CN106048111A - Blast furnace burden screening control method - Google Patents

Blast furnace burden screening control method Download PDF

Info

Publication number
CN106048111A
CN106048111A CN201610483203.XA CN201610483203A CN106048111A CN 106048111 A CN106048111 A CN 106048111A CN 201610483203 A CN201610483203 A CN 201610483203A CN 106048111 A CN106048111 A CN 106048111A
Authority
CN
China
Prior art keywords
flow
interval
screening
blast furnace
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610483203.XA
Other languages
Chinese (zh)
Other versions
CN106048111B (en
Inventor
张贺顺
任立军
陈军
曹锋
王有良
刘长江
王牧麒
魏志军
黄俊杰
郭之明
陈建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Jingtang United Iron and Steel Co Ltd
Original Assignee
Shougang Jingtang United Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Jingtang United Iron and Steel Co Ltd filed Critical Shougang Jingtang United Iron and Steel Co Ltd
Priority to CN201610483203.XA priority Critical patent/CN106048111B/en
Publication of CN106048111A publication Critical patent/CN106048111A/en
Application granted granted Critical
Publication of CN106048111B publication Critical patent/CN106048111B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/006Automatically controlling the process

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Combined Means For Separation Of Solids (AREA)
  • Manufacture Of Iron (AREA)
  • Blast Furnaces (AREA)

Abstract

The invention discloses a blast furnace burden screening control method applied to a blast furnace burden screening control system. The blast furnace burden screening control method comprises the steps that the actual second flow value that current raw materials enter a furnace is obtained; whether the actual second flow value is in the second flow control section or not is judged, wherein the second flow control section is matched with the current raw materials; when the judgment result shows that the actual second flow value is not in the second flow control section, the vibration frequency is adjusted; and the adjusted vibration frequency value is fed back to a feeder of the blast furnace, and the feeder adjusts the feeding amount of a vibration screen according to the vibration frequency value. The technical problem that in the prior art, limitation exists in improvement of the raw material screening effect is effectively solved, the screening effect of the raw materials entering the furnace is greatly improved, the powder entering the blast furnace is greatly reduced, and stable and smooth blast furnace running and load improving can be well promoted.

