CN106041411A - Method for repairing high-temperature superheater access header - Google Patents
Method for repairing high-temperature superheater access header Download PDFInfo
- Publication number
- CN106041411A CN106041411A CN201610706191.2A CN201610706191A CN106041411A CN 106041411 A CN106041411 A CN 106041411A CN 201610706191 A CN201610706191 A CN 201610706191A CN 106041411 A CN106041411 A CN 106041411A
- Authority
- CN
- China
- Prior art keywords
- header
- hole
- arm
- welding
- connecting tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P6/00—Restoring or reconditioning objects
- B23P6/04—Repairing fractures or cracked metal parts or products, e.g. castings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
A method for repairing a high-temperature superheater access header belongs to the field of thermal power generation and includes the following steps: 1, cutting away the part of a fourth support tube from the bottom of the header to a support tube linear part; 2, making a welding socket hole in the header; 3, changing a connecting tube; 4, welding the connecting tube between the header and the support tube remaining part; 5, thermally treating the welded part online; the welding socket hole is arranged at the original fourth support tube and header welded position on the header and is a stepped hole, including a through hole, a terrace and an expanded hole; the through hole is communicated with the header; the terrace is perpendicular to the through hole, is in a circular shape and is concentric with the through hole; the expanded hole is arranged in the terrace and concentric with the through hole, the defect that the fourth support tube for the high-temperature superheater access container easily experiences weld cracking due to stress produced by insufficient curvature can be overcome, and normal operation of the header can be guaranteed.
Description
Technical field
The invention belongs to steam power plant field, enter particularly to a kind of thermal power plant steam boiler high temperature superheater
Outlet header restorative procedure.
Background technology
In thermal power generation corporations, it is dependent on steam boiler combust fuel, water heating is become the steam of High Temperature High Pressure, pushes away
Dynamic steam turbine rotates, and drives electromotor to carry out generating electricity;In the application of steam, in order to ensure that steam is unlikely to produce when application
Raw too much moisture, often keeps the condition of high temperature of steam, enters into header, be redistributed in each lateral, be beneficial to
The reasonable application of steam;In existing high temperature superheater imports and exports header, major part is to use header many distributed about little
Pipe, superheater steam pressure 13.7MPa, 540 ° of C of temperature, wherein the material of high temperature superheater header is 12Cr1MoV, conventional rule
Lattice are diameter 325 millimeters, wall thickness 50 millimeters, and the material of branched pipe is 12Cr1MoV, and specification is diameter 42 millimeters, wall thickness 5.5
Millimeter, proves through working practice, finds often occur from single 4th base inwards of high temperature superheater outlet header base
There is crackle in root, and through repeatedly repairing, this root arm becomes high temperature superheater outlet header and is easily damaged centrostigma.
Summary of the invention
For in the 4th phenomenon that pipe is easily damaged of thermal power plant high temperature superheater outlet header, the present inventor is carried out
Conscientiously studying, finding out its reason is that the 4th arm occurs that due to position limitation curvature is inadequate, causes when expanding with heat and contract with cold the
At four arms and header welding, stress is excessive, cracks, and the method used when repairing is incorrect, and therefore, the present invention carries
Go out a kind of high temperature superheater import and export header restorative procedure, it is characterised in that: comprise the following steps: 1, by the 4th arm from
Header root excises to arm straight line portion;2, in header, welding bore is made;3, connecting tube is changed;4, connecting tube is welded
To between header and arm remainder;5, the part that butt welding is taken over carries out burning optimization on line;Described step 1 is employing instrument
Seam is had the arm of crackle, cuts off at header, then the other end of arm is cut from the line part of the 4th arm
Disconnected, and take off;Described step 2 is at original header the 4th tube socket, re-works the butt hole of branched pipe;Institute
The step 3 stated is by the part of the 4th arm removed, and uses the connecting tube of new construction to be replaced;Described step 4 is
Between branch holder and the 4th arm of residue that the connecting tube of new construction is welded in header;Described step 5 is to connect
Pipe carries out heat treatment, to eliminate stress with header and original 4th arm straight line portion weld and near zone.
Described welding bore is arranged at original 4th arm of header and header welding, for stepped ramp type hole, including
Through hole, platform, reaming;Described through hole and header internal run-through;Described platform is vertical with through hole, for circular and same with through hole
The heart;Described reaming is arranged on platform, concentric with through hole;Wherein a diameter of 65mm of reaming, hole depth is 4-5mm.
Described connecting tube, including body, the first bending, the second bending, the 3rd bending, step;Described body material
Identical with original 4th arm with diameter and wall thickness;The first described sweep is arranged on body top, curved to second
The lateral separation of bent portions is not less than 50 millimeters;The second described bending is arranged on the middle part of body, the second described bending section
The length divided is not less than 300 millimeters, and transverse curvature is not less than 50 millimeters;The 3rd described bending is arranged on the bottom of body;Institute
The step stated is arranged on body two ends, and the outer dia of step part is more than body outer dia 1-2 millimeter.
Burning optimization on line in described step 5 be use electrical heating elements, by the header near weld seam and weld seam and
Pipe wraps up, and uses temperature controller that its heating-up temperature is carried out temperature and time control;Electrical heating elements therein is heating
Rope;Described heating rope includes heating wire, asbestos cord;Described heating wire is wrapped in the middle of asbestos cord, and two ends are with power supply even
Logical;Described asbestos cord swathes the outside at heating wire, it is ensured that heating wire is wrapped without exposed completely, forms flexible heater rope.
Described welding parameter is: butt weld uses complete manual argon welding weldering welding;Welding current 110-120A;Arm pipe
Row imports and exports header welding with high temperature superheater, uses plug-in type, angle welding ground floor bottom argon arc welding welding method, one side
Weldering double-faced forming, welding current 110-125A, second and third layer R317 welding rod, Ф 3.2mm;Second layer electric current 105-110A, the
Three layers of electric current 108-1103A;Use welding machine is ZX7-400S, and striking mode is high-frequency arc strike, and argon arc welding is 160 types model,
Torch neck a diameter of Ф 10mm, argon flow amount is 8-10ml, and argon arc welding electrode uses cerium crow extremely rod to be Ф 2.5mm, welding wire type
Number being R31, gage of wire is 2.5mm.
Described heat treatment parameter is: heat treatment uses high tempering;Temperature 730 ± 10 DEG C. warming and cooling rate:
125℃/h;Constant temperature time: 210 minutes;In temperature-fall period, temperature can not control below 300 DEG C;Overall process automatically dotting is remembered
Record.
Beneficial effect
The beneficial effects of the present invention is, it is possible to overcome owing to high temperature superheater imports and exports the 4th arm of header due to curvature not
Enough produce stress and easily cause the defect of bead crack, it is ensured that header normally works.
Accompanying drawing explanation
Fig. 1 is the arm connection diagram that existing high temperature superheater imports and exports header
1. header, 2. the first arm, 3. the second arm, 4. the 3rd arm, 6. the 4th arm.
Fig. 2 is the arm connection diagram that the high temperature superheater after repairing imports and exports header
1. header, 2. the first arm, 3. the second arm, 4. the 3rd arm, 5. connecting tube, 6. the 4th arm.
Fig. 3 is the structural representation of connecting tube
51. bodys, 52. first bendings, 53. second bendings, 54. the 3rd bendings, 55. steps.
Fig. 4 is the structural representation of base in header
1. header, 11. through holes, 12. platforms, 13. reamings.
Fig. 5 is the structural representation of heating rope
71. heating wire, 72. asbestos cords.
Fig. 6 is the temperature profile of burning optimization on line after welding
Wherein abscissa is time coordinate, and vertical coordinate is temperature coordinate.
Detailed description of the invention
In order to further illustrate technical scheme, further illustrate the specific embodiment party of the present invention in conjunction with accompanying drawing
Formula, as in Fig. 3, this example with WGZ670/13.7-12 type boiler, evaporation capacity is 670t/h, superheater steam pressure
13.7MPa, as a example by the supporting high temperature superheater of temperature 540 DEG C imports and exports header, selects diameter 42 millimeters, wall thickness in this example
5.5 millimeters, material is 12Cr1MoV, steel pipe as body 51, selecting the first bending 52 is 150 to the distance of body 51 upper end
Millimeter, the lateral separation to the second bending 53 is 80 millimeters, fore-and-aft distance 200 millimeters, selects the second bending 53 to the 3rd bending
The lateral separation of 54 is 80 millimeters, and fore-and-aft distance is 200 millimeters, and selecting the 3rd bending 54 is 150 to the distance of body 51 lower end
Millimeter, processes the step 55 of a diameter of 41 mm length 20 millimeters, just completes the enforcement of connecting tube 5 at body 51 two ends;
Owing to have employed three crooked positions, adding the 4th arm 6 extendable room when expanding with heat and contract with cold, stress is disappeared by these bendings
Consumption, without concentrating on the commissure between the 4th arm 6 and header 1, the most just decreases the probability that this weld seam cracks, subtracts
Lack header and repaired number of times, improve work efficiency.
As a example by the pipe of a diameter of 42 millimeters of the 4th arm 6 of selection in Fig. 4, this example, selecting base structure is through hole 11
Diameter 30 millimeters, diameter 65 mm depth of reaming 13 is 5 millimeters, and reaming 13 is concentric with through hole 11, reaming 13 and through hole 11
Intersection constitutes platform 12, this completes the enforcement of base in header 1, owing to have employed reaming 13 and platform 12 so that
Space even uniform is welded, it is ensured that weld strength and stress are uniform between 4th arm 6 and header 1.
As Fig. 5, this example selected the heating wire of commercially available electric blanket as heating wire 71, select diameter 4-5 millimeter
Asbestos cord 72, as asbestos cord 72, is closely wrapped in the outside of heating wire 71, forms the enforcement of heating rope by asbestos cord uniformly,
Due to the spatial complex between arm and header 1, using heating rope can preferably adapt to the covering of zones of different, heating is all
Even;Owing to have employed heating wire 71 as thermal source, it is possible to control heating curves and heating-up temperature easily.
As in Fig. 2, this example with WGZ670/13.7-12 type boiler, evaporation capacity is 670t/h, superheater steam pressure
13.7MPa, as a example by the supporting high temperature superheater of temperature 540 DEG C imports and exports header, by the 4th arm 6 from root resection length
700 millimeters, the mouth of pipe of remaining 4th arm 6 is made groove and is beneficial to welding, by the junction of the 4th arm 6 in header 1
Base, produce aforementioned structure and shape, the platform 12 that connecting tube 5 one end and base are alignd and concentric with through hole 11,
By the other end and the mouth of pipe docking of the 4th arm 6 remainder of connecting tube 5, welding, butt weld uses complete manual argon
Weldering weldering welding;Welding current 110-120A;Arm bank of tubes imports and exports header welding with high temperature superheater, uses plug-in type, fillet welding
Seam ground floor bottom argon arc welding welding method, single face welding and double face shaping, welding current 110-125A, second and third layer R317
Welding rod, Ф 3.2mm;Second layer electric current 105-110A, third layer electric current 108-1103A;Use welding machine is ZX7-400S, striking side
Formula is high-frequency arc strike, and argon arc welding is 160 types model, torch neck a diameter of Ф 10mm, and argon flow amount is 8-10ml, argon arc welding
Electrode uses cerium crow extremely rod to be Ф 2.5mm, and welding wire model is R31, and gage of wire is 2.5mm;So ensure that weld seam is heated
Uniformly, it is connected firmly.
Such as Fig. 6, heating rope is respectively wound around header 1 and the 4th arm 6 and the outside of connecting tube 5, switches on power and control
Device processed, uses high tempering to carry out burning optimization on line;Temperature 730 ± 10 DEG C. warming and cooling rate: 125 DEG C/h;Constant temperature
Time: 210 minutes;In temperature-fall period, temperature can not control below 300 DEG C;Overall process automatically dotting record, the completeest
Become elimination welding stress, it is ensured that the work of welding quality.It was verified that the 4th arm 6 after the method is repaired, do not have
The defects such as the weld cracking that is similar to occurred again.
Claims (1)
1. high temperature superheater imports and exports a restorative procedure for header, comprises the following steps: 1, by the 4th arm from header root
Portion excises to arm straight line portion;2, in header, welding bore is made;3, connecting tube is changed;4, connecting tube is welded to header
And between arm remainder;5, the part that butt welding is taken over carries out burning optimization on line;Described step 1 is that employing instrument is by interface
There is the arm of crackle at place, cuts off at header, is then cut off from the straight line portion of the 4th arm by the other end of arm, and takes
Under;Described step 2 is at original header the 4th tube socket, re-works the butt hole of branched pipe;Described step
Rapid 3 is by the part of the 4th arm removed, and uses the connecting tube of new construction to be replaced;Described step 4 is newly to tie
Between branch holder and the 4th arm of residue that the connecting tube of structure is welded in header;Described step 5 is by connecting tube and collection
Case and original 4th arm straight line portion weld and near zone carry out heat treatment, to eliminate stress;It is characterized in that: institute
The welding bore stated is arranged at original 4th arm of header and header welding, for stepped ramp type hole, including through hole, and platform,
Reaming;Described through hole and header internal run-through;Described platform is vertical with through hole, for circular and concentric with through hole;Described
Reaming is arranged on platform, concentric with through hole;Wherein a diameter of 65mm of reaming, hole depth is 4-5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610706191.2A CN106041411B (en) | 2016-08-23 | 2016-08-23 | A kind of high temperature superheater imports and exports header restorative procedure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610706191.2A CN106041411B (en) | 2016-08-23 | 2016-08-23 | A kind of high temperature superheater imports and exports header restorative procedure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106041411A true CN106041411A (en) | 2016-10-26 |
CN106041411B CN106041411B (en) | 2018-01-05 |
Family
ID=57195008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610706191.2A Expired - Fee Related CN106041411B (en) | 2016-08-23 | 2016-08-23 | A kind of high temperature superheater imports and exports header restorative procedure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106041411B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112916990A (en) * | 2021-01-26 | 2021-06-08 | 中广核核电运营有限公司 | Replacement method of nuclear grade branch pipe seat |
CN118617035A (en) * | 2024-08-09 | 2024-09-10 | 淄博索雷工业设备维护技术有限公司 | Equipment and method for rapidly repairing transmission shaft |
CN118617035B (en) * | 2024-08-09 | 2024-10-22 | 淄博索雷工业设备维护技术有限公司 | Equipment and method for rapidly repairing transmission shaft |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4687894A (en) * | 1985-05-29 | 1987-08-18 | Daiichi Koshuha Kogyo Kabushiki Kaisha | Induction heating method and apparatus for relieving residual stress in welded joints in pipe line |
EP0477066A1 (en) * | 1990-09-19 | 1992-03-25 | Framatome | Method of replacing a tube of a heat exchanger and application of this method |
CN202549158U (en) * | 2012-03-14 | 2012-11-21 | 中国神华能源股份有限公司 | Weld holder |
CN103170712A (en) * | 2013-03-29 | 2013-06-26 | 东方电气集团东方锅炉股份有限公司 | Tube socket fillet weld reheat crack prevention method |
CN104789749A (en) * | 2015-03-31 | 2015-07-22 | 中国神华能源股份有限公司 | Method for heat treatment of welded joint in tube panel |
-
2016
- 2016-08-23 CN CN201610706191.2A patent/CN106041411B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4687894A (en) * | 1985-05-29 | 1987-08-18 | Daiichi Koshuha Kogyo Kabushiki Kaisha | Induction heating method and apparatus for relieving residual stress in welded joints in pipe line |
EP0477066A1 (en) * | 1990-09-19 | 1992-03-25 | Framatome | Method of replacing a tube of a heat exchanger and application of this method |
CN202549158U (en) * | 2012-03-14 | 2012-11-21 | 中国神华能源股份有限公司 | Weld holder |
CN103170712A (en) * | 2013-03-29 | 2013-06-26 | 东方电气集团东方锅炉股份有限公司 | Tube socket fillet weld reheat crack prevention method |
CN104789749A (en) * | 2015-03-31 | 2015-07-22 | 中国神华能源股份有限公司 | Method for heat treatment of welded joint in tube panel |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112916990A (en) * | 2021-01-26 | 2021-06-08 | 中广核核电运营有限公司 | Replacement method of nuclear grade branch pipe seat |
CN118617035A (en) * | 2024-08-09 | 2024-09-10 | 淄博索雷工业设备维护技术有限公司 | Equipment and method for rapidly repairing transmission shaft |
CN118617035B (en) * | 2024-08-09 | 2024-10-22 | 淄博索雷工业设备维护技术有限公司 | Equipment and method for rapidly repairing transmission shaft |
Also Published As
Publication number | Publication date |
---|---|
CN106041411B (en) | 2018-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104985305B (en) | Improved steel pipe and hubbed flange butt joint submerged-arc welding | |
CN103267281B (en) | Deposition robot and deposition method for water-cooled wall of fluidized bed boiler | |
CN105665898A (en) | Automatic submerged arc welding method for pearlitic heat-resistant steel composite board | |
CN104084675A (en) | High temperature nickel base alloy welding process | |
CN106041411B (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN106702129A (en) | Post-weld heat treatment process | |
CN110814560A (en) | Large-caliber G115 pipeline on-site welding method | |
CN107706126A (en) | A kind of vertical bell jar and processing method | |
CN107900496A (en) | A kind of 45# steel main shaft and 45# steel flange disk welding methods | |
CN106180989A (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN106180987A (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN106238858A (en) | A kind of welding method of low-temperature steel structure | |
CN206084287U (en) | High temperature over heater exit collection case connecting pipe for restoration | |
CN206105283U (en) | High temperature over heater exit collection case welded seat hole for restoration | |
CN206123037U (en) | It restores power consumption heating element to be used for high temperature over heater to import and export collection case | |
CN103481008B (en) | Deep-hole repair welding technology | |
CN106239029B (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN110773839A (en) | Welding process method for preventing repair welding cracks of nickel-based alloy bent pipe | |
CN106112383B (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN106180988A (en) | A kind of high temperature superheater imports and exports header restorative procedure | |
CN101053921A (en) | Large and medium mixed-flow water turbine rotary wheel mixed gas protection welding technology | |
CN111136366A (en) | Welding process for high-pressure seamless steel pipe | |
CN111334649A (en) | G115 steel small-diameter pipe heat treatment method through flexible ceramic resistance heating | |
CN111136398A (en) | Boiler pipeline butt welding process | |
CN112176160B (en) | On-site composite heat treatment method for pipe connecting seat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 Termination date: 20190823 |
|
CF01 | Termination of patent right due to non-payment of annual fee |