CN106091516B - A kind of rapid cooling device of hardware making iron block - Google Patents

A kind of rapid cooling device of hardware making iron block Download PDF

Info

Publication number
CN106091516B
CN106091516B CN201610738368.7A CN201610738368A CN106091516B CN 106091516 B CN106091516 B CN 106091516B CN 201610738368 A CN201610738368 A CN 201610738368A CN 106091516 B CN106091516 B CN 106091516B
Authority
CN
China
Prior art keywords
block
sliding
sliding rail
water tank
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610738368.7A
Other languages
Chinese (zh)
Other versions
CN106091516A (en
Inventor
应澄夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG JUSHENG NUMERICAL CONTROL MACHINE TOOL Co.,Ltd.
Original Assignee
Wenzhou Kaiyu Hardware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Kaiyu Hardware Co Ltd filed Critical Wenzhou Kaiyu Hardware Co Ltd
Priority to CN201610738368.7A priority Critical patent/CN106091516B/en
Publication of CN106091516A publication Critical patent/CN106091516A/en
Application granted granted Critical
Publication of CN106091516B publication Critical patent/CN106091516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D1/00Devices using naturally cold air or cold water
    • F25D1/02Devices using naturally cold air or cold water using naturally cold water, e.g. household tap water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D3/00Devices using other cold materials; Devices using cold-storage bodies
    • F25D3/02Devices using other cold materials; Devices using cold-storage bodies using ice, e.g. ice-boxes

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)

Abstract

The present invention relates to a kind of cooling device more particularly to a kind of rapid cooling devices of hardware making iron block.The technical problem to be solved in the present invention is to provide a kind of rapid cooling devices of hardware making iron block that cooling efficiency is high.In order to solve the above-mentioned technical problem, the present invention provides such a rapid cooling devices of hardware making iron block, include guide plate, ceiling hold, right support, the first spring, the first sliding rail, the first water tank, piston, connecting rod, the first wedge block, the first sliding block, second sliding rail etc.;Ceiling hold bottom is equipped with guide plate, the first water tank and the first spring successively from left to right, and pilot hole is provided on guide plate, and top is equipped with the first stereoplasm tube on the left of the first water tank, and piston is equipped in the first water tank.The present invention uses electric pushrod, using gearing property, starts electric pushrod, drives and places the lower section that the circumferential right side moves to the first stereoplasm tube and the second stereoplasm tube, drives piston upwards, block is driven to move right.

Description

A kind of rapid cooling device of hardware making iron block
Technical field
The present invention relates to a kind of cooling device more particularly to a kind of rapid cooling devices of hardware making iron block.
Background technology
Process that is cooling, instigating the temperature of hot object to reduce without phase change.There are commonly contacts for cooling method Ice cooling, air cooling, water cooling, vacuum cooled etc..Contact ice cooling is a kind of common simple cooling means, and row Effective cooling means.This be it is a kind of being in direct contact product with ice, take heat away from product, other than having high cooling velocity, Ice-melt can make always product surface keep moistening.This method is frequently used for cooling fish, leafy vegetable and some fruit, also uses In the processing of some food such as pork luncheon meat.Air-cooling is inhaled as cooling medium stream through product with the cold air after cooling Take heat.Used air themperature when common product is pre-chilled is not lower than solidification point, in case product freezes.Water cooling But method is cooling food cooling will to be needed to the method for assigned temperature by water at low temperature.The foundation of vacuum cooled is water in low pressure The latent heat of vaporization is drawn when lower evaporation.This method is most rapid in current all cooling means.
Existing iron block cooling device haves the shortcomings that cooling efficiency is low, thus there is an urgent need for research and develop a kind of cooling efficiency it is high five The golden rapid cooling device of making iron block.
Invention content
(1) technical problems to be solved
The present invention for the disadvantage that overcomes existing iron block cooling device cooling efficiency low, the invention solves technology ask Topic is to provide a kind of rapid cooling device of hardware making iron block that cooling efficiency is high.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a rapid cooling device of hardware making iron block, Include guide plate, ceiling hold, right support, the first spring, the first sliding rail, the first water tank, piston, connecting rod, the first wedge block, One sliding block, the second sliding rail, the second wedge block, the second sliding block, head rod, third sliding block, the second connecting rod, third sliding rail, Four-slider, third wedge block, the 5th sliding block, electric pushrod, places ring, the first stereoplasm tube, contact wheel, shifting at third connecting rod Lever, fixed block and second spring;Right support upper end be equipped with ceiling hold, ceiling hold bottom from left to right successively be equipped with guide plate, First water tank and the first spring are provided with pilot hole on guide plate, and top is equipped with the first stereoplasm tube, the first water tank on the left of the first water tank It is interior to be equipped with piston, the first sliding rail and the second sliding rail are equipped on the left of right support, the first sliding rail is located above the second sliding rail, the first sliding rail It is equipped with the first sliding block, the first lower spring end connect with the first slider top, and the first sliding block left end is equipped with the first wedge block, and first Connecting rod is equipped at the top of wedge block, small end is connect with piston base, and the second sliding rail is equipped with the second sliding block and third sliding block, the Two sliding blocks are located at third sliding block left, and head rod is connected between the second sliding block and third sliding block, and the second slider top is set There is the second wedge block, the second wedge block is located at below the first wedge block, is hingedly connected with the second connecting rod on third sliding block, and second Sliding rail top left is equipped with third sliding rail, and third sliding rail is equipped with Four-slider and the 5th sliding block, and Four-slider is located at the 5th and slides Below block, the second connecting rod upper end is articulated and connected with Four-slider, and third connecting rod is equipped at the top of Four-slider, and the 5th sliding block is right End is equipped with third wedge block, and third wedge block bottom is connect with third connecting rod upper end, and contact wheel is equipped on the right side of third wedge block, Contact wheel is equipped with mobile bar, and mobile bar is equipped with fixed block, second spring, mobile bar are connected between fixed block and guide plate Across second spring, mobile bar right end passes through pilot hole, and mobile bar right end, which is equipped with, places ring, and top is equipped with electricity on the right side of third sliding rail It is connect at the top of dynamic push rod, electric pushrod bottom and third wedge block.
Preferably, further include having the second water tank, block, the 6th sliding block, third spring, the 4th sliding rail, the second stereoplasm tube, Two electromagnet and the first electromagnet, the outer left side top of the first water tank are equipped with the 4th sliding rail, and the 4th sliding rail is located on the first stereoplasm tube Side, the 4th sliding rail are equipped with the 6th sliding block, are connected with third spring on the right side of the 6th sliding block between the outer left side of the first water tank, and the 6th Slider top is equipped with block, and block left end is equipped with the second electromagnet, and ceiling hold bottom left is equipped with the second water tank, the second water tank position Between guide plate and the first water tank, the second water tank bottom is equipped with the second stereoplasm tube, and block passes through the second stereoplasm tube, and it is right to place ring Side upper end is equipped with the first electromagnet, and the first electromagnet is located at the second electromagnet left.
Preferably, further include having reinforcing rib, ceiling hold bottom left is equipped with reinforcing rib, reinforcing rib lower end and guide plate right side Top connects, and reinforcing rib is located at the second water tank left, and the top and bottom of reinforcing rib are inclination shape, the width of reinforcing rib upper surface Degree is equal with the width of ceiling hold bottom surface, and the width of reinforcing rib lower surface is equal with the width of guide plate right lateral surface.
Preferably, further include having placing frame, placing frame is equipped on the right side of right support, the shape of placing frame is spill, placing frame Two wall of left and right it is contour, the height of placing frame is 1/5th of right support height, and the thickness of placing frame is 4cm, placing frame Material is high-quality steel.
Preferably, further include having collecting tank, guide plate lower end is equipped with collecting tank, and collecting tank, which is located at, places ring, the first hard The shape of the lower section of pipe and the first stereoplasm tube, collecting tank is spill, and two wall of left and right of collecting tank is contour, and the thickness of collecting tank is The material of 3cm, collecting tank are stainless steel.
Preferably, further include having timer, lower end is equipped with timer, timer bottom and third sliding rail on the left of third sliding rail Lower end is in same level, and the shape of timer is cuboid, and the width of timer is equal with the width of third sliding rail.
Preferably, further include having limited block, the second sliding rail is equipped with limited block, and limited block is located at the right of the second sliding block, Limited block is located at the left of right support, and the shape of limited block is cuboid, and length of the limited block apart from right support is 2cm.
Preferably, the diagram shape of facing of the first wedge block, the second wedge block and third wedge block is trapezoidal, the first wedge shape Block bottom surface, the second wedge block top surface and third wedge block right lateral surface be it is skewed, the first wedge block bottom with Agree at the top of second wedge block.
Preferably, the material of right support is Q235 steel, and the shape of right support is cuboid, and the length of right support is 3cm, The width of right support is 4cm, and the height of right support is 100cm, and the shape of the cross section of right support right wall is rectangle, right support The shape of the cross section at top is rectangle.
Operation principle:When iron block needs cooling, iron block to be cooled is placed on after placing on ring, starts electric pushrod Elongation drives third wedge block to move downward, and contact wheel is driven to move right, and drives mobile bar to move right, second spring quilt Compression drives the circumferential right side of placement to move to below the first stereoplasm tube, and third wedge block drives third connecting rod to move downward, and drives Four-slider moves downward, and the second connecting rod upper end is driven to move downward, and the second connecting rod lower end moves right, and third is driven to slide Block moves right, and head rod is driven to move right, and the second sliding block is driven to move right, and the second wedge block is driven to transport to the right It is dynamic, it drives the first wedge block to move upwards, connecting rod and the first sliding block is driven to move upwards, the first spring is compressed, band piston Move upwards, to make the water in the first water tank pass through the outflow of the first stereoplasm tube, be sprinkled upon the surface of iron block to be cooled to iron block into Row cooling, when the water level in placement ring reach a certain height, electric pushrod stops elongation.Start electric pushrod to shorten, drive Third wedge block moves upwards, and third connecting rod is driven to move upwards, and Four-slider is driven to move upwards, and drives the second connecting rod Upper end moves upwards, and the second connecting rod lower end moves downward, and third sliding block is driven to move downward, and head rod is driven to transport to the left It is dynamic, drive the second sliding block to move downward, after driving the second wedge block to move downward reset, electric pushrod stops shortening.In elastic force Under effect, the first spring and second spring elongation reset, and the first spring drives the first sliding block to move downward, and drives the first wedge block It moves downward, connecting rod is driven to move downward, drive piston moves downward to reset, second spring drives mobile bar to move downward, band Dynamic contact wheel and the circumferential left movement of placement reset.When the temperature of iron block drops to a certain degree, people can take out iron block.It repeats The above operation can cool down other iron blocks to be cooled.
Because further including having the second water tank, block, the 6th sliding block, third spring, the 4th sliding rail, the second stereoplasm tube, second Electromagnet and the first electromagnet, the outer left side top of the first water tank are equipped with the 4th sliding rail, and the 4th sliding rail is located above the first stereoplasm tube, 4th sliding rail is equipped with the 6th sliding block, is connected with third spring between the outer left side of the first water tank on the right side of the 6th sliding block, the 6th slides Block is equipped at the top of block, block left end is equipped with the second electromagnet, and ceiling hold bottom left is equipped with the second water tank, and the second water tank is located at Between guide plate and the first water tank, the second water tank is located at bottom and is equipped with the second stereoplasm tube, and block passes through the second stereoplasm tube, places ring Right side upper end is equipped with the first electromagnet, and the first electromagnet is located at the second electromagnet left.Initially, ice cube is housed in the second water tank, Be powered to the first electromagnet and the second electromagnet, make the first electromagnet and the second electromagnet band same magnetic, the first electromagnet and Second electromagnet is mutually exclusive.Start electric pushrod elongation, when placement ring being driven to move right, the first electromagnet is driven to transport to the right Dynamic, under the action of Lorentz force, the second electromagnet moves right, and block is driven to move right, and the 6th sliding block is driven to transport to the right Dynamic, third spring is compressed, and when the second electromagnet moves right certain position, ice cube is fallen from the second stereoplasm tube, ice cube It falls on iron block, the cooling of iron block can be accelerated, reach the higher effect of cooling efficiency.Start electric pushrod to shorten, drive is put When setting circumferential left movement reset, the first electromagnet is driven to move downward reset.First electromagnet and the power-off of the second electromagnet, in bullet Under force effect, the elongation of third spring resets, and the 6th sliding block is driven to move downward, and block is driven to move downward, and drives the second electromagnetism Iron moves downward reset.
Because further including having reinforcing rib, ceiling hold bottom left is equipped with reinforcing rib, on the right side of reinforcing rib lower end and guide plate on Side's connection, reinforcing rib are located at the second water tank left, and the top and bottom of reinforcing rib are inclination shape, the width of reinforcing rib upper surface Equal with the width of ceiling hold bottom surface, the width of reinforcing rib lower surface is equal with the width of guide plate right lateral surface, can be with Play the role of stable equilibrium ceiling hold and guide plate.
Because further including having placing frame, placing frame is equipped on the right side of right support, the shape of placing frame is spill, a left side for placing frame Right two walls are contour, and the height of placing frame is 1/5th of right support height, and the thickness of placing frame is 4cm, the material of placing frame For high-quality steel, service life is long, it is possible to place iron block to be cooled or iron block that storage has cooled down.
Because further including having collecting tank, guide plate lower end be equipped with collecting tank, collecting tank be located at place ring, the first stereoplasm tube and The shape of the lower section of first stereoplasm tube, collecting tank is spill, and two wall of left and right of collecting tank is contour, and the thickness of collecting tank is 3cm, is received Integrate the material of slot as stainless steel, service life is long, it is possible to it collects from the water placed under circulation, recycles water resource, Achieve the effect that save cost.
Because further including having timer, lower end is equipped with timer on the left of third sliding rail, timer bottom under third sliding rail End is in same level, and the shape of timer is cuboid, and the width of timer is equal with the width of third sliding rail, works as iron When the cooling time of block reaches preset time, it is possible to remind people to remove iron block, avoid iron block cooling time too short or It is long, it can preferably cool down iron block.
Because further including having limited block, the second sliding rail is equipped with limited block, and limited block is located at the right of the second sliding block, limits Block is located at the left of right support, and the shape of limited block is cuboid, and length of the limited block apart from right support is 2cm, so working as During moving right, limited block plays the role of limiting the second sliding block mobile range second sliding block, to prevent the second sliding block It is detached from the second sliding rail.
(3) advantageous effect
The present invention uses electric pushrod, using gearing property, starts electric pushrod, drives the circumferential right side of placement to move to first hard The lower section of matter pipe and the second stereoplasm tube drives piston upwards, and block is driven to move right, low in the first water tank to make Ice cube in warm water and the second water tank is fallen on iron block, and water at low temperature and ice cube simultaneously cool down iron block, have reached cooling effect The high effect of rate.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Fig. 6 is the 6th kind of main structure diagram of the present invention.
Fig. 7 is the 7th kind of main structure diagram of the present invention.
Label in attached drawing be:1- guide plates, 2- ceiling holds, 3- right supports, the first springs of 4-, the first sliding rails of 5-, 6- One water tank, 7- pistons, 8- connecting rods, the first wedge blocks of 9-, the first sliding blocks of 10-, the second sliding rails of 11-, the second wedge blocks of 12-, 13- Two sliding blocks, 14- head rods, 15- third sliding blocks, the second connecting rods of 16-, 17- third sliding rails, 18- Four-sliders, 19- Three connecting rods, 20- third wedge blocks, the 5th sliding blocks of 21-, 22- electric pushrods, 23- pilot holes, 24- place ring, and 25- first is hard Matter pipe, 26- contact wheels, 27- mobile bars, 28- fixed blocks, 29- second springs, the second water tanks of 30-, 31- blocks, 32- the 6th are slided Block, 33- third springs, the 4th sliding rails of 34-, the second stereoplasm tubes of 35-, the second electromagnet of 36-, the first electromagnet of 37-, 38- reinforce Muscle, 39- placing frames, 40- collecting tanks, 41- timers, 42- limited blocks.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of rapid cooling device of hardware making iron block includes as shown in figs. 1-7 guide plate 1, ceiling hold 2, right branch Frame 3, the first spring 4, the first sliding rail 5, the first water tank 6, piston 7, connecting rod 8, the first wedge block 9, the first sliding block 10, the second sliding rail 11, the second wedge block 12, the second sliding block 13, head rod 14, third sliding block 15, the second connecting rod 16, third sliding rail 17, Four-slider 18, third wedge block 20, the 5th sliding block 21, electric pushrod 22, places ring 24, the first stereoplasm tube at third connecting rod 19 25, contact wheel 26, mobile bar 27, fixed block 28 and second spring 29;3 upper end of right support is equipped with ceiling hold 2,2 bottom of ceiling hold It is equipped with guide plate 1, the first water tank 6 and the first spring 4 successively from left to right, pilot hole 23, the first water tank 6 is provided on guide plate 1 It is equipped with the first stereoplasm tube 25 above left side, piston 7 is equipped in the first water tank 6,3 left side of right support is equipped with the first sliding rail 5 and second Sliding rail 11, the first sliding rail 5 are located at the top of the second sliding rail 11, and the first sliding rail 5 is equipped with the first sliding block 10,4 lower end of the first spring with First sliding block, 10 top connection, 10 left end of the first sliding block are equipped with the first wedge block 9, and 9 top of the first wedge block is equipped with connecting rod 8, even 8 upper end of bar is connect with 7 bottom of piston, and the second sliding rail 11 is equipped with the second sliding block 13 and third sliding block 15, and the second sliding block 13 is located at 15 left of third sliding block, is connected with head rod 14 between the second sliding block 13 and third sliding block 15,13 top of the second sliding block is set There are the second wedge block 12, the second wedge block 12 to be located at 9 lower section of the first wedge block, the second connection is hingedly connected on third sliding block 15 Bar 16,11 top left of the second sliding rail are equipped with third sliding rail 17, and third sliding rail 17 is equipped with Four-slider 18 and the 5th sliding block 21, Four-slider 18 is located at 21 lower section of the 5th sliding block, and 16 upper end of the second connecting rod is articulated and connected with Four-slider 18, Four-slider 18 Top is equipped with third connecting rod 19, and 21 right end of the 5th sliding block is equipped with third wedge block 20, and 20 bottom of third wedge block connects with third 19 upper end of extension bar connects, and the right side of third wedge block 20 is equipped with contact wheel 26, and contact wheel 26 is equipped with mobile bar 27, in mobile bar 27 Equipped with fixed block 28, second spring 29 is connected between fixed block 28 and guide plate 1, mobile bar 27 passes through second spring 29, moves 27 right end of lever passes through pilot hole 23, and 27 right end of mobile bar, which is equipped with, places ring 24, and 17 right side top of third sliding rail is equipped with electronic push away Bar 22,22 bottom of electric pushrod are connect with 20 top of third wedge block.
Further include having the second water tank 30, block 31, the 6th sliding block 32, third spring 33, the 4th sliding rail 34, the second stereoplasm tube 35, the second electromagnet 36 and the first electromagnet 37,6 outer left side top of the first water tank are equipped with the 4th sliding rail 34, the 4th sliding rail 34 Above the first stereoplasm tube 25, the 4th sliding rail 34 is equipped with the 6th sliding block 32,32 right side of the 6th sliding block and 6 outer left side of the first water tank Between be connected with third spring 33,32 top of the 6th sliding block is equipped with block 31, and 31 left end of block is equipped with the second electromagnet 36, topmast 2 bottom left of frame is equipped with the second water tank 30, and the second water tank 30 is located between guide plate 1 and the first water tank 6,30 bottom of the second water tank Equipped with the second stereoplasm tube 35, block 31 passes through the second stereoplasm tube 35, places 24 right side upper end of ring and is equipped with the first electromagnet 37, and first Electromagnet 37 is located at 36 left of the second electromagnet.
Further include having reinforcing rib 38,2 bottom left of ceiling hold is equipped with reinforcing rib 38, and 38 lower end of reinforcing rib is right with guide plate 1 Connection, reinforcing rib 38 are located at 30 left of the second water tank above side, and the top and bottom of reinforcing rib 38 are inclination shape, reinforcing rib 38 The width of upper surface is equal with the width of 2 bottom surface of ceiling hold, width and 1 right lateral surface of guide plate of 38 lower surface of reinforcing rib Width it is equal.
Further include having placing frame 39,3 right side of right support is equipped with placing frame 39, and the shape of placing frame 39 is spill, placing frame 39 two wall of left and right is contour, and the height of placing frame 39 is 1/5th of 3 height of right support, and the thickness of placing frame 39 is 4cm, is put The material for setting frame 39 is high-quality steel.
Further include having collecting tank 40,1 lower end of guide plate is equipped with collecting tank 40, and collecting tank 40, which is located at, places ring 24, first firmly The shape of the lower section of matter pipe 25 and the first stereoplasm tube 25, collecting tank 40 is spill, and two wall of left and right of collecting tank 40 is contour, collecting tank 40 thickness is 3cm, and the material of collecting tank 40 is stainless steel.
Further include having timer 41,17 left side lower end of third sliding rail is equipped with timer 41, and 41 bottom of timer is slided with third 17 lower end of rail is in same level, and the shape of timer 41 is cuboid, width and the third sliding rail 17 of timer 41 Width is equal.
Further include having limited block 42, the second sliding rail 11 is equipped with limited block 42, and limited block 42 is located at the right side of the second sliding block 13 Side, limited block 42 are located at the left of right support 3, and the shape of limited block 42 is cuboid, length of the limited block 42 apart from right support 3 Degree is 2cm.
The diagram shape of facing of first wedge block 9, the second wedge block 12 and third wedge block 20 is trapezoidal, the first wedge block 9 bottom surfaces, 12 top surface of the second wedge block and 20 right lateral surface of third wedge block are skewed, 9 bottom of the first wedge block Agree with 12 top of the second wedge block in portion.
The material of right support 3 is Q235 steel, and the shape of right support 3 is cuboid, and the length of right support 3 is 3cm, right branch The width of frame 3 is 4cm, and the height of right support 3 is 100cm, and the shape of the cross section of 3 right wall of right support is rectangle, right support 3 The shape of the cross section at top is rectangle.
Operation principle:When iron block needs cooling, iron block to be cooled is placed on after placing on ring 24, starts electronic push away Bar 22 extends, and third wedge block 20 is driven to move downward, and contact wheel 26 is driven to move right, and mobile bar 27 is driven to move right, Second spring 29 is compressed, and placement ring 24 is driven to move right to 25 lower section of the first stereoplasm tube, the drive third of third wedge block 20 Connecting rod 19 moves downward, and Four-slider 18 is driven to move downward, and 16 upper end of the second connecting rod is driven to move downward, the second connection 16 lower end of bar moves right, and third sliding block 15 is driven to move right, and head rod 14 is driven to move right, and drives the second sliding block 13 move right, and the second wedge block 12 is driven to move right, and the first wedge block 9 is driven to move upwards, and connecting rod 8 and first is driven to slide Block 10 moves upwards, and the first spring 4 is compressed, and band piston 7 moves upwards, to make the water in the first water tank 6 pass through first Stereoplasm tube 25 flows out, and the surface for being sprinkled upon iron block to be cooled cools down iron block, when the water level placed in ring 24 reaches certain height When spending, electric pushrod 22 stops elongation.Start electric pushrod 22 to shorten, third wedge block 20 is driven to move upwards, drives third Connecting rod 19 moves upwards, and Four-slider 18 is driven to move upwards, and 16 upper end of the second connecting rod is driven to move upwards, the second connection 16 lower end of bar moves downward, and third sliding block 15 is driven to move downward, and head rod 14 is driven to move downward, and drives the second sliding block 13 move downward, and after driving the second wedge block 12 to move downward reset, electric pushrod 22 stops shortening.Under the effect of elasticity, One spring 4 and second spring 29 elongation reset, the first spring 4 drive the first sliding block 10 move downward, drive the first wedge block 9 to Lower movement drives connecting rod 8 to move downward, and band piston 7 moves downward reset, and second spring 29 drives mobile bar 27 to transport to the left It is dynamic, drive contact wheel 26 and placement ring 24 to move downward reset.When the temperature of iron block drops to a certain degree, people can be by iron block It takes out.It repeats above operation, other iron blocks to be cooled can be cooled down.
Because further including having the second water tank 30, block 31, the 6th sliding block 32, third spring 33, the 4th sliding rail 34, second hard Matter pipe 35, the second electromagnet 36 and the first electromagnet 37,6 outer left side top of the first water tank are equipped with the 4th sliding rail 34, the 4th sliding rail 34 are located at the top of the first stereoplasm tube 25, and the 4th sliding rail 34 is equipped with the 6th sliding block 32,32 right side of the 6th sliding block with outside the first water tank 6 Third spring 33 is connected between left side, 32 top of the 6th sliding block is equipped with block 31, and 31 left end of block is equipped with the second electromagnet 36, 2 bottom left of ceiling hold is equipped with the second water tank 30, and the second water tank 30 is located between guide plate 1 and the first water tank 6, the second water tank 30 It is equipped with the second stereoplasm tube 35 positioned at bottom, block 31 passes through the second stereoplasm tube 35, places 24 right side upper end of ring and is equipped with the first electromagnetism Iron 37, the first electromagnet 37 are located at 36 left of the second electromagnet.Initially, ice cube is housed in the second water tank 30, gives the first electromagnet 37 and second electromagnet 36 be powered, make the first electromagnet 37 and the second electromagnet 36 with same magnetic, the first electromagnet 37 and the Two electromagnet 36 are mutually exclusive.Start electric pushrod 22 to extend, when placement ring 24 being driven to move right, drives the first electromagnet 37 It moves right, under the action of Lorentz force, the second electromagnet 36 moves right, and block 31 is driven to move right, and drives the 6th Sliding block 32 moves right, and third spring 33 is compressed, and when the second electromagnet 36 moves right certain position, ice cube is from second Stereoplasm tube 35 is fallen, and ice cube is fallen on iron block, can accelerate the cooling of iron block, reaches the higher effect of cooling efficiency.Start electricity Dynamic push rod 22 shortens, and when placement ring 24 being driven to move downward reset, the first electromagnet 37 is driven to move downward reset.First electromagnetism Iron 37 and the power-off of the second electromagnet 36, under the effect of elasticity, the elongation of third spring 33 resets, and the 6th sliding block 32 is driven to transport to the left It is dynamic, it drives block 31 to move downward, the second electromagnet 36 is driven to move downward reset.
Because further including having reinforcing rib 38,2 bottom left of ceiling hold is equipped with reinforcing rib 38,38 lower end of reinforcing rib and guide plate 1 right side top connection, reinforcing rib 38 are located at 30 left of the second water tank, and the top and bottom of reinforcing rib 38 are inclination shape, are reinforced The width of 38 upper surface of muscle is equal with the width of 2 bottom surface of ceiling hold, width and 1 right side of guide plate of 38 lower surface of reinforcing rib The width on surface is equal, can play the role of stable equilibrium ceiling hold 2 and guide plate 1.
Because further including having placing frame 39,3 right side of right support is equipped with placing frame 39, and the shape of placing frame 39 is spill, is put Two wall of left and right for setting frame 39 is contour, and the height of placing frame 39 is 1/5th of 3 height of right support, and the thickness of placing frame 39 is The material of 4cm, placing frame 39 are high-quality steel, and service life is long, it is possible to place iron block to be cooled or storage is cold But iron block.
Because further including having collecting tank 40,1 lower end of guide plate is equipped with collecting tank 40, and collecting tank 40, which is located at, places ring 24, the The shape of the lower section of one stereoplasm tube 25 and the first stereoplasm tube 25, collecting tank 40 is spill, and two wall of left and right of collecting tank 40 is contour, is received Integrate the thickness of slot 40 as 3cm, the material of collecting tank 40 is stainless steel, and service life is long, it is possible to collect from placement ring 24 The water flowed down recycles water resource, achievees the effect that save cost.
Because further including having timer 41,17 left side lower end of third sliding rail is equipped with timer 41,41 bottom of timer and the Three sliding rails, 17 lower end is in same level, and the shape of timer 41 is cuboid, width and the third sliding rail of timer 41 17 width is equal, when reaching preset time the cooling time of iron block, it is possible to remind people to remove iron block, avoid iron Block is too short or long cooling time, can preferably cool down iron block.
Because further including having limited block 42, the second sliding rail 11 is equipped with limited block 42, and limited block 42 is located at the second sliding block 13 Right, limited block 42 is located at the left of right support 3, and the shape of limited block 42 is cuboid, and limited block 42 is apart from right support 3 Length be 2cm, so when the second sliding block 13 during moving right, limited block 42 play limitation the second sliding block 13 movement The effect of amplitude is detached from the second sliding rail 11 to prevent the second sliding block 13.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of rapid cooling device of hardware making iron block, which is characterized in that include guide plate(1), ceiling hold(2), it is right Holder(3), the first spring(4), the first sliding rail(5), the first water tank(6), piston(7), connecting rod(8), the first wedge block(9), One sliding block(10), the second sliding rail(11), the second wedge block(12), the second sliding block(13), head rod(14), third sliding block (15), the second connecting rod(16), third sliding rail(17), Four-slider(18), third connecting rod(19), third wedge block(20)、 5th sliding block(21), electric pushrod(22), place ring(24), the first stereoplasm tube(25), contact wheel(26), mobile bar(27), it is solid Determine block(28)And second spring(29);Right support(3)Upper end is equipped with ceiling hold(2), ceiling hold(2)Bottom is set successively from left to right There is guide plate(1), the first water tank(6)With the first spring(4), guide plate(1)On be provided with pilot hole(23), the first water tank(6)It is left The first stereoplasm tube is equipped with above side(25), the first water tank(6)It is interior to be equipped with piston(7), right support(3)Left side is equipped with the first sliding rail (5)With the second sliding rail(11), the first sliding rail(5)Positioned at the second sliding rail(11)Top, the first sliding rail(5)It is equipped with the first sliding block (10), the first spring(4)Lower end and the first sliding block(10)Top connects, the first sliding block(10)Left end is equipped with the first wedge block(9), First wedge block(9)Top is equipped with connecting rod(8), connecting rod(8)Upper end and piston(7)Bottom connects, the second sliding rail(11)It is equipped with Second sliding block(13)With third sliding block(15), the second sliding block(13)Positioned at third sliding block(15)Left, the second sliding block(13)With Three sliding blocks(15)Between be connected with head rod(14), the second sliding block(13)Top is equipped with the second wedge block(12), the second wedge Shape block(12)Positioned at the first wedge block(9)Lower section, third sliding block(15)On be hingedly connected with the second connecting rod(16), the second sliding rail (11)Top left is equipped with third sliding rail(17), third sliding rail(17)It is equipped with Four-slider(18)With the 5th sliding block(21), the Four-slider(18)Positioned at the 5th sliding block(21)Lower section, the second connecting rod(16)Upper end and Four-slider(18)Articulated connection, the 4th Sliding block(18)Top is equipped with third connecting rod(19), the 5th sliding block(21)Right end is equipped with third wedge block(20), third wedge block (20)Bottom and third connecting rod(19)Upper end connects, third wedge block(20)Right side is equipped with contact wheel(26), contact wheel(26) It is equipped with mobile bar(27), mobile bar(27)It is equipped with fixed block(28), fixed block(28)With guide plate(1)Between be connected with Two springs(29), mobile bar(27)Across second spring(29), mobile bar(27)Right end passes through pilot hole(23), mobile bar(27) Right end, which is equipped with, places ring(24), third sliding rail(17)Electric pushrod is equipped with above right side(22), electric pushrod(22)Bottom and the Three wedge blocks(20)Top connects;Further include having the second water tank(30), block(31), the 6th sliding block(32), third spring(33)、 4th sliding rail(34), the second stereoplasm tube(35), the second electromagnet(36)With the first electromagnet(37), the first water tank(6)Outer left side Top is equipped with the 4th sliding rail(34), the 4th sliding rail(34)Positioned at the first stereoplasm tube(25)Top, the 4th sliding rail(34)It is equipped with the Six sliding blocks(32), the 6th sliding block(32)Right side and the first water tank(6)Third spring is connected between outer left side(33), the 6th sliding block (32)Top is equipped with block(31), block(31)Left end is equipped with the second electromagnet(36), ceiling hold(2)Bottom left is equipped with second Water tank(30), the second water tank(30)Positioned at guide plate(1)With the first water tank(6)Between, the second water tank(30)Bottom is equipped with second Stereoplasm tube(35), block(31)Across the second stereoplasm tube(35), place ring(24)Right side upper end is equipped with the first electromagnet(37), the One electromagnet(37)Positioned at the second electromagnet(36)Left;Further include having reinforcing rib(38), ceiling hold(2)Bottom left, which is equipped with, to be added Strengthening tendons(38), reinforcing rib(38)Lower end and guide plate(1)Connection, reinforcing rib above right side(38)Positioned at the second water tank(30)It is left Side, reinforcing rib(38)Top and bottom be inclination shape, reinforcing rib(38)The width and ceiling hold of upper surface(2)Bottom surface Width it is equal, reinforcing rib(38)The width and guide plate of lower surface(1)The width of right lateral surface is equal;Further include having placing frame (39), right support(3)Right side is equipped with placing frame(39), placing frame(39)Shape be spill, placing frame(39)Two wall of left and right It is contour, placing frame(39)Height be right support(3)/ 5th of height, placing frame(39)Thickness be 4cm, placing frame (39)Material be high-quality steel.
2. a kind of rapid cooling device of hardware making iron block according to claim 1, which is characterized in that further include having receipts Collect slot(40), guide plate(1)Lower end is equipped with collecting tank(40), collecting tank(40)Positioned at placement ring(24), the first stereoplasm tube(25) With the first stereoplasm tube(25)Lower section, collecting tank(40)Shape be spill, collecting tank(40)Two wall of left and right it is contour, collecting tank (40)Thickness be 3cm, collecting tank(40)Material be stainless steel.
3. a kind of rapid cooling device of hardware making iron block according to claim 1, which is characterized in that further include having to determine When device(41), third sliding rail(17)Left side lower end is equipped with timer(41), timer(41)Bottom and third sliding rail(17)Lower end In same level, timer(41)Shape be cuboid, timer(41)Width and third sliding rail(17)Width It spends equal.
4. a kind of rapid cooling device of hardware making iron block according to claim 1, which is characterized in that further include limited Position block(42), the second sliding rail(11)It is equipped with limited block(42), limited block(42)Positioned at the second sliding block(13)Right, limited block (42)Positioned at right support(3)Left, limited block(42)Shape be cuboid, limited block(42)Apart from right support(3)'s Length is 2cm.
5. a kind of rapid cooling device of hardware making iron block according to claim 1, which is characterized in that the first wedge block (9), the second wedge block(12)With third wedge block(20)Diagram shape of facing be trapezoidal, the first wedge block(9)Bottom surface, Second wedge block(12)Top surface and third wedge block(20)Right lateral surface is skewed, the first wedge block(9)Bottom with Second wedge block(12)Agree at top.
6. a kind of rapid cooling device of hardware making iron block according to claim 1, which is characterized in that right support(3) Material be Q235 steel, right support(3)Shape be cuboid, right support(3)Length be 3cm, right support(3)Width For 4cm, right support(3)Height be 100cm, right support(3)The shape of the cross section of right wall is rectangle, right support(3)Top The shape of the cross section in portion is rectangle.
CN201610738368.7A 2016-08-26 2016-08-26 A kind of rapid cooling device of hardware making iron block Active CN106091516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610738368.7A CN106091516B (en) 2016-08-26 2016-08-26 A kind of rapid cooling device of hardware making iron block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610738368.7A CN106091516B (en) 2016-08-26 2016-08-26 A kind of rapid cooling device of hardware making iron block

Publications (2)

Publication Number Publication Date
CN106091516A CN106091516A (en) 2016-11-09
CN106091516B true CN106091516B (en) 2018-08-24

Family

ID=57226378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610738368.7A Active CN106091516B (en) 2016-08-26 2016-08-26 A kind of rapid cooling device of hardware making iron block

Country Status (1)

Country Link
CN (1) CN106091516B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106439470A (en) * 2016-11-30 2017-02-22 广东技术师范学院 Industrial lubricating oil rapid cooling device
CN107695324A (en) * 2017-11-17 2018-02-16 洛阳华世耐磨材料制造有限公司 A kind of metalwork auxiliary forming device
CN108679927B (en) * 2018-06-14 2024-07-23 济宁创佳化工科技有限公司 Cooling equipment of coating
CN112013608A (en) * 2020-09-10 2020-12-01 杨仁华 Rapid iron block cooling device for hardware manufacturing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04273967A (en) * 1991-03-01 1992-09-30 Fuji Electric Co Ltd Water storage tank for water-cooled refrigerating device
CN104439003A (en) * 2014-12-01 2015-03-25 天津市远野科技发展有限公司 Cold header
CN105057375A (en) * 2015-09-11 2015-11-18 金迈思(天津)建筑工程技术有限公司 Device for cooling steel pipes
CN105415625A (en) * 2015-12-03 2016-03-23 重庆市渝西钢铁(集团)有限公司 Cooling system of casting mould
CN205298349U (en) * 2015-10-24 2016-06-08 嘉善烽火节能设备有限公司 Quick radiating electromagnetic braking ware
CN205980507U (en) * 2016-08-26 2017-02-22 温州市凯宇五金有限公司 Five metals preparation is with rapid cooling device of iron plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04273967A (en) * 1991-03-01 1992-09-30 Fuji Electric Co Ltd Water storage tank for water-cooled refrigerating device
CN104439003A (en) * 2014-12-01 2015-03-25 天津市远野科技发展有限公司 Cold header
CN105057375A (en) * 2015-09-11 2015-11-18 金迈思(天津)建筑工程技术有限公司 Device for cooling steel pipes
CN205298349U (en) * 2015-10-24 2016-06-08 嘉善烽火节能设备有限公司 Quick radiating electromagnetic braking ware
CN105415625A (en) * 2015-12-03 2016-03-23 重庆市渝西钢铁(集团)有限公司 Cooling system of casting mould
CN205980507U (en) * 2016-08-26 2017-02-22 温州市凯宇五金有限公司 Five metals preparation is with rapid cooling device of iron plate

Also Published As

Publication number Publication date
CN106091516A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106091516B (en) A kind of rapid cooling device of hardware making iron block
CN100422672C (en) Cold storage appliance
CN205980507U (en) Five metals preparation is with rapid cooling device of iron plate
CN104206933A (en) Oil absorbing box device
CN107187686A (en) A kind of portable label sticking machine of valve
CN205732905U (en) A kind of accurate rapid molding device of magnet strip
CN106196796B (en) A kind of automatic ice-making system
CN208972482U (en) A kind of chicken thawing apparatus that thawing rate is fast
CN206283151U (en) A kind of power distribution cabinet with self-cooling function
CN208450582U (en) It is a kind of convenient for fast blanking and the casting device of cooling
CN206357297U (en) A kind of foamed plastics dicer
CN207280781U (en) Aquatic products sampler
CN209788345U (en) Freezing and refrigerating storage equipment for aquatic products
CN113952800A (en) Dust removal type generator based on waste heat recycling technology of iron and steel enterprise
CN112338153A (en) Energy-saving cooling device for pouring steel mold
CN217357763U (en) High-speed cold storage door
CN110220346A (en) Aluminium sheet evaporator direct-cooling type ice machine
KR101626596B1 (en) Freezing removal apparatus of natural convention type evaporator for lowtemperature storehouse
CN110280080B (en) Mechanical pulse ash and dust remover
CN214665505U (en) Ware is accomodate in blood station refrigerator-freezer defrosting
CN218065521U (en) Deicing equipment for low-temperature refrigerator
CN220689462U (en) Cooling liquid tank groove replacement device
CN212884770U (en) Forge and use constant temperature heating device
CN108130410A (en) A kind of hardware is made of alloy cutter annealing device
CN217464995U (en) Regularly extrude formula ice machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201127

Address after: Ten groups of 226000 Gangzha District Jiangsu city of Nantong Province Qin Zao Jie Dao Yuan Qiao Cun

Patentee after: NANTONG JUSHENG NUMERICAL CONTROL MACHINE TOOL Co.,Ltd.

Address before: Lucheng District of Wenzhou City, Zhejiang province 325008 Yang Yi Street Sand Bridge Industrial Zone C2 building

Patentee before: WENZHOU KAIYU HARDWARE Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 226300 Xuzhuang science and Technology Industrial Park, Xingren Town, Tongzhou District, Nantong City, Jiangsu Province

Patentee after: NANTONG JUSHENG NUMERICAL CONTROL MACHINE TOOL Co.,Ltd.

Address before: 226000 group 10, Yuanqiao village, qinzao street, Gangzha District, Nantong City, Jiangsu Province

Patentee before: NANTONG JUSHENG NUMERICAL CONTROL MACHINE TOOL Co.,Ltd.