CN106082807A - Oil (water) well envelope is altered, leak stopping system is prepared and application process - Google Patents
Oil (water) well envelope is altered, leak stopping system is prepared and application process Download PDFInfo
- Publication number
- CN106082807A CN106082807A CN201610414218.0A CN201610414218A CN106082807A CN 106082807 A CN106082807 A CN 106082807A CN 201610414218 A CN201610414218 A CN 201610414218A CN 106082807 A CN106082807 A CN 106082807A
- Authority
- CN
- China
- Prior art keywords
- oil
- water
- well
- stifled
- closure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/42—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
- C09K8/426—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/42—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
- C09K8/46—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
- C09K8/467—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/00474—Uses not provided for elsewhere in C04B2111/00
- C04B2111/00724—Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries
Landscapes
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Inorganic Chemistry (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Structural Engineering (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Sealing Material Composition (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Abstract
Oil (water) well envelope is altered, leak stopping system prepares and application process is field of oilfield chemistry, it compensate for oil field oil (water) well sealing skill, the deficiency of sealing current state of technology, it is made up of pre-stifled system and closure system two parts, and closure system is made up of following material component: oil well G class g cement 40 50%, ultrafine slag powder 15 20%, polymer dispersion powder 8 15%, SILICA FUME 8%, UEA H extender 12%, polyacrylic fibre 2%, USZ drag reducer 0.2 0.5%, GH 1 (or GH 7) retarder 0.1 1.5%;Pre-stifled system has pre-stifled system 1 and pre-stifled system 2 two types;System dosing of the present invention is simple, and rheological characteristic, injection are good, and system plastic, that hardening time is adjustable is controlled, construction safety;Be applicable to oil (water) well under the complex geological conditions such as loose in debt stratum, fractured reservoir and seam, hole type limestone formation seal alter, leak stopping, sealing operation, be also suitable in drilling process missing greatly the leak stopping returned.
Description
Technical field
The present invention relates to field of oilfield chemistry, especially oil (water) well envelope is altered, leak stopping system is prepared and application process.
Technical background
Oil field is leaked for oily (water) well set, the outer closure used by closure process altered and no longer have Development volue oil reservoir of pipe
Cement class system that system is mainly made up of oil-well cement and additive thereof and the resinae body of gel-type resin and modifier thereof
System.
Cement class system defect is, volume contraction after solidification, poor with stratum and set tube wall cementing properties;Resinae blocks
System is difficult to adjust hardening time, and range of application is limited, and construction safety risk is the biggest;Particularly with loose stratum in debt, split
Seam property stratum and seam hole type limestone formation, be often difficult to resident because of blocking agent, and the most existing closure system defect blocks operation
Blocking agent is with big, and success rate is low, causes such oil (water) well to can not get effectively administering and scrapping.
Summary of the invention
It is an object of the invention to provide system dosing oil (water) well envelope simple, construction safety alter, the preparation of leak stopping system and
Application process, it compensate for oil field oil (water) well sealing skill, the deficiency of sealing current state of technology, it is an object of the invention to this
Sample realizes, and it is made up of pre-stifled system and closure system two parts, and closure system is made up of following material component: oil well G level
Cement 40-50%, ultrafine slag powder 15-20%, polymer dispersion powder 8-15%, SILICA FUME 8%, UEA-H extender 12%, polypropylene
Acid fiber 2%, USZ drag reducer 0.2-0.5%, GH-1 (or GH-7) retarder 0.1-1.5%;The preparation method of closure system is to press
Above-mentioned component and ratio put in blender successively and mix thoroughly, obtain closure system siccative.During on-the-spot application, by closure system dry powder
Being oar body with clear water mix and blend, the ratio of mud is 0.6-1.2.
Described pre-stifled system, it is made up of pre-stifled system 1 and pre-stifled system 2 two types, pre-stifled system 1 each component
Accounting for reaction system mass percent is: acrylamide 7-10%, DMAA ammonio methacrylate 3-5%, modified starch 2-
4%, N, N '-methene base bisacrylamide 0.02-0.08%, initiator are (for persulfate, azo diisobutyl amidine salt, the tert-butyl group
Hydrogen peroxide one therein, depending on temperature conditions) 0.02-0.06%, surplus be clear water, its static gelation time 0.5-
12 hours controlled, maximum 105 hours of dynamic gelling time;
Described pre-stifled system 2, its each component accounts for system percentage ratio: water soluble amino carboxylic acid resin 3-6%, closure system dry powder
5-20%, surplus are clear water, and its gelling time 0.5-3 hour is controlled.
The application process of the present invention is, the first step clamp-ons 5-30m to oil (water) well purpose well section3Pre-stifled system, on ground
Form high-strength gel under the conditions of Ceng or plastic body realizes preliminary soft closure, improve the presence of follow-up closure system, for second step
Closure creates conditions, and second step clamp-ons 4-15m to oil (water) well purpose well section3Closure system, form tool under formation conditions
Have micro-swollen, cementing properties good, shock proof rigidity firming body, it is achieved the closure of the high intensity of purpose well section.
The performance of closure system is, closure system dry powder is oar body with clear water mix and blend, its slurry proportion 1.35-
1.77, slurry do not settles, not bleed, and 50-580 minute hardening time is controlled;Oar body solidifies its firming body after 24 hours, pressure resistance
Degree >=25MPa, rupture strength >=15MPa, linear expansion rate >=0.3%.
Meaning of the present invention is: system dosing of the present invention is simple, and rheological characteristic, injection are good, and system plastic, hardening time can
Adjust controlled, construction safety;The present invention is applicable to the complexity such as loose stratum in debt, fractured reservoir and seam, hole type limestone formation
Under geological conditions oil (water) well envelope alter, leak stopping, sealing operation, be also suitable in drilling process missing greatly the leak stopping returned.
Detailed description of the invention
Embodiment 1, the present invention are made up of pre-stifled system and closure system two parts, and closure system is by following material component group
Become: oil well G class g cement 40-50%, ultrafine slag powder 15-20%, polymer dispersion powder 8-15%, SILICA FUME 8%, UEA-H extender
12%, polyacrylic fibre 2%, USZ drag reducer 0.2-0.5%, GH-1 (or GH-7) retarder 0.1-1.5%;Its preparation method is,
Put in blender successively in above-mentioned component and ratio and mix thoroughly, obtain closure system siccative;During on-the-spot application, closure system is done
Powder and clear water mix and blend are oar body, and the ratio of mud is 0.6-1.2.
Embodiment 2, described pre-stifled system, have pre-stifled system 1 and pre-stifled system 2 two types, pre-stifled system 1 each component
Accounting for reaction system mass percent is: acrylamide 7-10%, DMAA ammonio methacrylate 3-5%, modified starch 2-
4%, N, N '-methene base bisacrylamide 0.02-0.08%, initiator are (for persulfate, azo diisobutyl amidine salt, the tert-butyl group
Hydrogen peroxide one therein, depending on temperature conditions) 0.02-0.06%, surplus be clear water, its static gelation time 0.5-
12 hours controlled, maximum 105 hours of dynamic gelling time.
Embodiment 3, described pre-stifled system 2, each component accounts for system percentage ratio: water soluble amino carboxylic acid resin 3-6%, envelope
Stifled system dry powder 5-20%, surplus are clear water, and its gelling time 0.5-3 hour is controlled.
Embodiment 4, the application process of the present invention are that the first step clamp-ons 5-30m to oil (water) well purpose well section3Pre-stifled body
System, forms high-strength gel under formation conditions or plastic body realizes preliminary soft closure, improve the presence of follow-up closure system, for
Second step closure creates conditions, and second step clamp-ons 4-15m to oil (water) well purpose well section3Closure system, under formation conditions
Formation have micro-swollen, cementing properties good, shock proof rigidity firming body, it is achieved the closure of the high intensity of purpose well section.
Embodiment 5, the performance of closure system are that closure system dry powder is oar body with clear water mix and blend, its slurry proportion
1.35-1.77, slurry do not settles, not bleed, and 50-580 minute hardening time is controlled;Oar body solidifies its firming body after 24 hours,
Comprcssive strength >=25MPa, rupture strength >=15MPa, linear expansion rate >=0.3%.
Claims (4)
1. oil (water) well envelope alter, leak stopping system, it is characterized in that: it by pre-stifled system and closure system two parts form, occluding body
System is made up of following material component: oil well G class g cement 40-50%, ultrafine slag powder 15-20%, polymer dispersion powder 8-15%, micro-
Silica flour 8%, UEA-H extender 12%, polyacrylic fibre 2%, USZ drag reducer 0.2-0.5%, GH-1 (or GH-7) retarder 0.1-
1.5%;Its preparation method is, puts in blender successively in above-mentioned component and ratio and mixes thoroughly, obtains closure system siccative;On-the-spot
During application, being oar body by closure system dry powder and clear water mix and blend, the ratio of mud is 0.6-1.2.
Oil the most according to claim 1 (water) well envelope is altered, leak stopping system, it is characterized in that: pre-stifled system is by pre-stifled system 1
Forming with pre-stifled system 2 two types, pre-stifled system 1 each component accounts for reaction system mass percent and is: acrylamide 7-10%,
DMAA ammonio methacrylate 3-5%, modified starch 2-4%, N, N '-methene base bisacrylamide 0.02-0.08%, draw
Send out agent (for persulfate, azo diisobutyl amidine salt, tert-butyl hydroperoxide one therein, depending on temperature conditions)
0.02-0.06%, surplus are clear water, and its static gelation time 0.5-12 hour is controlled, maximum 105 hours of dynamic gelling time;In advance
The stifled each component of system 2 accounts for system percentage ratio: water soluble amino carboxylic acid resin 3-6%, closure system dry powder 5-20%, surplus are clear
Water, its gelling time 0.5-3 hour is controlled.
3. described in claim 1 oil (water) well envelope alter, the application process of leak stopping system, it is characterized in that: the first step to oil (water) well
Purpose well section clamp-ons 5-30m3Pre-stifled system, form high-strength gel under formation conditions or plastic body realize preliminary soft closure,
Improving the presence of follow-up closure system, create conditions for second step closure, second step clamp-ons 4-to oil (water) well purpose well section
15m3Closure system, under formation conditions formed have micro-swollen, cementing properties good, shock proof rigidity firming body, it is achieved purpose
The high intensity closure of well section.
4. oil (water) well envelope described in claim 1 alter, the performance of leak stopping system, it is characterized in that: closure system dry powder and clear water mix
Closing stirring in oar body, its slurry proportion 1.35-1.77, slurry do not settles, not bleed, and 50-580 minute hardening time is controlled;Oar
Body solidifies its firming body after 24 hours, comprcssive strength >=25MPa, rupture strength >=15MPa, linear expansion rate >=0.3%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610414218.0A CN106082807B (en) | 2016-06-15 | 2016-06-15 | Oil(Water)Well envelope is altered, leak stopping system prepares and application process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610414218.0A CN106082807B (en) | 2016-06-15 | 2016-06-15 | Oil(Water)Well envelope is altered, leak stopping system prepares and application process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106082807A true CN106082807A (en) | 2016-11-09 |
CN106082807B CN106082807B (en) | 2018-02-02 |
Family
ID=57845902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610414218.0A Active CN106082807B (en) | 2016-06-15 | 2016-06-15 | Oil(Water)Well envelope is altered, leak stopping system prepares and application process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106082807B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106967393A (en) * | 2017-04-19 | 2017-07-21 | 中国石油集团川庆钻探工程有限公司工程技术研究院 | A kind of curable low-density plugging operation liquid and preparation method thereof |
CN107033864A (en) * | 2017-05-14 | 2017-08-11 | 石磊 | A kind of preparation method of sealing agent |
CN108979585A (en) * | 2018-07-27 | 2018-12-11 | 中国石油天然气股份有限公司 | A kind of method for blocking of casing damage well set breakpoint |
WO2019016304A1 (en) | 2017-07-20 | 2019-01-24 | Danmarks Tekniske Universitet | Quick-setting elastomer plugging composition |
CN109516731A (en) * | 2018-12-13 | 2019-03-26 | 广西宏发海绵城市科技有限公司 | The production technology of inorganic water-permeable and water retention environmental protection brick |
CN113480254A (en) * | 2021-06-01 | 2021-10-08 | 陕西弘大众为石油科技有限公司 | Composite material plugging agent for water plugging and leakage plugging of horizontal well and preparation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090143257A1 (en) * | 2007-12-03 | 2009-06-04 | Ling Kong Teng | Methods and Compositions for Controlling Water Production |
CN102492404A (en) * | 2011-12-13 | 2012-06-13 | 四川嘉华企业(集团)股份有限公司 | Anti-blowby cement slurry |
CN102504781A (en) * | 2011-10-14 | 2012-06-20 | 中国石油天然气集团公司 | Oil and water well sealing and plugging agent and preparation method thereof |
CN103045214A (en) * | 2013-01-16 | 2013-04-17 | 西南石油大学 | Plugging thixotropic cement paste for oil-gas well and preparation method for same |
CN103232838A (en) * | 2013-04-24 | 2013-08-07 | 新疆克拉玛依市采丰实业有限责任公司 | Preparation and application method of cement profile control agent |
CN104109514A (en) * | 2014-05-15 | 2014-10-22 | 中国石油化工股份有限公司 | Plugging agent system for permanently plugging multilayer low-pressure large-tunnel oil reservoir and technology using the same |
-
2016
