CN106065558A - Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating - Google Patents

Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating Download PDF

Info

Publication number
CN106065558A
CN106065558A CN201610398889.2A CN201610398889A CN106065558A CN 106065558 A CN106065558 A CN 106065558A CN 201610398889 A CN201610398889 A CN 201610398889A CN 106065558 A CN106065558 A CN 106065558A
Authority
CN
China
Prior art keywords
mix
stir
buton rock
mixed
stirred
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610398889.2A
Other languages
Chinese (zh)
Inventor
刘黎萍
高经纬
李伊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201610398889.2A priority Critical patent/CN106065558A/en
Publication of CN106065558A publication Critical patent/CN106065558A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1054Preparing mixtures of which at least part of the solid ingredients has previously been deposited on the surface, excluding penetrating or surface dressing, e.g. in situ mixing, mixing involving lifting of spread or windrowed aggregate
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1059Controlling the operations; Devices solely for supplying or proportioning the ingredients
    • E01C19/1068Supplying or proportioning the ingredients

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The present invention relates to a kind of BUTON rock asphalt modified asphalt mixture heating and mix and stir processing technology, to gather materials and carry out adding stand-by heat, then it is sequentially added into the Colophonium of heating, the kir of heating and breeze, controls the temperature of gained compound, it is thus achieved that BUTON rock asphalt modified asphalt mixture.Compared with prior art, the present invention have be easily achieved, mix and stir technique simply efficiently, asphalt content is few and compound is prone to the features such as compacting, can more preferably play the modifying function of BUTON rock asphalt.

Description

Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating
Technical field
The invention belongs to road engineering technical field, especially relate to a kind of BUTON rock asphalt modified asphalt mixture heating Mix and stir processing technology.
Background technology
The production process of BUTON rock asphalt modified asphalt mixture be by gathering materials, Colophonium, kir and breeze etc. are by necessarily Ratio mix and stir, obtain hot-laid mixture, major function is to improve the high-temperature behavior on road surface and water stability, improves road with this and uses Performance, to meet the demand of traffic loading and climatic environment.Due to BUTON rock asphalt stable performance, ageing resistance is strong, and easily It is dissolved in matrix pitch so that it is modified asphalt mixture has that production technology is simple, performance prominent, the feature of use easy to spread.
Currently used kir routine mixes and stirs technique, the most first will heating after gather materials and the kir under room temperature is being mixed Mixing and stirring in cylinder, then the Colophonium after heating is added to mix and stir in cylinder and mixed and stirred, add breeze the most again, present in it, problem has: (1) heating of kir needs to rely on and gathers materials and the conduction of heat of matrix pitch, then kir could with gather materials, matrix pitch body System merges, but within the limited mixing time, only rely on gather materials, the kir of matrix pitch conduction of heat heating may reach Less than the optimum temperature playing modifying function;(2) do not account for thickness to gather materials and the difference of kir adsorptive pitch ability, cause It is different that the Colophonium that thickness is gathered materials wraps up in attached situation, and then has influence on the compacting of compound, just need to increase drip for reaching objective air void Blue or green consumption, causes the waste of Colophonium resource, reduces the economy of BUTON rock asphalt modified pitch.Therefore, according to BUTON rock asphalt Feature improve existing technique of mixing and stirring necessary, propose kir mixed material heating for this and mix and stir technique.
Summary of the invention
Defect that the purpose of the present invention is contemplated to overcome above-mentioned prior art to exist and provide a kind of BUTON rock asphalt to change Property asphalt mixture heating mix and stir processing technology, with obtain Colophonium wrap up in attached uniformly, stable performance, meet hot-mix asphalt mixture Can requirement, good economy performance, mix and stir production technology simple BUTON rock asphalt modified asphalt mixture.
The purpose of the present invention can be achieved through the following technical solutions:
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating, the method employing following steps:
(1) will gather materials and carry out adding stand-by heat;
(2) join in step (1) products therefrom after Colophonium being heated and mix and stir;
(3) kir is joined in step (2) products therefrom mix and stir;
(4) breeze is joined in step (3) products therefrom and mix and stir;
(5) temperature of rate-determining steps (4) gained compound, it is thus achieved that BUTON rock asphalt modified asphalt mixture;
Kir described in step (3) is heated to 80~110 DEG C before joining step (2) products therefrom.
As preferred embodiment, kir is heated to 90 DEG C.
Gather materials for limestone, basalt or diabase described in step (1), utilize mixing station to be heated to 180~200 DEG C, or utilize indoor small to mix pot heating, controlling to mix and stir temperature is 165~175 DEG C.
Colophonium described in step (2) is 70# matrix pitch, SBS modified pitch or other label matrix pitch, is heated to 155~170 DEG C.Utilize mixing station to mix and stir 25~30s, or utilize indoor small to mix pot to mix and stir 90~110s.
Step (3) utilizes mixing station mix and stir 5~10s, or utilize indoor small to mix pot to mix and stir 60~90s.
Breeze described in step (4) is limestone mineral powder, is heated to 165~175 DEG C.Utilize mixing station mix and stir 22~ 32s, or utilize indoor small to mix pot to mix and stir 90~110s.
The temperature of the compound described in step (5) controls at 155~175 DEG C.
Described gather materials, the weight ratio of Colophonium, kir and breeze is 100:3.5~5.0:1~3:1~3.
Compared with prior art, the invention have the advantages that
The method of the present invention is by heating kir in advance, and in sequence add gather materials, Colophonium, kir and Breeze, carries out the preparation of processes of rock asphalt modified asphalt compound: kir can improve itself and matrix pitch by heating in advance Adhesive capacity, gives full play to kir modifying function, and the water resistant improving kir compound damages performance, high temperature anti-rut behavior And crack resistance at low-temperature, and using room temperature kir to make kir compound, it is good that its performance can not show a candle to heat kir;Add Order adds kir after changing into being initially charged Colophonium, it is considered to difference is gathered materials and wrapped up in the feature that attached situation is different from Colophonium, is effectively improved The thickness Colophonium that gathers materials wraps up in attached uniformity, and compound is prone to compacting, and performance is improved.
The creativeness that the present invention is the most prominent is that, adds kir and is first preheating to 80~110 DEG C, if kir temperature Too low, its asphalt component is likely not to have fully activation, affects it attached with wrapping up in of gathering materials;And if temperature is too high, it is likely that lead Cause ageing of asphalt and affect its performance.
The method of the present invention needs increase kir heating steps and change the adding order of Colophonium and kir, more conventional For mixing and stirring technique, total mixing time in production process of mixing and stirring of whole compound can keep constant, and existing batching plant only needs Increase kir firing equipment or use hot recycling equipment.
The more conventional technique of method of the present invention can promote the adhesiveness of kir and wrap up in attached effect, improves kir modified The compactness of asphalt, and improve its pavement performance, can be used for the making of each surface layer of bituminous paving, there is obvious economy And social benefit.
The method of the present invention have be easily achieved, mix and stir technique simply efficiently, compound be prone to the features such as compacting, can be more preferably Play the modifying function of BUTON rock asphalt.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.
Gather materials in following example, the mass percent of Colophonium, kir, breeze is according to " asphalt highway construction skill Art specification JTG F40-2004 " determined by mix-design, and a large amount of ashy substances contained in kir should be taken into account in In mineral composition.
Breeze used below is limestone mineral powder, and kir is BUTON rock asphalt.
Used below gather materials, the mass percent of Colophonium, kir, breeze is 100:3~5:2~3:1~3;Mixing Material gradation design is AC-13 or AC-20.
Embodiment 1
First being sampled BUTON rock asphalt, then sample is stripped test, test records this BUTON rock asphalt Bitumen content be 30.7%.The BUTON rock asphalt ashy substance obtained for extraction test carries out sieve test, result of the test As shown in table 1.
Mineral screening result after the extracting of table 1 BUTON rock asphalt
Screen size/mm 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Percent of pass/% 100 98.93 91.42 84.15 73.38 54.33 38.62
Coarse aggregate uses diabase, and concrete screening result is as shown in table 2, and for BUTON rock asphalt after gathering materials and extracting Ashy substance carries out the test of relative density, and test result is as shown in table 3.
Thick, the fine aggregate screening result of table 2
Table 3 gathers materials and BUTON rock asphalt ashy substance relative density test result
Gather materials 0-3 3-5 5-10 10-15 Ashy substance
Bulk density (g/cm3) 2.63 2.68 2.95 2.96 2.165
Apparent density (g/cm3) 2.63 2.68 3.00 3.01 2.165
Colophonium selects 70# matrix pitch, and property indices is satisfied by requirement after measured.
To gather materials, kir, breeze carry out AC-13 gradation design, and formate gradation composition meets " asphalt highway construction technology Specification JTG F40-2004 " grading limit requirement.
By above-mentioned gathering materials, kir, matrix pitch mix and stir technique according to heating respectively with breeze and routine is mixed and stirred technique and entered Row mixes and stirs.Wherein, adding proportion of gathering materials is: 10-15:5-10:3-5:0-3: breeze=20:36:12:27:3, and kir fills Quality is the 3% of compound gross mass, and No. 70 matrix pitch consumptions are the 4.58% of compound gross mass.
Above-mentioned gather materials, technique is mixed and stirred in the heating of matrix pitch, BUTON rock asphalt, breeze, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir is heated to 90 DEG C standby;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4) kir in step (2) is added mix and stir pot mixes and stirs 60s;
(5), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(6) compound after being mixed and stirred by step (5) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
Above-mentioned gather materials, the routine of matrix pitch, BUTON rock asphalt, breeze mixes and stirs technique, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir under room temperature is added mix and stir pot mixes and stirs 60s;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(5) compound after being mixed and stirred by step (4) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
For above-mentioned respectively according to heating mix and stir technique, routine mix and stir technique obtain BUTON rock asphalt modified pitch mixing Material carries out the test of indoor marshal piece parameter, and result of the test is as shown in table 4.Visible, the cloth mixed and stirred under technique is mixed and stirred in heating The density of honest processes of rock asphalt modified asphalt compound marshal piece is more preferable.Wherein, VV is the porosity of compacting asphalt.
Table 4 BUTON rock asphalt modified asphalt mixture marshal piece parametric results
Technique Voidage meansigma methods (%) Remarks
Common process 4.02 Make four parallel test specimens to average
Technique is mixed and stirred in heating 3.72 Make four parallel test specimens to average
Use above-mentioned respectively according to heating mix and stir technique, routine mix and stir technique obtain BUTON rock asphalt modified pitch mixing Material carries out dynamic stability test, indirect tensile test on frozen-thaw and low temperature cracking test, and result of the test is as shown in table 5.Visible, heating is mixed and stirred The performance of the BUTON rock asphalt modified asphalt mixture mixed and stirred under technique is more preferable.In table, VV is the hole of compacting asphalt Rate, DS is the dynamic stability of asphalt mixture in track test, and TSR is freeze-thaw split strength ratio, RTIt it is low temperature cleavage strength.
Table 5 difference mixes and stirs the contrast of craft cloth honest processes of rock asphalt modified asphalt mixture performance
Embodiment 2
First being sampled BUTON rock asphalt, then sample is stripped test, test records this BUTON rock asphalt Bitumen content be 30.7%.The BUTON rock asphalt ashy substance obtained for extraction test carries out sieve test, result of the test As shown in table 6.
Mineral screening result after the extracting of table 6 BUTON rock asphalt
Screen size/mm 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Percent of pass/% 100 98.93 91.42 84.15 73.38 54.33 38.62
Coarse aggregate uses diabase, and concrete screening result is as shown in table 7, and for BUTON rock asphalt after gathering materials and extracting Ashy substance carries out the test of relative density, and test result is as shown in table 8.
Thick, the fine aggregate screening result of table 7
Table 8 gathers materials and BUTON rock asphalt ashy substance relative density test result
Gather materials 0-3 3-5 5-10 10-15 Ashy substance
Bulk density (g/cm3) 2.63 2.68 2.95 2.96 2.165
Apparent density (g/cm3) 2.63 2.68 3.00 3.01 2.165
Colophonium selects 70# matrix pitch, and property indices is satisfied by requirement after measured.
To gather materials, kir, breeze carry out AC-13 gradation design, and formate gradation composition meets " asphalt highway construction technology Specification JTG F40-2004 " grading limit requirement.
By above-mentioned gathering materials, kir, matrix pitch mix and stir technique according to heating respectively with breeze and routine is mixed and stirred technique and entered Row mixes and stirs.Wherein, adding proportion of gathering materials is: 10-15:5-10:3-5:0-3: breeze=20:36:12:27:3, and kir fills Quality is the 3% of compound gross mass, and No. 70 matrix pitch consumptions are the 4.58% of compound gross mass.
Above-mentioned gather materials, technique is mixed and stirred in the heating of matrix pitch, BUTON rock asphalt, breeze, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir is heated to 110 DEG C standby;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4) kir in step (2) is added mix and stir pot mixes and stirs 60s;
(5), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(6) compound after being mixed and stirred by step (5) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
Above-mentioned gather materials, the routine of matrix pitch, BUTON rock asphalt, breeze mixes and stirs technique, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir under room temperature is added mix and stir pot mixes and stirs 60s;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(5) compound after being mixed and stirred by step (4) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
For above-mentioned mixing and stirring technique (kir is heated to 110 DEG C) according to heating respectively, routine mixes and stirs the cloth that technique obtains Honest processes of rock asphalt modified asphalt compound carries out the test of indoor marshal piece parameter, and result of the test is as shown in table 9.Visible, add The density that heat mixes and stirs the BUTON rock asphalt modified asphalt mixture marshal piece mixed and stirred under technique is more preferable.
Table 9 BUTON rock asphalt modified asphalt mixture marshal piece parametric results
Technique Voidage meansigma methods (%) Remarks
Common process 4.02 Make four parallel test specimens to average
Technique (110 DEG C) is mixed and stirred in heating 3.84 Make four parallel test specimens to average
Use above-mentioned respectively according to heating mix and stir technique, routine mix and stir technique obtain BUTON rock asphalt modified pitch mixing Material carries out dynamic stability test, indirect tensile test on frozen-thaw and low temperature cracking test, and result of the test is as shown in table 5.Visible, heating is mixed and stirred The performance of the BUTON rock asphalt modified asphalt mixture mixed and stirred under technique is more preferable.In table, DS is asphalt mixture in track test Dynamic stability, TSR is freeze-thaw split strength ratio, RTIt it is low temperature cleavage strength.
Table 10 difference mixes and stirs the contrast of craft cloth honest processes of rock asphalt modified asphalt mixture performance
Embodiment 3
Laboratory test embodiment: be first sampled BUTON rock asphalt, is then stripped test to sample, and test is surveyed The bitumen content obtaining this BUTON rock asphalt is 30.7%.The BUTON rock asphalt ashy substance obtained for extraction test sieves Test, result of the test is as shown in table 11.
Mineral screening result after the extracting of table 11 BUTON rock asphalt
Screen size/mm 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Percent of pass/% 100 98.93 91.42 84.15 73.38 54.33 38.62
Coarse aggregate uses diabase, and concrete screening result is as shown in table 12, and for BUTON rock asphalt after gathering materials and extracting Ashy substance carry out the test of relative density, test result is as shown in table 13.
Table 12 thickness is gathered materials screening result
Table 13 gathers materials and BUTON rock asphalt ashy substance relative density test result
Gather materials 0-3 3-5 5-10 10-15 Ashy substance
Bulk density (g/cm3) 2.63 2.68 2.95 2.96 2.165
Apparent density (g/cm3) 2.63 2.68 3.00 3.01 2.165
Colophonium selects SBS modified pitch, and property indices is satisfied by requirement after measured.
To gather materials, kir, breeze carry out AC-13 gradation design, and formate gradation composition meets " asphalt highway construction technology Specification JTG F40-2004 " grading limit requirement.
By above-mentioned gathering materials, kir, matrix pitch mix and stir technique according to kir heating technique and routine respectively with breeze Mix and stir.Wherein, adding proportion of gathering materials is: 10-15:5-10:3-5:0-3: breeze=20:36:12:27:3, and kir is mixed Add that quality is compound gross mass 3%, SBS modified pitch consumption is the 4.8% of compound gross mass.
Above-mentioned gather materials, technique is mixed and stirred in the heating of SBS modified pitch, BUTON rock asphalt, breeze, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir is heated to 90 DEG C standby;
(3) SBS Colophonium is heated to about 170 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4) kir in step (2) is added mix and stir pot mixes and stirs 60s;
(5), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(6) compound after being mixed and stirred by step (5) gained takes the dish out of the pot at 165~175 DEG C, 160~170 DEG C of molding.
Above-mentioned gather materials, the routine of matrix pitch, BUTON rock asphalt, breeze mixes and stirs technique, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir under room temperature is added mix and stir pot mixes and stirs 60s;
(3), after SBS modified pitch being heated to 170 DEG C, join to mix and stir and pot mixes and stirs 90s;
(4), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(5) compound after being mixed and stirred by step (4) gained takes the dish out of the pot at 165~175 DEG C, 160~170 DEG C of molding.
For above-mentioned respectively according to heating mix and stir technique, routine mix and stir technique obtain BUTON rock asphalt modified pitch mixing Material carries out the test of indoor marshal piece parameter, and result of the test is as shown in table 14.Visible, the cloth mixed and stirred under technique is mixed and stirred in heating The density of honest processes of rock asphalt modified asphalt compound marshal piece is more preferable, and under identical voidage, Colophonium addition is less.
Table 14 BUTON rock asphalt modified asphalt mixture marshal piece parametric results
Embodiment 4
First being sampled BUTON rock asphalt, then sample is stripped test, test records this BUTON rock asphalt Bitumen content be 30.7%.The BUTON rock asphalt ashy substance obtained for extraction test carries out sieve test, result of the test As shown in Table 15.
Mineral screening result after the extracting of table 15 BUTON rock asphalt
Screen size/mm 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Percent of pass/% 100 98.93 91.42 84.15 73.38 54.33 38.62
Coarse aggregate uses diabase, and concrete screening result is as shown in table 16, and for BUTON rock asphalt after gathering materials and extracting Ashy substance carry out the test of relative density, test result is as shown in table 17.
Table 16 thickness is gathered materials screening result
Table 17 gathers materials and BUTON rock asphalt ashy substance relative density test result
Gather materials 0-3 3-5 5-10 10-15 Ashy substance
Bulk density (g/cm3) 2.63 2.68 2.95 2.96 2.165
Apparent density (g/cm3) 2.63 2.68 3.00 3.01 2.165
Colophonium selects SBS modified pitch, and property indices is satisfied by requirement after measured.
To gather materials, kir, breeze carry out AC-13 gradation design, and formate gradation composition meets " asphalt highway construction technology Specification JTG F40-2004 " grading limit requirement.
By above-mentioned gathering materials, kir, matrix pitch mix and stir technique according to kir heating technique and routine respectively with breeze Mix and stir.Wherein, adding proportion of gathering materials is: 10-15:5-10:3-5:0-3: breeze=20:36:12:27:3, and kir is mixed Add that quality is compound gross mass 3%, SBS modified pitch consumption is the 4.8% of compound gross mass.
Above-mentioned gather materials, technique is mixed and stirred in the heating of SBS modified pitch, BUTON rock asphalt, breeze, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir is heated to 110 DEG C standby;
(3) SBS Colophonium is heated to about 170 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4) kir in step (2) is added mix and stir pot mixes and stirs 60s;
(5), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(6) compound after being mixed and stirred by step (5) gained takes the dish out of the pot at 165~175 DEG C, 160~170 DEG C of molding.
Above-mentioned gather materials, the routine of matrix pitch, BUTON rock asphalt, breeze mixes and stirs technique, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir under room temperature is added mix and stir pot mixes and stirs 60s;
(3), after SBS modified pitch being heated to 170 DEG C, join to mix and stir and pot mixes and stirs 90s;
(4), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(5) compound after being mixed and stirred by step (4) gained takes the dish out of the pot at 165~175 DEG C, 160~170 DEG C of molding.
For above-mentioned mixing and stirring technique (kir is heated to 110 DEG C) according to heating respectively, routine mixes and stirs the cloth that technique obtains Honest processes of rock asphalt modified asphalt compound carries out the test of indoor marshal piece parameter, and result of the test is as shown in table 18.Visible, add The density that heat mixes and stirs the BUTON rock asphalt modified asphalt mixture marshal piece mixed and stirred under technique is more preferable.
Table 18 BUTON rock asphalt modified asphalt mixture marshal piece parametric results
Embodiment 5
First being sampled BUTON rock asphalt, then sample is stripped test, test records this BUTON rock asphalt Bitumen content be 25.1%.The BUTON rock asphalt ashy substance obtained for extraction test carries out sieve test, result of the test As shown in table 19.
Mineral screening result after the extracting of table 19 BUTON rock asphalt
Gather materials employing limestone, and concrete screening result is as shown in table 20, and for BUTON rock asphalt after gathering materials and extracting Ashy substance carries out the test of relative density, and test result is as shown in table 21.
Table 20 limestone and breeze screening result
Table 21 gathers materials and BUTON rock asphalt ashy substance relative density test result
Colophonium selects 70# matrix pitch, and property indices is satisfied by requirement after measured.
To gather materials, kir, breeze carry out AC-20 gradation design, and formate gradation composition meets " asphalt highway construction technology Specification JTG F40-2004 " grading limit requirement.
By above-mentioned gathering materials, kir, matrix pitch mix and stir technique according to heating respectively with breeze and routine is mixed and stirred technique and entered Row mixes and stirs.Wherein, adding proportion of gathering materials is: 12-40:6-12:3-6:0-3: breeze=33:40:10:14:1, and kir fills Quality is the 3% of compound gross mass, and matrix pitch consumption is the 3.38% of compound gross mass.
Above-mentioned gather materials, technique is mixed and stirred in the heating of matrix pitch, BUTON rock asphalt, breeze, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir is heated to 90 DEG C standby;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4) kir in step (2) is added mix and stir pot mixes and stirs 60s;
(5), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(6) compound after being mixed and stirred by step (5) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
Above-mentioned gather materials, the routine of matrix pitch, BUTON rock asphalt, breeze mixes and stirs technique, comprises the following steps:
(1), after gathering materials and being heated to 180 DEG C, join and mix and stir in pot, mix and stir kettle temperature and be maintained at 165~175 DEG C;
(2) kir under room temperature is added mix and stir pot mixes and stirs 60s;
(3) matrix pitch is heated to about 155 DEG C, joins to mix and stir and pot mixes and stirs 90s;
(4), after breeze being heated to 180 DEG C, join to mix and stir and pot mixes and stirs 90s;
(5) compound after being mixed and stirred by step (4) gained takes the dish out of the pot at 155~165 DEG C, 150~160 DEG C of molding.
For above-mentioned respectively according to heating mix and stir technique, routine mix and stir technique obtain BUTON rock asphalt modified pitch mixing Material carries out the test of indoor marshal piece parameter, and result of the test is as shown in table 22.Visible, the cloth mixed and stirred under technique is mixed and stirred in heating The density of honest processes of rock asphalt modified asphalt compound marshal piece is more preferable, and under identical voidage, Colophonium addition is less.
Table 22 BUTON rock asphalt modified asphalt mixture marshal piece parametric results
Mix and stir technique VV meansigma methods/% VMA meansigma methods/% VFA meansigma methods/%
Common process 5.78 13.68 57.79
Technique is mixed and stirred in heating 4.16 12.19 65.86
Embodiment 6
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating, the method employing following steps:
(1) limestone aggregates is utilized mixing station be heated to 180 DEG C standby;
(2) 70# matrix pitch is heated to 155 DEG C, utilizes mixing station to mix and stir 25s, be then added to step (1) gained and produce Thing mixes and stirs;
(3) kir is heated to 80 DEG C, then utilizes mixing station to mix and stir 5s, be then added in step (2) products therefrom Mix and stir;
(4) limestone mineral powder is heated to 165 DEG C, then utilizes mixing station to mix and stir 22s, be then added to step (3) gained Product mixes and stirs, above-mentioned gathers materials, the weight ratio of Colophonium, kir and breeze is 100:3.5:1:1;
(5) temperature of rate-determining steps (4) gained compound is at 155 DEG C, it is thus achieved that BUTON rock asphalt modified asphalt mixture.
Embodiment 7
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating, the method employing following steps:
(1) basalt aggregate is utilized mixing station be heated to 200 DEG C standby;
(2) 70# matrix pitch is heated to 170 DEG C, utilizes mixing station to mix and stir 30s, be then added to step (1) gained and produce Thing mixes and stirs;
(3) kir is heated to 90 DEG C, then utilizes mixing station to mix and stir 10s, be then added in step (2) products therefrom Mix and stir;
(4) limestone mineral powder is heated to 175 DEG C, then utilizes mixing station to mix and stir 32s, be then added to step (3) gained Product mixes and stirs, above-mentioned gathers materials, the weight ratio of Colophonium, kir and breeze is 100:4:3:2;
(5) temperature of rate-determining steps (4) gained compound is at 175 DEG C, it is thus achieved that BUTON rock asphalt modified asphalt mixture.
Embodiment 8
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating, the method employing following steps:
(1) basalt aggregate is utilized indoor small mix pot be heated to 165 DEG C standby;
(2) SBS modified pitch is heated to 160 DEG C, utilizes indoor small to mix pot and mix and stir 90s, be then added to step (1) Products therefrom mixes and stirs;
(3) kir is heated to 100 DEG C, then utilizes indoor small to mix pot and mix and stir 60s, be then added to step (2) institute Obtain in product and mix and stir;
(4) limestone mineral powder is heated to 170 DEG C, then utilizes indoor small to mix pot and mix and stir 110s, be then added to step (3) products therefrom mixes and stirs, above-mentioned gather materials, the weight ratio of Colophonium, kir and breeze is 100:5:3:3;
(5) temperature of rate-determining steps (4) gained compound is at 170 DEG C, it is thus achieved that BUTON rock asphalt modified asphalt mixture.
Embodiment 9
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating, the method employing following steps:
(1) diabase is gathered materials utilize indoor small mix pot be heated to 175 DEG C standby;
(2) SBS modified pitch is heated to 165 DEG C, utilizes indoor small to mix pot and mix and stir 110s, be then added to step (1) products therefrom mixes and stirs;
(3) kir is heated to 110 DEG C, then utilizes indoor small to mix pot and mix and stir 90s, be then added to step (2) institute Obtain in product and mix and stir;
(4) limestone mineral powder is heated to 170 DEG C, then utilizes indoor small to mix pot and mix and stir 90s, be then added to step (3) products therefrom mixes and stirs, above-mentioned gather materials, the weight ratio of Colophonium, kir and breeze is 100:5:3:2;
(5) temperature of rate-determining steps (4) gained compound is at 170 DEG C, it is thus achieved that BUTON rock asphalt modified asphalt mixture.
The above-mentioned description to embodiment is to be understood that for ease of those skilled in the art and apply this Bright.These embodiments obviously easily can be made various amendment by person skilled in the art, and described herein General Principle is applied in other embodiments without through performing creative labour.Therefore, the invention is not restricted to enforcement here Example, those skilled in the art are according to the announcement of the present invention, and the improvement made without departing from scope and amendment all should be Within protection scope of the present invention.

Claims (10)

1. a processing technology is mixed and stirred in the heating of BUTON rock asphalt modified asphalt mixture, the method employing following steps:
(1) will gather materials and carry out adding stand-by heat;
(2) join in step (1) products therefrom after Colophonium being heated and mix and stir;
(3) kir is joined in step (2) products therefrom mix and stir;
(4) breeze is joined in step (3) products therefrom and mix and stir;
(5) temperature of rate-determining steps (4) gained compound, it is thus achieved that BUTON rock asphalt modified asphalt mixture;
It is characterized in that, the kir described in step (3) is heated to 80~110 DEG C before joining step (2) products therefrom.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature Being, described kir is preferably heated to 90 DEG C.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature It is, gathers materials for limestone, basalt or diabase described in step (1), utilize mixing station to be heated to 180~200 DEG C, or Person utilizes indoor small to mix pot heating, and controlling to mix and stir temperature is 165~175 DEG C.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature Being, the Colophonium described in step (2) is 70# matrix pitch, SBS modified pitch or other label matrix pitch, is heated to 155 ~170 DEG C.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature It is, step (2) utilizes mixing station mix and stir 25~30s, or utilize indoor small to mix pot to mix and stir 90~110s.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature It is, step (3) utilizes mixing station mix and stir 5~10s, or utilize indoor small to mix pot to mix and stir 60~90s.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature Being, the breeze described in step (4) is limestone mineral powder, is heated to 165~175 DEG C.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature It is, step (4) utilizes mixing station mix and stir 22~32s, or utilize indoor small to mix pot to mix and stir 90~110s.
Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating the most according to claim 1, its feature Being, the temperature of the compound described in step (5) controls at 155~175 DEG C.
10. heat according to a kind of BUTON rock asphalt modified asphalt mixture according to any one of claim 1-9 and mix and stir making Technique, it is characterised in that described gather materials, the weight ratio of Colophonium, kir and breeze is 100:3.5~5.0:1~3:1~3.
CN201610398889.2A 2016-06-07 2016-06-07 Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating Pending CN106065558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610398889.2A CN106065558A (en) 2016-06-07 2016-06-07 Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610398889.2A CN106065558A (en) 2016-06-07 2016-06-07 Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating

Publications (1)

Publication Number Publication Date
CN106065558A true CN106065558A (en) 2016-11-02

Family

ID=57420566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610398889.2A Pending CN106065558A (en) 2016-06-07 2016-06-07 Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating

Country Status (1)

Country Link
CN (1) CN106065558A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106568669A (en) * 2016-11-10 2017-04-19 同济大学 Method of testing adhesion of rock asphalt
CN107268388A (en) * 2017-05-16 2017-10-20 同济大学 The preparation method of BUTON rock asphalt modified asphalt mixture
CN107500611A (en) * 2017-09-08 2017-12-22 长安大学 A kind of waste and old grease premixing enhancing asphalt and preparation method thereof
CN108560365A (en) * 2018-03-16 2018-09-21 同济大学 A kind of method of minute design BUTON rock asphalt mixture
CN116219831A (en) * 2023-05-08 2023-06-06 熙恒科技(常熟)有限公司 Regenerating equipment and method for Buton rock modified regenerated asphalt concrete
CN117585940A (en) * 2023-10-08 2024-02-23 安徽省交通规划设计研究总院股份有限公司 Preparation method of rock asphalt and SBS modified asphalt composite modified asphalt mixture

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130635A (en) * 2007-08-06 2008-02-27 江苏宝利沥青股份有限公司 Method for producing compound modified bitumen
CN102417735A (en) * 2011-09-08 2012-04-18 江阴泰富沥青有限公司 Production processes of rock asphalt modified asphalt and mixture
CN102585524A (en) * 2011-12-28 2012-07-18 赖炳聪 Preparation method of modified asphalt by using rock asphalt
CN102690082A (en) * 2012-05-29 2012-09-26 华南理工大学 Method for preparing modified asphalt macadam mixture by pretreated rock asphalt
CN104725882A (en) * 2014-10-11 2015-06-24 江苏苏博特新材料股份有限公司 High-modulus asphalt based on natural asphalt modification, as well as preparation method and application thereof
CN105060772A (en) * 2015-08-28 2015-11-18 同济大学 Preparation method for mixed material of Buton rock asphalt and modified asphalt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130635A (en) * 2007-08-06 2008-02-27 江苏宝利沥青股份有限公司 Method for producing compound modified bitumen
CN102417735A (en) * 2011-09-08 2012-04-18 江阴泰富沥青有限公司 Production processes of rock asphalt modified asphalt and mixture
CN102585524A (en) * 2011-12-28 2012-07-18 赖炳聪 Preparation method of modified asphalt by using rock asphalt
CN102690082A (en) * 2012-05-29 2012-09-26 华南理工大学 Method for preparing modified asphalt macadam mixture by pretreated rock asphalt
CN104725882A (en) * 2014-10-11 2015-06-24 江苏苏博特新材料股份有限公司 High-modulus asphalt based on natural asphalt modification, as well as preparation method and application thereof
CN105060772A (en) * 2015-08-28 2015-11-18 同济大学 Preparation method for mixed material of Buton rock asphalt and modified asphalt

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘宇等: "北美岩沥青干湿法改性机理比较分析", 《西部交通科技》 *
张福强等: "布敦岩沥青在海南的应用研究", 《公路交通科技》 *
谢凌等: "北美岩沥青应用性能研究", 《九江学院学报》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106568669A (en) * 2016-11-10 2017-04-19 同济大学 Method of testing adhesion of rock asphalt
CN106568669B (en) * 2016-11-10 2021-05-07 同济大学 Test method for rock asphalt adhesiveness
CN107268388A (en) * 2017-05-16 2017-10-20 同济大学 The preparation method of BUTON rock asphalt modified asphalt mixture
CN107268388B (en) * 2017-05-16 2020-04-03 同济大学 Preparation method of Buton rock asphalt modified asphalt mixture
CN107500611A (en) * 2017-09-08 2017-12-22 长安大学 A kind of waste and old grease premixing enhancing asphalt and preparation method thereof
CN107500611B (en) * 2017-09-08 2020-08-28 长安大学 Waste grease premixed reinforced asphalt mixture and preparation method thereof
CN108560365A (en) * 2018-03-16 2018-09-21 同济大学 A kind of method of minute design BUTON rock asphalt mixture
CN108560365B (en) * 2018-03-16 2021-03-26 同济大学 Method for finely designing Buton rock asphalt mixture
CN116219831A (en) * 2023-05-08 2023-06-06 熙恒科技(常熟)有限公司 Regenerating equipment and method for Buton rock modified regenerated asphalt concrete
CN117585940A (en) * 2023-10-08 2024-02-23 安徽省交通规划设计研究总院股份有限公司 Preparation method of rock asphalt and SBS modified asphalt composite modified asphalt mixture
CN117585940B (en) * 2023-10-08 2024-05-28 安徽省交通规划设计研究总院股份有限公司 Preparation method of rock asphalt and SBS modified asphalt composite modified asphalt mixture

Similar Documents

Publication Publication Date Title
CN106065558A (en) Processing technology is mixed and stirred in a kind of BUTON rock asphalt modified asphalt mixture heating
CN106202651B (en) A kind of optimum design method of heat regeneration asphalt mixture mineral aggregate gradation
CN104844072B (en) Preparation method of plant-mixed hot recycled asphalt mixture
CN104773976B (en) A kind of preparation method of the hot in-plant reclaimed asphalt mixture containing regenerative agent
CN109180077A (en) A kind of asphalt and its production technology
CN106018181B (en) A kind of test method measuring the new Bituminous concrete surface fusion degree of heat regeneration asphalt mixture
CN105060772A (en) Preparation method for mixed material of Buton rock asphalt and modified asphalt
CN106009719A (en) Plant-mixed warm recycled asphalt mixture and preparation method thereof
CN103556560A (en) Preparation method of high-performance warm-mix regenerated asphalt mixture
US20150128829A1 (en) Development of a renewable carbon-based bio-modifier for asphalt cement
CN110171942A (en) A kind of moisturecuring response type Bituminous Pavement Cold feed supplement and preparation method thereof
CN1686913A (en) Color asphalt concrete capable of shining
CN101624273A (en) Asphalt mixture taking regenerative micro powder of waste concrete as filler
CN111960728B (en) Warm-mix recycled mixture
CN107118578A (en) A kind of storable high-modulus bitumen cementitious matter is prepared and application process
CN105385177A (en) Economical high-modulus bituminous mixture additive and preparation method thereof
CN108589473A (en) A kind of mixing method of hot in-plant reclaimed asphalt mixture
CN106946501B (en) Concrete debris regenerated aggregate Warm-Mix Bitumen Mixture and preparation method thereof
CN106587705B (en) A kind of SMA asphalt concrete modifying agent and preparation method thereof
CN108483999B (en) Colored permeable pavement asphalt mixture and preparation and application thereof
CN106045385A (en) Preparation method of rubber asphalt mastic crushed stone mixture
CN105000826B (en) Staging blending normal-temperature asphalt mixture preparing technology
CN104140223B (en) One is delivered directly activation rubber-asphalt mixture and preparation method thereof
CN106904875A (en) A kind of asphalt surface course Performance of Diatomite Modified Asphalt Mixture and preparation method thereof
CN107974092A (en) A kind of preparation method of the straight preparation method and asphalt for mixing formula SBS asphalt modifiers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161102

RJ01 Rejection of invention patent application after publication