Description

A kind of blast furnace burden screening control method
Technical field
The present invention relates to ironmaking field of engineering technology, particularly relate to a kind of blast furnace burden screening control method.
Background technology
Blast furnace burden is the basis of blast fumance, and concentrate is the modernization large blast furnace basic demand to raw material, is high Stove is along steady basis.Blast furnace raw material worker is devoted to improve the quality of feed stock for blast furnace always, takes conjunction by screening sieve The raw material of suitable particle diameter, reduce as far as possible feed stock for blast furnace containing powder rate, blast furnace stable smooth operation is played an important role.Existing blast furnace burden Screening control method has two kinds, sluice gate dental lamina aperture control methods and material screening time control act on feed bin.
On feed bin, sluice gate dental lamina aperture control methods is the difference according to material kind, rule of thumb uses manual change's feed bin brake application The feeding adjusting control vibrosieve of mouth dental lamina aperture, although this method serves control feeding to a certain extent Effect, do not introduce quantitative criteria, to blast furnace raw material change adaptation indifferent, screening effect is poor, and more powder enters Enter blast furnace, affect blast furnace permeability, cause the poor stability of coal gas.When material screening time control act is by computer program Between computer, the sieving time of every tank material is calculated, according to sieve material total time difference, adjust sluice gate dental lamina aperture. Concrete way is to be timing starting point by choosing the enabling signal of every vibrosieve, and weighing pot full value vibrosieve stops vibration As timing halt, count every batch of overall sieving time entering furnace charge, through the sieving time of feed stock for blast furnace is added up Analyzing, the screening formulating different furnace charge adjusts standard, thus realizes more accurately adjusting controlling sluice gate dental lamina aperture on feed bin.
Sieving time control methods goes up sluice gate dental lamina aperture control methods relatively, although can to a certain degree improve and make feed stock for blast furnace Screening effect, but when weighing pot sieve material setting value change time or crude fuel change time, it is clear that, sieving time control Preparation method but can not adjust fast, accurately, therefore has limitation in material screening effect improving.
Summary of the invention
The embodiment of the present invention, by providing a kind of blast furnace burden screening control method, solves existing sieving time control methods Improving limited technical problem in material screening effect.
First aspect, embodiments provides a kind of blast furnace burden screening control method, is applied to a blast furnace burden In screening control system, described blast furnace burden screening control method includes:
Obtain current raw material and enter the second flow actual value of stove;
Judge described second flow actual value whether in volume per second control interval, wherein, described volume per second control interval with Described current raw material mates;
When judged result is no, adjust frequency of vibration;
Frequency of vibration value after adjusting feeds back to the batcher of described blast furnace, makes described batcher according to described vibration frequency Rate value adjusts vibrosieve feeding coal.
Preferably, after judging that described second flow actual value is whether in volume per second control interval, described method is also wrapped Include:
When judged result is no, carry out alarm.
Preferably, if the screening second flow upper limit that described second flow actual value is interval more than described volume per second control, described Adjust frequency of vibration particularly as follows: reduce described frequency of vibration;
If the screening second flow lower limit that described second flow actual value is interval less than described volume per second control, described adjustment is vibrated Frequency is particularly as follows: increase described frequency of vibration.
Preferably, described volume per second control is interval, and be specially preset in described blast furnace burden screening control system is former Beginning second flow sets interval.
Preferably, described volume per second control is interval particularly as follows: receive the interval institute of second flow screening expectation of operator's input Generate;
Wherein, when rainy season or winter production, described second flow screening expectation interval sets more than described original second flow Interval, when described current raw material is better than quality of furnace charge meansigma methods, described second flow screening expectation interval is less than the described original second Flow set is interval.
Preferably, described original second flow setting interval determines for experimental data is carried out screening.
Preferably, when described current raw material is sintering deposit, described original second flow sets interval particularly as follows: 50~80kg/ s;When described current raw material is coke, described original second flow sets interval particularly as follows: 50~100kg/s;Described current raw material During for pelletizing, described original second flow sets interval particularly as follows: 20~40kg/s;When described current raw material is Australia ore deposit, described former Beginning second flow sets interval particularly as follows: 60~80kg/s;When described current raw material is miscellaneous ore deposit, described original second flow sets interval Particularly as follows: 60~80kg/s.
Preferably, after the current raw material of described acquisition enters the second flow actual value of stove, described method also includes:
Persistently storage records each described second flow actual value, forms the second flow actual value set of every batch of material screening;
Described second flow actual value set is carried out contrast process, determines from described second flow actual value set Good screening control interval;
Replacing a upper screening control interval with described current optimal screening control interval, write is as described volume per second control Interval, wherein, a described upper screening control interval is that original second flow sets interval or upper one most preferably sieves control interval.
Preferably, the current raw material of described acquisition enters the second flow actual value of stove, including:
Weighing pot weight is gathered at each time point;
Weighing pot weight changing value is defined as described second flow actual value, wherein, described title divided by second level screening duration Measuring tank weight changing value is the difference between the weighing pot gravimetric value of current point in time and the weighing pot gravimetric value of previous time point.
The one or more technical schemes provided in the embodiment of the present invention, at least have the following technical effect that or advantage:
1, the second flow actual value of stove is entered owing to have employed the current raw material of acquisition;Then judge that whether second flow actual value exists Frequency of vibration is adjusted when inherence, volume per second control interval judged result is no;Then the frequency of vibration value feedback after adjusting is paramount The batcher of stove, makes batcher adjust vibrosieve feeding coal according to frequency of vibration value.Thus the sieve material of each second can be understood in real time Weight, makes in raw materials control quantization more accurate, can be adjusted sieve material feeding coal in real time, it is achieved that to material screening mistake Journey is dynamic, quantify supervision and control, make Vibration Screen component be in optimum state all the time, even if the sieve material of weighing pot sets Value change time or crude fuel change and be also unaffected, efficiently solve existing sieving time control methods and improving raw material Limited technical problem on screening effect, significantly improves the screening effect of feed stock for blast furnace, makes blast furnace feeding powder big Width reduces, and can well promote blast furnace stable smooth operation and Load lifting.
Volume per second control interval is adjusted by the second flow screening expectation interval 2, receiving operator's input, thus realizes Can adjust the feeding coal of vibrosieve under the conditions of varying environment, different material in time, the screening amount making vibrosieve is the most true Protect and be in adaptive current optimum state.
3, the second flow actual value set of every batch of material screening is recorded due to storage, it is possible to realization can to screening control situation Review, it is simple to optimal screening of constantly analyzing and researching out the second flow actual value set stored controls parameter, it is achieved thereby that sieve Divide the lasting improvement of effect.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
Fig. 1 is the flow chart of blast furnace burden screening control method in the embodiment of the present invention.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
A kind of blast furnace burden screening control method that the embodiment of the present invention provides, is applied to blast furnace burden screening control system In, with reference to shown in Fig. 1, this blast furnace burden screening control method comprises the steps:
S101, obtain current raw material and enter the second flow actual value of stove.
Wherein, S101 specifically includes following steps: gather weighing pot weight at each time point.Thus obtain each time The gravimetric tank gravimetric value of point.Then, weighing pot weight changing value is defined as second flow actual value divided by second level screening duration.Tool Body, weighing pot weight changing value is the weighing pot weight change of adjacent time point, in specific implementation process, weighing pot weight Changing value is that the weighing pot gravimetric value of current point in time subtracts each other, with the weighing pot gravimetric value of previous time point, the difference obtained.
In specific implementation process, S101 is for continuously carrying out or or continuing, to be continuously obtained according to prefixed time interval Raw material enters the second flow actual value of stove.
Then, enter the second flow actual value of stove obtaining raw material every time, be carried out S102: whether judge second flow actual value In volume per second control interval, wherein, volume per second control is interval and current raw material mates.
Concrete, volume per second control is interval and current raw material coupling indication is the second flow control that different material kinds is mated System interval is different.In specific implementation process, the volume per second control interval of same material kind is not changeless, but Persistently improve volume per second control according to actual production interval, be continuously available and currently most preferably sieve control interval, thus realize screening The lasting improvement of effect, then detailed description of the invention is as follows:
In the starting stage that blast furnace burden screening controls, volume per second control interval controls system for being preset in blast furnace burden screening Original second flow in system sets interval.Specifically, the original second flow that different material kind is mated sets interval different, often The volume per second control interval planting raw material can be all experimental data to be carried out screening determine.For example, current raw material is sintering During ore deposit, original second flow sets interval particularly as follows: 50~80kg/s;When current raw material is coke, original second flow sets interval Particularly as follows: 50~100kg/s;When current raw material is pelletizing, original second flow sets interval particularly as follows: 20~40kg/s;Currently When raw material is Australia ore deposit, original second flow sets interval particularly as follows: 60~80kg/s;When current raw material is miscellaneous ore deposit, original second flow Set interval particularly as follows: 60~80kg/s.
After the starting stage that blast furnace burden screening controls, the weight sieving raw material each second is made to show at monitor terminal On, volume per second control interval can be adjusted by operator in time, then volume per second control interval specially reception operator is defeated The second flow screening expectation interval entered is generated.Wherein, when rainy season or winter production, the second flow screening expectation district of input Between set interval more than original second flow, when current raw material is better than quality of furnace charge meansigma methods, second flow screening expectation is interval little Interval is set in original second flow.Thus operator can according to current practice appropriateness relaxing or reducing control interval, Such as, shown below is these five kinds of sintering deposit, coke, pelletizing, Australia ore deposit and miscellaneous ore deposit material kind under normal circumstances, in the winter time and rain Under the conditions of season, and under the conditions of current raw material is better than quality of furnace charge meansigma methods, on the screening second flow that volume per second control is interval, Lower limit, with reference to shown in table 1 below:
The screening second flow upper and lower limit of the different material kind of table 1.
Thus volume per second control interval can be adjusted under different material condition, varying environment in time and make to control more reasonable In the range of, give full play to the optimum efficiency of vibration screen, make the screening amount of vibrosieve be in optimum state all the time.
After the starting stage that blast furnace burden screening controls, volume per second control interval is specifically as follows historical storage Second flow actual value application PDCA (Plan Do Check Action) circulation automatically analyzes and draws and currently most preferably sieve control zone Between.
Specifically, it is after the current raw material of acquisition enters the second flow actual value of stove, the second flow that storage record obtains Actual value, thus form the second flow actual value set of every batch of material screening, second flow actual value set is carried out contrast process, should Determine from second flow actual value set with PDCA and currently most preferably sieve control interval.Replace with current optimal screening control interval A upper screening control interval, so that the most most preferably screening control interval is write as volume per second control interval, wherein, a upper screening Control interval is that original second flow sets interval or upper one most preferably sieves control interval.Such as, when replacing for the first time, replaced A upper screening control interval be that original second flow sets interval, every time replacing after replacing it for the first time is last application What PDCA circulation automatically analyzed out most preferably sieves control interval (most preferably the sieving control interval of last write).Thus second flow What control interval was lasting changes to, in more zone of reasonableness, give full play to the optimum efficiency of vibration screen automatically, makes the sieve of vibrosieve Component is in optimum state all the time.
S103, when judged result is no, adjust frequency of vibration.
S104, will adjust after frequency of vibration value feed back to the batcher of blast furnace, make batcher adjust according to frequency of vibration value Whole vibrosieve feeding coal.
Specifically, there is direct relation due to the good of feed stock for blast furnace screening effect and bad and vibrosieve feeding coal.Namely Say that the feeding control of vibrosieve, in rational interval range, can give full play to the optimum efficiency of vibration screen.Vibration The feeding coal of sieve is excessive, causes the bed of material on screen cloth blocked up, causes finished product material powder too much, affects smooth operation of furnace;Vibrosieve Feeding coal is too small, causes the long badly damaged screening plant of sieving time, and the generation having jumping material phenomenon (i.e. has part former Expect the most screened to be directly entered finished product batch can).Thus the supervision of material screening process dynamics quantization and control control vibrosieve Rationally feeding coal, it is possible to optimize screening efficiency.
In further technical scheme, this blast furnace burden screening control method also comprises the steps: in judged result For time no, carry out alarm, play the effect of warning operator.
Below, as a example by the heat size blast furnace as 5500m3, use the present invention provide blast furnace burden screening control method with Existing furnace charge sieving time control methods carries out sieving the test of sintering deposit, and the measured data drawn is as shown in table 2 below:
Table 2. enters the contrast of stove ore deposit grain size category measured data when sieving sintering deposit
As can be seen from Table 2, after implementing furnace charge screening volume per second control method, when entering stove sintering deposit particle diameter < 5mm, powder is significantly Reduce.
By in the invention described above embodiment provide one or more technical schemes, at least have the following technical effect that or Advantage:
1, the second flow actual value of stove is entered owing to have employed the current raw material of acquisition;Then judge that whether second flow actual value exists Frequency of vibration is adjusted when inherence, volume per second control interval judged result is no;Then the frequency of vibration value feedback after adjusting is paramount The batcher of stove, makes batcher adjust vibrosieve feeding coal according to frequency of vibration value.Thus the sieve material of each second can be understood in real time Weight, makes in raw materials control quantization more accurate, can be adjusted sieve material feeding coal in real time, it is achieved that to material screening mistake Journey is dynamic, quantify supervision and control, make Vibration Screen component be in optimum state all the time, even if the sieve material of weighing pot sets Value change time or crude fuel change and be also unaffected, efficiently solve existing sieving time control methods and improving raw material Limited technical problem on screening effect, significantly improves the screening effect of feed stock for blast furnace, makes blast furnace feeding powder big Width reduces, and can well promote blast furnace stable smooth operation and Load lifting.
Volume per second control interval is adjusted by the second flow screening expectation interval 2, receiving operator's input, thus realizes Can adjust the feeding coal of vibrosieve under the conditions of varying environment, different material in time, the screening amount making vibrosieve is the most true Protect and be in adaptive current optimum state.
3, the second flow actual value set of every batch of material screening is recorded due to storage, it is possible to realization can to screening control situation Review, it is simple to optimal screening of constantly analyzing and researching out the second flow actual value set stored controls parameter, it is achieved thereby that sieve Divide the lasting improvement of effect.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make other change and amendment to these embodiments.So, claims are intended to be construed to include excellent Select embodiment and fall into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and the modification essence without deviating from the present invention to the present invention God and scope.So, if these amendments of the present invention and modification belong to the scope of the claims in the present invention and equivalent technologies thereof Within, then the present invention is also intended to comprise these change and modification.

Claims (9)

1. a blast furnace burden screening control method, is applied in a blast furnace burden screening control system, it is characterised in that described Blast furnace burden screening control method includes:
Obtain current raw material and enter the second flow actual value of stove;
Judge described second flow actual value whether in volume per second control interval, wherein, described volume per second control is interval and described Current raw material coupling;
When judged result is no, adjust frequency of vibration;
Frequency of vibration value after adjusting feeds back to the batcher of described blast furnace, makes described batcher according to described frequency of vibration value Adjust vibrosieve feeding coal.
2. blast furnace burden screening control method as claimed in claim 1, it is characterised in that judging described second flow actual value Whether after in volume per second control interval, described method also includes:
When judged result is no, carry out alarm.
3. blast furnace burden screening control method as claimed in claim 2, it is characterised in that if described second flow actual value is more than The screening second flow upper limit that described volume per second control is interval, described adjustment frequency of vibration is particularly as follows: reduce described frequency of vibration;
If the screening second flow lower limit that described second flow actual value is interval less than described volume per second control, described adjustment frequency of vibration Particularly as follows: increase described frequency of vibration.
4. blast furnace burden screening control method as claimed in claim 3, it is characterised in that described volume per second control is interval, tool Body is that the original second flow being preset in described blast furnace burden screening control system sets interval.
5. blast furnace burden screening control method as claimed in claim 3, it is characterised in that described volume per second control is interval concrete By: the second flow screening receiving operator's input expects what interval was generated;
Wherein, when rainy season or winter production, described second flow screening expectation interval sets interval more than described original second flow, When described current raw material is better than quality of furnace charge meansigma methods, described second flow screening expectation interval sets less than described original second flow Fixed interval.
6. the blast furnace burden screening control method as described in claim 4 or 5, it is characterised in that described original second flow sets Interval determines for experimental data is carried out screening.
7. blast furnace burden screening control method as claimed in claim 6, it is characterised in that
When described current raw material is sintering deposit, described original second flow sets interval particularly as follows: 50~80kg/s;
When described current raw material is coke, described original second flow sets interval particularly as follows: 50~100kg/s;
When described current raw material is pelletizing, described original second flow sets interval particularly as follows: 20~40kg/s;
When described current raw material is Australia ore deposit, described original second flow sets interval particularly as follows: 60~80kg/s;
When described current raw material is miscellaneous ore deposit, described original second flow sets interval particularly as follows: 60~80kg/s.
8. blast furnace burden screening control method as claimed in claim 1, it is characterised in that enter stove at the current raw material of described acquisition Second flow actual value after, described method also includes:
Persistently storage records each described second flow actual value, forms the second flow actual value set of every batch of material screening;
Described second flow actual value set is carried out contrast process, determines current optimal sieve from described second flow actual value set Divide control interval;
Replacing a upper screening control interval with described current optimal screening control interval, write is as described volume per second control district Between, wherein, a described upper screening control interval is that original second flow sets interval or upper one most preferably sieves control interval.
9. blast furnace burden screening control method as claimed in claim 1, it is characterised in that the current raw material of described acquisition enters stove Second flow actual value, including:
Weighing pot weight is gathered at each time point;
Weighing pot weight changing value is defined as described second flow actual value, wherein, described weighing pot divided by second level screening duration Weight changing value is the difference between the weighing pot gravimetric value of current point in time and the weighing pot gravimetric value of previous time point.
CN201610483203.XA 2016-06-28 2016-06-28 A kind of blast furnace burden screening control method Active CN106048111B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610483203.XA CN106048111B (en) 2016-06-28 2016-06-28 A kind of blast furnace burden screening control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610483203.XA CN106048111B (en) 2016-06-28 2016-06-28 A kind of blast furnace burden screening control method

Publications (2)

Publication Number Publication Date
CN106048111A true CN106048111A (en) 2016-10-26
CN106048111B CN106048111B (en) 2019-04-12

Family

ID=57166703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610483203.XA Active CN106048111B (en) 2016-06-28 2016-06-28 A kind of blast furnace burden screening control method

Country Status (1)

Country Link
CN (1) CN106048111B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574275A (en) * 2017-09-15 2018-01-12 首钢京唐钢铁联合有限责任公司 Prevent the method and device of furnace top material tank for blast furnace heavy burder
CN108254216A (en) * 2018-03-15 2018-07-06 攀钢集团西昌钢钒有限公司 Mineral aggregate sampling method, device and the readable storage medium storing program for executing of a kind of blast furnace
CN110274841A (en) * 2018-03-15 2019-09-24 中冶长天国际工程有限责任公司 The diagnostic method and device of screening process in sintering fuel granularmetric composition detection system
CN111703751A (en) * 2020-08-03 2020-09-25 广东韶钢松山股份有限公司 Bin mouth, discharging device and method
CN112322812A (en) * 2020-10-14 2021-02-05 首钢京唐钢铁联合有限责任公司 Method and device for controlling fuel charging of material tank
CN113219843A (en) * 2021-06-11 2021-08-06 武汉科技大学 Self-adaptive control system and method for dynamic load of screen surface of vibrating screen
CN114893138A (en) * 2022-05-10 2022-08-12 佰思迪(天津)科技有限公司 Pulse type negative pressure adsorption equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102402231A (en) * 2011-09-21 2012-04-04 河北省首钢迁安钢铁有限责任公司 Electric vibration discharging control method and system
CN102799116A (en) * 2011-05-24 2012-11-28 宝山钢铁股份有限公司 Multi-variety coke screening nonlinear control device and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102799116A (en) * 2011-05-24 2012-11-28 宝山钢铁股份有限公司 Multi-variety coke screening nonlinear control device and method
CN102402231A (en) * 2011-09-21 2012-04-04 河北省首钢迁安钢铁有限责任公司 Electric vibration discharging control method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘长江 等: ""京唐高炉精准布料实践"", 《矿冶(增刊)》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574275A (en) * 2017-09-15 2018-01-12 首钢京唐钢铁联合有限责任公司 Prevent the method and device of furnace top material tank for blast furnace heavy burder
CN107574275B (en) * 2017-09-15 2019-07-02 首钢京唐钢铁联合有限责任公司 Prevent the method and device of furnace top material tank for blast furnace heavy burder
CN108254216A (en) * 2018-03-15 2018-07-06 攀钢集团西昌钢钒有限公司 Mineral aggregate sampling method, device and the readable storage medium storing program for executing of a kind of blast furnace
CN110274841A (en) * 2018-03-15 2019-09-24 中冶长天国际工程有限责任公司 The diagnostic method and device of screening process in sintering fuel granularmetric composition detection system
CN108254216B (en) * 2018-03-15 2021-04-27 攀钢集团西昌钢钒有限公司 Method and device for sampling mineral aggregate of blast furnace tank and readable storage medium
CN110274841B (en) * 2018-03-15 2021-12-24 中冶长天国际工程有限责任公司 Diagnosis method and device for screening process in sintered fuel grain size composition detection system
CN111703751A (en) * 2020-08-03 2020-09-25 广东韶钢松山股份有限公司 Bin mouth, discharging device and method
CN112322812A (en) * 2020-10-14 2021-02-05 首钢京唐钢铁联合有限责任公司 Method and device for controlling fuel charging of material tank
CN112322812B (en) * 2020-10-14 2022-07-15 首钢京唐钢铁联合有限责任公司 Method and device for controlling fuel feeding of material tank
CN113219843A (en) * 2021-06-11 2021-08-06 武汉科技大学 Self-adaptive control system and method for dynamic load of screen surface of vibrating screen
CN114893138A (en) * 2022-05-10 2022-08-12 佰思迪(天津)科技有限公司 Pulse type negative pressure adsorption equipment
CN114893138B (en) * 2022-05-10 2023-11-17 佰思迪(天津)科技有限公司 Pulse type negative pressure adsorption equipment

Also Published As

Publication number Publication date
CN106048111B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN106048111A (en) Blast furnace burden screening control method
CN107377170B (en) Artificial gravel aggregate production system
CN206229696U (en) A kind of vertical particle tealeaves skimming screening plant
CN206292622U (en) Disk pelletizing intellectuality production control system
CN205813554U (en) A kind of tobacco processing line constant flux control system
CN108129050A (en) A kind of device and method for controlling product grain fineness number modulus
CN108345281B (en) Method for controlling ore feeding lumpiness ore blending in ore dressing process
CN104722237A (en) Complete production device for combusting coal water slurry
CN108940462A (en) A kind of On-Line Control Method of coking mixed coal smashing fineness
CN206778210U (en) A kind of system of compounding ingredient containing Iron Ore Powder
CN2249127Y (en) Adding-ratio controller for sintering added coal powder
CN101532081B (en) Method and device for optimizing sintering solid fuel mixing rate
CN110079667A (en) Material moisture regulating system and method in a kind of pelletizing production
CN102520691A (en) Burn-through point control system and method thereof
CN110639684B (en) Coordinated optimization control method of semi-final cement grinding system
CN204047861U (en) A kind of refining tea grading production line
CN205644257U (en) Cement raw feed proportioning system based on fuzzy matching and rate value feedback
CN103234351B (en) Control method for carbon content of sintered material
CN102799116B (en) Multi-variety coke screening nonlinear control device and method
CN213923210U (en) Sintering batching system
JP2012158813A (en) Charging method of sintering material
CN104927888B (en) The determination method of coking coal as-fired coal Task-size Controlling point
CN109988909A (en) A kind of material adjusting method and device for pelletizer
CN206199102U (en) A kind of biomass carbon base soil heavy metal passivant process units
CN111054512B (en) Ore crushing and grinding parameter control method and device in SABC crushing and grinding process system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant