A kind of densification tower structure suitable for SVG
Technical field
The invention belongs to power grid transmission & distribution electro-technical fields, and in particular to a kind of densification tower structure suitable for SVG.
Background technique
As power industry rapidly develops, demand will keep lasting, quick growth trend and demand size is increasing
Greatly, current China's electric utility reliability requirement is high, practical;Economic benefit is prominent;Energy conservation, environmental protection efficiently become main
Trend.Due to the continuous development of transmission system, reactive requirement and compensation position are stepped up, and reactive compensation is wanted in other places
Asking may sharply increase, can be to being it is necessary to establish a kind of mobile reactive compensation system while meeting fixed SVG
The place transfer that emergency of uniting is idle, quickly to put into operation.
Mobile SVG can satisfy the idle occasion of a variety of urgent needs, however in order to realize the removable of SVG equipment, it is necessary to
Equipment volume must be made small, light-weight, structural strength is high, in terms of meeting various transports and substation place to size, weight, antidetonation
Requirement.
Conventional SVG equipment is mounted on module in metal cabinet built-in electrical insulation frame, and cabinet body is then fixed on house
It is interior, or be fixed in container.Since many problems can be brought using metal cabinet: complete under high voltage use environment
Device volume is big, difficult to install than heavier, at high cost, is easy to produce shelf depreciation etc..
In view of this, it is necessary to provide a kind of densification tower structures suitable for SVG, to solve the above problems.
Summary of the invention
For problem and the shortcomings of the prior art pointed in background technique, the purpose of the present invention is to provide one
Kind is suitable for the densification tower structure of SVG, and densification frame-type layout can effectively solve to improve in above-mentioned background technique
The problem of mentioning, densification frame-type of the invention are laid out SVG, both can satisfy the installation in fixed house, and also can satisfy
Installation inside mobile container.
To achieve the goals above, the technical scheme adopted by the invention is that: a kind of densification frame-type suitable for SVG
Structure, which is characterized in that main building block has: cabinet, hollow square tube epoxy pulling modeling corner post, SVG power module, groove profile
Angle, SVG module guide rail and cabling channel are moulded in epoxy pulling;Wherein:
Cabinet main body frame is welded by I-steel and rectangular steel pipe, the bottom of box and top there are specific aperture,
Corner post is moulded for fixation hollow square tube epoxy pulling, hollow square tube epoxy pulling modeling corner post upper and lower side is separately connected cabinet
Bottom and top, guarantee completely vertical at the top of hollow square tube epoxy pulling modeling corner post and the bottom of box;
The cross-brace beam of SVG module guide rail moulds angle using the pulling of groove profile epoxy, and angle and hollow is moulded in groove profile epoxy pulling
Square tube epoxy pulling modeling corner post is vertically fixed, and groove profile epoxy pulling modeling angle arranges three layers from the bottom up, and every layer is a phase, according to
Electrical design is respectively defined as A B C three-phase;SVG power module is successively carried out every layer of module by copper bar according to electrical principle
Connection;
Groove profile epoxy pulling moulds the groove surface at angle outward, and the cabling channel for placing optical fiber is installed on groove profile epoxy pulling modeling
In angle and fasten.
Further, cabinet as described in the above technical scheme includes top plate, side plate, lining and bottom plate, wherein top plate
And side plate uses corrosion-resistant structure hot continuous-milling steel plate;Lining is used with meshed silencing cotton colored steel;Bottom plate is divided into two layers,
Upper plate uses rib aluminium sheet, and screw is fixed convenient for wiring disassembly, lower plate use cold-rolled steel sheet and cabinet base directly to weld for
One.
Further, hollow square tube epoxy pulling modeling corner post as described in the above technical scheme and groove profile epoxy pulling modeling
Angle only needs to carry out the fixed installation that frame can be completed of simple vertical and transverse lap.
Further, hollow square tube epoxy pulling modeling corner post as described in the above technical scheme and groove profile epoxy pulling modeling
The selection of dimension at angle must be determined according to the weight of SVG power module and transporting with the stress condition under seismology.
Further, groove profile epoxy pulling as described in the above technical scheme moulds one layer of angle bottommost and arrives bottom of box metal
The distance between component needs to meet the electric clearance and creepage distance of system voltage.
Compared with prior art, the present invention is with following the utility model has the advantages that densification tower structure provided by the invention
SVG (static synchronous compensator) is widely used in the biggish enterprise of the electric loads such as power grid, wind power plant, coal mine, steel mill, is used for
Balance network voltage, the functions such as compensation power factor, the effective stability for improving network system.The structure is as SVG module
Insulating supporting, the installation of multi-quantity SVG module can be suitble to, be reasonably electrically connected, while may be implemented in high electricity
The insulation of pressure.Densification tower structure is since with small in size, convenient for installation and maintenance, electrical insulation properties are good, at low cost
The advantages that, it is suitable for indoor location, the installation of movable container inside, equipment manufacturing costs can be reduced.Densification frame
Formula structure has following four outstanding advantages:
1, electrical insulation properties are good: conventional SVG equipment uses metallic supports, can increase the spacing between two layers, and
Under high voltages and its it is easy to produce partial discharge phenomenon, will affect service life of equipment, will cause accident when serious;And it uses
It can reduce the spacing between two layers behind groove profile epoxy pulling modeling angle, partial discharge phenomenon will not occur.
2, occupied area is small: every phase (layer) module is successively attached by SVG module according to electrical principle by copper bar, is made
Equipment is more clear in maintenance and maintenance;After moulding angle section frame using epoxy pulling, since it is with good insulating properties
Can, device structure can be made more compact to reduce the occupied area of equipment;According to practical engineering calculation, using this densification
Tower structure layout can save 30% occupied area relative to the cabinet type mounting means of tradition;Save 20% manufacturing cost.
3, simple and compact for structure, convenient for assembly and in-site installation;Densification frame-type of the invention is laid out SVG, structure letter
It is single compact, it both can satisfy the installation in fixed house, and also can satisfy the installation inside mobile container.
4, manufacture processing cost is low;It is simple relative to conventional metalwork processing that angle is moulded in epoxy pulling, it is only necessary to carry out
It is simple to cut and punch, therefore, it can significantly save manufacturing cost.
Detailed description of the invention
Fig. 1 and Fig. 2 is the schematic layout pattern of the densification tower structure suitable for SVG of the invention.
Fig. 3 and Fig. 4 is the scheme of installation that angle is moulded in the hollow square tube epoxy pulling of the present invention.
Fig. 5 and Fig. 6 is the schematic diagram that angle section is moulded in the hollow square tube epoxy pulling of the present invention.
Fig. 7 and Fig. 8 is the schematic diagram that angle section is moulded in groove profile epoxy pulling of the present invention.
Fig. 9 is the electrical connection schematic diagram of the densification tower structure suitable for SVG of the invention.
Symbol description in attached drawing: corner post, 3SVG power module, 4 groove profile rings are moulded in 1 cabinet, 2 hollow square tube epoxy pullings
Angle, 5SVG module guide rail, 6 cabling channels, 11 top plates, 12 side plates, 13 linings, 14 upper plates, 15 lower plates, 16A are moulded in oxygen pulling
Phase cascade copper bar, 17B phase cascades copper bar, 18C phase cascades copper bar.
Specific embodiment
For a better understanding of the present invention, below with reference to the embodiment content that the present invention is furture elucidated, but it is of the invention
Content is not limited solely to the following examples.Those skilled in the art can make various modifications or changes to the present invention, these
Within the scope of equivalent form equally claims listed by the application limit.
As shown in Fig. 1 to 2, the densification tower structure suitable for SVG of the invention, main building block has: cabinet
1, angle 4, SVG module guide rail 5, cabling are moulded in hollow square tube epoxy pulling modeling corner post 2, SVG power module 3, groove profile epoxy pulling
Slot 6.
1 main body frame of cabinet is welded by I-steel and rectangular steel pipe, and top plate 11 and side plate 12 use corrosion-resistant structure
Use hot continuous-milling steel plate;Lining 13 is using with meshed silencing cotton colored steel;Bottom plate is divided into two layers, and upper plate 14 uses rib aluminium
Plate, screw is fixed convenient for wiring disassembly, and lower plate 15 is directly welding as one using the pedestal of cold-rolled steel sheet and cabinet.1 bottom of cabinet
There are specific apertures for portion and top, mould corner post 2 for the epoxy pulling of fixation hollow square tube, hollow square tube epoxy pulling is moulded
2 upper and lower side of corner post is separately connected the bottom and top of cabinet, guarantees hollow square tube epoxy pulling modeling corner post 2 and the bottom of box
Top is completely vertical.As shown in Figs. 3-4.
The cross-brace beam of SVG module guide rail 5 moulds angle 4 using the pulling of groove profile epoxy, by itself and hollow square tube epoxy pulling
It moulds corner post 2 vertically to fix, groove profile epoxy pulling moulds the groove surface at angle 4 outward, and one layer of bottommost is arrived bottom of box metal portion
The distance between part needs to meet the electric clearance and creepage distance of system voltage.The cloth from the bottom up of angle 4 is moulded in groove profile epoxy pulling
Three layers are set, every layer is a phase, is respectively defined as A B C three-phase according to electrical design.Hollow square tube epoxy pulling modeling angle 2 and groove profile
The selection of dimension that angle 4 is moulded in epoxy pulling must the weight according to SVG power module 3 and the stress under transport and seismology
Situation.The cabling channel 6 for placing optical fiber is installed in groove profile epoxy pulling modeling angle 4 and is fastened, both can satisfy SVG power in this way
Stress of the module 3 under various load (transport, earthquake), can also be preferably hidden by cabling channel 6, keeps overall appearance simpler
Clean beauty.All epoxy pulling modeling angle sections only need to carry out the fixed peace that frame can be completed of simple vertical and transverse lap
Dress.As shown in Figs. 3-4.
Conventional SVG equipment uses metallic supports, can increase the spacing between two layers, and is extremely easy under high voltages
Partial discharge phenomenon is generated, service life of equipment is will affect, will cause accident when serious.So moulding angle using groove profile epoxy pulling
The spacing between two layers can be reduced after 4, partial discharge phenomenon will not occur.
It is conventional material that angle is moulded in epoxy pulling, using high-intensitive aramid fiber and glass fibre in epoxy resin-impregnated matrix
Through bonding, molding and hot setting process, pull out the reinforcing profile of continuous length, material have excellent mechanical property,
The features such as electric property, high temperature resistance.Conventional SVG equipment uses metal framework, and manufacturing procedure is cumbersome, and oxidation resistance is poor,
Component is relatively more, and rigging error is caused to increase.And epoxy pulling modeling angle is simple relative to conventional metalwork processing, it is only necessary to
It is simply cut and is punched.Manufacturing cost can significantly be saved.The two kinds of profile section institutes of such as Fig. 5 to 8 used
Show.
Every phase (layer) module is successively attached by SVG power module according to electrical principle by copper bar, is tieing up equipment
It is more clear when shield and maintenance.It is resistance in order to avoid under high voltages since traditional cabinet type SVG has metal framework as support
Pressure and shelf depreciation problem, it is often that the line space design between electrical body and metal framework is very big, so that equipment volume be made to increase
Greatly, but after using epoxy pulling modeling angle section frame, since it is with good insulation performance, device structure can be made more
The compact occupied area to reduce equipment.According to practical engineering calculation, using this densification tower structure layout relative to
The cabinet type mounting means of tradition can save 30% occupied area;Save 20% manufacturing cost.As shown in Figure 9.