- 2016-06-15 CN CN201610414218.0A patent/CN106082807B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090143257A1 (en) * | 2007-12-03 | 2009-06-04 | Ling Kong Teng | Methods and Compositions for Controlling Water Production |
CN102504781A (en) * | 2011-10-14 | 2012-06-20 | 中国石油天然气集团公司 | Oil and water well sealing and plugging agent and preparation method thereof |
CN102492404A (en) * | 2011-12-13 | 2012-06-13 | 四川嘉华企业(集团)股份有限公司 | Anti-blowby cement slurry |
CN103045214A (en) * | 2013-01-16 | 2013-04-17 | 西南石油大学 | Plugging thixotropic cement paste for oil-gas well and preparation method for same |
CN103232838A (en) * | 2013-04-24 | 2013-08-07 | 新疆克拉玛依市采丰实业有限责任公司 | Preparation and application method of cement profile control agent |
CN104109514A (en) * | 2014-05-15 | 2014-10-22 | 中国石油化工股份有限公司 | Plugging agent system for permanently plugging multilayer low-pressure large-tunnel oil reservoir and technology using the same |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106967393A (en) * | 2017-04-19 | 2017-07-21 | 中国石油集团川庆钻探工程有限公司工程技术研究院 | A kind of curable low-density plugging operation liquid and preparation method thereof |
CN107033864A (en) * | 2017-05-14 | 2017-08-11 | 石磊 | A kind of preparation method of sealing agent |
WO2019016304A1 (en) | 2017-07-20 | 2019-01-24 | Danmarks Tekniske Universitet | Quick-setting elastomer plugging composition |
CN108979585A (en) * | 2018-07-27 | 2018-12-11 | 中国石油天然气股份有限公司 | A kind of method for blocking of casing damage well set breakpoint |
CN109516731A (en) * | 2018-12-13 | 2019-03-26 | 广西宏发海绵城市科技有限公司 | The production technology of inorganic water-permeable and water retention environmental protection brick |
CN113480254A (en) * | 2021-06-01 | 2021-10-08 | 陕西弘大众为石油科技有限公司 | Composite material plugging agent for water plugging and leakage plugging of horizontal well and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106082807B (en) | 2018-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106082807B (en) | Oil(Water)Well envelope is altered, leak stopping system prepares and application process | |
CN110387222B (en) | Porous gel plugging agent, preparation method and application thereof | |
CN106317321B (en) | It is used to prepare the composition of underground crosslinking plural gel and crosslinking plural gel prepared therefrom | |
CN110129013A (en) | Organic-inorganic composite GEL USED FOR PLUGGING WELL LOST CIRCULATION and the preparation method and application thereof | |
CN107382208B (en) | Quick-setting early strength mixed slurry | |
CN106381138B (en) | A kind of high pressure-bearing is without crosslinking supermolecule plural gel sealing agent and preparation method thereof | |
KR102049753B1 (en) | Grout composition enabling early high strength development and tunnel grouting reinforcement method using the same | |
CN106566501B (en) | Flexible plugging agent and preparation method and application thereof | |
CN103045212B (en) | A kind of Microcapsule guar gum and preparation method thereof | |
CN109021951A (en) | A kind of sand-fixating agent and preparation method thereof that consolidation reaction itself not occurring | |
CN108531146B (en) | Drilling leakage-stopping liquid and preparation method thereof | |
CN109437711A (en) | A kind of carbon nanotube thixotropy cementing slurry and preparation method thereof | |
CN102719232B (en) | Bridging particle for shallow casing blind hole | |
CN112980407A (en) | Temperature-controllable gel plugging agent and preparation method and application thereof | |
CN113403055B (en) | Water-soluble polymer degradation agent and preparation and application thereof | |
CN104045271B (en) | A kind of sealing agent for oil field or natural gas extraction and preparation method thereof | |
CN102851013A (en) | Composite super gel plugging agent for drilling | |
CN114620977B (en) | Ultrahigh-temperature well cementation cement paste and preparation method and application thereof | |
CN105441046B (en) | Suitable for crack and the hydrogen bond hydrogel of solution cavity leak stopping | |
CN107892543A (en) | A kind of sealing material for Karst water bursting and preparation method thereof and method for sealing | |
CN104529339B (en) | A kind of polypropylene cross-linked copolymer fiber concrete leak stopping slurry | |
WO2024051495A1 (en) | Lost-circulation composition, lost-circulation material and use thereof | |
CN105602536B (en) | A kind of non-acid-soluble high intensity seal stoppage agent and preparation method thereof | |
CN106188401A (en) | From degraded leak-proof leak-stopping material and preparation method thereof, from degraded leak-proof leak-stopping product and application thereof | |
CN105601803B (en) | A kind of synthetic method of slippery water drag reducer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |