CN106067071A CN201610364805.3A CN201610364805A CN106067071A CN 106067071 A CN106067071 A CN 106067071A CN 201610364805 A CN201610364805 A CN 201610364805A CN 106067071 A CN106067071 A CN 106067071A
Authority
CN
China
Prior art keywords
planning
model
electric power
state
power network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610364805.3A
Other languages
Chinese (zh)
Other versions
CN106067071B (en
Inventor
王中阳
李润秋
卢闽
朱岸明
罗迪
许文波
焦熠琨
张合宝
王威
田圣柯
杨尉镮
张蕾
王道斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority to CN201610364805.3A priority Critical patent/CN106067071B/en
Publication of CN106067071A publication Critical patent/CN106067071A/en
Application granted granted Critical
Publication of CN106067071B publication Critical patent/CN106067071B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/043Optimisation of two dimensional placement, e.g. cutting of clothes or wood
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of multi-state Model management method based on segment encoding, comprise the following steps: 1) set up electric network model management root;2) basis electric network model is created, the management service of Electric Power Network Planning model data is in step 1) newly-built benchmark the release directory under the electric network model that creates management root, under benchmark the release directory, create basis state catalogue simultaneously, and the basic electric network model created is stored in the state catalogue of basis;3) by step 2) create Planning Example on the basis of the basic electric network model that creates, in Planning Example, then create annual planning;The benchmark version, basis state and the planning state information that are relied on Planning Example encode according to Planning Example coding rule, obtain Electric Power Network Planning case coding;4) Electric Power Network Planning case coding in Electric Power Network Planning model access request is resolved, then according to the result resolved in Instances Pool by corresponding service instance query Electric Power Network Planning model data, the method can realize the access queries to many group Electric Power Network Planning model datas simultaneously.

Description

A kind of multi-state Model management method based on segment encoding
Technical field
The invention belongs to the sub-field of the data management in Computer Science and Technology, relate to a kind of many based on segment encoding States model management method.
Background technology
In power automatic system, electric network model, as the data structure of description actual electric network structure, is that electric power is automatic The core data of change system, and in Electric Power Network Planning application, Electric Power Network Planning research worker sets for the planning of power grid architecture Meter reflection is exactly the design to grid model data in computer systems, along with society requires not for the power supply capacity of electrical network Disconnected raising, existing electric network composition is also required to constantly improve, and Electric Power Network Planning personnel need to research to develop different planning sides Case, the pluses and minuses of the various scheme of relative analysis, it is desirable to be able to access simultaneously and overlap grid model data more.Current existing electrical network is advised The system of drawing, it is common that carry out planning and designing based on a set of basis grid model data, generate a set of planning electric network model, each Electric Power Network Planning correspond to a set of grid model data, during Electric Power Network Planning data different if desired for analysis and research, needs to reload The grid model data that this Electric Power Network Planning is corresponding, and a set of grid model data can only be loaded every time, it is impossible to meet many simultaneously Individual Electric Power Network Planning research to the visiting demands overlapping grid model data more.
Summary of the invention
It is an object of the invention to the shortcoming overcoming above-mentioned prior art, it is provided that a kind of many morphotypes based on segment encoding Type management method, the method can realize the access queries organizing Electric Power Network Planning model data more simultaneously.
For reaching above-mentioned purpose, multi-state Model management method based on segment encoding of the present invention includes following step Rapid:
1) electric network model management root is set up;
2) creating basis electric network model, the management service of Electric Power Network Planning model data is in step 1) management of the electric network model that creates Newly-built benchmark the release directory under root, creates basis state catalogue, and the basis electricity that will create under benchmark the release directory simultaneously Pessimistic concurrency control stores in the state catalogue of basis;
3) by step 2) create Planning Example on the basis of the basic electric network model that creates, in Planning Example, then create year Metric is drawn, the corresponding planning states model of each annual planning;Benchmark version, basis state and the rule that extraction Planning Example is relied on Drawing state information, the benchmark version then relied on Planning Example, basis state and planning state information are according to Planning Example coding rule Then encode, obtain Electric Power Network Planning case coding, and this Electric Power Network Planning case coding is identified as the unique of Planning Example;
4) when the management service of Electric Power Network Planning model data receives the access request of Electric Power Network Planning model, then electrical network is resolved Electric Power Network Planning case coding in plan model access request, it is corresponding that what then basis parsed is accessed for Electric Power Network Planning case The benchmark version of Electric Power Network Planning model, basis state, Planning Example and planning state information determine the planning that this Planning Example is corresponding States model servicelocation information, and planning states model servicelocation information is routed on corresponding Service Instance, by this service Example carries out planning the inquiry of states model data, then returns again to Query Result.
Electric Power Network Planning case coding is successively by characterizing the benchmark version of basic state electric network model, the base that Planning Example is relied on Plinth state, Planning Example and planning state information composition.
Also include that multi-state Model data service instance pond, multi-state Model data service instance pond manage multiple planning state automatically The life cycle of model access service example, when the time that any one Service Instance is not queried is more than or equal to preset value Time, then delete this Service Instance.
The method have the advantages that
Multi-state Model management method based on segment encoding of the present invention is when concrete operations, first to each Planning Example Carry out orderly storage, then encoded by the basic version that Planning Example is relied on, basis state and planning state information, Electric Power Network Planning case encodes, and is identified as the unique of Planning Example by this Electric Power Network Planning case coding, in query script, only Electric Power Network Planning case coding need to be parsed in Electric Power Network Planning model access request, can Search and Orientation to service corresponding to this coding Example, thus realize simultaneously to the access queries organizing Electric Power Network Planning model data more, simple to operate, substantially increase Electric Power Network Planning The motility of market demand and availability, ensure the efficiency of data access simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of Electric Power Network Planning case coding in the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in further detail:
With reference to Fig. 1, multi-state Model management method based on segment encoding of the present invention comprises the following steps:
1) electric network model management root is set up;
2) creating basis electric network model, the management service of Electric Power Network Planning model data is in step 1) management of the electric network model that creates Newly-built benchmark the release directory under root, creates basis state catalogue, and the basis electricity that will create under benchmark the release directory simultaneously Pessimistic concurrency control stores in the state catalogue of basis;
3) by step 2) create Planning Example on the basis of the basic electric network model that creates, in Planning Example, then create year Metric is drawn, the corresponding planning states model of each annual planning;Benchmark version, basis state and the rule that extraction Planning Example is relied on Drawing state information, the benchmark version then relied on Planning Example, basis state and planning state information are according to Planning Example coding rule Then encode, obtain Electric Power Network Planning case coding, and this Electric Power Network Planning case coding is identified as the unique of Planning Example;
4) when the management service of Electric Power Network Planning model data receives the access request of Electric Power Network Planning model, then electrical network is resolved Electric Power Network Planning case coding in plan model access request, it is corresponding that what then basis parsed is accessed for Electric Power Network Planning case The benchmark version of Electric Power Network Planning model, basis state, Planning Example and planning state information determine the planning that this Planning Example is corresponding States model servicelocation information, and planning states model servicelocation information is routed on corresponding Service Instance, by this service Example carries out planning the inquiry of states model data, then returns again to Query Result.
Electric Power Network Planning case coding is successively by characterizing the benchmark version of basic state electric network model, the base that Planning Example is relied on Plinth state, Planning Example and planning state information composition.
Present invention additionally comprises multi-state Model data service instance pond, multi-state Model data service instance pond manages multiple automatically Planning states model accesses the life cycle of Service Instance, when the time that any one Service Instance is not queried is more than or equal to pre- If during value, then deleting this Service Instance.
Described Electric Power Network Planning model data management service includes that model data accesses engine, model instance management and model Access route;Model data accesses engine and mainly realizes the access mechanism for model data file, the model after additions and deletions being changed Data persistence is in model data file, and this access engine also provides for data access merit based on model data file simultaneously Energy;Plan model instance management module is responsible for the management to Planning Example, and a corresponding planning states model of Planning Example (contains Basis states model), use the mechanism of memory limited, model data file is mapped to shared drive, receive outside to electricity The access request of net plan model, accesses engine by model data and provides the visit of Planning Example correspondence Electric Power Network Planning model data Ask, and return operating result;Plan model accesses the main parsing being responsible for Electric Power Network Planning case coding rule of route, it is provided that planning Benchmark version, basis state and the encoding service of planning state information that case is relied on, and advise according to the coding of Electric Power Network Planning case Then, resolve the model data example that positioning planning case is corresponding, the access request of Electric Power Network Planning model is forwarded to this planning case The Service Instance that example is corresponding, it is achieved the access to arbitrary planning states model data.
Planning Example, as one of the core of the present invention, is relied on by described Electric Power Network Planning case segmented encoding law Basic version information, basis state information and planning state information encode according to unified rule, set up Electric Power Network Planning case Coding and the mapping relations of Electric Power Network Planning model, Electric Power Network Planning case coded format sees Fig. 1, comprises following content: electrical network is advised Draw case coding be made up of four segment encodings, successively characterize Planning Example relied on basic version information, basis state information, Planning Example information and planning state information, as the index to different model states, Electric Power Network Planning Model Management Service is by resolving Coding is automatically positioned model data corresponding to Planning Example and provides access service.

Claims (3)

1. a multi-state Model management method based on segment encoding, it is characterised in that comprise the following steps:
1) electric network model management root is set up;
2) creating basis electric network model, the management service of Electric Power Network Planning model data is in step 1) electric network model that creates management root mesh Newly-built benchmark the release directory under record, creates basis state catalogue, and the basic electrical network mould that will create under benchmark the release directory simultaneously Type stores in the state catalogue of basis;
3) by step 2) create Planning Example on the basis of the basic electric network model that creates, in Planning Example, then create year metric Draw, the corresponding planning states model of each annual planning;Benchmark version, basis state and the planning state that extraction Planning Example is relied on Information, the benchmark version then relied on Planning Example, basis state and planning state information are entered according to Planning Example coding rule Row coding, obtains Electric Power Network Planning case coding, and this Electric Power Network Planning case encodes the unique mark as Planning Example;
4) when the management service of Electric Power Network Planning model data receives the access request of Electric Power Network Planning model, then Electric Power Network Planning is resolved Electric Power Network Planning case coding in model access request, is then accessed for, according to parse, the electrical network that Electric Power Network Planning case is corresponding The benchmark version of plan model, basis state, Planning Example and planning state information determine the planning morphotype that this Planning Example is corresponding Type servicelocation information, and planning states model servicelocation information is routed on corresponding Service Instance, by this Service Instance Carry out planning the inquiry of states model data, then return again to Query Result.
Multi-state Model management method based on segment encoding the most according to claim 1, it is characterised in that Electric Power Network Planning case Example coding is successively by characterizing the benchmark version of the basic state electric network model that Planning Example is relied on, basis state, Planning Example and rule Draw state information composition.
Multi-state Model management method based on segment encoding the most according to claim 1, it is characterised in that also include polymorphic Model data service instance pool, multi-state Model data service instance pond automatically manages multiple planning states model and accesses Service Instance Life cycle, when the time that any one Service Instance is not queried is more than or equal to preset value, then deletes this Service Instance.
CN201610364805.3A 2016-05-27 2016-05-27 Multi-state model management method based on segmented coding Expired - Fee Related CN106067071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610364805.3A CN106067071B (en) 2016-05-27 2016-05-27 Multi-state model management method based on segmented coding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610364805.3A CN106067071B (en) 2016-05-27 2016-05-27 Multi-state model management method based on segmented coding

Publications (2)

Publication Number Publication Date
CN106067071A true CN106067071A (en) 2016-11-02
CN106067071B CN106067071B (en) 2020-01-10

Family

ID=57420798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610364805.3A Expired - Fee Related CN106067071B (en) 2016-05-27 2016-05-27 Multi-state model management method based on segmented coding

Country Status (1)

Country Link
CN (1) CN106067071B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018196264A1 (en) * 2017-04-24 2018-11-01 中国电力科学研究院有限公司 Construction method, apparatus and equipment for futuristic power grid model and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102646222A (en) * 2012-02-17 2012-08-22 中国电力科学研究院 All-data management method of power grid
CN102855271A (en) * 2012-07-05 2013-01-02 中国电力科学研究院 Storage and traceable management method for multi-version power grid model
CN105447175A (en) * 2015-12-09 2016-03-30 中国电力科学研究院 Power grid model sharing method applicable to distributed computation of power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102646222A (en) * 2012-02-17 2012-08-22 中国电力科学研究院 All-data management method of power grid
CN102855271A (en) * 2012-07-05 2013-01-02 中国电力科学研究院 Storage and traceable management method for multi-version power grid model
CN105447175A (en) * 2015-12-09 2016-03-30 中国电力科学研究院 Power grid model sharing method applicable to distributed computation of power system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018196264A1 (en) * 2017-04-24 2018-11-01 中国电力科学研究院有限公司 Construction method, apparatus and equipment for futuristic power grid model and storage medium
US10832179B2 (en) 2017-04-24 2020-11-10 China Electric Power Research Institute Co. Ltd. Method for constructing a future-state power grid model, device and equipment and storage medium

Also Published As

Publication number Publication date
CN106067071B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN102308297B (en) Data migration method, data migration device and data migration system
CN103399942B (en) A kind of data engine system supporting the many tenants of SaaS and method of work thereof
CN103714145B (en) Relationship type and Key-Value type database spatial data index method
CN105278373A (en) Substation integrated information processing system realizing method
CN102163232B (en) SQL (Structured Query Language) interface implementing method supporting IEC61850 object query
CN103631907A (en) Method and system for migrating relational data to HBbase
CN103744960A (en) Metadata indexing module and method based on cloud platform
CN102750406A (en) Multi-version management method for model set and difference model-based power grid model
CN102214228A (en) Large-grid distributed real-time database system and data management method thereof
CN103631596A (en) Configuration device and configuration method of business object data entry and updating rule
CN108446326B (en) A kind of isomeric data management method and system based on container
KR102141784B1 (en) System for managing ontology data of power grid
CN112132327A (en) Multi-source data fusion-oriented intelligent planning system for power distribution network
CN104504008A (en) Data migration algorithm based on nested SQL (structured query language) to HBase
CN102654878B (en) Data operation method for distributed database in embedded system and board card
CN110888878A (en) Service-oriented main data management method and system
CN103606032B (en) A kind of method in two dimension power grid GIS data set
CN110490761A (en) A kind of power grid distribution net equipment account data model modelling approach
CN112328594B (en) Embedded device model data management method and device
CN109213820A (en) Method for realizing fusion use of multiple types of databases
CN106802928B (en) Power grid historical data management method and system
CN105373621A (en) Rapid database-system-across data increment migration method
CN106067071A (en) A kind of multi-state Model management method based on segment encoding
CN104881739A (en) Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard
CN105550351B (en) The extemporaneous inquiry system of passenger's run-length data and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

Termination date: 20200527