CN106049213A - Control method and structure of non-uniform settlement of highway soft soil roadbed - Google Patents

Control method and structure of non-uniform settlement of highway soft soil roadbed Download PDF

Info

Publication number
CN106049213A
CN106049213A CN201610607667.7A CN201610607667A CN106049213A CN 106049213 A CN106049213 A CN 106049213A CN 201610607667 A CN201610607667 A CN 201610607667A CN 106049213 A CN106049213 A CN 106049213A
Authority
CN
China
Prior art keywords
soil
sash
reinforced concrete
bed course
subgrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610607667.7A
Other languages
Chinese (zh)
Other versions
CN106049213B (en
Inventor
朱汉华
陈孟冲
沈健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communications Planning Institute Co Ltd
Original Assignee
Ningbo Communications Planning Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communications Planning Institute Co Ltd filed Critical Ningbo Communications Planning Institute Co Ltd
Priority to CN201610607667.7A priority Critical patent/CN106049213B/en
Publication of CN106049213A publication Critical patent/CN106049213A/en
Application granted granted Critical
Publication of CN106049213B publication Critical patent/CN106049213B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a control method and structure of non-uniform settlement of a highway soft soil roadbed. The method comprises: (1) piling a cement mixing pile into the highway soft soil roadbed; (2) pouring a steel reinforced concrete framework at the top of the cement mixing pile, wherein the steel reinforced concrete framework is internally provided with frame cells which are arranged in a rectangular array; (3) spreading one layer of geogrids on the steel reinforced concrete framework; (4) fixing one elastic soil guide arch cushion layer with a spherical segment shape on one geogrid above each frame cell, and supporting outer edges of bottom surfaces of the elastic soil guide arch cushion layers on geogrid beams; (5) spreading graded crushed stones on the geogrids and the elastic soil guide arch cushion layers; (6) filling a slag roadbed layer by layer to a designed height. By adopting the control method and structure, the integrity of a stress deformation shape of the newly built slag roadbed filled with a soil and stone mixture can be controlled, and road surface cracks caused by the non-uniform settlement is prevented.

Description

The control method of a kind of highway soft soil settlement of subgrade and structure
Technical field
The invention belongs to construction method field, be specifically related to a kind of highway soft soil settlement of subgrade control method and Structure.
Background technology
The soft soil roadbed uneven subsidence of existing highway is the most prominent, and particularly soil stone mixing is filling roadbed, is presented as Road surface portraitlandscape cracking;But the globality roadbeds such as lime-clay, soil stone mixing roadbed later stage slip casting, road surface portraitlandscape ftractures Phenomenon is seldom;The key problem of highway soft soil settlement of subgrade controls roadbed force and deformation state globality exactly and asks Topic.How economical solve along seamount many less, the abundant local new highway roadbed force and deformation state globality of slag of delaying controls to ask Topic, so that it may avoid road surface portraitlandscape cracking disease repeatedly to go wrong, not only save construction fund but also maintenance fund can be saved.
Summary of the invention
The present invention is directed to the existing newly-built soil stone slag roadbed of delaying that fills of mixing do not use and effectively control roadbed stress deformation State integrity issues, and the control method of a kind of highway soft soil settlement of subgrade is provided.Thus at roadbed bottom with soft The controlling measurement such as framework newly-built soil stone is used to mix the slag roadbed force and deformation state globality of delaying filled between soil base top layer, Avoid road surface portraitlandscape cracking disease problem.
The control method of highway soft soil settlement of subgrade includes:
1) in highway soft soil roadbed, cement mixing pile is set;
2) at cement mixing pile top pouring reinforcement concrete framework, reinforced concrete frame has rectangular array row The sash of cloth;
3) on reinforced concrete frame, one layer of GSZ is laid;
4) an elastic soil arch bed course that guides in segment shape, and bullet are fixed on the GSZ above each sash Property guide soil arch bed course outer, bottom surface be supported on sash beam;
5) making graded broken stone on GSZ and elastic guiding soil arch bed course;
6) placement in layers delays slag roadbed to design height.
The core of the present invention is to utilize the effect of soil arch bed course, the soil pressure of roadbed is guided to sash beam, it is to avoid straight Connect and act on weak soil crust layer, prevent roadbed from producing differential settlement.It is found by the applicant that: by arranging segment-shaped and having one Fixed elastic soil arch guides bed course (Fig. 4), and roadbed block above bed course or granule have sinking tendency but run into bed course and hinder, Bed course periphery roadbed can produce top roadbed block or the holding power of granule, and self-assembling formation soil encircles.And elastic guiding native arch pad The outer, bottom surface of layer is supported on sash beam, and therefore soil arch upper load is transferred to sash joist support load.In reinforced concrete frame Each sash all assume responsibility for transfer load, therefore reinforced concrete frame will undertake above roadbed as an entirety The weight of the slag of delaying filled.Thus, roadbed force and deformation state is just provided with globality, it is to avoid because differential settlement is caused Road surface portraitlandscape cracking disease problem.
It addition, the reinforced concrete frame bottom support of the present invention has cement mixing pile, to alleviate weak soil crust layer Pressure.In prior art, much setting prefabricated pile or steel-pipe pile, its problem is: can work if being fought to the finish, if Not fighting to the finish, stake cannot be stablized in weak soil, and then causes differential settlement.The effect of GSZ further functions as support Effect, uniform load, improves stability.
As preferably, a length of 0-8m of described cement mixing pile.Further, when weak soil crust layer is sufficiently thick Waiting, can be not provided with stake, a length of 0m of i.e. described cement mixing pile, reinforced concrete frame is directly arranged at soft soil foundation Crust layer on.Thus, it is possible to reduce cost investment further.
As preferably, described elastic guiding soil arch bed course is centrally located on same vertical line with sash, and elastic guiding The bottom surface circle of soil arch bed course is tangent with the four of sash beam centrages, i.e. the border of bottom surface circle at least covers the centrage of beam.Should Under state, adjacent elastic guiding soil arch bed course is the most circumscribed.When shifting load, an entirety completely can be formed, The most mutually support, the pressure globality of top is transferred on reinforced concrete frame, improves its stability.
As preferably, described reinforced concrete frame casting method is: arrange smooth ground, arranges according to design plane Excavate and arrange the soil box that shape is identical, cast-in-situ steel reinforced concrete framework in soil box with reinforced concrete frame, and carry out maintenance. The method can save cost, and easy construction.
As preferably, in described reinforced concrete frame, bottom, each sash summit has all set cement mixing pile, phase Same pile is shared at the common vertex of adjacent sash.It is possible to improve the stability of reinforced concrete frame entirety stress, Prevent differential settlement further.
As preferably, described cement mixing pile is 2.0 × 2.0m rectangular array horizontal layout;Described armored concrete Sash a size of 2.0 × 2.0m in framework, sash deck-molding 0.2m, wide 0.5m;Described elastic guiding soil arch base surface diameter 2m, high 0.3-0.5m.Under this design parameter, it is possible in the case of ensureing that it controls effect, improve the economy of cost, It is easy to promote the use of.
As preferably, described elastic guiding soil arch course is hard foam.
Another object of the present invention is to provide the control structure of a kind of highway soft soil settlement of subgrade, including reinforcing bar Concrete frame, GSZ and elastic guiding soil arch bed course;Described reinforced concrete frame has rectangular array row The sash of cloth, lays one layer of GSZ, the GSZ above each sash is fixed one above reinforced concrete frame Elastic guiding soil in segment shape encircles bed course, and the elastic outer, bottom surface guiding native arch bed course is supported on sash beam.
As preferably, in described reinforced concrete frame, bottom, each sash summit has all set cement mixing pile, institute The length of the cement mixing pile stated is preferably 0-8m;As further preferably, described elastic guiding soil encircles bed course and sash It is centrally located on same vertical line, and the elastic bottom surface guiding soil to encircle bed course circle is tangent with the four of sash beam centrages;Described The elastic material guiding soil arch bed course is preferably rigid foam.
The control method of the highway soft soil settlement of subgrade of the present invention, between roadbed bottom and soft soil foundation top layer Use the measure such as framework and elastic guiding soil arch bed course, together form the overall structure of weight above a carrying, it is possible to control Make newly-built soil stone and mix the slag roadbed force and deformation state globality of delaying filled, prevent because differential settlement causes road surface to occur out Split.Economy of the present invention solve along seamount many less, the abundant local new highway roadbed force and deformation state globality of slag of delaying controls Problem, not only saves construction fund but also save maintenance fund.
Accompanying drawing explanation
Fig. 1 is soft subgrade treatment site plan;
Fig. 2 is soft subgrade treatment vertical section layout drawing;
Fig. 3 is soft soil roadbed elastic guiding soil arch bed course elevation;
The load transfer schematic diagram that Fig. 4 is caused by soil arch guiding bed course.
Detailed description of the invention
With detailed description of the invention the present invention it is further elaborated below in conjunction with the accompanying drawings and illustrates.In the present invention, each is implemented The technical characteristic of mode, on the premise of not colliding with each other, all can carry out respective combination.
As it is shown in figure 1, the control structure of a kind of highway soft soil settlement of subgrade, including reinforced concrete frame, soil Work grid and elastic guiding soil arch bed course;Described reinforced concrete frame has the sash of rectangular array arrangement, reinforcing bar Lay one layer of GSZ above concrete frame, the GSZ above each sash is fixed a bullet in segment shape Property guide soil arch bed course, and the elastic outer, bottom surface guiding soil arch bed course is supported on sash beam.Described steel reinforced concrete frame In frame, bottom, each sash summit has all set cement mixing pile, and the length of described cement mixing pile is preferably 0-8m.Described Elastic guide soil arch bed course to be centrally located on same vertical line with sash, and the elastic bottom surface circle guiding soil arch bed course and sash Four beam centrages tangent;The described elastic material guiding soil arch bed course is preferably rigid foam.Based on this structure Highway soft soil settlement of subgrade can be controlled.Its construction method includes:
(1) according to characteristics of soft clay and code requirement, arrangeCement mixing pile, length range 0.0~8.0m (cement The a length of 0m of mixing pile, described reinforced concrete frame is directly arranged on the crust layer of soft soil foundation), horizontal layout in 2.0 × 2.0m rectangular array.
(2) according to roadbed height and related specifications requirement, smooth ground is arranged, according to the horizontal layout requirement of highway, edge Roadbed bearing of trend excavation has a soil box of sash of rectangular array arrangement, and the deep 20cm of soil box, wide 50cm are cast-in-place in soil box High 20cm, the sash beam of wide 50cm, sash a size of 2.0 × 2.0m in reinforced concrete frame.Ultimately form every segment length 20m's Reinforced concrete frame, and maintenance 24 days.Sash is corresponding with cement mixing pile, and bottom, each sash summit has all set cement and stirred Mix stake.
(3) on reinforced concrete frame, one layer of GSZ is laid;
(4) an elastic soil arch bed course that guides in segment shape is placed on the GSZ above each sash, and It is fixed with geo-grid sheet.In the present embodiment, guide soil arch base surface diameter 2m, high 0.3-as it is shown on figure 3, elastic 0.5m, material is hard foam.Elastic guiding soil arch bed course is centrally located on same vertical line with sash, and elastic guiding The bottom surface circle of soil arch bed course is tangent with the four of sash beam centrages, makes the elastic outer, bottom surface guiding soil arch bed course be supported on frame On lattice beam.
(5) making 50cm graded broken stone on GSZ and elastic guiding soil arch bed course;
(6) according to the every 50cm of code requirement mono-layer, placement in layers delays slag roadbed to design height.
Finally, the control structure of the highway soft soil settlement of subgrade of formation is as illustrated in fig. 1 and 2.
Embodiment described above is the one preferably scheme of the present invention, and so it is not intended to limiting the invention.Have Close the those of ordinary skill of technical field, without departing from the spirit and scope of the present invention, it is also possible to make various change Change and modification.The technical scheme that the most all modes taking equivalent or equivalent transformation are obtained, all falls within the guarantor of the present invention In the range of protecting.

Claims (10)

1. the control method of a highway soft soil settlement of subgrade, it is characterised in that including:
1) in highway soft soil roadbed, cement mixing pile is set;
2) at cement mixing pile top pouring reinforcement concrete framework, reinforced concrete frame has rectangular array arrangement Sash;
3) on reinforced concrete frame, one layer of GSZ is laid;
4) fix an elastic guiding soil arch bed course in segment shape on the GSZ above each sash, and elasticity is drawn The outer, bottom surface leading soil arch bed course is supported on sash beam;
5) making graded broken stone on GSZ and elastic guiding soil arch bed course;
6) placement in layers delays slag roadbed to design height.
2. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described cement The a length of 0-8m of mixing pile.
3. the control method of highway soft soil settlement of subgrade as claimed in claim 2, it is characterised in that described cement The a length of 0m of mixing pile, described reinforced concrete frame is directly arranged on the crust layer of soft soil foundation.
4. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described elasticity Soil arch bed course and sash is guided to be centrally located on same vertical line, and four of the elastic bottom surface circle guiding soil arch bed course and sash Beam centrage is tangent.
5. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described reinforcing bar Concrete frame casting method is: arrange smooth ground, arranges that excavation arranges shape with reinforced concrete frame according to design plane The soil box that shape is identical, cast-in-situ steel reinforced concrete framework in soil box, and carry out maintenance.
6. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described reinforcing bar In concrete frame, bottom, each sash summit has all set cement mixing pile.
7. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described cement Mixing pile is 2.0 × 2.0m rectangular array horizontal layout;Sash a size of 2.0 × 2.0m in described reinforced concrete frame, Sash deck-molding 0.2m, wide 0.5m;Described elastic guiding soil arch base surface diameter 2m, high 0.3-0.5m.
8. the control method of highway soft soil settlement of subgrade as claimed in claim 1, it is characterised in that described elasticity Guiding soil arch course is hard foam.
9. the control structure of a highway soft soil settlement of subgrade, it is characterised in that include reinforced concrete frame, geotechnique Grid and elastic guiding soil arch bed course;Having the sash of rectangular array arrangement in described reinforced concrete frame, reinforcing bar mixes Lay one layer of GSZ above solidifying soil framework, the GSZ above each sash is fixed the elasticity in segment shape Guide soil arch bed course, and the elastic outer, bottom surface guiding soil arch bed course is supported on sash beam.
10. the control structure of highway soft soil settlement of subgrade as claimed in claim 9, it is characterised in that described steel In reinforced concrete framework, bottom, each sash summit has all set cement mixing pile, and the length of described cement mixing pile is preferably 0-8m;Preferably, described elastic guiding soil arch bed course is centrally located on same vertical line with sash, and elastic guiding soil arch pad The bottom surface circle of layer is tangent with the four of sash beam centrages;The described elastic material guiding soil arch bed course is preferably rigid foam Plastics.
CN201610607667.7A 2016-07-27 2016-07-27 A kind of control method and structure of highway soft soil settlement of subgrade Active CN106049213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610607667.7A CN106049213B (en) 2016-07-27 2016-07-27 A kind of control method and structure of highway soft soil settlement of subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610607667.7A CN106049213B (en) 2016-07-27 2016-07-27 A kind of control method and structure of highway soft soil settlement of subgrade

Publications (2)

Publication Number Publication Date
CN106049213A true CN106049213A (en) 2016-10-26
CN106049213B CN106049213B (en) 2018-03-20

Family

ID=57196371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610607667.7A Active CN106049213B (en) 2016-07-27 2016-07-27 A kind of control method and structure of highway soft soil settlement of subgrade

Country Status (1)

Country Link
CN (1) CN106049213B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316292A (en) * 2018-02-08 2018-07-24 中交第二航务工程局有限公司 A kind of cement mixing pile pile group construction method
CN109355992A (en) * 2018-10-16 2019-02-19 中铁二院工程集团有限责任公司 A kind of karst region is anti-to collapse road structure and construction method suddenly
CN109667207A (en) * 2017-10-16 2019-04-23 成都隶盈科技有限公司 A kind of construction method in mud-rock flow soft base upper berth pad road
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN109958016A (en) * 2017-12-22 2019-07-02 张远凤 A kind of extremely frigid zones marshland roadbed anti-sedimentation structure
CN110485230A (en) * 2019-09-17 2019-11-22 招商局重庆交通科研设计院有限公司 A kind for the treatment of structures and construction method of high water level weak soil Bridgehead by Blastig
CN115305759A (en) * 2022-08-08 2022-11-08 中国十七冶集团有限公司 Road foundation protection system for deep soft foundation and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317307A (en) * 1997-05-19 1998-12-02 Dia Consultant:Kk Construction method for road
JPH11269860A (en) * 1998-03-26 1999-10-05 Shimizu Corp Composite improvement ground structure
CN1609343A (en) * 2004-08-06 2005-04-27 陶钧炳 Structure of king crab type light dyke-dam and method
KR100796003B1 (en) * 2007-03-21 2008-01-21 (주)삼주건설기술단 Road structure pressing for drainage
CN102605699A (en) * 2012-03-23 2012-07-25 河海大学 Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment
CN103821160A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 Soft soil foundation combined pile net structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317307A (en) * 1997-05-19 1998-12-02 Dia Consultant:Kk Construction method for road
JPH11269860A (en) * 1998-03-26 1999-10-05 Shimizu Corp Composite improvement ground structure
CN1609343A (en) * 2004-08-06 2005-04-27 陶钧炳 Structure of king crab type light dyke-dam and method
KR100796003B1 (en) * 2007-03-21 2008-01-21 (주)삼주건설기술단 Road structure pressing for drainage
CN102605699A (en) * 2012-03-23 2012-07-25 河海大学 Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment
CN103821160A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 Soft soil foundation combined pile net structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667207A (en) * 2017-10-16 2019-04-23 成都隶盈科技有限公司 A kind of construction method in mud-rock flow soft base upper berth pad road
CN109667207B (en) * 2017-10-16 2021-04-02 广东建咨工程管理有限公司 Construction method for paving road on debris flow soft foundation
CN109958016A (en) * 2017-12-22 2019-07-02 张远凤 A kind of extremely frigid zones marshland roadbed anti-sedimentation structure
CN108316292A (en) * 2018-02-08 2018-07-24 中交第二航务工程局有限公司 A kind of cement mixing pile pile group construction method
CN108316292B (en) * 2018-02-08 2020-02-07 中交第二航务工程局有限公司 Construction method for cement mixing pile group
CN109355992A (en) * 2018-10-16 2019-02-19 中铁二院工程集团有限责任公司 A kind of karst region is anti-to collapse road structure and construction method suddenly
CN109355992B (en) * 2018-10-16 2024-01-23 中铁二院工程集团有限责任公司 Karst area sudden collapse prevention roadbed structure and construction method
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN109853313B (en) * 2019-01-17 2024-04-30 浙江绿艺建设有限公司 Pile foundation side soft soil foundation road friction resistance eliminating structure and construction method
CN110485230A (en) * 2019-09-17 2019-11-22 招商局重庆交通科研设计院有限公司 A kind for the treatment of structures and construction method of high water level weak soil Bridgehead by Blastig
CN110485230B (en) * 2019-09-17 2024-04-02 招商局重庆交通科研设计院有限公司 Treatment structure and construction method of high-water-level soft soil bridge head roadbed
CN115305759A (en) * 2022-08-08 2022-11-08 中国十七冶集团有限公司 Road foundation protection system for deep soft foundation and construction method thereof

Also Published As

Publication number Publication date
CN106049213B (en) 2018-03-20

Similar Documents

Publication Publication Date Title
CN106049213B (en) A kind of control method and structure of highway soft soil settlement of subgrade
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN106400636B (en) A kind of control method of the soft soil roadbed differential settlement of Multi-layer road
CN107142856A (en) Bridge pier and the bridge of lifting reconstruction that abutment remodeling method, abutment, abutment are transformed
CN108103871B (en) Construction method of roadbed foam concrete filling technology adjacent to existing subway facility
CN102644295A (en) Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN107059667A (en) Door shape assembled armored concrete box culvert and its construction method
CN103233406B (en) A kind of road and storage yard pavement structure layer of long-term durable stable use and construction method thereof
CN104790428B (en) Ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure and construction method thereof
CN110644323A (en) Pavement slab, pavement structure and construction method suitable for temporary road soft soil foundation
CN103334357A (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
RU2392387C2 (en) Device and method for reinforcement of mast base
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN215976664U (en) Rigid pile composite foundation treatment structure of lower horizontal pipe gallery structure
CN107700299A (en) A kind of elevated bridge lower floor road structure and its construction method
CN206941425U (en) The bridge of abutment, the bridge pier of abutment transformation and lifting reconstruction
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN205975243U (en) Highway weak soil road bed is uniform settlement's control structure not
CN204676593U (en) A kind of superelevation overall steel-plastic Geogrid Reinforced Soil abutment wall-retaining structure
CN218813764U (en) Stress-maintaining type faces combination continuous pile wall supporting construction forever
CN207878440U (en) A kind of reinforcement composite foundation structure suitable for soft soil foundation
US20110110717A1 (en) Structure for Supporting Vehicular Traffic
CN203295915U (en) Road storage yard surfacing structure layer capable of being used durably and stably for long time
RU2522268C2 (en) Reinforced sand bed with curved bottom
CN211285121U (en) Road surface board and road surface structure suitable for interim road weak soil foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant