CN106088385B - 高烈度地区框架结构楼梯防震结构 - Google Patents
高烈度地区框架结构楼梯防震结构 Download PDFInfo
- Publication number
- CN106088385B CN106088385B CN201610664432.1A CN201610664432A CN106088385B CN 106088385 B CN106088385 B CN 106088385B CN 201610664432 A CN201610664432 A CN 201610664432A CN 106088385 B CN106088385 B CN 106088385B
- Authority
- CN
- China
- Prior art keywords
- stair
- overhanging
- terraced beam
- lines area
- highlight lines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
- E04F11/0223—Cantilevered stairways
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种高烈度地区框架结构楼梯防震结构,尤其是一种应用于房屋建筑工程领域的高烈度地区框架结构楼梯防震结构。本发明提供一种既可以避免主体结构竖向构件中间受力,形成短柱或局部错层,又可以有效防止中间休息平台在强震作用下断裂的高烈度地区框架结构楼梯防震结构,包括主体结构和楼梯休息平台,主体结构包括楼梯框架柱,楼梯框架柱上设置有悬挑梯梁,所述楼梯休息平台安放在悬挑梯梁上,楼梯休息平台与悬挑梯梁为滑动连接。本申请可以有效避免中间休息平台板和悬挑梯梁使主体结构竖向构件中间受力,形成短柱或局部错层等。在高烈度地区强震作用下,楼梯间柱子和砌体填充墙也不会开裂甚至倒塌。
Description
技术领域
本发明涉及一种高烈度地区框架结构楼梯防震结构,尤其是一种应用于房屋建筑工程领域的高烈度地区框架结构楼梯防震结构。
背景技术
在对已发生地震震害对建筑破坏情况的调查中发现框架结构中的楼梯间大部分都遭到了较严重的破坏,并主要表现在三个方面:楼梯构件与主体结构强链接,梯板起到斜撑作用,造成楼梯间刚度过大,吸收地震力较多,砌体填充墙在地震发生时会发生开裂甚至倒塌现象,梯板也因参与共同抵抗地震作用而受拉断裂;楼梯间柱子受层间休息平台梁影响形成短柱,短柱在地震中极易发生剪切破坏,由于剪切破坏为脆性破坏,因此破坏发生的既突然又严重。楼梯间作为重要疏散工具,在抗震防灾中起着重要作用,楼梯对结构安全及人身安全影响重大,《建筑抗震设计规范》(GB5011-2010)要求“计算中应考虑楼梯构件的影响”。“考虑楼梯构件的影响”应注意下列两个方面的影响:一是,楼梯对主体结构竖向构件的影响(使主体结构竖向构件中间受力,形成短柱或局部错层等);二是,要考虑楼梯的传力需要(楼梯作为水平传力构件之一,应确保其传力及疏散功能的实现)。
现有技术中,解决楼梯构件的影响的方法有如下两种:一、按国家建筑标准设计图集《混凝土结构施工图平面整体表示方法制图规则和构造详图》(现浇混凝土板式楼梯)(11G101-2)中做法,如图1所示,设置滑动支座。二、如图2所示,采用楼梯休息平台与主体结构脱开。但是上述现有技术有存在很多缺点。方法一的缺点:不能解决楼梯对主体结构竖向构件的影响。中间休息平台板和梯梁使主体结构竖向构件中间受力,形成短柱或局部错层等。地震作用下,仍会产生破坏。方法二的缺点:虽能解决楼梯对主体结构竖向构件的影响,可以避免主体结构竖向构件中间受力,形成短柱或局部错层等。但是根据我国大陆和台湾地震的经验,9度和9度以上时,1.5m以上的悬挑阳台和走廊等震害严重其至倒塌;8度时(《高层建筑混凝土结构技术规程》增加了7度0.15g),2m以上的悬挑阳台和走廊等震害严重(摘自《建筑抗震设计规范》(GB50011-2010)第5.1.1条条文说明)。也就是在高烈度地区,按方法二施工后在强震作用下,中间休息平面会断裂从而带来新的安全隐患。
发明内容
本发明所要解决的技术问题是提供一种既可以避免主体结构竖向构件中间受力,形成短柱或局部错层,又可以有效防止中间休息平台在强震作用下断裂的高烈度地区框架结构楼梯防震结构。
本发明解决其技术问题所采用的高烈度地区框架结构楼梯防震结构,包括主体结构和楼梯休息平台,所述主体结构包括楼梯框架柱,所述楼梯框架柱上设置有悬挑梯梁,所述悬挑梯梁的一端与楼梯框架柱连接,另一端悬空,所述楼梯休息平台安放在悬挑梯梁上,所述楼梯休息平台与悬挑梯梁为滑动连接,其滑动方向为水平方向,所述楼梯休息平台和主体结构之间留有缝隙。
进一步的是,所述悬挑梯梁和楼梯休息平台之间设置有滑动支座。
进一步的是,所述滑动支座为设置在悬挑梯梁和楼梯休息平台之间的聚四氟乙烯板。
进一步的是,所述聚四氟乙烯板的宽度与悬挑梯梁的宽度相同。
进一步的是,相邻楼梯框架柱之间设置一组悬挑梯梁,该组悬梁梯梁由两根悬挑梯梁组成,其中两根悬挑梯梁的一端分别与两个楼梯框架柱连接,另一端悬空,且两根悬挑梯梁之间留有空隙。
进一步的是,一组悬挑梯梁之间空隙的长度范围为200mm至400mm。
本发明的有益效果是:本申请采用在楼梯框架柱上设置有悬挑梯梁的结构,降低主体结构的刚度,即使在强震状态下不同楼梯框架柱之间所传递的水平横向力也极小,并在悬挑梯梁结构上设置滑动连接的休息平台,可以有效避免中间休息平台板和悬挑梯梁使主体结构竖向构件中间受力,形成短柱或局部错层等。在高烈度地区强震作用下,楼梯间柱子和砌体填充墙也不会开裂甚至倒塌。
附图说明
图1是现有技术方法一的结构示意;
图2是现有技术方法二的结构示意;
图3是本申请的俯视图;
图4是本申请的断面图;
图中零部件、部位及编号:主体结构1、楼梯框架柱2、楼梯休息平台3、悬挑梯梁4、滑动支座5。
具体实施方式
下面结合附图对本发明作进一步说明。
如图3及图4所示,本发明的岩高烈度地区框架结构楼梯防震结构,包括主体结构1和楼梯休息平台3,所述主体结构1包括楼梯框架柱2,所述楼梯框架柱2上设置有悬挑梯梁4,所述悬挑梯梁4的一端与楼梯框架柱2连接,另一端悬空,所述楼梯休息平台3安放在悬挑梯梁4上,所述楼梯休息平台3与悬挑梯梁4为滑动连接,其滑动方向为水平方向,所述楼梯休息平台3和主体结构1之间留有缝隙。本申请采用在楼梯框架柱2上设置有悬挑梯梁4的结构,降低主体结构1的刚度,即使在强震状态下不同楼梯框架柱2之间所传递的水平横向力也极小,并在悬挑梯梁4结构上设置滑动连接的休息平台,可以有效避免中间休息平台板和悬挑梯梁4使主体结构1竖向构件中间受力,形成短柱或局部错层等。在高烈度地区强震作用下,楼梯间柱子和砌体填充墙也不会开裂甚至倒塌。
所述悬挑梯梁4和楼梯休息平台3之间设置有滑动支座5。为有效实现休息平台与悬挑梯梁4之间的滑动连接,可以采用在挑梯梁和楼梯休息平台3之间设置有滑动支座5的形式,当楼梯受到外力作用时,楼梯休息平台3可以通过滑动支座5相对悬挑梯梁4滑动,避免受主体结构1作用而断裂。
作为一种具体的实施方式,滑动支座5为设置在悬挑梯梁4和楼梯休息平台3之间的聚四氟乙烯板。
具体实施时,聚四氟乙烯板的宽度与悬挑梯梁4的宽度相同,这样既可以节约材料,有可以保证挑梯梁和楼梯休息平台3之间的相对滑动。
相邻楼梯框架柱2之间设置一组悬挑梯梁4,该组悬梁梯梁由两根悬挑梯梁4组成,其中两根悬挑梯梁4的一端分别与两个楼梯框架柱2连接,另一端悬空,且两根悬挑梯梁4之间留有空隙。采用前述结构可以是使悬挑梯梁4跨度减少一半以上,避免高烈度地区在强震作用下中间休息平台悬挑梯梁4构件的破坏。
一组悬挑梯梁4之间空隙的长度范围为200mm至400mm。在工程应用时该范围由根据砖的模楼确定。
此外,可以在休息平台和主体结构1之间留50mm的缝隙,以避免地震时主体结构1的形变和运动对休息平台造成破坏。
Claims (6)
1.高烈度地区框架结构楼梯防震结构,包括主体结构(1)和楼梯休息平台(3),所述主体结构(1)包括楼梯框架柱(2),其特征在于:所述楼梯框架柱(2)上设置有悬挑梯梁(4),所述悬挑梯梁(4)的一端与楼梯框架柱(2)连接,另一端悬空,所述楼梯休息平台(3)安放在悬挑梯梁(4)上,所述楼梯休息平台(3)与悬挑梯梁(4)为滑动连接,其可滑动方向为水平方向,所述楼梯休息平台(3)和主体结构(1)之间留有缝隙。
2.如权利要求1所述的高烈度地区框架结构楼梯防震结构,其特征在于:所述悬挑梯梁(4)和楼梯休息平台(3)之间设置有滑动支座(5)。
3.如权利要求2所述的高烈度地区框架结构楼梯防震结构,其特征在于:所述滑动支座(5)为设置在悬挑梯梁(4)和楼梯休息平台(3)之间的聚四氟乙烯板。
4.如权利要求3所述的高烈度地区框架结构楼梯防震结构,其特征在于:所述聚四氟乙烯板的宽度与悬挑梯梁(4)的宽度相同。
5.如权利要求1所述的高烈度地区框架结构楼梯防震结构,其特征在于:相邻楼梯框架柱(2)之间设置一组悬挑梯梁(4),该组悬梁梯梁由两根悬挑梯梁(4)组成,其中两根悬挑梯梁(4)的一端分别与两个楼梯框架柱(2)连接,另一端悬空,且两根悬挑梯梁(4)之间留有空隙。
6.如权利要求5所述的高烈度地区框架结构楼梯防震结构,其特征在于:一组悬挑梯梁(4)之间空隙的长度范围为200mm至400mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664432.1A CN106088385B (zh) | 2016-08-12 | 2016-08-12 | 高烈度地区框架结构楼梯防震结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664432.1A CN106088385B (zh) | 2016-08-12 | 2016-08-12 | 高烈度地区框架结构楼梯防震结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088385A CN106088385A (zh) | 2016-11-09 |
CN106088385B true CN106088385B (zh) | 2018-11-30 |
Family
ID=57456949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610664432.1A Active CN106088385B (zh) | 2016-08-12 | 2016-08-12 | 高烈度地区框架结构楼梯防震结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088385B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469203B (zh) * | 2018-12-25 | 2023-09-19 | 中国电建集团成都勘测设计研究院有限公司 | 高烈度地区框架结构柱梁节点整体结构 |
CN111155676A (zh) * | 2019-12-26 | 2020-05-15 | 中交一航局安装工程有限公司 | 一种砌体结构防裂缝的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383552A (zh) * | 2011-08-31 | 2012-03-21 | 中国建筑西南设计研究院有限公司 | 分离式减震型楼梯 |
CN103758299A (zh) * | 2014-02-08 | 2014-04-30 | 江苏中南建筑产业集团有限责任公司 | 具滑动支座的抗震楼梯及其施工方法 |
CN104088412A (zh) * | 2014-07-23 | 2014-10-08 | 宋志伟 | 一种医院病房专用抗震逃生楼梯 |
CN204456695U (zh) * | 2015-01-30 | 2015-07-08 | 贵州省水利水电勘测设计研究院 | 一种用于拱坝的预制混凝土楼梯 |
CN204876146U (zh) * | 2015-06-24 | 2015-12-16 | 上海赛弗工程减震技术有限公司 | 一种连梁型金属阻尼器 |
CN205935284U (zh) * | 2016-08-12 | 2017-02-08 | 中国电建集团成都勘测设计研究院有限公司 | 高烈度地区框架结构楼梯防震结构 |
-
2016
- 2016-08-12 CN CN201610664432.1A patent/CN106088385B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383552A (zh) * | 2011-08-31 | 2012-03-21 | 中国建筑西南设计研究院有限公司 | 分离式减震型楼梯 |
CN103758299A (zh) * | 2014-02-08 | 2014-04-30 | 江苏中南建筑产业集团有限责任公司 | 具滑动支座的抗震楼梯及其施工方法 |
CN104088412A (zh) * | 2014-07-23 | 2014-10-08 | 宋志伟 | 一种医院病房专用抗震逃生楼梯 |
CN204456695U (zh) * | 2015-01-30 | 2015-07-08 | 贵州省水利水电勘测设计研究院 | 一种用于拱坝的预制混凝土楼梯 |
CN204876146U (zh) * | 2015-06-24 | 2015-12-16 | 上海赛弗工程减震技术有限公司 | 一种连梁型金属阻尼器 |
CN205935284U (zh) * | 2016-08-12 | 2017-02-08 | 中国电建集团成都勘测设计研究院有限公司 | 高烈度地区框架结构楼梯防震结构 |
Also Published As
Publication number | Publication date |
---|---|
CN106088385A (zh) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088385B (zh) | 高烈度地区框架结构楼梯防震结构 | |
Bhat et al. | AU,“Earthquake behavior of building with and without shear walls” | |
Patel et al. | A Performance study and seismic evaluation of RC frame buildings on sloping ground | |
Sakale et al. | Seismic behavior of buildings having horizontal irregularities | |
Sayyed et al. | Seismic analysis of vertical irregular RC building with stiffness and setback irregularities | |
Bongilwar et al. | Significance of shear wall in multi-storey structure with seismic analysis | |
CN205935284U (zh) | 高烈度地区框架结构楼梯防震结构 | |
Tegos et al. | Analysis and design of staircases against seismic loadings | |
Mohite et al. | Response spectrum analysis of G+ 15 story building with and without base isolation system | |
Sukhdeve | Optimum position of outrigger in G+ 40 RC building | |
Goel | Influence of Masonry Infill Walls on Seismic Performance of RC Framed Structures-A Comparison of AAC and Conventional Brick Infill | |
CN104453199A (zh) | 一种电梯井施工操作平台 | |
Motwani et al. | Simulation of brick infill and effect of openings on RC frames using ANSYS | |
Sunagar et al. | Sustainability concepts in the design of tall structures | |
Uddin et al. | Comparative Study on Seismic Behaviour of Composite and RCC plan Irregular Structures | |
CN203334565U (zh) | 钢结构楼梯梁的滑动构造 | |
Santhosh et al. | Seismic Analysis and Design of Multi Storey Building with Non Parallel Shear Wall System | |
Zhang et al. | The seismic design of staircase in frame structure | |
Farouk et al. | Soil, foundation, and superstructure interaction (II): superstructure and foundations’ tie beams analyses | |
CN203008345U (zh) | 一种超高层核心筒梁板结构立体施工装置 | |
Kalsait et al. | Design of Earthquake Resistant Multistoried Building On A Sloping Ground | |
Manmathan et al. | Analysis of buildings with varying percentages of diaphragm openings | |
Pendhari et al. | Modeling of staircase and its effect on the seismic performance of RCC building | |
Wagh et al. | Codal comparison of seismic analysis of a high-rise structure | |
Shahnewaz et al. | Seismic effects on deep beams in a reinforced concrete building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |