CN106049365A - Novel net tying ring construction technique - Google Patents

Novel net tying ring construction technique Download PDF

Info

Publication number
CN106049365A
CN106049365A CN201610345288.5A CN201610345288A CN106049365A CN 106049365 A CN106049365 A CN 106049365A CN 201610345288 A CN201610345288 A CN 201610345288A CN 106049365 A CN106049365 A CN 106049365A
Authority
CN
China
Prior art keywords
steel plate
protection threshold
wheel bank
wheel protection
tying ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610345288.5A
Other languages
Chinese (zh)
Inventor
高平原
任飞
任一飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610345288.5A priority Critical patent/CN106049365A/en
Publication of CN106049365A publication Critical patent/CN106049365A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/20Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
    • E02B3/26Fenders
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a novel net tying ring construction technique. A novel net tying ring is composed of a wheel protection threshold internal embedded part and a wheel protection threshold external connecting part. The novel net tying ring construction technique comprises the following steps that (1) a wheel protection threshold external wrapping steel plate is machined; (2) the wheel protection threshold external wrapping steel plate is installed; (3) after the wheel protection threshold external wrapping steel plate is installed, an embedded nut is fixed to the wheel protection threshold external wrapping steel plate by means of a fixing bolt through a drilled bolt hole; (4) a wheel protection threshold formwork is erected, concrete is poured, and a breast wall surface course is constructed after the formwork is dismounted; (5) after construction of the breast wall surface course is completed, the fixing bolt is dismounted, and wheel protection threshold oil paint is brushed; and (6) after the oil paint is air-dried, an external bolt and a ring body are installed. According to the novel net tying ring construction technique, the spit type net tying ring combining the embedded nut and the external bolt is used for replacing a traditional integrated structure, and the installation quality of the net tying ring is guaranteed; and meanwhile, the net tying ring can be maintained and replaced conveniently in the using process.

Description

Novel system net ring construction technology
Technical field
The present invention relates to a kind of Wharf Engineering technical field, particularly relate to a kind of novel system net ring construction technology.
Background technology
Along bank gravity type closed square structure Wharf Engineering, 2 miscellaneous berths of Deep Water Steel altogether, harbour top is protected wheel bank and is provided with For hang anti-goods fall net be net ring, former system net ring design is integral type structure, and carrying out construction by this technique can produce Some problems.First be net ring for tilting to install, increase installation difficulty and under identical operating conditions installation quality the most difficult To ensure, the presentation quality of engineering can be directly influenced.Secondly in order to be net ring and protect the one-piece casting of wheel bank, need protecting For being that net ring sponson reserves bar v notch v in wheel bank template, it is contemplated that be the installation deviation of net ring, reserve bar v notch v Being greater than is the overhanging size of net ring, breach and be to have space between net ring, after this also certainly will increase template only slurry and form removal The difficulty of concrete surface repairing and intensity.Meanwhile, if being that net ring is in use lost, integral structure is the most not It is beneficial to change, keep in repair.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of novel system net ring construction technology is provided.
The present invention for achieving the above object, by the following technical solutions: novel system net ring construction technology, it is characterised in that Including following operating procedure:
1., processing protects wheel bank encased steel plate, according to being net ring and the plane and the elevation location that protect wheel bank on the steel plate of side, land Carry out the boring of bolt hole;
2., wheel bank encased steel plate is protected in installation;
3., protect wheel bank encased steel plate installation after, with fixing bolt, embedded nut is solid by the bolt hole being drilled It is scheduled on and protects on wheel bank encased steel plate;
4., Zhi Li protect wheel bank template casting concrete, after form removal, carry out the construction of breastwork surface layer;
5., unload fixing bolt after breastwork surface construction and wheel bank paint is protected in brushing;
6., paint air-dry after, outer connecting bolt and ring body are installed.
Described step 2. middle installation protects survey crew reply steel plate absolute altitude and plan-position during wheel bank encased steel plate Unwrapping wire.
Described step 6. in ring body be the rounded ring body being formed from steel.
The invention has the beneficial effects as follows:
(1), the present invention improve after be net ring installation Comparison improve before be net ring install, eliminate in installation process Measurement school after measuring independent unwrapping wire and installing before installation and program, eliminate be single branching standing template operation at net ring and Patch work to concrete surface after form removal, thus decrease the input of manpower and materials.
(2), the split type system net ring that the what is more important present invention uses embedded nut and outer connecting bolt to combine substitutes Traditional integral structure, is that the installation quality of net ring is guaranteed, and on inspection, is that the alignment error of net ring is all at allowable error Within the scope of, presentation quality is preferable.It has been also convenient in use, to being the maintenance of net ring, replacing simultaneously.
Accompanying drawing explanation
Fig. 1 is the scheme of installation of construction technology of the present invention;
In figure: 1-embedded nut;2-protects wheel bank encased steel plate;The outer connecting bolt of 3-;4-ring body;
It is described in detail referring to the drawings below with reference to embodiments of the invention.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
As it is shown in figure 1, novel system net ring construction technology, including following operating procedure:
1., processing protects wheel bank encased steel plate 2, according to being net ring and the plane and the elevation location that protect wheel bank on the steel plate of side, land Carry out the boring of bolt hole;
2., installing and protect wheel bank encased steel plate 2, in installation process, survey crew is to steel plate absolute altitude and plan-position unwrapping wire;
3., protect wheel bank encased steel plate 2 installation after, with fixing bolt by embedded nut 1 by the bolt hole being drilled It is fixed on and protects on wheel bank encased steel plate 2;
4., Zhi Li protect wheel bank template casting concrete, after form removal, carry out the construction of breastwork surface layer;
5., unload fixing bolt after breastwork surface construction and wheel bank paint is protected in brushing;
6., paint air-dry after, outer connecting bolt 3 and ring body 4 are installed.
Described step 6. in ring body 4 be the rounded ring body being formed from steel.
Above the present invention is exemplarily described, it is clear that the present invention implements and is not subject to the restrictions described above, As long as have employed method design and the various improvement that carry out of technical scheme of the present invention, or the most improved directly apply to other Close, all within protection scope of the present invention.

Claims (3)

  1. The most novel system net ring construction technology, it is characterised in that include following operating procedure:
    1., processing protect wheel bank encased steel plate (2), side, land steel plate enters according to the plane and elevation location being net ring and protect wheel bank The boring of row bolt hole;
    2., wheel bank encased steel plate (2) is protected in installation;
    3., protect wheel bank encased steel plate (2) installation after, with fixing bolt by embedded nut (1) by the bolt hole being drilled It is fixed on and protects on wheel bank encased steel plate (2);
    4., Zhi Li protect wheel bank template casting concrete, after form removal, carry out the construction of breastwork surface layer;
    5., unload fixing bolt after breastwork surface construction and wheel bank paint is protected in brushing;
    6., paint air-dry after, outer connecting bolt (3) and ring body (4) are installed.
  2. Novel system the most according to claim 1 net ring construction technology, it is characterised in that described step 2. middle installation protects wheel bank Survey crew reply steel plate absolute altitude and plan-position unwrapping wire during encased steel plate (2).
  3. Novel system the most according to claim 1 net ring construction technology, it is characterised in that described step 6. in ring body (4) For the rounded ring body being formed from steel.
CN201610345288.5A 2016-05-23 2016-05-23 Novel net tying ring construction technique Withdrawn CN106049365A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610345288.5A CN106049365A (en) 2016-05-23 2016-05-23 Novel net tying ring construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610345288.5A CN106049365A (en) 2016-05-23 2016-05-23 Novel net tying ring construction technique

Publications (1)

Publication Number Publication Date
CN106049365A true CN106049365A (en) 2016-10-26

Family

ID=57177794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610345288.5A Withdrawn CN106049365A (en) 2016-05-23 2016-05-23 Novel net tying ring construction technique

Country Status (1)

Country Link
CN (1) CN106049365A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1143922A (en) * 1997-07-29 1999-02-16 Bridgestone Corp Fender impact receiving plate installation structure
CN200940245Y (en) * 2006-07-28 2007-08-29 大港油田集团有限责任公司 Road built by assembled casing filled with stone
CN202809477U (en) * 2012-09-05 2013-03-20 天津港滚装码头有限公司 Embedded foldable dock guard ridge
CN204455813U (en) * 2015-01-05 2015-07-08 中交第二航务工程勘察设计院有限公司 A kind of access bridge sewage collection equipment
CN105568929A (en) * 2016-02-26 2016-05-11 中铁二十四局集团安徽工程有限公司 Rectangular bridge pier collision prevention facility and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1143922A (en) * 1997-07-29 1999-02-16 Bridgestone Corp Fender impact receiving plate installation structure
CN200940245Y (en) * 2006-07-28 2007-08-29 大港油田集团有限责任公司 Road built by assembled casing filled with stone
CN202809477U (en) * 2012-09-05 2013-03-20 天津港滚装码头有限公司 Embedded foldable dock guard ridge
CN204455813U (en) * 2015-01-05 2015-07-08 中交第二航务工程勘察设计院有限公司 A kind of access bridge sewage collection equipment
CN105568929A (en) * 2016-02-26 2016-05-11 中铁二十四局集团安徽工程有限公司 Rectangular bridge pier collision prevention facility and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高平原等: "重力式码头工程质量通病治理的新成果", 《港工技术》 *

Similar Documents

Publication Publication Date Title
CN102728980B (en) Method for limiting and positioning octagonal spud leg in folding process
CN105987847A (en) Steel hydrogen embrittlement test device under cathode protection in marine environment and test method
CN105864509B (en) One kind changes pipeline section and quickly repairs submarine pipeline method
CN104805822B (en) The pre-buried fixing device of single hole multiple spot pore pressure gauge and method for embedding thereof
CN110758674A (en) Method for installing ship anchor winch block section
CN104060830B (en) Method for lifting and transporting large parts of underground nuclear power station
CN101618465A (en) Method for boring hole on screw shaft pipe subsection in supertanker construction
CN203049446U (en) Examinable, replaceable and adjustable arch bridge suspender system
CN102493989A (en) Auxiliary device for monitoring and measuring convergence points in tunnel construction by cross diaphragm (CRD) method and method for burying auxiliary device
CN103521939B (en) A kind of valve sealing face repair process
CN106049365A (en) Novel net tying ring construction technique
CN204571337U (en) A kind of fixed structure repairing floor empty drum cracking
CN204418025U (en) Marine crane ship pile equipment adjuster
CN102951260B (en) Method for installing steering oar on ship body sections
CN105004460A (en) Hollow inclusion strain gauge in composite structure
CN105501391B (en) A kind of all-direction propeller is installed to the installation method of bottom of ship from building berth
CN103645287B (en) A kind of device for carrying out laboratory slip casting test to test block
CN106524994A (en) Embedded part, observation part, settlement observation point component for settlement observation and observation method
CN204775907U (en) Equipment fixing frock
CN204754985U (en) It lays protective apparatus to be used for tunnel radially to converge monitoring point and mounting tool thereof
KR20140052165A (en) Method for mooring vessels at quay
CN207904918U (en) A kind of drilled pile casing locating rack
KR20110038226A (en) Method for performing light weight in a dock(on the ground) before launching a ship
CN114152242A (en) Dam horizontal displacement monitoring vertical line protection pipe pre-embedding construction method
CN104846850B (en) Steel sheet pile protection system for tidal range area and water level fluctuation area and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20161026