CN106064444A - A kind of manufacture method of drought snow skiing part - Google Patents

A kind of manufacture method of drought snow skiing part Download PDF

Info

Publication number
CN106064444A
CN106064444A CN201610400796.9A CN201610400796A CN106064444A CN 106064444 A CN106064444 A CN 106064444A CN 201610400796 A CN201610400796 A CN 201610400796A CN 106064444 A CN106064444 A CN 106064444A
Authority
CN
China
Prior art keywords
sliding part
skiing
shaper
support member
manufacture method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610400796.9A
Other languages
Chinese (zh)
Inventor
尖锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610400796.9A priority Critical patent/CN106064444A/en
Publication of CN106064444A publication Critical patent/CN106064444A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14008Inserting articles into the mould
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63CSKATES; SKIS; ROLLER SKATES; DESIGN OR LAYOUT OF COURTS, RINKS OR THE LIKE
    • A63C19/00Design or layout of playing courts, rinks, bowling greens or areas for water-skiing; Covers therefor
    • A63C19/10Ice-skating or roller-skating rinks; Slopes or trails for skiing, ski-jumping or tobogganing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C2045/1486Details, accessories and auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/52Sports equipment ; Games; Articles for amusement; Toys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

The present invention relates to outdoor sports facility field, be specifically related to drought snowslide field, particularly relate to the manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps: that support member is put into the support member groove in sliding part dynamic mold by a.;B. sliding part shaper and sliding part dynamic mold are combined formation skiing part shaper;C. operate injection machine, be molded in skiing part shaper by the injection channel on sliding part shaper;D. after the skiing part semi-finished product molding obtained in step c, sliding part dynamic mold is separated with sliding part shaper;E. the skiing part in step d is taken out and obtain part of skiing.

Description

A kind of manufacture method of drought snow skiing part
Technical field
The present invention relates to outdoor sports facility field, be specifically related to drought snowslide field, particularly relate to a kind of drought snow The manufacture method of skiing part.
Background technology
Skiing is one of outdoor activity of liking of people, and natural skifield only falls at cold winter, snow deposit Ground cumulative thickness could be for when reaching to a certain degree, and is restricted by geographical position.To this end, occur in that artificial ski field:
American-European countries have developed different types of Plastic ski surface: the comb-type drought such as once injection moulding avenges splicing Block, this splicing block entirety is similar to floor tile, and sliding surface is hard, and slider easily causes somatic damage after falling down.A kind of employing is separately had to make brush The brush type drought snow blanket of technique, owing to frictional force is big, slope requirement is high, must increase a large amount of uninterrupted watering supplementary means could slide OK, and outdoor application is the most easy to clean.The drought snow that both the above technique makes there is also an i.e. weatherability of common shortcoming and holds Long property, owing to drought snow pack builds area greatly, outdoor use is in the majority, invests big cost recovery slowly in addition, the time to drought snow material The time limit requires increasingly harsher.
State Intellectual Property Office discloses invention entitled on October 23rd, 2013: it is sliding that PET container makes drought snow The patent of invention of road method, its synopsis is: the manufacture method of a kind of drought snow athletic ground novel slipway, relates to Plastic sliding Manufacture field, road.In order to reduce existing drought snowslide manufacturing cost and protect environmental sanitary safety, more preferably promote drought snow fortune Dynamic development, the present invention is that one utilizes PET container equipped with liquid substance and in the case of sealing, and has by pressure, tough Property height, aging resistance, recovery is fast, smooth in appearance frictional resistance is little feature, according to its feature, multiple plastics equipped with liquid are held Device connects combination and is fixed on ground, the final manufacture method making composition novel drought snowslide, although above-mentioned patent solves portion Divide drought snow problem, but again without solving in prior art: identical material can not meet the complete of aforementioned middle drought snow skiing function Portion's requirement.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides the manufacture method of a kind of drought snow skiing part.
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member is put into the support member groove in sliding part dynamic mold;
B. sliding part shaper and sliding part dynamic mold are combined formation skiing part shaper;
C. operate injection machine, be molded in skiing part shaper by the injection channel on sliding part shaper;
D. after the skiing part semi-finished product molding obtained in step c, sliding part dynamic mold and sliding part shaper are divided From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold includes support member groove and sliding part lower semisphere forming tank, described sliding part stock mould Tool includes sliding part episphere forming tank and injection channel.
Described support member groove is strip and connects with sliding part lower semisphere forming tank.
Described sliding part episphere forming tank is connected with described injection channel.
Described sliding part episphere forming tank is semicircle shape sphere.
Described sliding part lower semisphere forming tank outer surface is concave shaped cambered surface.
The skiing part being fabricated by by said method includes: support member and the sliding part contacted with skis, described slip Part is split type connection with support member;Described sliding part is fixed on support member top.
Described sliding part and skis contact surface are circular arc, and described sliding part episphere is semicircle shape sphere, described cunning The lower semisphere outer surface of moving part is concave shaped cambered surface.
Beneficial effects of the present invention:
In the technical program, the exclusive split-type structural to skiing part structure designs so that skiing part and the effect of support member and merit Can obtain farthest playing, so that the technique making skiing part changes over composite from homogenous material, make slip The motility that part and support member select at material is discharged.Complicated skiing skill action and severe use environmental requirement Support member has firm high resilience, impact resistance characteristic, requires again that it has the most constant weather-proof in open air free from worldly cares simultaneously Feature.Part of skiing then must meet skiing plate hight lubrication, the most wear-resisting and do not damage the characteristic of snow slab.At present, international and domestic existing In patent, support member and skiing part are same material, attend to one thing and lose sight of another, and be difficult to during the most satisfied drought snow uses is various Different requirements, the steel cable that in this patent, support member uses permanence good, neither too hard, nor too soft makes, and skiing part then uses a kind of longevity The solidity engineering plastics that life is long, be not easily decomposed are made, and not only meet physical slide requirement but also meet propping up of " technology and life-span " Support needs.
Owing to sliding part is different with support member material, the material of sliding part in addition to mainly meeting high lubrication property, other As supported elasticity, impact resistance etc. for secondary demand, so sliding part now can make sliding part more with single material Smooth, decrease the resistance between skis larger, improve skiing fidelity.
The skiing part manufactured by the technical program substantially prolongs whole service life compared with avenging with tradition drought.
Reference
1. support member, 101, sliding part, 2. sliding part dynamic mold, 3. sliding part shaper, 4. support member groove, 5. slide Part episphere, 6. sliding part lower semisphere, 7. sliding part episphere forming tank, 701. sliding part lower semisphere forming tank, 8. injection are led to Road.
Accompanying drawing explanation
Fig. 1 is the working state schematic representation in the technical program;
Fig. 2 is the working state schematic representation in the technical program;
Fig. 3 is the working state schematic representation in the technical program;
Fig. 4 is the working state schematic representation in the technical program;
Fig. 5 is the working state schematic representation in the technical program;
Fig. 6 is the working state schematic representation in the technical program.
Specific embodiment:
Embodiment 1:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
Embodiment 2:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Embodiment 3:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Embodiment 4:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Embodiment 5:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Described sliding part episphere forming tank 7 is connected with described injection channel 8.
Embodiment 6:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Described sliding part episphere forming tank 7 is connected with described injection channel 8.
Described sliding part episphere forming tank 7 is in semicircle shape sphere.
Embodiment 7:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Described sliding part episphere forming tank 7 is connected with described injection channel 8.
Described sliding part episphere forming tank 7 is in semicircle shape sphere.
Described sliding part lower semisphere forming tank 701 outer surface is concave shaped cambered surface.
Embodiment 8:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Described sliding part episphere forming tank 7 is connected with described injection channel 8.
Described sliding part episphere forming tank 7 is in semicircle shape sphere.
Described sliding part lower semisphere forming tank 701 outer surface is concave shaped cambered surface.
The skiing part being fabricated by by said method includes: support member 1 and the sliding part 101 contacted with skis, described Sliding part 101 is connected for split type with support member 1;Described sliding part 101 is fixed on support member 1 top.
Embodiment 9:
The manufacture method of a kind of drought snow skiing part, it is characterised in that method comprises the steps:
A. support member 1 is put into the support member groove in sliding part dynamic mold 2;
B. together with 2-in-1 with sliding part dynamic mold for sliding part shaper 3, skiing part shaper is formed;
C. operate injection machine, be molded in skiing part shaper by the injection channel 8 on sliding part shaper 3;
D. by sliding part dynamic mold 2 and sliding part shaper 3 points after the skiing part semi-finished product molding obtained in step c From;
E. the skiing part in step d is taken out and obtain part of skiing.
In described step c, when raw material is thermosetting raw material, step c now is: to the cunning by obtaining in step b Snow part shaper carries out filler, and then heating mould makes plastic molting.
In described step c, when raw material is carbon fiber material, step c now is: noted by mixed carbon fiber material Enter in the skiing part shaper obtained in step b.
Described sliding part dynamic mold 2 includes support member groove 4 and sliding part lower semisphere forming tank 701, described sliding part Shaper 3 includes sliding part episphere forming tank 7 and injection channel 8.
Described support member groove 4 connects in strip and with sliding part lower semisphere forming tank 701.
Described sliding part episphere forming tank 7 is connected with described injection channel 8.
Described sliding part episphere forming tank 7 is in semicircle shape sphere.
Described sliding part lower semisphere forming tank 701 outer surface is concave shaped cambered surface.
The skiing part being fabricated by by said method includes: support member 1 and the sliding part 101 contacted with skis, described Sliding part 101 is connected for split type with support member 1;Described sliding part 101 is fixed on support member 1 top.
Described sliding part 101 and skis contact surface are circular arc, described sliding part episphere 5 in semicircle shape sphere, institute Lower semisphere 6 outer surface stating sliding part is concave shaped cambered surface.

Claims (10)

1. the manufacture method of a drought snow skiing part, it is characterised in that method comprises the steps:
A. support member (1) is put into the support member groove in sliding part dynamic mold (2);
B. sliding part shaper (3) and sliding part dynamic mold (2) are combined formation skiing part shaper;
C. operate injection machine, noted in skiing part shaper by the injection channel (8) on sliding part shaper (3) Mould;
D. by sliding part dynamic mold (2) and sliding part shaper after the skiing part semi-finished product molding obtained in step c (3) separate;
E. the skiing part in step d is taken out and obtain part of skiing.
A kind of manufacture method of drought snow skiing part, it is characterised in that: in described step c, work as raw material During for thermosetting raw material, step c now is: the skiing part shaper by obtaining in step b is carried out filler, then adds Mold heat makes plastic molting.
A kind of manufacture method of drought snow skiing part, it is characterised in that: in described step c, work as raw material During for carbon fiber material, step c now is: the skiing part sizing that will obtain in mixed carbon fiber material implantation step b In mould.
A kind of manufacture method of drought snow skiing part, it is characterised in that: described sliding part dynamic mold (2) include that support member groove (4) and sliding part lower semisphere forming tank (701), described sliding part shaper (3) include sliding part Episphere forming tank (7) and injection channel (8).
A kind of drought snow skiing part manufacture method, it is characterised in that described support member groove (4) in Strip and connecting with sliding part lower semisphere forming tank (701).
The manufacture method of a kind of drought snow skiing part, it is characterised in that described sliding part episphere becomes Type groove (7) is connected with described injection channel (8).
The manufacture method of a kind of drought snow skiing part, it is characterised in that described sliding part episphere becomes Type groove (7) is in semicircle shape sphere.
The manufacture method of a kind of drought snow skiing part, it is characterised in that described sliding part lower semisphere becomes Type groove (701) outer surface is concave shaped cambered surface.
9. the manufacture method of a drought snow skiing part, it is characterised in that the skiing part being fabricated by by said method includes: support Part (1) and the sliding part (101) contacted with skis, described sliding part (101) is split type connection with support member (1);Described Sliding part (101) is fixed on support member (1) top.
A kind of drought snow skiing part manufacture method, it is characterised in that described sliding part (101) with Skis contact surface is circular arc, and described sliding part episphere (5) is in semicircle shape sphere, and the lower semisphere (6) of described sliding part is outward Surface is concave shaped cambered surface.
CN201610400796.9A 2016-06-08 2016-06-08 A kind of manufacture method of drought snow skiing part Pending CN106064444A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610400796.9A CN106064444A (en) 2016-06-08 2016-06-08 A kind of manufacture method of drought snow skiing part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610400796.9A CN106064444A (en) 2016-06-08 2016-06-08 A kind of manufacture method of drought snow skiing part

Publications (1)

Publication Number Publication Date
CN106064444A true CN106064444A (en) 2016-11-02

Family

ID=57421120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610400796.9A Pending CN106064444A (en) 2016-06-08 2016-06-08 A kind of manufacture method of drought snow skiing part

Country Status (1)

Country Link
CN (1) CN106064444A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4179539A (en) * 1977-08-18 1979-12-18 Herbert Schweizer Ski slope
WO1998041691A1 (en) * 1997-03-15 1998-09-24 Derek Gordon Whitaker Artificial shock absorbing surface
CN104968179A (en) * 2015-04-22 2015-10-07 惠州智科实业有限公司 Insert injection molding radiator and preparation technology thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4179539A (en) * 1977-08-18 1979-12-18 Herbert Schweizer Ski slope
WO1998041691A1 (en) * 1997-03-15 1998-09-24 Derek Gordon Whitaker Artificial shock absorbing surface
CN104968179A (en) * 2015-04-22 2015-10-07 惠州智科实业有限公司 Insert injection molding radiator and preparation technology thereof

Similar Documents

Publication Publication Date Title
CN104369302A (en) Molding technology of double-color EVA foaming shoe sole
US9611594B2 (en) Artificial lawn
CN106064444A (en) A kind of manufacture method of drought snow skiing part
CN206157525U (en) Artificial skiing lawn
CN201024370Y (en) Floor for skating rink
CN106039692A (en) Supporting component applied to sliding way as well as sliding way auxiliary module and sliding way
CN107881877B (en) Dry land sliding snow floor tile and manufacturing method thereof
CN105797360A (en) Skiing member for dry skiing
CN106039693A (en) Slide way splicing module and slide way
CN207193701U (en) One kind is mated formation convenient prefabrication type environmental protection running track coiled material
CN106013728B (en) A kind of Multifunctional elastic athletic floor
CN203256567U (en) Wear resistant antiskid silicon PU plastic surface layer
CN207739104U (en) A kind of dry skiing floor tile
CN205531177U (en) Outdoor floor
CN209555705U (en) A kind of mushroom slideway
CN106120513A (en) A kind of man-made ski lawn
CN105330934A (en) Anti-aging road edge stone mold
CN105903176A (en) Installing method of skiing assembly for dry land skiing
CN207739105U (en) A kind of dry skiing floor tile
CN206062290U (en) A kind of electric insulation sole of bipeltate
CN205382672U (en) Outdoor sport dismouting timber apron
CN105903175A (en) Skiing assembly for dry land skiing
CN201738214U (en) Artificial turf
KR102156942B1 (en) Manufacturing method of impact-absorbing eco-friendly precast pavers
CN208038968U (en) A kind of split type dry skiing floor tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161102

RJ01 Rejection of invention patent application after publication