CN106024375A - Flange structure for capacitor framework - Google Patents
Flange structure for capacitor framework Download PDFInfo
- Publication number
- CN106024375A CN106024375A CN201610482335.0A CN201610482335A CN106024375A CN 106024375 A CN106024375 A CN 106024375A CN 201610482335 A CN201610482335 A CN 201610482335A CN 106024375 A CN106024375 A CN 106024375A
- Authority
- CN
- China
- Prior art keywords
- flange
- framework
- plate
- capacitor
- flanged plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003990 capacitor Substances 0.000 title claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 42
- 239000010959 steel Substances 0.000 claims abstract description 42
- 239000000463 material Substances 0.000 claims abstract description 13
- 238000005452 bending Methods 0.000 claims description 5
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 claims description 3
- 239000011701 zinc Substances 0.000 claims description 3
- 229910052725 zinc Inorganic materials 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 8
- 238000005246 galvanizing Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01G—CAPACITORS; CAPACITORS, RECTIFIERS, DETECTORS, SWITCHING DEVICES, LIGHT-SENSITIVE OR TEMPERATURE-SENSITIVE DEVICES OF THE ELECTROLYTIC TYPE
- H01G2/00—Details of capacitors not covered by a single one of groups H01G4/00-H01G11/00
- H01G2/02—Mountings
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Vibration Prevention Devices (AREA)
Abstract
The invention provides a flange structure for a capacitor framework. The flange structure comprises two flanges and frameworks, wherein flange fixing members are arranged between the flanges and frameworks, flange plates are arranged on the flanges, and section steels are arranged on the frameworks. The flange plates and the flange fixing members are welded together, and the flange fixing members and the section steels are welded together. The flange structure for capacitor framework is simple in structure, has low processing capability requirements, requires less working hours and material, and reduces production cost. The bearing structure is reasonable, and the anti-vibration performance is excellent. Since the section steels do not directly contact with the flange plates, the specification of the section steels can be selected as needed. Matching of the section steel and the flange plates are convenient.
Description
Technical field
The present invention relates to flange apparatus field, the flange arrangement of a kind of capacitor framework.
Background technology
The flange arrangement of existing capacitor installation framework is two panels flanged plate structure, and this structure has the disadvantage that: 1,
The flange height of framework is high.The whole flange of framework generally has 140mm~180mm high, and AC and DC is filtered by DC transmission engineering
Ripple capacitor device has the requirement of limit for height, AC capacitor device generally to have 7 layers~14 layers, and direct current capacitors device leads to
Often having 28 layers~36 layers, the flange height of every layer of framework is high, and the height that can cause capacitor device is the highest, antidetonation master gage
Calculation is difficult to qualified;2, the flange arrangement of framework is high to processing technique Capability Requirement.In the upper flange plate of flange and lower flange plate
Respectively having 4 or 8 installing holes, upper and lower hole requires coaxial line, and the upper flange plate of flange and lower flange plate also require to put down
OK, this is just the highest to processing technique Capability Requirement;3, shaped steel coordinates difficulty with flange version.Because shaped steel needs to be welded on method
Between blue upper flange plate and lower flange plate, when upper flange plate and lower flange plate respectively have 8 installing holes, shaped steel and peace
Dress hole coordinates difficulty;4, force structure is not reasonable, and anti-seismic performance is the most excellent;5, processing man-hours requirement, material is many.
Summary of the invention
The technical problem to be solved in the present invention is to overcome existing defect, it is provided that a kind of simple for structure, processing technique ability
Ask low;Excellent earthquake resistance;Man-hours requirement and material are few, and production cost is low, force structure rational capacitor framework
Flange arrangement.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
The flange arrangement of a kind of capacitor framework, including two flanges and framework, is provided with flange in the middle of described flange and framework
Fixture;Described flange is provided with flanged plate;Described framework is provided with shaped steel;Described flanged plate weld with flange fixture and
Become;Described flange fixture is welded with shaped steel.
Further, the number of described flanged plate is 1;The material of described flanged plate is steel plate;The thickness of described steel plate is
20mm。
Further, described flanged plate is provided with galvanizing stream zinc hole.
Further, the bending angle of described flanged plate fixture is 90 °.
Further, the material of described flanged plate fixture is steel plate;The thickness of described steel plate is 20mm.
Further, described framework is connected by steel plate and securing member.
The present invention provides the flange arrangement of a kind of capacitor framework, and the flange height of framework only has 20mm, ratio original structure energy
Short 120mm~160mm, as a example by ac filter capacitor device 10 layers, can make device height reduction 1200mm~1600mm,
Short 3600mm~4800mm of energy as a example by 30 layers of DC filter capacitors device, can fill by improvement capacitor to a great extent
The anti-seismic performance put.Present configuration is succinct, low to processing technique Capability Requirement;Man-hours requirement and material are few, reduce life
Produce cost;The framework flange force structure of the present invention is reasonable, excellent earthquake resistance;Because shaped steel the most directly connects with flanged plate
Touching, it is possible to select the specification of shaped steel as required, shaped steel coordinates convenient with flanged plate.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, with embodiments of the invention
It is used for together explaining the present invention, is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is perspective view of the present invention.
Fig. 2 is top view of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred embodiment described herein
It is merely to illustrate and explains the present invention, being not intended to limit the present invention.
As depicted in figs. 1 and 2, the flange arrangement of the present invention a kind of capacitor framework, including two flanges 1 and framework 2,
It is provided with flange fixture 3 in the middle of described flange 1 and framework 2;Described flange 1 is provided with flanged plate 4;On described framework 2
It is provided with shaped steel 5;Described flanged plate 4 is welded with flange fixture 3;Described flange fixture 3 weld with shaped steel 5 and
Become;The number of described flanged plate 4 is 1;The material of described flanged plate 4 is steel plate;The thickness of described steel plate is 20mm;Institute
State flanged plate 4 and be provided with galvanizing stream zinc hole;The bending angle of described flanged plate fixture 3 is 90 °;Described flange
The material of plate fixture 3 is steel plate;The thickness of described steel plate is 20mm;By steel plate and securing member between described framework 2
Connect.
The present invention provides the flange arrangement of a kind of capacitor framework, the flange 1 height only 20mm of framework, compares original structure
Can short 120mm~160mm, as a example by ac filter capacitor device 10 layers, can make device height reduction 1200mm~
1600mm, as a example by 30 layers of DC filter capacitors device can short 3600mm~4800mm, can improvement to a great extent
The anti-seismic performance of capacitor device.Present configuration is succinct, low to processing technique Capability Requirement;Man-hours requirement and material are few,
Reduce production cost;The framework flange force structure of the present invention is reasonable, excellent earthquake resistance;Because shaped steel 5 and flanged plate
4 the most directly contact, it is possible to select the specification of shaped steel 5 as required, and shaped steel 5 coordinates convenient with flange 1 plate.
The thickness of flanged plate 4 of the present invention and flanged plate fixture 3 can change other thickness into, the bending angle of flanged plate fixture 3
Degree can change, and shaped steel 5 can use other section bar instead, such as channel-section steel, angle steel, I-steel and bending steel etc., flanged plate 4, method
The material of blue plate fixture 3 and shaped steel 5 can change other material into, such as aluminium alloy, rustless steel etc..
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment
Being described in detail the present invention, for a person skilled in the art, it still can be to foregoing embodiments institute
The technical scheme recorded is modified, or wherein portion of techniques feature is carried out equivalent.All spirit in the present invention and
Within principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.
Claims (6)
1. a flange arrangement for capacitor framework, including two flanges and framework, is characterized in that: described flange and framework
Centre is provided with flange fixture;Described flange is provided with flanged plate;Described framework is provided with shaped steel;Described flanged plate and flange
Fixture is welded;Described flange fixture is welded with shaped steel.
The flange arrangement of capacitor framework the most according to claim 1, is characterized in that: the number of described flanged plate is
1;The material of described flanged plate is steel plate;The thickness of described steel plate is 20mm.
The flange arrangement of capacitor framework the most according to claim 2, is characterized in that: described flanged plate is provided with heat
Zinc-plated stream zinc hole.
The flange arrangement of capacitor framework the most according to claim 1, is characterized in that: described flanged plate fixture
Bending angle is 90 °.
The flange arrangement of capacitor framework the most according to claim 4, is characterized in that: described flanged plate fixture
Material is steel plate;The thickness of described steel plate is 20mm.
The flange arrangement of capacitor framework the most according to claim 1, is characterized in that: described framework by steel plate and
Securing member connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610482335.0A CN106024375A (en) | 2016-06-28 | 2016-06-28 | Flange structure for capacitor framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610482335.0A CN106024375A (en) | 2016-06-28 | 2016-06-28 | Flange structure for capacitor framework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106024375A true CN106024375A (en) | 2016-10-12 |
Family
ID=57084160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610482335.0A Pending CN106024375A (en) | 2016-06-28 | 2016-06-28 | Flange structure for capacitor framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106024375A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203127516U (en) * | 2013-03-01 | 2013-08-14 | 无锡赛晶电力电容器有限公司 | Integrally-transported frame type capacitor bank |
CN104425781A (en) * | 2013-08-27 | 2015-03-18 | 三星Sdi株式会社 | Battery pack |
JP2015170558A (en) * | 2014-03-10 | 2015-09-28 | 株式会社Gsユアサ | Rack, installation method of the same, and power storage facility |
CN205828140U (en) * | 2016-06-28 | 2016-12-21 | 无锡赛晶电力电容器有限公司 | The flange arrangement of capacitor framework |
-
2016
- 2016-06-28 CN CN201610482335.0A patent/CN106024375A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203127516U (en) * | 2013-03-01 | 2013-08-14 | 无锡赛晶电力电容器有限公司 | Integrally-transported frame type capacitor bank |
CN104425781A (en) * | 2013-08-27 | 2015-03-18 | 三星Sdi株式会社 | Battery pack |
JP2015170558A (en) * | 2014-03-10 | 2015-09-28 | 株式会社Gsユアサ | Rack, installation method of the same, and power storage facility |
CN205828140U (en) * | 2016-06-28 | 2016-12-21 | 无锡赛晶电力电容器有限公司 | The flange arrangement of capacitor framework |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106024375A (en) | Flange structure for capacitor framework | |
CN104259661B (en) | A kind of fixture for laser welding for T junction component | |
CN205828140U (en) | The flange arrangement of capacitor framework | |
CN201756409U (en) | Hanging-type rail connecting structure | |
CN106996144B (en) | The crossbeam of steel construction and the interconnecting piece of column | |
CN204195108U (en) | Arc steel structure welding absorption type is started to exchange fire basin | |
JP2015067978A (en) | Lateral buckling stiffening structure of steel frame beam | |
CN104401339B (en) | Rail vehicle roof and side wall connecting structure | |
CN202689652U (en) | Connecting member of single-tube communication tower platform | |
CN202326651U (en) | Composite metal corrugated flange gasket | |
JP5978005B2 (en) | Brace mounting structure | |
CN105987230A (en) | Pipe clamp cross arm | |
CN208060132U (en) | A kind of curtain wall pendant part bearingtest system | |
CN202071833U (en) | Riveting type cabinet plate framework of motor train unit driver cab | |
CN205387751U (en) | Designability villa connects | |
CN107503435B (en) | Adjustable high-strength steel connecting structure | |
CN203846675U (en) | Grooved beam | |
CN204753298U (en) | Cement covers worker's board | |
CN205781890U (en) | Component for the splicing of shaped steel suspension and support | |
CN219299699U (en) | Cross overlap joint frock for I-steel | |
JP5290478B1 (en) | Rail fixing member | |
CN102145842B (en) | Setting structure of rope hitch plate for elevator car frame | |
CN203845631U (en) | Lifting beam | |
CN207892027U (en) | A kind of connector of H profile steel secondary beam and H profile steel girder | |
CN203718916U (en) | Oil heater fixed support and oil heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161012 |
|
RJ01 | Rejection of invention patent application after publication |