CN106042154B - A kind of method that air passage is constructed in gypsum mold - Google Patents

A kind of method that air passage is constructed in gypsum mold Download PDF

Info

Publication number
CN106042154B
CN106042154B CN201610406541.3A CN201610406541A CN106042154B CN 106042154 B CN106042154 B CN 106042154B CN 201610406541 A CN201610406541 A CN 201610406541A CN 106042154 B CN106042154 B CN 106042154B
Authority
CN
China
Prior art keywords
copper pipe
gypsum mold
gypsum
mold
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610406541.3A
Other languages
Chinese (zh)
Other versions
CN106042154A (en
Inventor
张军
张帆
谌寰海
孙炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Hangkong University
Original Assignee
Nanchang Hangkong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Hangkong University filed Critical Nanchang Hangkong University
Priority to CN201610406541.3A priority Critical patent/CN106042154B/en
Publication of CN106042154A publication Critical patent/CN106042154A/en
Application granted granted Critical
Publication of CN106042154B publication Critical patent/CN106042154B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0008Venting channels, e.g. to avoid vacuum during demoulding or allowing air to escape during feeding, pressing or moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/34Moulds, cores, or mandrels of special material, e.g. destructible materials
    • B28B7/344Moulds, cores, or mandrels of special material, e.g. destructible materials from absorbent or liquid- or gas-permeable materials, e.g. plaster moulds in general

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The invention discloses a kind of methods that air passage is constructed in gypsum mold, it is beneficial to the quick-drying inner ventilation environment of gypsum mold for being configured with, including gypsum mold matrix, the prefabricated micropore copper pipe rack placed in gypsum mold, copper pipe rack leaves outlet in the outer surface of mold, room temperature or 35 100 DEG C air or compressed airs are passed to, rapid draing is carried out to gypsum mold.Copper pipe rack enhances the structural strength of gypsum mold, constructs smoothly ventilated environment in mould inside, drying efficiency is high, long lifespan, repeats and utilizes.

Description

A kind of method that air passage is constructed in gypsum mold
Technical field
The present invention relates to a kind of drying means of gypsum mold, and in particular to the building method of gypsum mold air passage.
Background technology
Gypsum mold in Production of Ceramics, for casting biscuit, gypsum mold absorbs the moisture in a large amount of biscuit of ceramics, Help the biscuit of ceramics drying demoulding.But using the method spontaneously dried, speed is very slow, and the method needs of heat drying is used to disappear Consume the substantial amounts of energy, it is thus proposed that improved method.Such as Chinese patent literature discloses a kind of fast rapid-curing cutback of gypsum mold Drying method [application number:200910229324.1], preparation be in gypsum mold be equipped at least one air passage;Then to logical Gas is passed through in air flue and carries out primary drying, gypsum mold is subjected to redrying afterwards, is down to water content in gypsum mold ≤20%.But using pre-buried flexible plastic tube when it makes air passage, the mode of extraction flexible plastic tube after gypsum mold is cured, Such way, reduces the structural strength of gypsum mold, air passage also not intercommunication, and drying efficiency is high not enough.In in another example State's patent document discloses a kind of pressurize-to-dry type gypsum mould [application number:200720061135.4], including by gypsum material Manufactured die body, is provided with the permeability cell of more a diameter of 0.5~3cm among die body thickness, and permeability cell is in netted or pectination Distribution, at intervals of 5~20cm, and between connect or commissure;Snorkel is additionally provided in die body, it can be defeated with air compressor Outlet pipe accordingly connects.But its permeability cell is connected by non-woven fabrics or gauze winding, and junction does not have intensity, is not easy to make fitting mould The rack of shape variation, structural strength is low, through-gauze of drying process or the easy aging fragmentation of non-woven fabrics of absorbing water repeatedly, such as It passes to the higher air of temperature gypsum mold is dried, then non-woven fabrics or gauze service life are lower, and structure is webbed It is simply ventilated with the aperture on tube wall between tracheae, not penetrated through really, air makes gypsum mold without smoothly flow channel is stablized It is uneven by tolerance, influence drying effect.
The content of the invention
It is an object of the invention to provide a kind of building methods of air passage in gypsum mold, and air passage is by netted micropore Copper pipe is formed, and steam hose is inserted into several air passages outlet being exposed on the outside of mold as air inlet, several outlets are the most Exhaust outlet, pass to room temperature or 35-100 DEG C of hot air or compressed air, the air quickly flowed take away in gypsum mold Moisture reduces the water content of biscuit of ceramics in mold, accelerates the speed of moulding adobe blocks of gypsum mold, improves production efficiency.
The present invention is achieved in that a kind of method that air passage is constructed in gypsum mold, including gypsum mold matrix, micro- Hole copper pipe rack;Prefabricated micropore copper pipe rack is positioned in gypsum mold matrix, and copper pipe rack is stayed in the outer surface of mold There is outlet, pass to air, micropore copper pipe rack integrally forms air passage in gypsum mold;The making material of gypsum mold matrix For gypsum and composite gypsum material, gypsum and composite gypsum material or it is one of which or is several mixtures;The micropore copper Pipe network frame is that one or several micropore copper pipes in gypsum mold matrix, copper pipe are evenly arranged according to the shape of gypsum mold Spacing 2-30cm is communicated with one another in advance with the method for soldering, and the center line of longitudinal micropore copper pipe passes through residing plaster matrix position Cross-section center line, the longitudinal section center line that the center line of horizontal micropore copper pipe passes through residing plaster matrix position;It is described micro- A diameter of 0.1-10cm of hole copper pipe;The micropore of the micropore copper pipe, a diameter of 0.1-20mm;The gypsum mold air passage is So formed:
It is characterized in that:
(1)Seal treatment immerses micropore copper pipe rack in 80 degrees Celsius or more the paraffin melted, and taking-up is placed in steel wire It is cooled to room temperature on plate;
(2)Several half-dried plaster blocks are placed in the mould turnover for turning over molding jig, the thickness of plaster block is gypsum mold matrix The half of bottom part thickness subtracts copper pipe radius, and the micropore copper pipe rack being welded is placed on plaster block, adjusts net Rack position, the distance for making its distance left and right and front and rear mould turnover side plate is equal, places mold core, injects calcium plaster;
(3)After calcium plaster solidification, mold core and mould turnover are removed, gypsum mold matrix is obtained, puts it into baking oven, per half 10 degrees Celsius of hour heating, until when heat preservation 1 is small after 100 degrees Celsius, is slowly cooled to room temperature;
(4)Wax removal water is poured into micropore copper pipe rack reserves mouth in gypsum mold outer surface, is rinsed repeatedly several times, It is dried up with compressed air, the construction complete of air passage;
Further, the air led in the air passage for room temperature or 35-100 DEG C of hot air or compressed air.
Further, when being passed through air in reserving mouth in mold outer surface to copper pipe rack, several outlets is selected to make For air inlet, several outlets are left as exhaust outlet.
The present invention has the following advantages:
Air passage is communicated and reticulated by the welding of transverse direction and longitudinal direction micropore copper pipe, and copper pipe can be pre- according to the shape of gypsum mold First design, be relatively evenly arranged in the centre position of gypsum mold matrix thickness, gypsum mold matrix position of different shapes by Tolerance is more uniform, and drying efficiency is high;Netted micropore copper pipe skeleton needs not to be removed, forms the skeleton of gypsum mold, makes plaster mold The structural strength of tool greatly improves, and repeats and utilizes, while the thermal conductivity factor of copper material is high, hot-air is passed through, to gypsum mold Drying efficiency higher.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
10. gypsum mold matrix, 100. micropore copper pipe rack 101. exports in the figure
1001. longitudinal horizontal micropore copper pipes of micropore copper pipe 1002..
Specific embodiment
The embodiment of the present invention is described in further detail below in conjunction with description of the drawings, but the present embodiment is not used to limit The scope of the present invention processed, every similar structure using the present invention and its similar variation, should all be included in protection scope of the present invention.
As shown in Figure 1, the present invention is such to work and implementation, a kind of method that air passage is constructed in gypsum mold, Including gypsum mold matrix 10, prefabricated micropore copper pipe rack 100 is placed in gypsum mold, copper pipe rack is in the outer of mold Outlet 101 is left on surface, passes to air, and micropore copper pipe rack 100 is whole to form air passage in gypsum mold.Manufacturing process is such as Under:
A. calculated according to the shape of gypsum mold matrix 10 as a result, a longitudinal micropore copper pipe is placed in longitudinal direction every 10cm 1001, laterally a horizontal micropore copper pipe 1002 is placed every 8cm;Being bent into it with diameter 1cm copper pipes will riding position stone Longitudinal copper pipe is made in the shape at 10 longitudinal cross-section center of cream die matrix, and being bent into it with diameter 1cm copper pipes will riding position Horizontal copper pipe is made in the shape at 10 lateral cross section center of gypsum mold matrix;8 row of hole of the upper uniform drill straight footpath 1mm of drilling machine, wherein Longitudinal copper pipe reserves exit and 5cm is stayed not drill;Longitudinal micropore copper pipe 1001 is every the through hole of 8cm drill straights footpath 6mm;It will be laterally micro- Hole copper pipe 1002 is blocked according to calculating, every projected length 9cm;By above-mentioned longitudinal micropore copper pipe 1001 and horizontal micropore copper pipe 1002 are welded into designed rack, composition micropore copper pipe rack 100;
B. micropore copper pipe rack 100 is immersed in 80 degrees Celsius or more the paraffin melted, taking-up is placed in cold on expanded sheet metal But to room temperature, closed porosity;
C. several half-dried plaster blocks are placed in the mould turnover for turning over molding jig, the thickness of plaster block is gypsum mold matrix bottom The half subduction copper pipe radius of portion's segment thickness, the micropore copper pipe rack 100 being welded is placed on plaster block, is adjusted Rack position, the distance for making its distance left and right and front and rear mould turnover side plate is equal, places mold core, injects calcium plaster;
D. after calcium plaster solidification, mold core and mould turnover is removed, gypsum mold matrix 10 is obtained, puts it into baking oven, often Half an hour heats up 10 degrees Celsius, until when heat preservation 1 is small after 100 degrees Celsius, is slowly cooled to room temperature;
E. Wax removal water is poured into micropore copper pipe rack stays rack outlet 101 in gypsum mold outer surface, rinses 3 repeatedly It is secondary, it is passed through rack outlet drying, the construction complete of air passage with compressed air.
F. after biscuit of ceramics has moulded shape in gypsum mold, 2 racks are exported 101 as air inlet, remaining is as row Gas port is passed through the air that temperature is 50 DEG C or so into air passage, gypsum mold matrix 10 and biscuit of ceramics is dried.

Claims (3)

1. the method for air passage is constructed in a kind of gypsum mold, including gypsum mold matrix, micropore copper pipe rack;Prefabricated is micro- Hole copper pipe rack is positioned in gypsum mold matrix, and copper pipe rack leaves outlet in the outer surface of mold, passes to air, micropore copper Pipe network frame integrally forms air passage in gypsum mold;The making material of gypsum mold matrix be gypsum and composite gypsum material, Gypsum and composite gypsum material are one of which or are several mixtures;The micropore copper pipe rack is according to gypsum mold Be evenly arranged in gypsum mold matrix one of shape or several micropore copper pipes, plumbers shed use soldering in advance away from 2-30cm Method communicate with one another, the center line of longitudinal micropore copper pipe is laterally micro- by the cross-section center line of residing plaster matrix position The longitudinal section center line that the center line of hole copper pipe passes through residing plaster matrix position;A diameter of 0.1- of the micropore copper pipe 10cm;The micropore of the micropore copper pipe, a diameter of 0.1-20mm;What the gypsum mold air passage was formed by:
It is characterized in that:
(1)Seal treatment immerses micropore copper pipe rack in 80 degrees Celsius or more the paraffin melted, and taking-up is placed on expanded sheet metal It is cooled to room temperature;
(2)Several half-dried plaster blocks are placed in the mould turnover for turning over molding jig, the thickness of plaster block is gypsum mold base bottom The half of segment thickness subtracts copper pipe radius, and the micropore copper pipe rack being welded is placed on plaster block, adjustment rack position It puts, the distance for making its distance left and right and front and rear mould turnover side plate is equal, places mold core, injects calcium plaster;
(3)After calcium plaster solidification, mold core and mould turnover are removed, gypsum mold matrix is obtained, puts it into baking oven, per half an hour 10 degrees Celsius of heating until when heat preservation 1 is small after 100 degrees Celsius, is slowly cooled to room temperature;
(4)Wax removal water is poured into micropore copper pipe rack reserves mouth in gypsum mold outer surface, is rinsed repeatedly several times, with pressure Contracting air blow drying, the construction complete of air passage.
2. the method for air passage is constructed in a kind of gypsum mold according to claim 1, it is characterised in that:In the air passage The air led to for room temperature or 35-100 DEG C of hot air or compressed air.
3. the method for air passage is constructed in a kind of gypsum mold according to claim 1, it is characterised in that:To copper pipe rack When mold outer surface reserves and is passed through air in mouth, several outlets is selected to leave several outlets as row as air inlet Gas port.
CN201610406541.3A 2016-06-12 2016-06-12 A kind of method that air passage is constructed in gypsum mold Expired - Fee Related CN106042154B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610406541.3A CN106042154B (en) 2016-06-12 2016-06-12 A kind of method that air passage is constructed in gypsum mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610406541.3A CN106042154B (en) 2016-06-12 2016-06-12 A kind of method that air passage is constructed in gypsum mold

Publications (2)

Publication Number Publication Date
CN106042154A CN106042154A (en) 2016-10-26
CN106042154B true CN106042154B (en) 2018-05-29

Family

ID=57170787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610406541.3A Expired - Fee Related CN106042154B (en) 2016-06-12 2016-06-12 A kind of method that air passage is constructed in gypsum mold

Country Status (1)

Country Link
CN (1) CN106042154B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114055601B (en) * 2021-07-30 2023-04-14 东阳森久玩具有限公司 Production process of plastic compression product

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1103906A (en) * 1979-06-15 1981-06-30 John S. Bramwell Mould for casting ceramic slip
CN101284394A (en) * 2008-02-13 2008-10-15 崔学会 Pressure blank injecting, pressure drying gypsum mould and preparation method thereof
CN103042592A (en) * 2013-01-22 2013-04-17 洛阳市闻洲瓷业有限公司 Low-pressure fast-drainage plaster mold and manufacturing method
CN202934687U (en) * 2012-12-03 2013-05-15 洛阳市闻洲瓷业有限公司 Low pressure fast drainage plaster mold
CN204471554U (en) * 2015-01-20 2015-07-15 云南盛凌瓷业有限公司 Be provided with the air pressure rapid draing gypsum mold of protective layer
CN204818060U (en) * 2015-06-30 2015-12-02 成都易态科技有限公司 Design exhaust frock

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1103906A (en) * 1979-06-15 1981-06-30 John S. Bramwell Mould for casting ceramic slip
CN101284394A (en) * 2008-02-13 2008-10-15 崔学会 Pressure blank injecting, pressure drying gypsum mould and preparation method thereof
CN202934687U (en) * 2012-12-03 2013-05-15 洛阳市闻洲瓷业有限公司 Low pressure fast drainage plaster mold
CN103042592A (en) * 2013-01-22 2013-04-17 洛阳市闻洲瓷业有限公司 Low-pressure fast-drainage plaster mold and manufacturing method
CN204471554U (en) * 2015-01-20 2015-07-15 云南盛凌瓷业有限公司 Be provided with the air pressure rapid draing gypsum mold of protective layer
CN204818060U (en) * 2015-06-30 2015-12-02 成都易态科技有限公司 Design exhaust frock

Also Published As

Publication number Publication date
CN106042154A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN103071765A (en) Partial air cooling method for precast aperture passage in investment casting shell
FI84806B (en) BOEJNINGS- ELLER STOEDFORM FOER GLASSKIVOR.
CN106042154B (en) A kind of method that air passage is constructed in gypsum mold
CN102802835A (en) Core box with air vents integrated in pins
CN102463652A (en) Water and air separation type expandable polystyrene (EPS) foam plastic mold
CN106426768A (en) Automobile grille machining mold
CN206106238U (en) Car grill mold processing
JP2011513067A (en) Anode casting method and apparatus
US20090162465A1 (en) Method of Producing a Vulcanizing Mold with a Number of Profile Segments that can be Joined Together to Form a Circumferentially Closed Mold, and Vulcanizing Mold
CN212419520U (en) Wax mold dewaxing device for investment casting
KR102224908B1 (en) Anti-clogging mold and process for production thereof
CN205704628U (en) A kind of gypsum mold
CN103056311B (en) Process for shaping furnace outlet nozzle of calcium carbide smelting furnace by using V method
CN209830191U (en) Investment casting mould
CN214834171U (en) Foaming concrete layer exhaust dehumidification structure
CN203330401U (en) Feed box interlayer air inflow device of metal powder injection molding vacuum degreasing sintering furnace
CN209466402U (en) A kind of prefabricated panel mold
CN112620580A (en) Shell making process for long-hole castings
US20030010469A1 (en) Device and method for casting a workpiece and workpiece
CN106150524B (en) A kind of device producing tunnel water handling non-fine concrete building block
CN209304764U (en) The production system of precast concrete pile
CN105108164B (en) The material block cutting device of iron alloy grain casting machine
CN105034282A (en) Ejection cold-runner mould of automobile rubber vent pipe
ES2233210B1 (en) PROCEDURE OF MANUFACTURE OF EMPLOYED QUICK MOLDS FOR TRANSFORMATION OF PLASTIC AND MOLD AS GOT.
CN210161504U (en) PIR material casting mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

Termination date: 20190612

CF01 Termination of patent right due to non-payment of annual fee