CN106053038A - Gas-liquid-dual-purpose safety valve discharge capacity test device and test method - Google Patents

Gas-liquid-dual-purpose safety valve discharge capacity test device and test method Download PDF

Info

Publication number
CN106053038A
CN106053038A CN201610407187.6A CN201610407187A CN106053038A CN 106053038 A CN106053038 A CN 106053038A CN 201610407187 A CN201610407187 A CN 201610407187A CN 106053038 A CN106053038 A CN 106053038A
Authority
CN
China
Prior art keywords
valve
pressure vessel
pressure
test
switch valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610407187.6A
Other languages
Chinese (zh)
Other versions
CN106053038B (en
Inventor
王周杰
周张荣
迮晓锋
李连翠
朱幼君
陈智
龚胜泉
龚海京
黄维浩
李小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Shanghai Can Energy Equipment Co Ltd
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Can Energy Equipment Co Ltd, Shanghai Power Equipment Research Institute Co Ltd filed Critical Shanghai Can Energy Equipment Co Ltd
Priority to CN201610407187.6A priority Critical patent/CN106053038B/en
Publication of CN106053038A publication Critical patent/CN106053038A/en
Application granted granted Critical
Publication of CN106053038B publication Critical patent/CN106053038B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention provides a gas-liquid-dual-purpose safety valve discharge capacity test device. Another technical scheme is that the invention provides a gas safety valve discharge capacity test method based on the gas-liquid-dual-purpose safety valve discharge capacity test device. Another technical scheme is that the invention provides a liquid safety valve discharge capacity test method based on the gas-liquid-dual-purpose safety valve discharge capacity test device. Liquid and air safety valve discharge capacity test benches are combined organically, and a corresponding operation process flow is specially made for a safety valve test system, thereby effectively saving construction land, device investment and maintenance cost and the like.

Description

The assay device of a kind of gas liquid two purpose test Methods of Safety Valve Discharge Capacity and test method
Technical field
The present invention relates to the assay device of the Methods of Safety Valve Discharge Capacity of a set of gas liquid two purpose.
Background technology
Relief valve is last one overpressure protection apparatus of pressure bearing system, is main on boiler, pressure vessel, bearing pipe Safety attachment.In order to effectively reduce the pressure within pressure bearing system, it has to be ensured that it has during the discharge of relief valve superpressure Enough discharge capacitys, all relief valve series all has to pass through flow rate test in R&D process, to ensure that it meets standard and wants Ask.
Present relief valve divides according to Applicable media, can be divided into liquid safe valve and gas safety valve.And liquid peace The discharge coefficient of full valve needs liquid safe valve test bench location to go test, and gas safety valve needs gas safety valve test bench location to go Test.This is the common situation of current all safety valve testing platform positions.And if a relief valve manufacturer produces two simultaneously During the relief valve of type, also it is necessary for setting up liquid safe valve test bench location and gas safety valve testing table position respectively, so Both occupy too much land area and too increase the cost of equipment construction.
Liquid safety valve test platform and the gaseous state safety valve test platform of present each relief valve producer are separately to build If even some producer establishes the Methods of Safety Valve Discharge Capacity test bench location that steam is special the most specially.But the merit of these test bench location Can be single.That is the test(ing) medium of air test platform position can only be compressed air;The test of liquid safe valve test bench location Medium can only be water.Two cover systems are incompatible.So will result in the most unnecessary waste: 1, two overlap test bench location needs Hew out the place needed for two test bench location respectively, can not interfere, cause the waste in terms of occupation of land and building;2, build If two set test bench location, some equipment such as pressure vessel or compressor that originally can be general also must buy two sets, so Cause the waste of equipment;3, two test bench location are also required to safeguard respectively during one's term of military service, so also result in and safeguard into This waste;4, even will consider two set equipment power consumption simultaneously and water consumption in Factory Electricity Supply and water supply process, cause The waste that the capacity of power supply water system increases and produces.
Summary of the invention
The technical problem to be solved in the present invention: use a test platform to complete the test of liquid Methods of Safety Valve Discharge Capacity and gaseous state Methods of Safety Valve Discharge Capacity is tested.
In order to solve above-mentioned technical problem, a technical scheme of the present invention there is provided a kind of gas liquid two purpose test safety The assay device of valve discharge capacity, it is characterised in that include compressor, pressure vessel one, pressure vessel two, pressure vessel three and control System and tubing, compressor communicates with pressure vessel two via valve one, and the outlet of pressure vessel two is successively via switch Valve one, regulation valve one, effusion meter one, switch valve two communicate with the import of pressure vessel one, and the drain at pressure vessel one connects Being connected to quick release valve one, tested gas safety valve is connected with pressure vessel one via isolating valve one;
Pressure vessel two communicates with pressure vessel three via switch valve three, effusion meter two;Fluid to be measured relief valve via every Pressure vessel three is connected from valve two;Drain at pressure vessel three connects quick release valve two;Pressure vessel two is via cut-off Valve one connects watering, and the liquid level mouth of pressure vessel two connects liquidometer via stop valve two;The outlet of pressure vessel one also depends on The secondary import connecting pressure vessel two via switch valve four, regulation valve two, switch valve five;
During gas test, pressure vessel one is test chamber, and pressure vessel two is as accumulator, at switch valve three In closed mode, i.e. pressure vessel three is in idle state.But in liquid safe valve process of the test, pressure vessel one is storage Energy device, pressure vessel container two is water storage pressure vessel, and pressure vessel three is test chamber.In order to ensure whole system safety Valve runs reliably, and the design pressure of pressure vessel one, two, three is identical.
Switch valve one, regulation valve one, switch valve two, quick release valve one, isolating valve one, switch valve three, isolating valve two, open Close valve four, regulation valve two, switch valve five, quick release valve two by control system control;
Pressure vessel one, pressure vessel two, pressure vessel three, effusion meter one, tested relief valve, stream is gathered by control system Gauge two, the data of fluid to be measured relief valve.The measurement of all data and acquisition precision and control accuracy GB to be met and The requirement of ASME.
Preferably, described pressure vessel one, pressure vessel two, pressure vessel three are respectively equipped with relief valve one, safety Valve two and relief valve three.
Preferably, it is connected between described stop valve one with described pressure vessel two and has check-valves one;At described valve one It is connected with between described pressure vessel two and has check-valves two.
Preferably, described compressor also connects described pressure vessel one via valve two and check-valves three.
Preferably, the interface being connected with described effusion meter two of described pressure vessel three is provided with valve three, described The interface being connected with described switch valve three of pressure vessel three is provided with valve four, is provided with valve on described pressure vessel one Five.
Another technical scheme of the present invention there is provided a kind of based on above-mentioned gas liquid two purpose test Methods of Safety Valve Discharge Capacity The gas safety valve capacity test method of assay device, it is characterised in that comprise the following steps:
Step 1, opening control;
Step 2, open valve one, switch valve one, regulation valve one, switch valve two, isolating valve one, other all valves are transferred to Closed mode;
Step 3, start compressor, give pressure vessel two and pressure vessel one supercharging slowly, when pressure vessel two and After the pressure of pressure vessel one reaches 90% tested safety valve set pressure, closing switch valve one, regulation valve one, stop pressure Force container one pressurizes;
Step 4, compressor continue to pressurize in pressure vessel two, after pressure reaches preset value, enter step 5;
Step 5, maintained switch valve one are closed, and the regulation valve one of pressure vessel one import is opened to certain aperture, and this is opened Number of degrees value opens high level equal to the specified of tested relief valve;
Step 6, open the switch valve one of pressure vessel one import and from valve one, manually button pressure of pressure vessel one The aperture of the regulation valve one of import department makes pressure vessel one pressure, effusion meter one stable reading in desired value, gathers and records phase Close data, open quick release valve one afterwards, make pressure vessel one pressure drop to the set-pressure of tested relief valve of 80%;
If there is accident, pressure vessel one pressure is more than 115% tested safety valve set pressure, and control system will be automatically Switch valve one on safety interlocking closing presure container one admission line, switch valve two, and open quick release valve one, pressure holds When device one pressure is down to tested relief valve 80% set-pressure, quick release valve one is closed in hand-reset;
Step 7, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat Again test until pass the test or scene determine termination test after testing or relief valve being carried out field adjustable;
Step 8, according to step 2 to step 7, complete other twice long run test, carry out variance analysis according to test data, If in the margin of tolerance of the precision that the test data surveyed specify in standard, being successfully completed test, otherwise termination test, analysis reason And test separately after adjusting.
Another technical scheme of the present invention there is provided a kind of based on above-mentioned gas liquid two purpose test Methods of Safety Valve Discharge Capacity The liquid safe valve capacity test method of assay device, it is characterised in that comprise the steps:
Step 1, opening control, open switch valve three, and other all valves are transferred to closed mode;
Step 2, manual unlocking stop valve one and stop valve two, water-filling in pressure vessel two and pressure vessel three, to peace Water level required for full valve liquid pilot;
Step 3, open switch valve four, regulation valve two, switch valve five, it is ensured that can give pressure vessel one, pressure vessel two, press Force container San Tong method supercharging;
Step 4, start compressor, give pressure vessel one, pressure vessel two and pressure vessel three supercharging lentamente, when more than After the pressure of three containers reaches 90% fluid to be measured safety valve set pressure, closing switch valve four, regulation valve two, it is right to stop Pressure vessel two and pressure vessel three pressurize;
Step 5, compressor continue to pressurize in pressure vessel one, after pressure reaches preset value, and entrance step 6:
Step 6, maintained switch valve four are closed, and the regulation valve two of pressure vessel triple feed inlet is opened to certain aperture, and this is opened Number of degrees value opens high level equal to the specified of fluid to be measured relief valve;
Step 7, open the switch valve four of pressure vessel two import and the isolating valve two of fluid to be measured arranged at safety valve, pass through hands The aperture of the regulation valve two at dynamic button pressure of pressure vessel triple feed inlet makes pressure vessel three pressure, effusion meter two stable reading exist Desired value, gathers and records related data, opens quick release valve two afterwards, make pressure vessel three pressure drop to 80% tested The set-pressure of liquid safe valve;
If there is accident, pressure vessel three pressure is more than 115% fluid to be measured safety valve set pressure, and control system will Switch valve four on automatic safe chain closing presure container two admission line, switch valve five, and open quick release valve two, pressure When force container three pressure is down to fluid to be measured relief valve 80% set-pressure, hand-reset quick release valve two;
Step 8, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat Again test until pass the test or scene determine termination test after testing or relief valve being carried out field adjustable;
Step 9, according to step 3 to step 8, complete other twice long run test, carry out variance analysis according to test data, If in the margin of tolerance of the precision that the test data surveyed specify in standard, being successfully completed test, otherwise termination test, analysis reason And test separately after adjusting.
The present invention is organically combined togather liquid and air-safety valve capacity test platform position, and tries for this relief valve The corresponding operation technological process of check system tailor.Thus it is effectively saved construction land, equipment investment and maintenance cost Deng.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the present invention, and in figure, circle horizontal line represents that data acquisition line concentration, transverse line represent control line, and signal is all Sent by the computer in figure or gathered.
Detailed description of the invention
For making the present invention become apparent, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
In conjunction with Fig. 1, the assay device of a kind of gas liquid two purpose test Methods of Safety Valve Discharge Capacity that the present invention provides, including compressor 1, Pressure vessel 1, pressure vessel 23, pressure vessel 34 and control system 28.In pressure vessel 1, pressure vessel 23, pressure Relief valve 1, relief valve 2 12 and relief valve 3 32 it is respectively equipped with on force container 34.Pressure vessel 1 is provided with valve 5 27
Compressor 1 communicates with pressure vessel 23 via valve 1, and the outlet of pressure vessel 23 is successively via switch valve one 19, regulation valve 1, effusion meter 1, switch valve 2 22 communicate with the import of pressure vessel 1, putting of pressure vessel 1 Connection of eating dishes without rice or wine has quick release valve 1, tested relief valve 24 to be connected with pressure vessel 1 via isolating valve 1;
Pressure vessel 23 communicates with pressure vessel 34 via switch valve 3 29, effusion meter 2 30;At pressure vessel 34 The interface being connected with effusion meter 2 30 is provided with valve 3 31, on the interface being connected with switch valve 3 29 of pressure vessel 34 It is provided with valve 4 18;Fluid to be measured relief valve 34 connects pressure vessel 34 via isolating valve 2 33;Putting of pressure vessel 34 Eat dishes without rice or wine to connect quick release valve 2 35;Pressure vessel 23 connects fire hydrant 15, pressure via stop valve 1, check-valves 1 The liquid level mouth of container 23 connects liquidometer 16 via stop valve 2 17 and check-valves 28;The outlet of pressure vessel 34 is the most successively Via switch valve 49, regulation valve 2 10, the import of switch valve 5 11 connection pressure vessel 23;
Compressor 1 also connects pressure vessel 1 via valve 25 and check-valves 37;
Switch valve 1, regulation valve 1, switch valve 2 22, quick release valve 1, isolating valve 1, switch valve three 29, isolating valve 2 33, switch valve 49, regulation valve 2 10, switch valve 5 11, quick release valve 2 35 are controlled by control system 28 System;
Pressure vessel 1, pressure vessel 23, pressure vessel 34, effusion meter 1, tested safety is gathered by control system Valve 24, effusion meter 2 30, the data of fluid to be measured relief valve 34.
A kind of gas safety valve capacity test method that the present invention provides, comprises the following steps:
Step 1, opening control 28;
Step 2, open valve 1, switch valve 1, regulation valve 1, switch valve 2 22, isolating valve 1, other institutes Valve is had to be transferred to closed mode;
Step 3, startup compressor 1, give pressure vessel 23 and pressure vessel 1 supercharging, slowly when pressure vessel 23 And after the pressure of pressure vessel 1 reaches 90% tested relief valve 24 set-pressure, closing switch valve 1, regulation valve one 20, stop pressure vessel 1 is pressurizeed;
Step 4, compressor 1 continue to pressurize in pressure vessel 23, after pressure reaches preset value, enter step 5;
Step 5, maintained switch valve 1 are closed, and the regulation valve 1 of pressure vessel 1 import is opened to certain aperture, This aperture numerical value opens high level equal to tested the specified of relief valve 24;
Step 6, open the switch valve 1 of pressure vessel 1 import and from valve 1, manually button regulation pressure Container 1 import department regulation valve 1 aperture make pressure vessel 1 pressure, effusion meter 1 stable reading in desired value, Gather related data, open quick release valve 1 afterwards, make pressure vessel 1 pressure drop to the tested relief valve 24 of 80% Set-pressure;
If there is accident, pressure vessel 1 pressure is more than 115% tested relief valve 24 set-pressure, control system 28 By the switch valve 1 on chain for automatic safe closing presure container 1 admission line, switch valve 2 22, and open rapid blow-down Valve 1, when pressure vessel 1 pressure is down to tested relief valve 2480% set-pressure, quick release valve one is closed in hand-reset 26;
Step 7, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat Again test until pass the test or scene determine termination test after testing or relief valve being carried out field adjustable;
Step 8, according to step 2 to step 7, complete other twice long run test, carry out variance analysis according to test data, If in the margin of tolerance of the precision that the test data surveyed specify in standard, being successfully completed test, otherwise termination test, analysis reason And test separately after adjusting.
A kind of liquid safe valve capacity test method that the present invention provides, comprises the steps:
Step 1, opening control 28, open switch valve 3 29, other all valves are transferred to closed mode;
Step 2, manual unlocking stop valve 1 and stop valve 2 17, fill in pressure vessel 23 and pressure vessel 34 Water, to the water level required for relief valve liquid pilot;
Step 3, open switch valve 49, regulation valve 2 10, switch valve 5 11, it is ensured that hold to pressure vessel 1, pressure The supercharging simultaneously of device 23, pressure vessel 34;
Step 4, startup compressor 1, give pressure vessel 1, pressure vessel 23 and pressure vessel 34 supercharging lentamente, when After the pressure of three above container reaches 90% fluid to be measured relief valve 34 set-pressure, closing switch valve 49, regulation valve two 10, stop pressure vessel 23 and pressure vessel 34 are pressurizeed;
Step 5, compressor 1 continue to pressurize in pressure vessel 1, after pressure reaches preset value, enter step 6;
Step 6, maintained switch valve 49 are closed, and the regulation valve 2 10 of pressure vessel 34 import is opened to certain aperture, This aperture numerical value opens high level equal to the specified of fluid to be measured relief valve 34;
Isolating valve 2 33 at step 7, the switch valve 49 opening pressure vessel 23 import and fluid to be measured relief valve 34, Manually the aperture of the regulation valve 2 10 of button pressure of pressure vessel 34 import department makes pressure vessel 34 pressure, effusion meter two 30 stable reading, in desired value, gather related data, open quick release valve 2 35 afterwards, make pressure vessel 34 pressure drop to The set-pressure of the fluid to be measured relief valve 34 of 80%;
If there is accident, pressure vessel 34 pressure, more than 115% fluid to be measured relief valve 34 set-pressure, controls system System 28 is by the switch valve 49 on chain for automatic safe closing presure container 23 admission line, switch valve 5 11, and opens quickly Atmospheric valve 2 35, when pressure vessel 34 pressure is down to fluid to be measured relief valve 3480% set-pressure, hand-reset rapid blow-down Valve 2 35;
Step 8, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat Again test until pass the test or scene determine termination test after testing or relief valve being carried out field adjustable;
Step 9, according to step 3 to step 8, complete other twice long run test, carry out variance analysis according to test data, If in the margin of tolerance of the precision that the test data surveyed specify in standard, being successfully completed test, otherwise termination test, analysis reason And test separately after adjusting.

Claims (7)

1. the assay device of a gas liquid two purpose test Methods of Safety Valve Discharge Capacity, it is characterised in that include compressor (1), pressure vessel One (2), pressure vessel two (3), pressure vessel three (4) and control system (28), compressor (1) is via valve one (6) and pressure Container two (3) communicates, and the outlet of pressure vessel two (3) is successively via switch valve one (19), regulation valve one (20), effusion meter one (21), switch valve two (22) communicate with the import of pressure vessel one (2), the drain at pressure vessel one (2) connects to be had quickly Atmospheric valve one (26), tested relief valve (24) is connected with pressure vessel one (2) via isolating valve one (25);
Pressure vessel two (3) communicates with pressure vessel three (4) via switch valve three (29), effusion meter two (30);Fluid to be measured is pacified Full valve (34) connects pressure vessel three (4) via isolating valve two (33);Drain at pressure vessel three (4) connects rapid blow-down Valve two (35);Pressure vessel two (3) connects watering via stop valve one (14), and the liquid level mouth of pressure vessel two (3) is via cutting Only valve two (17) connects liquidometer (16);The outlet of pressure vessel three (4) is the most successively via switch valve four (9), regulation valve two (10), switch valve five (11) connects the import of pressure vessel two (3);
Switch valve one (19), regulation valve one (20), switch valve two (22), quick release valve one (26), isolating valve one (25), switch Valve three (29), isolating valve two (33), switch valve four (9), regulation valve two (10), switch valve five (11), quick release valve two (35) Controlled by control system (28);
Pressure vessel one (2), pressure vessel two (3), pressure vessel three (4), effusion meter one (21), tested is gathered by control system Relief valve (24), effusion meter two (30), the data of fluid to be measured relief valve (34).
The assay device of a kind of gas liquid two purpose the most as claimed in claim 1 test Methods of Safety Valve Discharge Capacity, it is characterised in that described Relief valve one (23), relief valve two (12) it is respectively equipped with on pressure vessel one (2), pressure vessel two (3), pressure vessel three (4) And relief valve three (32).
The assay device of a kind of gas liquid two purpose the most as claimed in claim 1 test Methods of Safety Valve Discharge Capacity, it is characterised in that described It is connected between stop valve one (14) with described pressure vessel two (3) and has check-valves one (13);In described valve one (6) and described pressure Connect between force container two (3) and have check-valves two (8).
The assay device of a kind of gas liquid two purpose the most as claimed in claim 1 test Methods of Safety Valve Discharge Capacity, it is characterised in that described pressure Contracting machine (1) also connects described pressure vessel one (2) via valve two (5) and check-valves three (7).
The assay device of a kind of gas liquid two purpose the most as claimed in claim 1 test Methods of Safety Valve Discharge Capacity, it is characterised in that described The interface being connected with described effusion meter two (30) of pressure vessel three (4) is provided with valve three (31), at described pressure vessel three (4) the interface being connected with described switch valve three (29) is provided with valve four (18), is provided with valve on described pressure vessel one (2) Door five (27).
6. the gas safety valve discharge capacity of the assay device testing Methods of Safety Valve Discharge Capacity based on the gas liquid two purpose described in claim 1 Test method, it is characterised in that comprise the following steps:
Step 1, opening control (28);
Step 2, open valve one (6), switch valve one (19), regulation valve one (20), switch valve two (22), isolating valve one (25), Other all valves are transferred to closed mode;
Step 3, startup compressor (1), give pressure vessel two (3) and pressure vessel one (2) supercharging, slowly when pressure vessel two (3) and after the pressure of pressure vessel one (2) reaches 90% tested relief valve (24) set-pressure, closing switch valve one (19), regulate valve one (20), stop pressure vessel one (2) is pressurizeed;
Step 4, compressor (1) continue pressurization in pressure vessel two (3), after pressure reaches preset value, enter step 5;
Step 5, maintained switch valve one (19) are closed, and the regulation valve one (20) of pressure vessel one (2) import is opened to necessarily open Degree, this aperture numerical value opens high level equal to the specified of tested relief valve (24);
Step 6, open the switch valve one (19) of pressure vessel one (2) import and from valve one (25), manually button regulation pressure The aperture of the regulation valve one (20) of force container one (2) import department makes pressure vessel one (2) pressure, effusion meter one (21) stable reading In desired value, gather related data, open quick release valve one (26) afterwards, make pressure vessel one (2) pressure drop to 80% The set-pressure of tested relief valve (24);
If there is accident, pressure vessel one (2) pressure is more than 115% tested relief valve (24) set-pressure, control system (28) by the switch valve one (19) on chain for automatic safe closing presure container one (2) admission line, switch valve two (22), and open Open quick release valve one (26), when pressure vessel one (2) pressure is down to tested relief valve (24) 80% set-pressure, hand-reset Close quick release valve one (26);
Step 7, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat test Or again test after relief valve is carried out field adjustable until pass the test or scene determine termination test;
Step 8, according to step 2 to step 7, complete other twice long run test, carry out variance analysis according to test data, if survey The margin of tolerance of precision that specifies in standard of test data in, be successfully completed test, otherwise termination test, analyze reason and tune Test separately after whole.
7. the liquid safe valve discharge capacity of the assay device testing Methods of Safety Valve Discharge Capacity based on the gas liquid two purpose described in claim 1 Test method, it is characterised in that comprise the steps:
Step 1, opening control (28), open switch valve three (29), other all valves are transferred to closed mode;
Step 2, manual unlocking stop valve one (14) and stop valve two (17), in pressure vessel two (3) and pressure vessel three (4) Water-filling, to the water level required for relief valve liquid pilot;
Step 3, open switch valve four (9), regulation valve two (10), switch valve five (11), it is ensured that can give pressure vessel one (2), press Force container two (3), pressure vessel three (4) supercharging simultaneously;
Step 4, startup compressor (1), increase to lentamente pressure vessel one (2), pressure vessel two (3) and pressure vessel three (4) Pressure, after the pressure of three above container reaches 90% fluid to be measured relief valve (34) set-pressure, closing switch valve four (9), regulate valve two (10), stop pressure vessel two (3) and pressure vessel three (4) are pressurizeed;
Step 5, compressor (1) continue pressurization in pressure vessel one (2), after pressure reaches preset value, enter step 6;
Step 6, maintained switch valve four (9) are closed, and the regulation valve two (10) of pressure vessel three (4) import is opened to necessarily open Degree, this aperture numerical value opens high level equal to the specified of fluid to be measured relief valve (34);
Step 7, the switch valve four (9) opening pressure vessel two (3) import and the isolating valve two at fluid to be measured relief valve (34) place (33), manually the aperture of the regulation valve two (10) of button pressure of pressure vessel three (4) import department makes pressure vessel three (4) press Power, effusion meter two (30) stable reading, in desired value, gather related data, open quick release valve two (35) afterwards, make pressure Container three (4) pressure drops to the set-pressure of the fluid to be measured relief valve (34) of 80%;
If there is accident, pressure vessel three (4) pressure, more than 115% fluid to be measured relief valve (34) set-pressure, controls system System (28) by the switch valve four (9) on chain for automatic safe closing presure container two (3) admission line, switch valve five (11), and Open quick release valve two (35), when pressure vessel three (4) pressure is down to fluid to be measured relief valve (34) 80% set-pressure, hands Dynamic reset quick release valve two (35);
Step 8, Treatment Analysis result of the test, according to safety valve product each and test data, it may be judged whether continue to repeat test Or again test after relief valve is carried out field adjustable until pass the test or scene determine termination test;
Step 9, according to step 3 to step 8, complete other twice long run test, carry out variance analysis according to test data, if survey The margin of tolerance of precision that specifies in standard of test data in, be successfully completed test, otherwise termination test, analyze reason and tune Test separately after whole.
CN201610407187.6A 2016-06-12 2016-06-12 A kind of experimental rig and test method of gas liquid two purpose test Methods of Safety Valve Discharge Capacity Active CN106053038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610407187.6A CN106053038B (en) 2016-06-12 2016-06-12 A kind of experimental rig and test method of gas liquid two purpose test Methods of Safety Valve Discharge Capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610407187.6A CN106053038B (en) 2016-06-12 2016-06-12 A kind of experimental rig and test method of gas liquid two purpose test Methods of Safety Valve Discharge Capacity

Publications (2)

Publication Number Publication Date
CN106053038A true CN106053038A (en) 2016-10-26
CN106053038B CN106053038B (en) 2019-04-09

Family

ID=57169815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610407187.6A Active CN106053038B (en) 2016-06-12 2016-06-12 A kind of experimental rig and test method of gas liquid two purpose test Methods of Safety Valve Discharge Capacity

Country Status (1)

Country Link
CN (1) CN106053038B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106872154A (en) * 2017-01-20 2017-06-20 合肥通用机械研究院 A kind of Low lift safety valve discharge capacity test system and method for testing
CN107421728A (en) * 2017-07-03 2017-12-01 泰安市特种设备检验研究院 A kind of safety valve and quick action emergency valve comprehensive calibration device and its method of calibration
CN107655670A (en) * 2017-09-28 2018-02-02 上海阀门厂股份有限公司 A kind of safety valve testing device and a kind of safety valve testing method
CN108760279A (en) * 2018-08-03 2018-11-06 超达阀门集团股份有限公司 A kind of harsh operating mode valve tester that can monitor valve torque and sealing
CN109238686A (en) * 2017-07-06 2019-01-18 北京康斯特仪表科技股份有限公司 Detector for safety valve and safety valve detection method
CN109489972A (en) * 2018-12-29 2019-03-19 重庆普惠斯阀门制造有限公司 A kind of device for testing flow and the liquid communication ability detection method using the device
CN113074933A (en) * 2021-03-18 2021-07-06 深圳市特种设备安全检验研究院 Safety valve discharge capacity testing device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1825081A (en) * 2006-03-28 2006-08-30 保一集团有限公司 Low temp. valve performance measuring system based on computer data acquiring
CN101543736A (en) * 2009-04-24 2009-09-30 华南理工大学 Visualization device for preparing gas hydrate in a spraying way
EP2244091A1 (en) * 2009-04-21 2010-10-27 Agilent Technologies, Inc. Leak detection upstream of a mixing point
CN202033253U (en) * 2010-12-09 2011-11-09 苏州锦鹏机电设备制造有限公司 Valve pressure testing medium system
CN103808503A (en) * 2014-02-24 2014-05-21 华东理工大学 Test device and test method for testing delivery capacity of steam security valve
CN103852245A (en) * 2012-12-04 2014-06-11 华东理工大学 Test device and test method for testing heat-state mechanical performance of safety valve
CN104359661A (en) * 2014-11-11 2015-02-18 浙江工业大学 Universal valve performance test device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1825081A (en) * 2006-03-28 2006-08-30 保一集团有限公司 Low temp. valve performance measuring system based on computer data acquiring
EP2244091A1 (en) * 2009-04-21 2010-10-27 Agilent Technologies, Inc. Leak detection upstream of a mixing point
CN101543736A (en) * 2009-04-24 2009-09-30 华南理工大学 Visualization device for preparing gas hydrate in a spraying way
CN202033253U (en) * 2010-12-09 2011-11-09 苏州锦鹏机电设备制造有限公司 Valve pressure testing medium system
CN103852245A (en) * 2012-12-04 2014-06-11 华东理工大学 Test device and test method for testing heat-state mechanical performance of safety valve
CN103808503A (en) * 2014-02-24 2014-05-21 华东理工大学 Test device and test method for testing delivery capacity of steam security valve
CN104359661A (en) * 2014-11-11 2015-02-18 浙江工业大学 Universal valve performance test device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106872154A (en) * 2017-01-20 2017-06-20 合肥通用机械研究院 A kind of Low lift safety valve discharge capacity test system and method for testing
CN107421728A (en) * 2017-07-03 2017-12-01 泰安市特种设备检验研究院 A kind of safety valve and quick action emergency valve comprehensive calibration device and its method of calibration
CN109238686A (en) * 2017-07-06 2019-01-18 北京康斯特仪表科技股份有限公司 Detector for safety valve and safety valve detection method
CN107655670A (en) * 2017-09-28 2018-02-02 上海阀门厂股份有限公司 A kind of safety valve testing device and a kind of safety valve testing method
CN108760279A (en) * 2018-08-03 2018-11-06 超达阀门集团股份有限公司 A kind of harsh operating mode valve tester that can monitor valve torque and sealing
CN108760279B (en) * 2018-08-03 2024-04-02 超达阀门集团股份有限公司 Harsh working condition valve test device capable of monitoring valve torque and sealing
CN109489972A (en) * 2018-12-29 2019-03-19 重庆普惠斯阀门制造有限公司 A kind of device for testing flow and the liquid communication ability detection method using the device
CN113074933A (en) * 2021-03-18 2021-07-06 深圳市特种设备安全检验研究院 Safety valve discharge capacity testing device and method
CN113074933B (en) * 2021-03-18 2024-05-03 深圳市质量安全检验检测研究院 Safety valve displacement testing device and method

Also Published As

Publication number Publication date
CN106053038B (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN106053038A (en) Gas-liquid-dual-purpose safety valve discharge capacity test device and test method
US9737830B2 (en) Separation device for three-phase fluid, method for making thereof, and method for separating a three-phase fluid
CN202073552U (en) Automatic oil-gas metering device
CN109387332A (en) Stripping pattern draft experiment device and method in Liquid valve
CN109060547A (en) Complex pressure environment test device
CN106251753B (en) Remote online non-destructive testing comprehensive experimental device
CN107421728A (en) A kind of safety valve and quick action emergency valve comprehensive calibration device and its method of calibration
CN102410961B (en) Gas cylinder detection system
CN203732294U (en) Ground automation test system of aircraft pressurization system
CN207336052U (en) A kind of safety valve, regulating valve Performance Test System
CN109443663B (en) Gate valve online pressing system
CN201126688Y (en) Nuclear power plant instrument control synthetic training apparatus
CN209069746U (en) A kind of high precision low pressure hydraulic pressure test platform
CN202561168U (en) Intelligent underground pressure regulation device for gas
CN203772507U (en) Closed valve service life test device
CN106092535B (en) A kind of gas liquid two purpose performance of safety valve experimental rig and test method
CN103674709B (en) Apparatus for testing performance of external safety relief valve of tank container
CN101104122A (en) Flow field special-purpose fast filter
CN202256096U (en) Device for testing runaway gas of methane in coal reservoir
CN208420321U (en) Safety valve testing equipment
CN101620801A (en) Device for simulating oil house processes
CN110726547A (en) Portable comprehensive checking device for pressure protection device
CN206054848U (en) The visual pressure release of pressure controls to adjust valve
CN109596340A (en) A kind of additional back pressure type safety valve waste side experimental rig and its test method
CN108827561A (en) Safety valve testing equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Applicant after: SHANGHAI POWER EQUIPMENT Research Institute

Applicant after: SHANGHAI PONENG ENERGY EQUIPMENT CO.,LTD.

Address before: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Applicant before: Shanghai Power Equipment Research Institute

Applicant before: SHANGHAI PONENG ENERGY EQUIPMENT CO.,LTD.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20180129

Address after: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Applicant after: SHANGHAI POWER EQUIPMENT Research Institute

Address before: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Applicant before: SHANGHAI POWER EQUIPMENT Research Institute

Applicant before: SHANGHAI PONENG ENERGY EQUIPMENT CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant