, has reached to reduce consuming, has reduced scaling loss, Improve product quality, reduce labor intensity, improve working conditions and improve effect of production efficiency, it is adaptable to batch operation, joining Alloy and the many melting of foundry returns.
Aluminum produces amount of heat in melting fusion process, and heat energy taste is the most recyclable to be used.For The most aluminium melting furnace of China, the heat taken away from the flue gas of discharge constitutes about the 40%-60% of the total quantity of heat given up of aluminium melting furnace. Their exhaust gas temperature higher than 600 DEG C, already belongs to high-temperature residual heat resource mostly, and general exhaust gas temperature often reduces by 10 DEG C, aluminum melting The efficiency of stove can improve 0.5%-0.6%.Therefore, exhaust gas heat loss misses the season maximum in aluminium melting furnace loss one, more than recovered flue gas Heat has the biggest energy-saving potential.
Summary of the invention
The present invention is by being used for preheating aluminium by the fume afterheat of aluminium melting furnace, and design device, this device big Gas approach and little exhanst gas outlet make the temperature of flue gas sufficiently be absorbed by aluminium, solve existing aluminium melting furnace fume afterheat Loss amount is big, utilizes insufficient problem.
For solving above-mentioned technical problem, the present invention is achieved by the following technical solutions:
The present invention is provided to the device of aluminium melting furnace fume afterheat preheating aluminium, put down including the work moved for aluminium Platform, described work platforms is fixed with flue gas cover, and the entrance point of described flue gas cover is provided with the first cover door, and the port of export is provided with the second cover Door;Upper surface one end of described flue gas cover is provided with out gas tank, and one end is provided with inlet box, described in give vent to anger box structure for bucket shape, the end Portion is provided with the second mesh, and described inlet box structure is down that bucket shape, bottom are provided with the first mesh;The bottom, both sides of described flue gas cover is divided Not being provided with flap, described flue gas cover two medial surface is respectively equipped with the fixing seat of fixing deflection plate.
Further, described inlet box top is provided with the air inlet being connected with flue, described in upper box part of giving vent to anger be provided with The gas outlet being connected with flue;The width of described inlet box is more than the width of gas tank;Flue gas by air inlet enter into Gas tank, is slowly entered flue gas cover by the first mesh, and is flowed out through going out gas tank by the second mesh, slow down flow of flue gas speed Degree, to improve the heat absorption of aluminium.
Further, described deflection plate is respectively arranged at two ends with rotary shaft, and described rotary shaft is rotatably assorted with fixing seat, baffling On the one hand the function of plate makes flue gas flow around aluminium, on the other hand, uses the bascule rotated, when contacting with aluminium not Impacted.
Further, described flap face is provided with the circular hole fixing with work platforms, and fixed form uses screw.
The method have the advantages that
The present invention is by being used for preheating aluminium by the fume afterheat of aluminium melting furnace, and design device, this device big Gas approach and little exhanst gas outlet make the temperature of flue gas sufficiently be absorbed by aluminium, quickly reduce flue-gas temperature, improve energy While the utilization rate of source, improve the service efficiency of aluminium melting furnace;The activity baffle arrangement arranged in the flue gas cover of this device, makes The airflow direction obtaining flue gas is vertical direction by the flow direction changed course of level, forms flue gas stream while hindering, makes flue gas Temperature in space is sufficiently mixed, and improves the absorbance of heat.
Certainly, the arbitrary product implementing the present invention it is not absolutely required to reach all the above advantage simultaneously.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, embodiment will be described required use below Accompanying drawing is briefly described, it should be apparent that, the accompanying drawing in describing below is only some embodiments of the present invention, for ability From the point of view of the those of ordinary skill of territory, on the premise of not paying creative work, it is also possible to obtain the attached of other according to these accompanying drawings Figure.
Fig. 1 is the present invention structural representation for the device of aluminium melting furnace fume afterheat preheating aluminium;
Fig. 2 is present invention schematic diagram after the flue gas cover structure of the device of aluminium melting furnace fume afterheat preheating aluminium;
Fig. 3 is present invention partial structurtes enlarged drawing at the M of the device of aluminium melting furnace fume afterheat preheating aluminium;
Fig. 4 is the present invention baffle arrangement schematic diagram for the device of aluminium melting furnace fume afterheat preheating aluminium;
In accompanying drawing, the list of parts representated by each label is as follows:
1-work platforms, 2-flue gas cover, 3-first covers door, and 4-second covers door, and 5-goes out gas tank, 6-inlet box, 7-deflection plate, 8-fixes seat, 9-flap, 201-the first mesh, 202-the second mesh, 701-rotary shaft.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, those of ordinary skill in the art obtained under not making creative work premise all other Embodiment, broadly falls into the scope of protection of the invention.
Referring to shown in Fig. 1, Fig. 2 and Fig. 3, the present invention is the device for aluminium melting furnace fume afterheat preheating aluminium, including The work platforms 1 moved for aluminium, work platforms 1 is fixed with flue gas cover 2, and the entrance point of flue gas cover 2 is provided with the first cover door 3, the port of export is provided with the second cover door 4;Upper surface one end of flue gas cover 2 is provided with out gas tank 5, and one end is provided with inlet box 6, goes out gas tank 5 Structure is down that bucket shape, bottom are provided with the second mesh 202, and inlet box 6 structure is down that bucket shape, bottom are provided with the first mesh 201;Flue gas The bottom, both sides of cover 2 is respectively equipped with flap 9, and 2 liang of medial surface of flue gas cover are respectively equipped with the fixing seat 8 of fixing deflection plate 7.
Wherein, inlet box 6 top is provided with the air inlet being connected with flue, goes out gas tank 5 top and is provided with and flue The gas outlet connected;The width of inlet box 6 is more than the width of gas tank 5;Flue gas enters inlet box 6 by air inlet, by the One mesh 201 slowly enters flue gas cover 2, and is flowed out through going out gas tank 5 by the second mesh 202, slow down flow of flue gas speed, with Improve the heat absorption of aluminium.
Wherein shown in Fig. 4, deflection plate 7 is respectively arranged at two ends with rotary shaft 701, and rotary shaft 701 is rotatably assorted with fixing seat 8, On the one hand the function of deflection plate 7 makes flue gas flow around aluminium, on the other hand, uses the bascule rotated, connects with aluminium Touch time unaffected.
Wherein, flap 9 is provided with and the fixing circular hole of work platforms 1, and fixed form uses screw.
The application process of the present embodiment is:
First, ready aluminium is subsequently placed on work platforms 1, opens the first cover door 3, start work platforms 1 On conveying switch, aluminium is sent in flue gas cover 2, closes the first cover door 3, then, flue gas enters air inlet along flue Case 6 enters in flue gas cover 2 through the first mesh 201, and flue gas is blocked by the deflection plate 7 in flue gas cover 2, is changed into vertically by moving horizontally The mode declined flows, and aluminium carries out sufficient heat transfer, and quickly reduces the temperature of flue gas;Bottom surface due to inlet box 6 Area is more than the base area of gas tank 5 so that intake velocity is faster than speed of giving vent to anger, and through after a while, aluminium absorbs certain Heat when being between solid-state and liquid, open the first cover door 3 and the second cover door 4 simultaneously, start the conveying on work platforms 1 Switch, sends aluminium, carries out the aluminium preheating of next group, and prepares to send in aluminium melting furnace to preheated aluminium.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.Preferred embodiment is the most detailed Describe all of details, be also not intended to the detailed description of the invention that this invention is only described.Obviously, according to the content of this specification, Can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is to preferably explain the present invention Principle and actual application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only Limited by claims and four corner thereof and equivalent.

Claims (4)

1., for the device of aluminium melting furnace fume afterheat preheating aluminium, including the work platforms (1) moved for aluminium, its feature exists In, described work platforms (1) is fixed with flue gas cover (2), the entrance point of described flue gas cover (2) is provided with the first cover door (3), outlet End is provided with the second cover door (4);Upper surface one end of described flue gas cover (2) is provided with out gas tank (5), and one end is provided with inlet box (6), institute Stating out gas tank (5) structure and be down that bucket shape, bottom are provided with the second mesh (202), described inlet box (6) structure is down bucket shape, bottom It is provided with the first mesh (201);The bottom, both sides of described flue gas cover (2) is respectively equipped with flap (9), inside described flue gas cover (2) two Face is respectively equipped with the fixing seat (8) of fixing deflection plate (7).
Device for aluminium melting furnace fume afterheat preheating aluminium the most according to claim 1, it is characterised in that described air inlet Case (6) top is provided with the air inlet being connected with flue, described in go out gas tank (5) top and be provided with giving vent to anger of being connected with flue Mouthful;The width of described inlet box (6) is more than the width of gas tank (5).
Device for aluminium melting furnace fume afterheat preheating aluminium the most according to claim 1, it is characterised in that described baffling Plate (7) is respectively arranged at two ends with rotary shaft (701), and described rotary shaft (701) is rotatably assorted with fixing seat (8).
Device for aluminium melting furnace fume afterheat preheating aluminium the most according to claim 1, it is characterised in that described flap (9) face is provided with the circular hole fixing with work platforms (1), and fixed form uses screw.
CN201610384394.4A 2016-05-30 2016-05-30 Device for aluminium melting furnace fume afterheat preheating aluminium Pending CN106091704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610384394.4A CN106091704A (en) 2016-05-30 2016-05-30 Device for aluminium melting furnace fume afterheat preheating aluminium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610384394.4A CN106091704A (en) 2016-05-30 2016-05-30 Device for aluminium melting furnace fume afterheat preheating aluminium

Publications (1)

Publication Number Publication Date
CN106091704A true CN106091704A (en) 2016-11-09

Family

ID=57447132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610384394.4A Pending CN106091704A (en) 2016-05-30 2016-05-30 Device for aluminium melting furnace fume afterheat preheating aluminium

Country Status (1)

Country Link
CN (1) CN106091704A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7241139B2 (en) * 2004-01-07 2007-07-10 XuDong Zhu Casting sand heating apparatus
CN202066384U (en) * 2010-10-14 2011-12-07 佛山市通润热能科技有限公司 Aluminum ingot preheating furnace
CN202836236U (en) * 2012-10-19 2013-03-27 保定安保能冶金设备有限公司 Aluminum filing drying preheating device
CN204830903U (en) * 2015-08-10 2015-12-02 赵迷迷 A device for melting aluminium kiln gas preheats aluminium considers to be worth doing
CN204997041U (en) * 2015-09-27 2016-01-27 山东华宇合金材料有限公司 Novel high -efficient aluminium ingot production line aluminium ingot conveyer belt preheats device
CN205002618U (en) * 2015-09-27 2016-01-27 山东华宇合金材料有限公司 Novel high -efficient aluminium ingot production line residual heat from flue gas utilizes system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7241139B2 (en) * 2004-01-07 2007-07-10 XuDong Zhu Casting sand heating apparatus
CN202066384U (en) * 2010-10-14 2011-12-07 佛山市通润热能科技有限公司 Aluminum ingot preheating furnace
CN202836236U (en) * 2012-10-19 2013-03-27 保定安保能冶金设备有限公司 Aluminum filing drying preheating device
CN204830903U (en) * 2015-08-10 2015-12-02 赵迷迷 A device for melting aluminium kiln gas preheats aluminium considers to be worth doing
CN204997041U (en) * 2015-09-27 2016-01-27 山东华宇合金材料有限公司 Novel high -efficient aluminium ingot production line aluminium ingot conveyer belt preheats device
CN205002618U (en) * 2015-09-27 2016-01-27 山东华宇合金材料有限公司 Novel high -efficient aluminium ingot production line residual heat from flue gas utilizes system

Similar Documents

Publication Publication Date Title
CN208678740U (en) Waste gas produced device when a kind of processing melting waste aluminum
CN107144142A (en) Using the sintering deposit exhaust heat recovering method of chamber type sintering ore deposit waste-heat recovery device
CN104676619B (en) The device that a kind of gas fired-boiler chimney is two-in-one with fountain flue gas waste heat recovery assembly
CN209131378U (en) A kind of rotary calcining kiln cooling device
CN206450073U (en) A kind of hybrid melting furnace of fusible aluminium ingot and aluminium waste
CN206563501U (en) A kind of rotary kiln cement clinker production line waste heat recycling system
CN105021051B (en) A kind of waste heat of cupola furnace utilizes dedusting and desulphurization integrated system
CN201950155U (en) Feeding device for casting waste sand hot method regeneration roasting furnace
CN205002618U (en) Novel high -efficient aluminium ingot production line residual heat from flue gas utilizes system
CN106091704A (en) Device for aluminium melting furnace fume afterheat preheating aluminium
CN203109160U (en) Drying tower for cast waste sand roaster
CN204830903U (en) A device for melting aluminium kiln gas preheats aluminium considers to be worth doing
CN206381822U (en) A kind of tin metallurgy flue gas desulfurization multifunction system
CN107648937B (en) U-shaped inertial dust removal device and dust removal method thereof
CN207405066U (en) A kind of device using smoke pre-heating glass batch
CN206469720U (en) A kind of smelting furnace waste heat recovery dust pelletizing system
CN205593292U (en) Tea leaf drying device
CN206430503U (en) A kind of environment-friendly type dries mixer
CN205940016U (en) Special drying device of tin copper gold and silver waste material comprehensive recovery
CN205255361U (en) Two hand former lines
CN206959612U (en) The electric furnace that a kind of hot tail gas utilizes
CN207515520U (en) A kind of high temperature furnace slag waste-heat recovery device
CN206304473U (en) A kind of dust-removing recovery device
CN208230523U (en) Enter the device of kiln soil using the soil waste heat desiccation after thermal desorption
CN205482335U (en) Coke hydraulic pressure verts to cast and melts aluminium stove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109