CN106087998B8 - 一种组合复合管桩地基的施工方法 - Google Patents

一种组合复合管桩地基的施工方法 Download PDF

Info

Publication number
CN106087998B8
CN106087998B8 CN201610654756.7A CN201610654756A CN106087998B8 CN 106087998 B8 CN106087998 B8 CN 106087998B8 CN 201610654756 A CN201610654756 A CN 201610654756A CN 106087998 B8 CN106087998 B8 CN 106087998B8
Authority
CN
China
Prior art keywords
pile
pipe
soil
construction method
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610654756.7A
Other languages
English (en)
Other versions
CN106087998A (zh
CN106087998B (zh
Inventor
刘敬忠
傅金华
刘建浩
刘林林
沈建波
秦雅苁
张文社
陈思虎
任彦芳
赵中阳
朱艳艳
孔祥安
谭庆飞
高秀华
刘刚
王洪艳
宫承会
王淑雯
刘艳华
李雪峰
王蓓蓓
赵彩红
刘莎莎
李婷婷
宫以粉
樊囡囡
赵毅
沈洁
徐红
孟庆莲
刘成
刘方顺
高建忠
刘敬荣
宋怀焕
刘从波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tonghai Decoration Engineering Co., Ltd.
Original Assignee
Shandong Tonghai Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tonghai Decoration Engineering Co ltd filed Critical Shandong Tonghai Decoration Engineering Co ltd
Priority to CN201610654756.7A priority Critical patent/CN106087998B8/zh
Publication of CN106087998A publication Critical patent/CN106087998A/zh
Application granted granted Critical
Publication of CN106087998B publication Critical patent/CN106087998B/zh
Publication of CN106087998B8 publication Critical patent/CN106087998B8/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种组合复合管桩地基的施工方法,管桩在地基处理中被广泛使用,但是其因桩端虚土和自身抗剪能力差而使其使用范围受到影响,本发明的方法利用桩端处理,管桩联合作用,以及桩周水泥土补强等方法有效的克服了上述缺陷,使得管桩的应用范围更加广泛,可靠性更高。

Description

一种组合复合管粧地基的施工方法
技术领域
[0001] 本发明涉及一种组合复合管桩地基的施工方法。
背景技术
[0002] 管桩和预应力管桩是当前最为常见的地基工程施工技术和方法之一,更是当前建 筑工程项目中最为常见的地基处理措施。其在施工的过程中存在着现场整洁、工程机械化 程度高、施工工艺简单的优势,但是由于其在施工的过程中也常常会因配套工艺及自身受 力特点而带来一些缺陷。
[0003] 目前工程项目中预应力管桩最早出现在二十世纪初期,当时仅仅是作为一种高层 建筑物的地基处理措施而存在的,伴随着科学技术的发展,这种施工工艺被广泛的应用在 各类型的建筑工程项目中。其主要可以分为钢管桩、混凝土管桩、钢管混凝土管桩等。预应 力管桩的出现与应用为目前社会发展提供了动力,也为社会主义现代化建设解决了不少难 题与隐患,进一步改善了我国人们的生活质量和提高人们的生活水平。但是预应力管桩在 实际的工程施工中仍然存在着许多问题,如何对预应力管桩进行合理的设计和优化,对保 证项目施工的安全和降低项目的造价等方面具有重要的作用。
[0004] 管桩地基在高层项目应用过程中出现的主要弊端包括,挤土效应和浮桩。在将管 粧打入土层中时,由于管桩对土体的挤压会使土体向四周排挤,周围的土体会因此而受到 严重的扰动。土体遭到严重的扰动后会发生径向位移,离管桩一定范围内的土体受到不排 水剪切和很大的水平挤压力,经过这些外部干扰后,土体会形成具有很强的孔隙水压力的 扰动重塑区。重塑区土体的不排水抗剪能力大大的削弱了,而且直接促使周围的土体会因 不排水剪切而被破坏。随着管桩数量的不断增加,会使已经打入土体的管桩和相邻靠近的 管桩产生较大的侧向位移和上浮,土体的和管桩的位移与管粧的数量成正比,用的管粧越 多产生的位移就越大。
[0005] 浮桩只是管桩挤土效应的另外一种表现形式,但是浮粧问题表现得非常之隐蔽, 往往是压桩工程结束之后在做静载检测时才发现这一问题。这个时候可能整个压桩工程已 经结束,要再次进行压桩就会处于非常被动的地位,而且再次压桩施工时的难度和施工资 金都会增加。
[0006] 管桩还存在的主要缺陷是沉桩不达标和断桩。沉桩没有达到设计要求的原因主要 有以下几点,施工前对地质的勘探点不够多,对持力层的起伏标高不明确,导致在考虑持力 层和选择管桩的长度时出现差错;没有设计合适的持力层,不恰当的持力层会使管桩的承 载力受较大的影响,例如在选择全风化层时由于全风化层具有易软化的特点,容易导致地 下水渗入管粧内部,大大的削弱了管桩的承载力;对单个管粧的承载力估算不准,导致选择 的管桩长度与压粧力不相匹配;管桩自身出现断裂。断桩是在管粧施工中经常遇到的问题, 主要原因是使用了未经检验的不合格管桩;管桩在地下碰到了坚硬障碍物;在压粧过程中 没有控制好垂直度;挤土效应造成管桩断裂。
[0007] 另外由于滥用管桩也会带来一些工程危险。管桩虽然在工程中得到了广泛的应 用,但是这并不代表着管桩适用于任何的施工场地,管桩的持力层可以选择是强风化岩层、 坚硬的黏土层或砂层和碎石层,但是管粧不能打入中风化和弱风化岩层。某工地在进行地 基施工时,打桩100根,但是其中有断粧23根,管桩破损率超过了 20%。相关单位在分析事故 时初步判断有管桩质量问题、压粧过程问题和地质问题等三个问题,但是在随后具体的事 故分析中排除了前面2种事故原因,一致认为管粧破损率高是由于地质问题所造成。之后的 地质勘探结果显示,在该施工场地中,岩基是属于中至微风化岩,坚硬的地基导致了管桩的 破损断裂。
[0008]另外,近期的研宄发现由于管桩抗剪切能力差,其破坏可能会是因断桩而导致上 部建筑物倾覆。还有管桩端部土体处理不好,导致其在受力过程中不均下沉而使得建筑物 拉裂。为了克服以上缺陷,本发明设计了以下技术方案。
发明内容
[0009] 一种组合复合管桩地基的施工方法,包括如下步骤:(1)向地基桩位处打入护筒, 然后将护筒中的土取出形成桩孔;(2)在桩孔底部放入土工布和钢板网;(3)在桩孔中放入 管桩;⑷将搅拌好的水泥土压灌送入护筒和管桩之间,并随之拔出护筒“5)依次按照桩位 形成临近位置的复合管桩“6)将各个管粧桩头局部破碎,穿过至少双层钢筋并浇筑混凝土 形成钢筋混凝土板或板带。
[0010] 在步骤(2)放入土工布和钢板网之前,对桩端土体进行夯扩。在进行步骤(3)在桩 孔中放入管粧之前,在管桩外壁上挂上钢板网,钢板网与管桩外壁伸出的锚件焊接。根据需 要,向水泥土中插入钢筋笼。在管桩周围的水泥土中插入硬质工程塑料厚壁水泥浆补液管, 补液管浇筑到钢筋混凝土板或板带中并伸出地基外侧。
[0011] 护筒内径为800mm,管桩外径直径为300mm-400mm。钢筋笼直径为700mm。
[0012] 按照本发明的方法施工的桩基础可靠性高,对周围环境影响小。而且没有锤击沉 粧的过程,管粧保持完好;通过管粧之间的联合受力,即防止了管桩的不均匀沉降,同时还 可以充分利用桩周的摩擦力,成为端承和摩擦联合作用的粧群,针对水泥土在地下水扰动 的过程中容易失去耐久性,在桩基设计中加入了补强设备,有效的改善了桩基的耐久性。
附图说明
[0013] 图1是本申请施工方法成粧后的侧视图;
[0014] 1 —预搅拌水泥土,2 —管桩,3 — 土工布,4 一补液管,5—钢板网,6 —混凝土板或板 带,7 —钢筋。
具体实施方式
[0015] 某工程场地地面标高为2.20m,根据岩土勘察报告,施工场地在清水池施工影响范 围内的土体均为第四纪松散沉积物,成因以滨海相沉积为主,主要分成如下6个工程地质 层,自上而下依次为:
[0016] ①素填土:灰色,湿,成份以粉质粘土为主,夹较多植物根茎,明(暗)塘部位底部见 厚约30cm黑淤,富含有机质,具臭味,土质松散,不均匀。层底标高:-0 •02m〜1 • 43m,层厚: 0.30m〜2.40m。
[0017] ②粉质粘土 :黄色,湿〜饱和,可塑,见铁锰质氧化物,无摇震反应,无光泽反应,切 面稍有光滑,中等干强度,中等初性,明(暗)塘部位该层土缺失,土质较均勾。层底标高: 0.46m〜0 • 53m,层厚:0 • 〇〜〇 • 90m。
[0018] ③淤泥质粉质粘土 :灰黄〜灰色,饱和,流塑,夹少量砂质粉土团块或薄层,无摇震 反应,切面光滑,中等干强度,中等韧性,拟建场地该层土层底面埋深稍有起伏,土质较均 勾。层底标高:-l3.07m 〜-11 • l9m,层厚:11.70m〜13_60m〇
[0019] ④粘土 :灰〜灰黄色,饱和,可塑,夹少量淤质粘性土条带,无摇震反应,切面稍有 光滑,中等干强度,中等韧性,该层土仅分布于拟建清水池场地北部,其余部位缺失,土质较 均匀。层底标高:-12.9¾〜-l2_79m,层厚:0•0〜l.6〇m〇
[0020]⑤粘质粉土:黄色,湿,稍密,夹较多软塑状粘性土薄层(单层厚2mm〜5mm),呈“千 层饼”状,层理清晰,见铁锰质氧化物,摇震反应中等,无光泽反应,中等干强度,中等韧性, 该层土仅分布于拟建清水池场地北部,其余部位缺失,土质欠均匀。层底标高:-14.32m〜-13.57m,层厚:0•0 〜1.50m。
[0021]⑥粉砂:黄〜灰色,饱和,中密,局部密实,夹少量淤质粘性土条带,见云母碎肩,颗 粒级配良好,平均粘粒含量为5.8%,拟建场地该层土分布不均匀,层面埋深及层厚变化较 大;强度在垂直与水平方向上变化较大,土质欠均匀。层底标高:-16.63m〜-13.97m,层厚: 1.40m〜3.50m。
[0022] 对本工程有影响的地下水类型主要为孔隙潜水(根据当地经验承压水对基坑开挖 及基桩施工的影响可不予考虑),勘察期间测得钻孔内初见水位标高在1.13m〜1.20m之间, 稳定水位标高在1 • 25m〜1 • 33m之间,地下水位年变化幅度在1.5m左右。场地环境地质条件 为湿润区含水量w彡30%的弱透水土层。
[0023] 根据以上地质情况,设计管桩长度为8米,桩径400mm,外围水泥土直径为800mm。按 照如下步骤施工:(1)向地基粧位处打入直径800mm的钢护筒,然后将护筒中的土取出形成 桩孔;(2)在桩孔底部放入2层土工布和1层钢板网,两者间隔放置;(3)在管桩外壁上焊接钢 板网,然后将管桩放入桩孔中;(4)将搅拌好的水泥土压灌送入护筒和管桩之间,并随之拔 出护筒;(5)依次按照桩位形成临近位置的复合管桩,并在管桩外侧的水泥土中插入补液 管,补液管开口位置在地下水位附近;(6)将各个管桩桩头局部破碎,穿过至少双层钢筋并 浇筑混凝土形成钢筋混凝土板或板带,补液管放入钢筋混凝土板或板带中。

Claims (7)

1. 一种组合复合管粧地基的施工方法,其特征在于,包括如下步骤:(1)向地基桩位处 打入护筒,然后将护筒中的土取出形成桩孔;(2)在桩孔底部放入土工布和钢板网;(3)在桩 孔中放入管桩;⑷将搅拌好的水泥土压灌送入护筒和管桩之间,并随之拔出护筒“5)依次 按照粧位形成临近位置的复合管桩;⑹将各个管桩桩头局部破碎,穿过至少双层钢筋并浇 筑混凝土形成钢筋混凝土板或板带。
2. 如权利要求1所述的施工方法,其特征在于,在步骤(2)放入土工布和钢板网之前,对 桩端土体进行穷扩。
3. 如权利要求1所述的施工方法,其特征在于,在进行步骤C3)在桩孔中放入管桩之前, 在管桩外壁上挂上钢板网,钢板网与管桩外壁伸出的锚件焊接。
4. 如权利要求1所述的施工方法,其特征在于,向水泥土中插入钢筋笼。
5. 如权利要求1所述的施工方法,其特征在于,在管桩周围的水泥土中插入水泥浆补液 管,补液管浇筑到钢筋混凝土板或板带中并伸出地基外侧。
6. 如权利要求1所述的施工方法,其特征在于,护筒内径为8〇〇mm,管桩外径直径为 300mm—400mm 〇
7. 如权利要求4所述的施工方法,其特征在于,钢筋笼直径为7〇〇mm。
CN201610654756.7A 2016-08-11 2016-08-11 一种组合复合管桩地基的施工方法 Active CN106087998B8 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610654756.7A CN106087998B8 (zh) 2016-08-11 2016-08-11 一种组合复合管桩地基的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610654756.7A CN106087998B8 (zh) 2016-08-11 2016-08-11 一种组合复合管桩地基的施工方法

Publications (3)

Publication Number Publication Date
CN106087998A CN106087998A (zh) 2016-11-09
CN106087998B CN106087998B (zh) 2018-01-02
CN106087998B8 true CN106087998B8 (zh) 2018-02-06

Family

ID=57456257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610654756.7A Active CN106087998B8 (zh) 2016-08-11 2016-08-11 一种组合复合管桩地基的施工方法

Country Status (1)

Country Link
CN (1) CN106087998B8 (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265694A (zh) * 2018-02-01 2018-07-10 温州市腾圣建设有限公司 一种深层地基的施工方法
CN109918721B (zh) * 2019-01-29 2019-10-29 成都理工大学 一种获取颗粒破碎条件下桩承式路基桩土应力比的方法
CN112609687A (zh) * 2020-11-17 2021-04-06 中国建筑第八工程局有限公司 Phc管桩植桩施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1488818A (zh) * 2003-08-04 2004-04-14 吕怀民 一种套盘桩和成桩方法和挤扩装置、沉桩机和用途
JP2015055077A (ja) * 2013-09-11 2015-03-23 日本コンクリート工業株式会社 基礎杭構造

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1488818A (zh) * 2003-08-04 2004-04-14 吕怀民 一种套盘桩和成桩方法和挤扩装置、沉桩机和用途
JP2015055077A (ja) * 2013-09-11 2015-03-23 日本コンクリート工業株式会社 基礎杭構造

Also Published As

Publication number Publication date
CN106087998A (zh) 2016-11-09
CN106087998B (zh) 2018-01-02

Similar Documents

Publication Publication Date Title
CN106087998B8 (zh) 一种组合复合管桩地基的施工方法
EP3861173A4 (en) Prestressed reinforced concrete pipe pile and a production method thereof
MX2017003394A (es) Supresor de ruido hidraulico y metodo para manipular un supresor de ruido hidraulico.
GB2534810A (en) Passivated cement accelerator
BR112018005760A2 (pt) método, composição, e, sistema de utilização de compostos de surfactantes sólidos em operações de cimentação de poços
MX2016002244A (es) Puntos de amarre de la tubería automatizada.
PL3249105T3 (pl) Prefabrykowany betonowy pal fundamentowy, sposób jego iniekcji i wytwarzania
EP3872266A4 (en) RING-SHAPED DAM WITH CONICAL SQUARE PIPES, TEMPORARY STRUCTURE FOR PIT EXCAVATION AND CONSTRUCTION PROCEDURES
EP3913145A4 (en) WATERPROOF PACKING AND PILE FOUNDATION STRUCTURE
EP3642173A4 (en) COMPOSITION, SYSTEM AND PROCEDURE FOR SOIL HEALTH PROMOTION
EP4026950A4 (en) RECTANGULAR PRECAST CONCRETE Pile WITH VARIABLE CROSS SECTION
WO2016005610A8 (en) Compositions and methods for well cementing
EP3333322A4 (en) NOZZLE STEEL CONSTRUCTION PROCESS, SOIL IMPROVEMENT ELEMENT AND FOUNDRY STRUCTURE
GB2580041B (en) Improvements in and relating to pile foundations
HK1251272A1 (zh) 連續互扣式管樁牆或圍堰施工方法
CA2885824C (en) Building assembly for greenhouses and other buildings
RU150970U1 (ru) Клинораспорный анкер
EP3322966A4 (en) Downhole stinger geotechnical sampling and in situ testing tool
TWI848059B (zh) 鋼筋混凝土構造物評估裝置、方法、及程式
GB2556130A (en) Multi-functional surfactant complexes for use in subterranean formations.
EP3159460A3 (en) Binding element for a building wall structure having an insulation layer
LV15552A (lv) Saliekams kompozītmateriālu skrūvpālis
EP3593610A3 (en) Machine, product and method for building unsurfaced roads
AU2017900633A0 (en) Soil Anchor Footing Extension
JP1707289S (ja) 建築用仮設杭

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Jingzhong

Inventor after: Zhao Zhongyang

Inventor after: Zhu Yanyan

Inventor after: Kong Xiangan

Inventor after: Tan Qingfei

Inventor after: Gao Xiuhua

Inventor after: Liu Gang

Inventor after: Wang Hongyan

Inventor after: Gong Chenghui

Inventor after: Wang Shuwen

Inventor after: Liu Yanhua

Inventor after: Fu Jinhua

Inventor after: Li Xuefeng

Inventor after: Wang Beibei

Inventor after: Zhao Caihong

Inventor after: Liu Shasha

Inventor after: Li Tingting

Inventor after: Gong Yifen

Inventor after: Fan Nannan

Inventor after: Zhao Yi

Inventor after: Shen Jie

Inventor after: Xu Hong

Inventor after: Liu Jianhao

Inventor after: Meng Qinglian

Inventor after: Liu Cheng

Inventor after: Liu Fangshun

Inventor after: Gao Jianzhong

Inventor after: Liu Jingrong

Inventor after: Song Huaihuan

Inventor after: Liu Congbo

Inventor after: Liu Linlin

Inventor after: Shen Jianbo

Inventor after: Qin Yacong

Inventor after: Zhang Wenshe

Inventor after: Chen Sihu

Inventor after: Ren Yanfang

Inventor before: Liu Congbo

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20171220

Address after: 250000 Shandong Province, Ji'nan City District Road 84 hero Mingshang Plaza B block, room 2-1103

Patentee after: Shandong Tonghai Decoration Engineering Co., Ltd.

Address before: Baoding City, Hebei province 073000 families of Hospital of Dingzhou city Xicheng District drilling team

Patentee before: Liu Congbo

TR01 Transfer of patent right
CI03 Correction of invention patent

Correction item: Patentee|Address|Inventor

Correct: Shandong Tonghai Decoration Engineering Co., Ltd.|250000 Shandong Province, Ji'nan City District Road 84 hero Mingshang Plaza B block, room 2-1103|Liu Jingzhong|Fu Jinhua|Liu Jianhao|Liu Linlin|Shen Jianbo|Qin Yacong|Zhang Wenshe|Chen Sihu|Ren Yanfang|Zhao Zhongyang|Zhu Yanyan|Kong Xiangan|Tan Qingfei|Gao Xiuhua|Liu Gang|Wang Hongyan|Gong Chenghui|Wang Shuwen|Liu Yanhua|Li Xuefeng|Wang Beibei|Zhao Caihong|Liu Shasha|Li Tingting|Gong Yifen|Fan Nannan|Zhao Yi|Shen Jie|Xu Hong|Meng Qinglian|Liu Cheng|Liu Fangshun|Gao Jianzhong|Liu Jingrong|Song Huaihuan|Liu Congbo

False: Liu Congbo|Baoding City, Hebei province 073000 families of Hospital of Dingzhou city Xicheng District drilling team|Liu Congbo

Number: 01-01

Page: The title page

Volume: 34

Correction item: Patentee|Address|Inventor

Correction item: Patentee|Address|Inventor

Correct: Shandong Tonghai Decoration Engineering Co., Ltd.|250000 Shandong Province, Ji'nan City District Road 84 hero Mingshang Plaza B block, room 2-1103|Liu Jingzhong|Fu Jinhua|Liu Jianhao|Liu Linlin|Shen Jianbo|Qin Yacong|Zhang Wenshe|Chen Sihu|Ren Yanfang|Zhao Zhongyang|Zhu Yanyan|Kong Xiangan|Tan Qingfei|Gao Xiuhua|Liu Gang|Wang Hongyan|Gong Chenghui|Wang Shuwen|Liu Yanhua|Li Xuefeng|Wang Beibei|Zhao Caihong|Liu Shasha|Li Tingting|Gong Yifen|Fan Nannan|Zhao Yi|Shen Jie|Xu Hong|Meng Qinglian|Liu Cheng|Liu Fangshun|Gao Jianzhong|Liu Jingrong|Song Huaihuan|Liu Congbo

Correct: Shandong Tonghai Decoration Engineering Co., Ltd.|250000 Shandong Province, Ji'nan City District Road 84 hero Mingshang Plaza B block, room 2-1103|Liu Jingzhong|Fu Jinhua|Liu Jianhao|Liu Linlin|Shen Jianbo|Qin Yacong|Zhang Wenshe|Chen Sihu|Ren Yanfang|Zhao Zhongyang|Zhu Yanyan|Kong Xiangan|Tan Qingfei|Gao Xiuhua|Liu Gang|Wang Hongyan|Gong Chenghui|Wang Shuwen|Liu Yanhua|Li Xuefeng|Wang Beibei|Zhao Caihong|Liu Shasha|Li Tingting|Gong Yifen|Fan Nannan|Zhao Yi|Shen Jie|Xu Hong|Meng Qinglian|Liu Cheng|Liu Fangshun|Gao Jianzhong|Liu Jingrong|Song Huaihuan|Liu Congbo

False: Liu Congbo|Baoding City, Hebei province 073000 families of Hospital of Dingzhou city Xicheng District drilling team|Liu Congbo

Number: 01-01

Volume: 34

CI03 Correction of invention patent