CN106015543B - A kind of split planet carrier welding splash-proof method - Google Patents

A kind of split planet carrier welding splash-proof method Download PDF

Info

Publication number
CN106015543B
CN106015543B CN201610566519.5A CN201610566519A CN106015543B CN 106015543 B CN106015543 B CN 106015543B CN 201610566519 A CN201610566519 A CN 201610566519A CN 106015543 B CN106015543 B CN 106015543B
Authority
CN
China
Prior art keywords
planet carrier
welding
side panel
circular side
shaped axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610566519.5A
Other languages
Chinese (zh)
Other versions
CN106015543A (en
Inventor
何鹏
王小荣
柳世波
刘青山
蒋慧平
董安志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO LIANYUANTONG PRECISION MACHINERY Co Ltd
Original Assignee
QINGDAO LIANYUANTONG PRECISION MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO LIANYUANTONG PRECISION MACHINERY Co Ltd filed Critical QINGDAO LIANYUANTONG PRECISION MACHINERY Co Ltd
Priority to CN201610566519.5A priority Critical patent/CN106015543B/en
Publication of CN106015543A publication Critical patent/CN106015543A/en
Application granted granted Critical
Publication of CN106015543B publication Critical patent/CN106015543B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16HGEARING
    • F16H57/00General details of gearing
    • F16H57/08General details of gearing of gearings with members having orbital motion
    • F16H57/082Planet carriers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/14Making specific metal objects by operations not covered by a single other subclass or a group in this subclass gear parts, e.g. gear wheels

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Details Of Gearings (AREA)
  • Retarders (AREA)

Abstract

A kind of split planet carrier welding splash-proof method, the present invention relates to split planet carrier welding splash-proof method.The present invention is to solve the problems, such as that existing planet carrier high processing costs, efficiency are low, can not realize automatic production line processing and produce during split planet carrier laser welding to splash and influence parts cleannes and assembly precision.The present invention is compound using German import equipment turnning and milling, and double main shaft double-pole tower structures, clamped one time can complete whole processing;Parts processing method, advanced laser welding mode is used after parts assembling, the present invention devises anti-splashing structure and secondary anti-splashing structure, fitting surface cleannes and assembly precision can be influenceed after solving the problems, such as laser through welding, efficiency is improved, assembly part reduces by 13 parts, saves material 35%, reduce assembly cost, realize automatic production line processing.The present invention is applied to material processing field.

Description

A kind of split planet carrier welding splash-proof method
Technical field
The present invention relates to split planet carrier welding splash-proof method.
Background technology
Planetary gear slow down have it is compact-sized, in light weight, large carrying capacity, transmission efficiency, be widely used in various subtract In fast mechanism, automatic gearbox of vehicles has that requirement is in light weight to reducing gear, transmission efficiency, it is compact-sized it is special will Ask, be the critical component of automatic gearbox of vehicles.At present, automatic gearbox of vehicles largely uses planet gear reducing mechanism, reaches One to four groups
Domestic at present mainly to use overall structure in case, automatic gear-box early development and small lot production have Cost advantage.However, when yield is substantially improved, our cost advantage has not just existed.And this technology is substantially all external Manufacturer monopolizes.
Existing overall structure, planetary gear installation position difficulty of processing is very big, and processing efficiency is low, and cost is with height, automation Production line realizes that difficulty is big, high material consumption (physical treatment).
Split planet carrier precision assembly welding splash-proof technology is that each automobile component part supply business research and development field is urgently to be resolved hurrily Problem.
Existing solution planet carrier Split type structure method mainly has three:(1) restructure and design or using alternative materials.Make With steel alloy hot investment casting, but the material mechanical performance after casting is bad, it is impossible to is applied to gearbox transmission (2) split forging Make, in processing, carburizing and then processing, welding, then in Precision Machining, assembling, but number of parts is relatively more, technique road Line length, manufacturing cost is high, and efficiency is low, and quality control difficulty is big;(3) high-carbon steel precision forging, the preheated weld after high frequency, but not It can realize and assemble high-accuracy welding;Because three of the above method shortcoming is more, therefore it is badly in need of a kind of new method and solves to ask above Topic.
The content of the invention
The present invention is that existing planet carrier high processing costs, efficiency are low, can not realize automatic production line processes in order to solve And the problem of splashing influence parts cleannes and assembly precision is produced during split planet carrier laser welding, and the one kind proposed Split planet carrier welding splash-proof method.
A kind of split planet carrier includes the T-shaped axle of planet carrier and planet carrier p-type support;
The T-shaped axle of planet carrier is made up of circular side panel and axle sleeve two parts, the circular side panel with central gear hole, four Planetary gear hole and four depressed parts, central gear hole position are uniformly distributed in the center of circular side panel, the surrounding in central gear hole Four planetary gear holes, the edge of circular side panel are uniformly arranged four depressed parts, and planetary gear hole and depressed part interlock successively Set, central gear hole and the concentric setting of axle sleeve;
Planet carrier p-type support is with driving tooth wheel bore, four planetary gear holes and four raised disc structures, circle Saw tooth is carried around disk body, driving gear hole position is uniformly distributed four rows in the center of disc, the surrounding of driving tooth wheel bore Star gear hole, the edge of planet carrier p-type support are uniformly arranged four projections, and four planetary gear holes and four projections are handed over successively Mistake is set, and each projection is shaped as partial circle shape, and chamfering, four projections of planet carrier p-type support are carried in each projection Linked together with four depressed parts of the T-shaped axle circular side panel of carrier;Four planetary gear holes of planet carrier p-type support and carrier Four planetary gear holes of T-shaped axle circular side panel correspond.
A kind of split planet carrier welding splash-proof method is realized according to the following steps:
Step 1:The circular side panel of the T-shaped axis blank part of manipulator clamping planet carrier of Digit Control Machine Tool, processing planet carrier are T-shaped The axle sleeve of axis blank part;
Step 2:Axle sleeve process finishing, process circular side panel;
Step 3:Using the T-shaped axle circular side panel processing depressed part of wire rod quality planet carrier;
Step 4:The solder side Vehicle Processing chamfering of planet carrier p-type support;
Step 5:Driving gear is welded on the planet carrier p-type support after step 4 processing;
Step 6:Central gear is installed on the T-shaped axle of planet carrier;
Step 7:The projection of the depressed part of the T-shaped axle of planet carrier and planet carrier p-type support is welded on one using laser welding Rise;The depressed part of the T-shaped axle of planet carrier and the projection of planet carrier p-type support collectively form anti-splashing structure;
Step 8:Planetary gear is installed after step 7 welding.
Invention effect:
The present invention uses precision forging, and then processing, carburizing, reassemble welding;Parts processing can solve planetary gear peace The problem of position difficulty of processing is big is filled, improves more than one times of production efficiency, assembly part reduces by 13 parts, saves material 35% (can be swaged into finished form in advance), reduces assembly cost, it is possible to achieve automatic production line is processed;Originally produce 100000 per year Planet carrier assembly needs 7 process equipments, a driving gear welding equipment, general assembly line (planetary gear, a driving tooth Wheel, sun wheel shaft), 4 process equipments, an erection welding equipment are now only needed, a planetary gear assembly line can be completed Produce more than 200,000 per year, have a good application prospect.The welding of split planet carrier uses advanced method for laser welding, especially exists Welded after parts assembling, fitting surface and the part of prepackage can be influenceed after being penetrated due to laser, the present invention devises anti-fly Structure is splashed, this structure operation is simple, and cost is low, can effective anti-splashing.
With the development of Numeric Control Technology, Digit Control Machine Tool function is increasingly advanced, and its working ability is more and more intrepid, by numerical control Laser welding machine tool develops high-efficiency laser welding assembly method, so as to solve complicated planet carrier assembly with being fitted to each other Processing problems, can efficiently solve that manual labor amount is big, efficiency is low and the problems such as structure/performance repeatability difference.
Brief description of the drawings
Fig. 1 is planet carrier structure figure;
Fig. 2 is planet carrier A-A sectional views;
Fig. 3 is the T-shaped axis side view of planet carrier;
Fig. 4 is circular side panel schematic diagram;A is circle a in figure;
Fig. 5 is planet carrier top view;
Fig. 6 is planet carrier p-type support side view;
Fig. 7 is planet carrier pictorial diagram;
Fig. 8 is the T-shaped axle pictorial diagram of planet carrier;
Fig. 9 is the T-shaped axle material object side view of planet carrier;
Figure 10 is wire rod quality schematic diagram;
Figure 11 is the T-shaped axle circular side panel pictorial diagram of planet carrier;B is welding angle in figure, and C is incident laser;
Figure 12 is planet carrier p-type support schematic diagram;E is chamfering section in figure, and F is solder side in figure;
Figure 13 is planet carrier material object profile;G is optical-fiber laser transmitter in figure, and e is laser, and b is reflection laser, and f is Weld seam, H are to need processing plane to be protected.
Embodiment
Embodiment one:As depicted in figs. 1 and 2, a kind of split planet carrier includes the T-shaped axle 1 of planet carrier and planet carrier P Type support 2;
The T-shaped axle of planet carrier (as shown in Figure 3) 1 is made up of circular side panel 1-1 and axle sleeve 1-2 two parts, the circular side panel (as shown in Fig. 4 and Figure 11) 1-1 carries central gear hole 1-3, four planetary gear hole 1-4 and four depressed part 1-5, sun tooth Wheel bore 1-3 is located at circular side panel 1-1 center, and central gear hole 1-3 surrounding is uniformly distributed four planetary gear hole 1-4, circle Shape side plate 1-1 edge is uniformly arranged four depressed part 1-5, and planetary gear hole 1-4 and depressed part 1-5 are staggered successively, Central gear hole 1-3 and the concentric settings of axle sleeve 1-2;
As shown in figure 5, planet carrier p-type support 2 is convex with driving tooth wheel bore 2-1, four planetary gear hole 1-4 and four 2-2 disc structure is played, carries saw tooth around disc, driving tooth wheel bore 2-1 is located at the center of disc, driving gear Hole 2-1 surrounding is uniformly distributed four planetary gear hole 1-4, and the edge of planet carrier p-type support 2 is uniformly arranged four raised 2- 2, four planetary gear hole 1-4 and four raised 2-2 are staggered successively, and each raised 2-2's is shaped as partial circle shape, often Chamfering, four raised 2-2 of planet carrier p-type support 2 and four depressions of the T-shaped circular side panel of axle 1 of carrier are carried on individual raised 2-2 Portion 1-5 links together;The four of the four planetary gear hole 1-4 and the T-shaped circular side panel 1-1 of axle 1 of carrier of planet carrier p-type support 2 Individual planetary gear hole 1-4 is corresponded.
Embodiment two:Present embodiment is unlike embodiment one:The split planet carrier also wraps Include central gear 3;Central gear 3 is made up of central gear main body and central gear shaft, the central gear shaft insertion T-shaped axle of planet carrier In 1 axle sleeve 1-2.
Other steps and parameter are identical with embodiment one.
Embodiment three:Present embodiment is unlike embodiment one or two:The split planet carrier Also include driving gear 4, driving gear 4 connects the driving gear hole site of planet carrier p-type support 2.
Other steps and parameter are identical with embodiment one or two.
Embodiment four:A kind of split planet carrier welding splash-proof method comprises the following steps:
Step 1:The circular side panel 1-1 of the T-shaped blank of axle 1 of manipulator clamping planet carrier of Digit Control Machine Tool, process planet carrier Axle sleeve 1-2 outlines, boring endoporus, gear hobbing and the drilling of the T-shaped blank of axle 1;
Step 2:Axle sleeve 1-2 process finishings, secondary main shaft synchronously clamp B ends, processing circular side panel 1-1 planes, endoporus and brill Hole;
Step 3:Using the T-shaped circular side panel 1-1 of the axle 1 processing depressed part 1-5 anti-splashing structures of wire rod quality planet carrier;
Step 4:The solder side Vehicle Processing chamfering of planet carrier p-type support 2, as shown in Fig. 6 and Figure 12, formed secondary anti- Splashing structure;
Step 5:Driving gear 4 is welded on the planet carrier p-type support 2 after step 4 processing;
Step 6:Central gear 3 is installed on the T-shaped axle 1 of planet carrier;The T-shaped axle material object of planet carrier is as shown in Figure 8 and Figure 9;
Step 7:Using laser welding by the raised 2-2 of the depressed part 1-5 of the T-shaped axle 1 of planet carrier and planet carrier p-type support 2 Weld together;The depressed part 1-5 of the T-shaped axle 1 of planet carrier and the raised 2-2 of planet carrier p-type support 2 collectively form anti-splashing knot Structure;
Step 8:Planetary gear is installed after step 7 welding.Planet carrier it is in kind as shown in fig. 7, planet carrier material object profile such as Shown in Figure 13.
Embodiment five:Present embodiment is unlike embodiment four:Numerical control in the step 1 Lathe is that turnning and milling is compound and double main shaft double-pole tower structures.
Other steps and parameter are identical with embodiment four.
Embodiment six:Present embodiment is unlike embodiment four or five:In the step 3 Wire rod quality model S60-063Q27-09, as shown in Figure 10.By customizing the wire rod quality with angle and main shaft automatic indexing function Rapid milling is processed
Other steps and parameter are identical with embodiment four or five.
Embodiment seven:Unlike one of present embodiment and embodiment four to six:The step 3 It is middle processing anti-splashing structure detailed process be:
The detailed process of processing anti-splashing structure is in the step 3:
The T-shaped circular side panel 1-1 of axle 1 of planet carrier a diameter of D, using the T-shaped circular side panel 1-1 of axle 1 of the planet carrier center of circle as circle The heart, make circle a by radius of the T-shaped circular side panel 1-1 of axle 1 of planet carrier center and planetary gear hole the 1-4 line of centres;With 0.28D is radius, makees circle a four circumcircles, and the center of circle of each circumcircle is located normal to closest with the circumcircle On the extended line of the T-shaped circular side panel 1-1 diameters of axle 1 of planet carrier of two planetary gear hole 1-4 circle center line connectings;By four circumcircles The position that axle 1 circular side panel 1-1 T-shaped with planet carrier is overlapped is milled into 1.5mm depressed part 1-5, depressed part 1-5 walls and planet carrier The T-shaped circular side panel 1-1 of axle 1 needs processing plane to be protected into hexagonal angle.
After laser through welding, remaining laser energy is also very big, if plane welded seam, then can destroy plane to be protected The part (such as central gear body) assembled, by processing 1.5mm depressed parts (anti-splashing structure), makes remaining laser energy Major part is acted on depressed part wall, and depressed part wall can produce wet look, meeting reflection laser, so depressed part wall is processed when processing Angled (by repeatedly testing this, 120 degree of effects of angle are best), reflects the laser light to not interference position, reaches anti- Splashing effects.
Other steps and parameter are identical with one of embodiment four to six.
Embodiment eight:Unlike one of present embodiment and embodiment four to seven:The step 4 Middle chamfering is chamfering section and the angle of the solder side of planet carrier p-type support (2), and chamfer angle is 28 °~32 °, chamfering section Width be 1.5~2.0mm.
Chamfering can be achieved by Vehicle Processing chamfering, and chamfer angle 30 degree (left and right) is proper, and angle is too small, is welded into Type face is bad, has stomata;Angle is too big, and welding splash-proof effect is deteriorated, and 30 degree of (left and right) angles are drawn by test of many times , the T-shaped shaft assembly of this angle and planet carrier forms 30 degree of angles, reach secondary anti-splashing (i.e. laser reflection when produce Splashing) effect.
A chamfering is done in the solder side of p-type support, a narrow and small inner chamber is formed, metal caused by laser welding is flown Granular absorption is splashed in inner chamber sharp corner, and obstructs stray laser, reaches secondary anti-splashing, is finally reached the preferable effect of anti-splashing Fruit.
Other steps and parameter are identical with one of embodiment four to seven.
Embodiment nine:Unlike one of present embodiment and embodiment four to eight:The step 7 The welding angle of middle laser welding is that the center of circle of incident laser and the T-shaped circular side panel 1-1 of axle 1 of planet carrier and the center of circle of circumcircle connect The angle of line, sin welding angle=0.4d/D, d is central gear (3) diameter.It is critically important to the effect of anti-splashing to weld angle, Angle it is too big, it is necessary to laser power will be very big, splashing, the too small influence welding effect of angle can be produced.
Other steps and parameter are identical with one of embodiment four to eight.

Claims (6)

  1. A kind of 1. split planet carrier welding splash-proof method, it is characterised in that the split planet carrier welding splash-proof method bag Include following steps:
    Step 1:The circular side panel (1-1) of the T-shaped axle of manipulator clamping planet carrier (1) blank of Digit Control Machine Tool, process planet carrier The axle sleeve (1-2) of T-shaped axle (1) blank;
    Step 2:After axle sleeve (1-2) process finishing, circular side panel (1-1) is processed;
    Step 3:Using processing depressed part (1-5) in the T-shaped axle of wire rod quality planet carrier (1) circular side panel (1-1);
    Step 4:The solder side of planet carrier p-type support (2) is got on the bus chamfering;
    Step 5:Driving gear (4) is welded on the planet carrier p-type support (2) after step 4 processing;
    Step 6:By on central gear (3) the installation T-shaped axle of planet carrier (1);
    Step 7:Using laser welding by the projection of the depressed part (1-5) of the T-shaped axle of planet carrier (1) and planet carrier p-type support (2) (2-2) welds together;The depressed part (1-5) of the T-shaped axle of planet carrier (1) and the projection (2-2) of planet carrier p-type support (2) are common Form anti-splashing structure;
    Step 8:Planetary gear is installed after step 7 welding.
  2. 2. a kind of split planet carrier welding splash-proof method according to claim 1, it is characterised in that in the step 1 Digit Control Machine Tool for turnning and milling is compound and double main shaft double-pole tower structures.
  3. 3. a kind of split planet carrier welding splash-proof method according to claim 2, it is characterised in that in the step 3 Wire rod quality model S60-063Q27-09.
  4. 4. a kind of split planet carrier welding splash-proof method according to claim 3, it is characterised in that in the step 3 Processing anti-splashing structure detailed process be:
    A diameter of D of the T-shaped axle of planet carrier (1) circular side panel (1-1), with the center of circle of the T-shaped axle of planet carrier (1) circular side panel (1-1) For the center of circle, make by radius of the line of centres in the center of the T-shaped axle of planet carrier (1) circular side panel (1-1) and planetary gear hole (1-4) Circle a;Using 0.28D as radius, make circle a four circumcircles, the center of circle of each circumcircle is located normal to and the circumcircle distance On the extended line of the T-shaped axle of planet carrier (1) circular side panel (1-1) diameter of two nearest planetary gear hole (1-4) circle center line connectings; Four circumcircles are milled into 1.5mm depressed part (1-5) with the position that the T-shaped axle of planet carrier (1) circular side panel (1-1) overlaps, The wall of depressed part (1-5) needs processing plane to be protected into hexagonal angle with the T-shaped axle of planet carrier (1) circular side panel (1-1).
  5. 5. a kind of split planet carrier welding splash-proof method according to claim 4, it is characterised in that in the step 4 Chamfering is chamfering section and the angle of the solder side of planet carrier p-type support (2), and chamfer angle is 28 °~32 °, chamfering section Width is 1.5~2.0mm.
  6. 6. a kind of split planet carrier welding splash-proof method according to claim 5, it is characterised in that in the step 7 The welding angle of laser welding is the center of circle and the center of circle of circumcircle of incident laser and the T-shaped axle of planet carrier (1) circular side panel (1-1) The angle of line, sin welding angle=0.4d/D, d is central gear (3) diameter.
CN201610566519.5A 2016-07-19 2016-07-19 A kind of split planet carrier welding splash-proof method Active CN106015543B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610566519.5A CN106015543B (en) 2016-07-19 2016-07-19 A kind of split planet carrier welding splash-proof method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610566519.5A CN106015543B (en) 2016-07-19 2016-07-19 A kind of split planet carrier welding splash-proof method

Publications (2)

Publication Number Publication Date
CN106015543A CN106015543A (en) 2016-10-12
CN106015543B true CN106015543B (en) 2018-03-27

Family

ID=57118330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610566519.5A Active CN106015543B (en) 2016-07-19 2016-07-19 A kind of split planet carrier welding splash-proof method

Country Status (1)

Country Link
CN (1) CN106015543B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11619302B2 (en) * 2017-06-14 2023-04-04 Dana Automotive Systems Group, Llc Actuation mechanism
CN107139140B (en) * 2017-07-05 2024-03-19 永康市皇冠电动工具制造有限公司 Hand-held power tool with centering device
CN109877532A (en) * 2018-11-30 2019-06-14 中国第一汽车股份有限公司 A kind of processing method of split type planet carrier assembly
CN110757057A (en) * 2019-10-17 2020-02-07 天津天海同步科技有限公司 Anti-off welding structure and process for welding new energy reducer parts

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101782144A (en) * 2010-03-24 2010-07-21 盛瑞传动股份有限公司 Planet carrier and processing technology thereof
CN102878277A (en) * 2012-10-26 2013-01-16 盛瑞传动股份有限公司 Planet carrier welding assembly and processing technology thereof
CN203067760U (en) * 2013-02-01 2013-07-17 深圳市兆威机电有限公司 Combined planet carrier
CN103277499A (en) * 2013-05-16 2013-09-04 重庆望江工业有限公司 Planet carrier for wind power gear box
CN104148909A (en) * 2014-07-03 2014-11-19 宁夏天地奔牛实业集团有限公司 Manufacturing method of installed and welded type planetary component
CN205937779U (en) * 2016-07-19 2017-02-08 青岛联源通机械有限公司 Components of a whole that can function independently planet carrier

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8187141B2 (en) * 2008-10-24 2012-05-29 Ford Global Technologies, Llc Planet pinion carrier for a gearset

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101782144A (en) * 2010-03-24 2010-07-21 盛瑞传动股份有限公司 Planet carrier and processing technology thereof
CN102878277A (en) * 2012-10-26 2013-01-16 盛瑞传动股份有限公司 Planet carrier welding assembly and processing technology thereof
CN203067760U (en) * 2013-02-01 2013-07-17 深圳市兆威机电有限公司 Combined planet carrier
CN103277499A (en) * 2013-05-16 2013-09-04 重庆望江工业有限公司 Planet carrier for wind power gear box
CN104148909A (en) * 2014-07-03 2014-11-19 宁夏天地奔牛实业集团有限公司 Manufacturing method of installed and welded type planetary component
CN205937779U (en) * 2016-07-19 2017-02-08 青岛联源通机械有限公司 Components of a whole that can function independently planet carrier

Also Published As

Publication number Publication date
CN106015543A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106015543B (en) A kind of split planet carrier welding splash-proof method
CN102927256B (en) Processing technique of planet carrier
CN102678881A (en) Rigid gear and flexible gear which are used for short-tube flexible-gear harmonic speed reducer and machining process thereof
DE102013219445A1 (en) Gear manufacturing process
US11318569B2 (en) Net forged spiral bevel gear
CN110293311B (en) High-precision speed reducer duplex gear production device for robot and use method
US10228053B2 (en) Method of reducing required machining on a pin type carrier
CN101797656A (en) Machine tool five-face milling head
CN205937779U (en) Components of a whole that can function independently planet carrier
CN102528410A (en) Process for manufacturing base body of engineering thin-walled drill
CN110153682B (en) Double helical gear tooth aligning device and use method
CN205967506U (en) Multiaxis puncher
CN201350521Y (en) Five-face milling head for machine tool
CN101111345B (en) A manufacturing method of flange type linear bushing by laser and linear bushing manufactured by the above method
CN206802270U (en) A kind of split type hub reduction gear framework and planet frame installing structure
US5857546A (en) Multiple-disk friction clutch
CN106964822B (en) High-twist handle screwdriver
CN208719160U (en) A kind of crossed roller bearing
CN103659961B (en) Drill bit device with convenient concentricity control function for concentric reducing circles
CN203023322U (en) Spline housing capable of being convenient to connect
CN212868358U (en) Sun gear of planetary gear
CN218325738U (en) Welding structure of main shaft
CN115351517B (en) Machining process for transmission planet carrier assembly
CN220783608U (en) Rotary tool and assembly platform
CN210756181U (en) Knurling tool for hub bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant