CN106026075A - Flexible DC back-to-back asynchronous networking method and system of power load center - Google Patents

Flexible DC back-to-back asynchronous networking method and system of power load center Download PDF

Info

Publication number
CN106026075A
CN106026075A CN201610585833.8A CN201610585833A CN106026075A CN 106026075 A CN106026075 A CN 106026075A CN 201610585833 A CN201610585833 A CN 201610585833A CN 106026075 A CN106026075 A CN 106026075A
Authority
CN
China
Prior art keywords
electrical network
team
load center
power load
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610585833.8A
Other languages
Chinese (zh)
Inventor
吴宝英
陈松波
李峰
刘正超
吴科成
高超
刘新苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201610585833.8A priority Critical patent/CN106026075A/en
Publication of CN106026075A publication Critical patent/CN106026075A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a flexible DC back-to-back asynchronous networking method and a flexible DC back-to-back asynchronous networking system of a power load center. The flexible DC back-to-back asynchronous networking method comprises the steps of: acquiring historical electricity utilization data of the power load center; acquiring power grid structural information of the power load center; dividing a power grid of the power load center into a predetermined number of grouped power grids according to the historical electricity utilization data and the power grid structural information; and establishing a flexible DC back-to-back power transmission system between every two grouped power grids in the predetermined number of grouped power grids, so as to realize asynchronous interconnection among the grouped power grids. By establishing the flexible DC back-to-back power transmission systems, the synchronous power grid of the power load center is isolated into the plurality of synchronous power grids, the power grid structure is simplified, the average electrical distance between the power substations is increased, the mutual influence between the alternating current and the direct current is reduced, and the problems such as short-circuit current standard exceeding, prominent mutual influence of multiple direct currents and high risk of large-scale power outage accidents of the power load center (such as a Pearl river delta power grid) can be effectively solved.

Description

The flexible direct current back-to-back Asynchronous Interconnection method and system of power load center
Technical field
The present invention relates to technical field of power systems, more particularly, it relates to a kind of power load center Flexible direct current back-to-back Asynchronous Interconnection method and system.
Background technology
Along with power system development, current electrical network be primarily present short circuit current exceed standard, many direct currents mutual The problems such as impact is prominent and large area accident risk is high.Specifically, current Guangdong Power Grid mainly have with Lower problem:
(1) grid contact is tight, and short circuit current exceeds standard
Guangdong Power Grid especially Pearl River Delta grid contact is tight, and junction quantity is many, single seat power plant, power transformation Outlet of standing is more, and between plant stand, electrical distance is near, causes overall short circuit current level to exceed standard.
(2) direct current drop point is intensive, and alternating current-direct current influences each other prominent, and operation of power networks risk is high
Guangdong Power Grid forms the electric network composition of " tetanic weak friendship " alternating current-direct current series-parallel connection at present, holds during DC Line Fault Easily causing large-scale power flow transfer, the stable problem of electrical network highlights.Each direct current equal drop point Pearl River Delta load Center, single time D.C. capacity is big, and direct current drop point distance is near, influences each other relatively big, and multiple-circuit line is even The risk of lock fault is higher, affects the stable operation of system.
(3) electric network composition is complicated, it is difficult to resist electrical network catastrophe failure
Pearl River Delta, Guangdong electrical network is complicated, and electric network composition is clear not, and trend is difficult to control to, it is difficult to construct electricity Second, third defence line, road of net safety, the ability resisting catastrophe failure is poor, the risk of large-area power-cuts Higher.
Therefore, how to solve the problems referred to above, be those skilled in the art need solve problem.
Summary of the invention
It is an object of the invention to provide the back-to-back Asynchronous Interconnection side of flexible direct current of a kind of power load center Method and system, to solve short circuit current and exceed standard, many direct currents influence each other prominent and large area blackout The problems such as risk is high.
For achieving the above object, following technical scheme is embodiments provided:
A kind of flexible direct current back-to-back Asynchronous Interconnection method of power load center, including:
The history electricity consumption data of regional in acquisition power load center;
Obtain the electric network composition information of described power load center;
According to described history electricity consumption data and described electric network composition information, by the electricity of described power load center Net is divided into the individual electrical network of forming a team of predetermined quantity;
The each two in electrical network of being formed a team by described predetermined quantity is formed a team and is set up flexible direct current between electrical network and lean against Back of the body transmission system, to realize forming a team the asynchronous interconnection between electrical network.
Wherein, according to described history electricity consumption data and described electric network composition information, by described electric load The electrical network of the heart is divided into the individual electrical network of forming a team of predetermined quantity, including:
Choose N number of history electricity consumption data target area more than predetermined threshold;Wherein, N is positive integer;
According to the positional information of N number of target area, and described electric network composition information, by described electric load The electrical network at center is divided into the individual electrical network of forming a team of predetermined quantity;Wherein, described N number of target area is described predetermined It is uniformly distributed in the individual electrical network of forming a team of quantity.
Wherein, the history electricity consumption data of regional in described acquisition power load center, including:
Obtain the history electricity consumption data in described power load center each city interior.
Wherein, the electrical network of described power load center is divided into the individual electrical network of forming a team of predetermined quantity include:
The electrical network of described power load center is divided into two electrical networks of forming a team;Wherein, each form a team electrical network by Looped network is constituted.
A kind of flexible direct current back-to-back Asynchronous Interconnection system of power load center, including:
First acquisition module, the history electricity consumption data of regional in obtaining power load center;
Second acquisition module, for obtaining the electric network composition information of described power load center;
Electrical network of forming a team divides module, is used for according to described history electricity consumption data and described electric network composition information, The electrical network of described power load center is divided into the individual electrical network of forming a team of predetermined quantity;
Set up module, form a team for each two in electrical network that described predetermined quantity is formed a team and build between electrical network The vertical back-to-back transmission system of flexible direct current, to realize forming a team the asynchronous interconnection between electrical network.
Wherein, electrical network of forming a team described in divides module and includes:
Module is chosen in target area, for choosing N number of history electricity consumption data target area more than predetermined threshold Territory;Wherein, N is positive integer;
Form a team electrical network division unit, for the positional information according to N number of target area, and described electrical network knot Structure information, is divided into the individual electrical network of forming a team of predetermined quantity by the electrical network of described power load center;Wherein, described N number of target area is uniformly distributed in described predetermined quantity forms a team electrical network.
Wherein, the history electricity consumption in each city in described first acquisition module obtains described power load center Data.
Wherein, the electrical network of described power load center is divided into two to form a team by electrical network division unit of forming a team described in Electrical network;Wherein, each electrical network of forming a team is made up of looped network.
By above scheme, the flexible direct current of a kind of power load center that the embodiment of the present invention provides Asynchronous Interconnection method and system back-to-back, including: in acquisition power load center, the history of regional is used Electricity data;Obtain the electric network composition information of described power load center;According to described history electricity consumption data and Described electric network composition information, is divided into the individual electrical network of forming a team of predetermined quantity by the electrical network of described power load center; Individual for the described predetermined quantity each two in electrical network of forming a team being formed a team, it is the most defeated to set up flexible direct current between electrical network Electricity system, to realize forming a team the asynchronous interconnection between electrical network;By building flexible direct current back-to-back by load Central synchronous electrical network, is isolated into multiple synchronised grids, simplifies electric network composition, increases between transformer station flat All electrical distance, reduces influencing each other between alternating current-direct current, can effectively solve load center (such as Pearl River Delta Electrical network) that short circuit current exceeds standard, many direct currents influence each other is prominent and large area blackout risk is high asks Topic.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only some embodiments of the present invention, for those of ordinary skill in the art, On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is that disclosed in the embodiment of the present invention, the flexible direct current of a kind of power load center is back-to-back asynchronous Network method schematic flow sheet;
Fig. 2 is the open a kind of back-to-back Asynchronous Interconnection side of power load center flexible direct current of the embodiment of the present invention Case schematic diagram;
Fig. 3 is that disclosed in the embodiment of the present invention, the flexible direct current of a kind of power load center is back-to-back asynchronous Net system structure schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not making Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of protection of the invention.
The embodiment of the invention discloses a kind of flexible direct current back-to-back Asynchronous Interconnection method of power load center And system, to solve short circuit current and exceed standard, many direct currents influence each other prominent and large area blackout wind The problems such as danger is high.
Seeing Fig. 1, the flexible direct current of a kind of power load center that the embodiment of the present invention provides is the most different Step networking method, including:
The history electricity consumption data of regional in S101, acquisition power load center;
Wherein, the history electricity consumption data of regional in described acquisition power load center, including:
Obtain the history electricity consumption data in described power load center each city interior.
Concrete, in the present embodiment during analysis of history electricity consumption data, can carry out according to the region divided Analyze, it is also possible to be directly analyzed according to each city in power load center.
S102, obtain the electric network composition information of described power load center;
Concrete, history electricity consumption data and electric network composition information in the present embodiment can be by the sides of investigation Formula obtains.
S103, according to described history electricity consumption data and described electric network composition information, by described electric load The electrical network of the heart is divided into the individual electrical network of forming a team of predetermined quantity;
Wherein, according to described history electricity consumption data and described electric network composition information, by described electric load The electrical network of the heart is divided into the individual electrical network of forming a team of predetermined quantity, including:
Choose N number of history electricity consumption data target area more than predetermined threshold;Wherein, N is positive integer;
According to the positional information of N number of target area, and described electric network composition information, by described electric load The electrical network at center is divided into the individual electrical network of forming a team of predetermined quantity;Wherein, described N number of target area is described predetermined It is uniformly distributed in the individual electrical network of forming a team of quantity.
The electrical network of described power load center is wherein divided into the individual electrical network of forming a team of predetermined quantity include:
The electrical network of described power load center is divided into two electrical networks of forming a team;Wherein, each form a team electrical network by Looped network is constituted.
Concrete, divide when form a team electrical network in the present embodiment, can be former according to power load center First electric network composition divides, when dividing, and can be by being divided in of trying one's best in area more for power consumption Different forms a team in electrical network.
S104, each two in electrical network of being formed a team by described predetermined quantity are formed a team and are set up flexibility between electrical network directly Flow back-to-back transmission system, to realize forming a team the asynchronous interconnection between electrical network.
In the present embodiment, based on the existing rack in Guangdong, Guangdong Power Grid is divided into two, east, west Internal connection is formed a team electrical network closely, is made up of some looped networks in respectively forming a team, and two form a team between electrical network by soft Directly realize asynchronous interconnection back-to-back.The method can utilize existing internal and external double-circular net to greatest extent, with less Cost, at utmost solves the problem that electrical network exists
Concrete, see a kind of power load center flexible direct current that Fig. 2 provides for the present embodiment back-to-back Asynchronous Interconnection scheme schematic diagram, special according to the distribution of Guangdong Power Grid load power and existing internal and external double-circular web frame Point, back-to-back by building flexible direct current between Guangzhou and Dongguan, Guangzhou and Shenzhen etc., it is achieved Guangdong The asynchronous interconnection of Pearl River Delta load center synchronised grids.After Asynchronous Interconnection, western group team knowledge Guangzhou, Foshan City, Zhongshan city, Jiangmen city, Zhuhai City, Zhaoqing and western district of Guangdong, form a team and cover Huizhou in east City, Dongguan City, Shenzhen, North Guangdong and east Guangdong Province.
The flexible direct current back-to-back Asynchronous Interconnection system provided the embodiment of the present invention below is introduced, under The flexible direct current back-to-back Asynchronous Interconnection system that literary composition describes is back-to-back asynchronous with above-described flexible direct current Net system can be cross-referenced.
Seeing Fig. 3, the flexible direct current of a kind of power load center that the embodiment of the present invention provides is the most different Step networked system, including:
First acquisition module 100, the history electricity consumption number of regional in obtaining power load center According to;
Second acquisition module 200, for obtaining the electric network composition information of described power load center;
Electrical network of forming a team divides module 300, for believing according to described history electricity consumption data and described electric network composition Breath, is divided into the individual electrical network of forming a team of predetermined quantity by the electrical network of described power load center;
Set up module 400, for each two in electrical network that described predetermined quantity is formed a team form a team electrical network it Between set up the back-to-back transmission system of flexible direct current, to realize forming a team the asynchronous interconnection between electrical network.
Based on technique scheme, described in form a team electrical network divide module 300 include:
Module is chosen in target area, for choosing N number of history electricity consumption data target area more than predetermined threshold Territory;Wherein, N is positive integer;
Form a team electrical network division unit, for the positional information according to N number of target area, and described electrical network knot Structure information, is divided into the individual electrical network of forming a team of predetermined quantity by the electrical network of described power load center;Wherein, described N number of target area is uniformly distributed in described predetermined quantity forms a team electrical network.
Based on technique scheme, described first acquisition module 100 is each in obtaining described power load center The history electricity consumption data in individual city.
Based on technique scheme, described in form a team the electrical network division unit electrical network by described power load center It is divided into two electrical networks of forming a team;Wherein, each electrical network of forming a team is made up of looped network.
The flexible direct current back-to-back Asynchronous Interconnection method of a kind of power load center that the embodiment of the present invention provides And system, including: the history electricity consumption data of regional in acquisition power load center;Obtain described electricity The electric network composition information of power load center;According to described history electricity consumption data and described electric network composition information, The electrical network of described power load center is divided into the individual electrical network of forming a team of predetermined quantity;By described predetermined quantity group Each two in group's electrical network is formed a team and is set up the back-to-back transmission system of flexible direct current between electrical network, to realize forming a team Asynchronous interconnection between electrical network;
Visible, the present invention has jumped out the current commonly used synchronised grids of power load center and has solved the normal of problem Rule thinking, from the angle of change load center power network development technology path, leans against by building flexible direct current The back of the body, by load center synchronised grids, is isolated into multiple synchronised grids, simplifies electric network composition, increase change Between power station, average electrical distance, reduces influencing each other between alternating current-direct current, effectively solves Guangdong Power Grid short circuit The problems such as prominent and large area blackout risk that electric current exceeds standard, many direct currents influence each other is high.
In this specification, each embodiment uses the mode gone forward one by one to describe, and each embodiment stresses Being the difference with other embodiments, between each embodiment, identical similar portion sees mutually.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses The present invention.Multiple amendment to these embodiments will be aobvious and easy for those skilled in the art See, generic principles defined herein can without departing from the spirit or scope of the present invention, Realize in other embodiments.Therefore, the present invention is not intended to be limited to the embodiments shown herein, And it is to fit to the widest scope consistent with principles disclosed herein and features of novelty.

Claims (8)

1. the flexible direct current of a power load center back-to-back Asynchronous Interconnection method, it is characterised in that bag Include:
The history electricity consumption data of regional in acquisition power load center;
Obtain the electric network composition information of described power load center;
According to described history electricity consumption data and described electric network composition information, by the electricity of described power load center Net is divided into the individual electrical network of forming a team of predetermined quantity;
The each two in electrical network of being formed a team by described predetermined quantity is formed a team and is set up flexible direct current between electrical network and lean against Back of the body transmission system, to realize forming a team the asynchronous interconnection between electrical network.
Flexible direct current the most according to claim 1 back-to-back Asynchronous Interconnection method, it is characterised in that According to described history electricity consumption data and described electric network composition information, the electrical network of described power load center is divided Form a team electrical network for predetermined quantity, including:
Choose N number of history electricity consumption data target area more than predetermined threshold;Wherein, N is positive integer;
According to the positional information of N number of target area, and described electric network composition information, by described electric load The electrical network at center is divided into the individual electrical network of forming a team of predetermined quantity;Wherein, described N number of target area is described predetermined It is uniformly distributed in the individual electrical network of forming a team of quantity.
Flexible direct current the most according to claim 2 back-to-back Asynchronous Interconnection method, it is characterised in that The history electricity consumption data of regional in described acquisition power load center, including:
Obtain the history electricity consumption data in described power load center each city interior.
4. according to the back-to-back Asynchronous Interconnection method of the flexible direct current described in any one in claim 1-3, It is characterized in that, the electrical network of described power load center is divided into the individual electrical network of forming a team of predetermined quantity include:
The electrical network of described power load center is divided into two electrical networks of forming a team;Wherein, each form a team electrical network by Looped network is constituted.
5. the flexible direct current of a power load center back-to-back Asynchronous Interconnection system, it is characterised in that Including:
First acquisition module, the history electricity consumption data of regional in obtaining power load center;
Second acquisition module, for obtaining the electric network composition information of described power load center;
Electrical network of forming a team divides module, is used for according to described history electricity consumption data and described electric network composition information, The electrical network of described power load center is divided into the individual electrical network of forming a team of predetermined quantity;
Set up module, form a team for each two in electrical network that described predetermined quantity is formed a team and build between electrical network The vertical back-to-back transmission system of flexible direct current, to realize forming a team the asynchronous interconnection between electrical network.
Flexible direct current the most according to claim 5 back-to-back Asynchronous Interconnection system, it is characterised in that Described electrical network of forming a team divides module and includes:
Module is chosen in target area, for choosing N number of history electricity consumption data target area more than predetermined threshold Territory;Wherein, N is positive integer;
Form a team electrical network division unit, for the positional information according to N number of target area, and described electrical network knot Structure information, is divided into the individual electrical network of forming a team of predetermined quantity by the electrical network of described power load center;Wherein, described N number of target area is uniformly distributed in described predetermined quantity forms a team electrical network.
Flexible direct current the most according to claim 6 back-to-back Asynchronous Interconnection system, it is characterised in that Described first acquisition module obtains the history electricity consumption data in described power load center each city interior.
8. according to the back-to-back Asynchronous Interconnection system of the flexible direct current described in any one in claim 5-7, It is characterized in that,
The electrical network of described power load center is divided into two electrical networks of forming a team by described electrical network division unit of forming a team; Wherein, each electrical network of forming a team is made up of looped network.
CN201610585833.8A 2016-07-22 2016-07-22 Flexible DC back-to-back asynchronous networking method and system of power load center Pending CN106026075A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610585833.8A CN106026075A (en) 2016-07-22 2016-07-22 Flexible DC back-to-back asynchronous networking method and system of power load center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610585833.8A CN106026075A (en) 2016-07-22 2016-07-22 Flexible DC back-to-back asynchronous networking method and system of power load center

Publications (1)

Publication Number Publication Date
CN106026075A true CN106026075A (en) 2016-10-12

Family

ID=57116326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610585833.8A Pending CN106026075A (en) 2016-07-22 2016-07-22 Flexible DC back-to-back asynchronous networking method and system of power load center

Country Status (1)

Country Link
CN (1) CN106026075A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104217281A (en) * 2014-08-14 2014-12-17 天津大学 Power grid planning method oriented towards cluster planning of city
WO2015193199A1 (en) * 2014-06-20 2015-12-23 University College Dublin National University Of Ireland, Dublin Method for controlling power distribution

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015193199A1 (en) * 2014-06-20 2015-12-23 University College Dublin National University Of Ireland, Dublin Method for controlling power distribution
CN104217281A (en) * 2014-08-14 2014-12-17 天津大学 Power grid planning method oriented towards cluster planning of city

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
余欣梅等: "珠江三角洲地区电网发展战略研究", 《南方电网技术》 *
刘明山: "基于组团式供电网络的设备调度关系转移及其模式研究", 《中国优秀硕士学位论文全文数据库》 *
梁锦照等: "快速发展城市的组团式电网规划新思路", 《电网技术》 *

Similar Documents

Publication Publication Date Title
Yazdaninejadi et al. Impact of inverter-based DERs integration on protection, control, operation, and planning of electrical distribution grids
CN103337869B (en) A kind of method of novel battery energy-storage system and function integration design thereof
CN104218604B (en) Network equivalent method based power distribution network reliability analysis method and system
CN104036342B (en) A kind of Electric power network planning method based on three-dimensional grid construction network mode
CN104297638B (en) Power distribution grid fault positioning method with high precision and low cost
CN107272645B (en) The photovoltaic electric station grid connection fault model and analysis method of Neutral Grounding through Resistance in Electrical
CN102427243A (en) Multi-terminal DC (Direct Current) power transmission system for combined synchronization of wind power plant and conventional power plant
CN105262069B (en) Hvdc transmission line longitudinal protection method based on failure DC component
CN102982230A (en) Short circuit current exceeding auxiliary decision method based on node impedance sensitivity
CN106655201A (en) Security domain-based safe optimization and control method for electric power thermal stability
CN102324789A (en) Intelligent substation domain control system on basis of substation control layer GOOSE (Generic Object Oriented Substation Event) and implementing method
CN102930141B (en) The quick calculation method that a kind of electrical network complexity monitoring section tidal current controls
CN102856981A (en) Station-area protection and control device with protection and control functions in converting station
CN102749492A (en) Short-circuit current computing method for ring-shaped ship power grid
CN103532160B (en) Analysis method for researching improving effect of grid structure on mutual influences of alternating current and direct current at receiving end
CN104104069A (en) Construction method for multi-agent based micro-grid protection system
CN105071447A (en) Alternating current/direct-current hybrid connection multi-infeed direct-current receiving end power grid strength obtaining method
CN104934982B (en) A kind of direct current partition method of multi-infeed DC system
CN109473988B (en) Method and device for controlling power flow and processing fault of intelligent power distribution network containing micro-grid
Sauhats et al. Two-terminal out-of-step protection for multi-machine grids using synchronised measurements
Wang et al. From distribution feeder to microgrid: An insight on opportunities and challenges
CN203104104U (en) Optimized backbone transmission network system for electric power information communication
CN106026075A (en) Flexible DC back-to-back asynchronous networking method and system of power load center
Bo et al. A new concept intelligent integrated protection system for distribution network
CN109378852A (en) A kind of method and system obtaining soft straight power grid DC neutral bus-bar fault measure amount

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161012