Prior art keywords
pile
test
datum line
line beam
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610658822.8A
Other languages
Chinese (zh)
Other versions
CN106088173A (en
Inventor
张明义
白晓宇
朱磊
王永洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201610658822.8A priority Critical patent/CN106088173B/en
Publication of CN106088173A publication Critical patent/CN106088173A/en
Application granted granted Critical
Publication of CN106088173B publication Critical patent/CN106088173B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

The invention belongs to civil engineering in-situ test equipment technical fields, it is related to a kind of prefabricated pile Horizontal Displacement and pile body stress joint test device, self-compensation fiber grating strain transducer string installation by adhering is electrically connected in the groove of test pile and with fiber grating sensor demodulator;Engineering pile is connected by steel plate cushion block with jack, and cushion block is placed under jack, and load transducer is in contact with the pressure end of jack, and load transducer is connected with load transducer display instrument;The side of spherical hinged-support is contacted with load transducer, the other side is contacted with test pile, it is fixedly installed with the first dial gauge and the second dial gauge respectively on first drilling angle steel and the second drilling angle steel, test pile has the first datum line beam far from one end branch of jack, and the first datum line beam is fixed with the second datum line beam far from the side of jack;Its structure is simple, easy to operate, at low cost, and measuring accuracy is high, and strong operability show that numerical result is direct, and precision is high, and error is small.

Description

A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device
Technical field:
The invention belongs to civil engineering in-situ test equipment technical field, it is related to a kind of prefabricated pile Horizontal Displacement and stake Body stress joint test device makes up and improves the deficiency of current test device, can more acurrate, more comprehensively, more easily obtain The horizontal displacement of prefabricated pile out, and the stress distribution of pile body is obtained simultaneously by embedded FBG sensor, it is ground for the test of prefabricated pile Study carefully and pile measurement provides foundation.
Background technique:
Prefabricated pile is very extensive in civil engineering industrial application, with going deep into for city development, the continuous leather of Building technology Newly, bridge and port engineering construction are more and more, and loading demands are also higher and higher, and in such engineering, pile foundation is in addition to that will hold Outside by biggish vertical load, often due to the brake force of wave force, wind-force, shaking force, ship impact force and vehicular load Etc. reasons make foundation pile bear biggish horizontal loading, so under the horizontal loads of such engineering pile, the carrying of pile foundation It characteristic and stress distribution research and detects particularly important.In existing engineering pile horizontal loading test and detection, only to stake Horizontal bearing capacity study and detected, and different due to building yard, loading device is also not quite similar, sometimes by Even fail in the loading device installation test result inaccuracy undesirable, lack of standardization that will cause, so the reasonable peace of loading device Dress and collocation are extremely important to the research and detection of the horizontal loading characteristic of stake.FBG sensing technology is along with fiber optic communication skill The development of art and fibre optics and the novel photoelectronics technology of one kind generated, have test data stability is good, precision is high, Small in size, light weight, convenient for being laid with installation, strong antijamming capability, waterproof, moisture-proof, high temperature resistant, anticorrosive, more series connection the features such as And it is widely used in the engineering fields such as the subsidence monitoring of bridge, tunnel and jacket offshore platform, in current FBG sensor In the test of embedded pile body characteristic, since its is easy to fall off, test result is affected by temperature big characteristic, can make measurement data not Accurately, so as to cause unsuccessful test.Therefore seek a kind of completely new stake horizontal loading test device for testing pile body stress Research and detection to engineering is significant.
Summary of the invention:
It is an object of the invention to overcome disadvantage of the existing technology, seeks design and a kind of prefabricated stake top level is provided Pile stress test is added to prefabricated pile horizontal static-load experiment in displacement and pile body stress joint test device, for directly measuring The horizontal displacement of prefabricated pile and pile body stress, convenient for studying the horizontal loading bearing capacity and mechanical characteristic of prefabricated pile.
To achieve the goals above, main structure of the invention includes engineering pile, steel plate cushion block, jack, load sensing Device, spherical hinged-support, test pile, the first dial gauge, the first Magnetic gauge stand, the first datum line beam, the second dial gauge, the second magnetic table Seat, the second datum line beam, self-compensation fiber grating strain transducer string, load transducer display instrument, fiber-optic grating sensor demodulation Instrument, the first drilling angle steel, cushion block and the second drilling angle steel;It is the recessed of 5mm × 5mm that cross section is vertically carved in the two sides of test pile The self-compensation fiber grating strain transducer string installation by adhering of slot, upper tightly lower sparse structure in the groove of test pile and uses structure Glue sealing, self-compensation fiber grating strain transducer string are electrically connected with fiber grating sensor demodulator;Engineering pile is test pile Counter-force is provided, the close stake that bearing capacity is more than or equal to test pile is chosen;Engineering pile is connected by steel plate cushion block with jack, steel plate The number of cushion block is determined according to the distance between test pile and engineering pile, to guarantee that engineering pile can sufficiently provide counter-force;Jack Under be placed with cushion block, load transducer is in contact with the pressure end of jack, for accurately measure jack application pressure value, Load transducer is connected with load transducer display instrument;The side of spherical hinged-support is contacted with load transducer, the other side and survey Test pile contact guarantees the power stepless action of jack application on test pile;At test pile and horizontal force action center parallel Two sides are fixedly installed with the first drilling angle steel using setscrew, at test pile and horizontal force action center parallel up at 50cm Two sides upright position is fixedly installed with the second drilling angle steel with same way, distinguishes on the first drilling angle steel and the second drilling angle steel It is fixedly installed with the first dial gauge and the second dial gauge, the dial plate of the first dial gauge and the second dial gauge is parallel to the ground;It surveys Test pile has the first datum line beam far from branch at one end distance test stake 30cm of jack, puts on the first dial gauge and the first datum line beam The the first Magnetic gauge stand connection set;First datum line beam is fixed with the second datum line beam far from the side of jack, the second datum line beam with First datum line beam is at a distance of 10cm, and the second benchmark depth of beam is higher than the first datum line beam, on the second datum line beam with the first datum line beam Correspondence is placed with the second Magnetic gauge stand being connected with the second dial gauge at same position.
Engineering pile of the present invention includes pre stressed empty piped piles, pre-stress hollow square pile and solid square pile.
The present invention realizes the test process of prefabricated pile horizontal displacement and pile body stress are as follows:
(1) before piling, the two sides of test pile face are carved to the groove of 5mm × 5mm, by self compensation light prefabricated in advance Fiber grating strain transducer string is put into two grooves, and is sealed with structure glue, is conserved two days, and self-compensation fiber grating strain passes Sensor string forms upper tightly lower sparse structure;
(2) it when test pile energy normal use, chooses suitable engineering pile and counter-force is provided, guarantee that its bearing capacity is more than or equal to and survey Test pile;
(3) spherical hinged-support, load transducer, jack, steel plate cushion block are successively put between test pile and engineering pile, The number of steel plate cushion block is determined according to the distance between test pile and engineering pile, guarantees that engineering pile can sufficiently provide counter-force, jack Lower placement cushion block, guarantee jack effect centroid be overlapped with test device each section center, each test device part centre with bury The self-compensation fiber grating strain transducer string set is vertical;
(4) drilling machine two sides face drill two holes at test pile and horizontal force action center parallel are used, it is solid with setscrew Fixed first drilling angle steel, same method fix the second drilling angle steel at 50cm right above the first drilling angle steel both sides;
(5) it is put away from the first datum line beam of branch at test pile 30cm and on the first datum line beam in test pile far from jack one end First dial gauge is fixed on the first drilling angle steel by the first Magnetic gauge stand, and the first dial gauge dial plate is parallel to the ground;Second Datum line beam fixes the second datum line beam, the second datum line beam and the first datum line beam at a distance of 10cm far from jack side, guarantees the second base Quasi- deck-molding is fixed on the second drilling angle steel in putting the second Magnetic gauge stand on the first datum line beam, the second datum line beam, by the second dial gauge On, the second dial gauge dial plate is parallel to the ground;
(6) self-compensation fiber grating strain transducer string is connected with fiber grating sensor demodulator, load transducer It is connected with load transducer display instrument;
(7) after checking that each component installation of test device is correct, load test is carried out to test pile, records corresponding position Shifting and stress variation value are completed to the horizontal displacement of prefabricated pile and the test of pile body stress.
For the present invention compared with existing test device, structure is simple, easy to operate, at low cost, and measuring accuracy is high, can operate Property it is strong, show that numerical result is direct, precision is high, and error is small.
Detailed description of the invention:
Fig. 1 is main structure schematic diagram of the invention.
Fig. 2 is self-compensation fiber grating strain transducer string scheme of installation of the invention.
Fig. 3 is that jack and steel plate cushion block of the invention contact schematic diagram.
Fig. 4 is that datum line beam of the invention puts schematic diagram.
Specific embodiment:
The present invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
The primary structure of the present embodiment includes engineering pile 1, steel plate cushion block 2, jack 3, load transducer 4, spherical hinged Seat 5, test pile 6, the first dial gauge 7, the first Magnetic gauge stand 8, the first datum line beam 9, the second dial gauge 10, the second Magnetic gauge stand 11, the second datum line beam 12, self-compensation fiber grating strain transducer string 13, load transducer display instrument 14, optical fiber grating sensing The drilling of device (FBG) demodulator 15, first angle steel 16, cushion block 17 and the second drilling angle steel 18;Vertically it is carved with cross section in the two sides of test pile 6 For the groove of 5mm × 5mm, 13 installation by adhering of self-compensation fiber grating strain transducer string of upper tightly lower sparse structure is in test pile It is sealed in 6 groove and with structure glue, self-compensation fiber grating strain transducer string 13 and fiber grating sensor demodulator 15 Electrical connection;Engineering pile 1 is that test pile 6 provides counter-force, chooses the close stake that bearing capacity is more than or equal to test pile 6;Engineering pile 1 passes through Steel plate cushion block 2 connects with jack 3, and the number of steel plate cushion block 2 is determined according to the distance between test pile 6 and engineering pile 1, to protect Card engineering pile 1 can sufficiently provide counter-force;Cushion block 17, the pressure end phase of load transducer 4 and jack 3 are placed under jack 3 Contact, for accurately measuring the pressure value of the application of jack 3, load transducer 4 is connected with load transducer display instrument 14;It is spherical The side of hinged-support 5 is contacted with load transducer 4, and the other side is contacted with test pile 6, and the power for guaranteeing that jack 3 applies uniformly is made With on test pile 6;Two sides at test pile 6 and horizontal force action center parallel are fixedly installed with the first brill using setscrew Hole angle steel 16, up peace with same way is fixed in two sides upright position at 50cm at test pile 6 and horizontal force action center parallel Equipped with the second drilling angle steel 18, it is fixedly installed with the first dial gauge 7 respectively on the first drilling angle steel 16 and the second drilling angle steel 18 With the second dial gauge 10, the dial plate of the first dial gauge 7 and the second dial gauge 10 is parallel to the ground;Test pile 6 is far from jack 3 6 30cm of one end distance test stake at branch have the first datum line beam 9, first placed on the first dial gauge 7 and the first datum line beam 9 Magnetic gauge stand 8 connects;First datum line beam 9 is fixed with the second datum line beam 12, the second datum line beam 12 and far from the side of jack 3 One datum line beam 9 is at a distance of 10cm, and the height of the second datum line beam 12 is higher than the first datum line beam 9, on the second datum line beam 12 with the first base Correspondence is placed with the second Magnetic gauge stand 11 being connected with the second dial gauge 10 at quasi- 9 same position of beam.
Engineering pile 1 described in the present embodiment includes pre stressed empty piped piles, pre-stress hollow square pile and solid square pile.
The present embodiment realizes the test process of prefabricated pile horizontal displacement and pile body stress are as follows:
(1) before piling, the two sides of 6 face of test pile are carved to the groove of 5mm × 5mm, by self compensation prefabricated in advance Fiber Bragg grating strain sensor string 13 is put into two grooves, and is sealed with structure glue, is conserved two days, self-compensation fiber grating is answered Become sensor string 13 and forms upper tightly lower sparse structure;
(2) it when test pile energy normal use, chooses suitable engineering pile 1 and counter-force is provided, guarantee that its bearing capacity is more than or equal to Test pile 6;
(3) spherical hinged-support 5, load transducer 4, jack 3, steel plate are successively put between test pile 6 and engineering pile 1 The number of cushion block 2, steel plate cushion block 2 is determined according to the distance between test pile 6 and engineering pile 1, guarantees that engineering pile 1 can be provided sufficiently instead Power is placed with cushion block 17 under jack 3, guarantees that jack 3 acts on centroid and is overlapped with test device each section center, respectively tests and fill It is vertical with embedding good self-compensation fiber grating strain transducer string 13 to set part centre;
(4) drilling machine two sides face drill two holes at test pile 6 and horizontal force action center parallel are used, it is solid with setscrew Fixed first drilling angle steel 16, same method fix the second drilling angle steel at 50cm right above the first drilling 16 both sides of angle steel 18;
(5) in test pile 6 far from 3 one end of jack away from branch the first datum line beam 9 and in the first datum line beam at test pile 630cm The first Magnetic gauge stand 8 is put on 9, and the first dial gauge 7 is fixed on the first drilling angle steel 16,7 dial plate of the first dial gauge and ground In parallel;The second datum line beam 12, the second datum line beam 12 and 9 phase of the first datum line beam are fixed far from 3 side of jack in the second datum line beam 9 Away from 10cm, guarantees that the second datum line beam 12 is higher than the first datum line beam 9, the second Magnetic gauge stand 11 is put on the second datum line beam 12, by second Dial gauge 10 is fixed on the second drilling angle steel 18, and 10 dial plate of the second dial gauge is parallel to the ground;
(6) self-compensation fiber grating strain transducer string 13 is connected with fiber grating sensor demodulator 15, load passes Sensor 4 is connected with load transducer display instrument 14;
(7) after checking that each component installation of test device is correct, load survey is carried out to test pile 6 according to corresponding specification Examination records corresponding displacement and stress variation value, completes to the horizontal displacement of prefabricated pile and the test of pile body stress.

Claims (1)

1. a kind of prefabricated pile Horizontal Displacement and pile body stress joint test device, it is characterised in that main structure includes engineering Stake, steel plate cushion block, jack, load transducer, spherical hinged-support, test pile, the first dial gauge, the first Magnetic gauge stand, first Datum line beam, the second dial gauge, the second Magnetic gauge stand, the second datum line beam, self-compensation fiber grating strain transducer string, load sensing Device display instrument, fiber grating sensor demodulator, the first drilling angle steel, cushion block and the second drilling angle steel;The two sides of test pile are perpendicular To be carved with cross section be 5mm × 5mm groove, the embedded peace of self-compensation fiber grating strain transducer string of upper tightly lower sparse structure It is sealed in the groove of test pile and with structure glue, self-compensation fiber grating strain transducer string and fiber-optic grating sensor solution Adjust instrument electrical connection;Engineering pile provides counter-force for test pile, chooses the close stake that bearing capacity is more than or equal to test pile;Engineering pile passes through Steel plate cushion block connects with jack, and the number of steel plate cushion block is determined according to the distance between test pile and engineering pile, to guarantee work Journey stake can sufficiently provide counter-force;Cushion block is placed under jack, load transducer is in contact with the pressure end of jack, for standard Really the pressure value that measurement jack applies, load transducer are connected with load transducer display instrument;The side of spherical hinged-support with Load transducer contact, the other side are contacted with test pile, guarantee the power stepless action of jack application on test pile;Test pile The first drilling angle steel, test pile and horizontal force are fixedly installed with using setscrew with the two sides at horizontal force action center parallel Action center locates at up 50cm two sides upright position in parallel and is fixedly installed with the second drilling angle steel, the first drilling with same way It is fixedly installed with the first dial gauge and the second dial gauge, the first dial gauge and the second percentage respectively on angle steel and the second drilling angle steel The dial plate of table is parallel to the ground;Test pile has the first datum line beam far from branch at one end distance test stake 30cm of jack, the The first Magnetic gauge stand placed on one dial gauge and the first datum line beam is connect;First datum line beam is fixed with far from the side of jack Second datum line beam, the second datum line beam and the first datum line beam are at a distance of 10cm, and the second benchmark depth of beam is higher than the first datum line beam, the It is corresponding at the first datum line beam same position on two datum line beams to be placed with the second Magnetic gauge stand being connected with the second dial gauge;It is described Engineering pile includes pre stressed empty piped piles, pre-stress hollow square pile and solid square pile;
Realize the test process of prefabricated pile horizontal displacement and pile body stress are as follows:
(1) before piling, the two sides of test pile face are carved to the groove of 5mm × 5mm, by self compensation optical fiber light prefabricated in advance Grid strain transducer string is put into two grooves, and is sealed with structure glue, is conserved two days, self-compensation fiber grating strain transducer String forms upper tightly lower sparse structure;
(2) it when test pile energy normal use, chooses suitable engineering pile and counter-force is provided, guarantee that its bearing capacity is more than or equal to test Stake;
(3) spherical hinged-support, load transducer, jack, steel plate cushion block, steel plate are successively put between test pile and engineering pile The number of cushion block is determined according to the distance between test pile and engineering pile, guarantees that engineering pile can sufficiently provide counter-force, jack decentralization Set cushion block, guarantee that jack effect centroid is overlapped with test device each section center, each test device part centre with it is embedding good Self-compensation fiber grating strain transducer string it is vertical;
(4) with drilling machine at test pile and horizontal force action center parallel two sides face drill two holes, fix the with setscrew One drilling angle steel, same method fix the second drilling angle steel at 50cm right above the first drilling angle steel both sides;
(5) away from the first datum line beam of branch at test pile 30cm and first is put on the first datum line beam far from jack one end in test pile First dial gauge is fixed on the first drilling angle steel by Magnetic gauge stand, and the first dial gauge dial plate is parallel to the ground;In the second benchmark Beam fixes the second datum line beam, the second datum line beam and the first datum line beam at a distance of 10cm far from jack side, guarantees the second datum line beam Higher than the first datum line beam, the second Magnetic gauge stand is put on the second datum line beam, and the second dial gauge is fixed on the second drilling angle steel, the Two dial gauge dial plates are parallel to the ground;
(6) self-compensation fiber grating strain transducer string is connected with fiber grating sensor demodulator, load transducer and load Lotus sensor display instrument is connected;
(7) after checking that test device each component installation is correct, load test is carried out to test pile, record corresponding displacement and Stress variation value is completed to the horizontal displacement of prefabricated pile and the test of pile body stress.
CN201610658822.8A 2016-08-11 2016-08-11 A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device Active CN106088173B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610658822.8A CN106088173B (en) 2016-08-11 2016-08-11 A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610658822.8A CN106088173B (en) 2016-08-11 2016-08-11 A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device

Publications (2)

Publication Number Publication Date
CN106088173A CN106088173A (en) 2016-11-09
CN106088173B true CN106088173B (en) 2019-04-02

Family

ID=57456858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610658822.8A Active CN106088173B (en) 2016-08-11 2016-08-11 A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device

Country Status (1)

Country Link
CN (1) CN106088173B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059952A (en) * 2017-02-28 2017-08-18 中交武汉港湾工程设计研究院有限公司 A kind of steel-pipe pile horizontal cyclic experimental provision of simulated waves load
CN109469125B (en) * 2019-01-11 2024-01-30 深圳宏业基岩土科技股份有限公司 Pile foundation load test device for fiber bragg grating sensing detection and detection method thereof
CN113389228B (en) * 2021-05-28 2022-04-08 青岛理工大学 Pile side transverse static load loading device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101188004B1 (en) * 2009-12-22 2012-10-04 성균관대학교산학협력단 Loading Device For Pile Load Test
CN203034498U (en) * 2013-01-07 2013-07-03 中国建筑第六工程局有限公司 Horizontal bearing capability test device of piles in permafrost region
CN103195112A (en) * 2013-04-18 2013-07-10 四川建筑职业技术学院 Foundation pile foundation model analyzing method and test device for same
CN204326120U (en) * 2014-12-05 2015-05-13 武汉科技大学 A kind of device measuring horizontal bearing capacity of single pile
CN205934996U (en) * 2016-08-11 2017-02-08 青岛理工大学 Testing arrangement is united to precast pile pile bolck horizontal displacement and pile body stress

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101188004B1 (en) * 2009-12-22 2012-10-04 성균관대학교산학협력단 Loading Device For Pile Load Test
CN203034498U (en) * 2013-01-07 2013-07-03 中国建筑第六工程局有限公司 Horizontal bearing capability test device of piles in permafrost region
CN103195112A (en) * 2013-04-18 2013-07-10 四川建筑职业技术学院 Foundation pile foundation model analyzing method and test device for same
CN204326120U (en) * 2014-12-05 2015-05-13 武汉科技大学 A kind of device measuring horizontal bearing capacity of single pile
CN205934996U (en) * 2016-08-11 2017-02-08 青岛理工大学 Testing arrangement is united to precast pile pile bolck horizontal displacement and pile body stress

Also Published As

Publication number Publication date
CN106088173A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN102607754B (en) Device for measuring negative skin friction of pile soil
CN103195112B (en) Foundation pile foundation model analyzing method and test device for same
CN106088173B (en) A kind of prefabricated pile Horizontal Displacement and pile body stress joint test device
CN107727483B (en) Penetration shearing device and method for foundation in-situ test based on fiber bragg grating
KR20110072136A (en) Loading device for pile load test
CN202610847U (en) Measuring device of pile soil negative friction
CN106088171B (en) A kind of prefabricated pile Horizontal Displacement and pile body stress joint test method
CN105181199A (en) Side hole stress releasing method of ground stress test
Bonopera et al. Fiber Bragg grating–differential settlement measurement system for bridge displacement monitoring: Case study
CN104749032A (en) Testing device for internal stress of soil-rock mixture or concrete
Alamdari et al. Non-contact structural health monitoring of a cable-stayed bridge: Case study
CN105890829A (en) Device for comparing test performance of force measuring locking anchor pipes of tunnel and test method
CN104111131A (en) Reinforced concrete structure stress in situ online monitoring method
CN106088172B (en) A kind of experimental rig of simultaneous determination bored concrete pile stake top and pile end displacement
CN105043611B (en) A kind of swelled ground lateral swelling force in-situ testing device
JP2011102527A (en) Horizontal load testing method of pile
Iskander Geotechnical underground sensing and monitoring
CN205934996U (en) Testing arrangement is united to precast pile pile bolck horizontal displacement and pile body stress
CN109029276A (en) A kind of contactless lateral deformation clearance survey device
Dam et al. The Company
Yang et al. Sensor monitoring of a newly designed foundation pit supporting structure
CN106351267A (en) Pile foundation bearing characteristic model testing device under down-pressing static load effect
CN217358824U (en) Large-section rectangular jacking pipe frictional resistance testing system
CN206721943U (en) A kind of pile foundation displacement auxiliary detection device
CN105971024B (en) A kind of test method of model pile foundation dynamic response

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant