CN106013557B - A kind of replaceable unit curtain wall system - Google Patents

A kind of replaceable unit curtain wall system Download PDF

Info

Publication number
CN106013557B
CN106013557B CN201610523783.0A CN201610523783A CN106013557B CN 106013557 B CN106013557 B CN 106013557B CN 201610523783 A CN201610523783 A CN 201610523783A CN 106013557 B CN106013557 B CN 106013557B
Authority
CN
China
Prior art keywords
column
aluminum plug
gear
notch
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610523783.0A
Other languages
Chinese (zh)
Other versions
CN106013557A (en
Inventor
李相林
王红明
单国良
陈红结
赵自茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Grandland Fangte Technology Construction Group Co ltd
Original Assignee
SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd filed Critical SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co Ltd
Priority to CN201610523783.0A priority Critical patent/CN106013557B/en
Publication of CN106013557A publication Critical patent/CN106013557A/en
Application granted granted Critical
Publication of CN106013557B publication Critical patent/CN106013557B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to a kind of replaceable unit curtain wall system;Column A, column B and bottom end rail, the section material section of upper beam is the cloudy frame material with notch, in adjacent column, movable aluminum plug is installed in wherein one side notch of crossbeam, movable aluminum plug is elongated, surfaces externally and internally is plugged with adhesive tape, aluminum plug is fixed in the notch of column and crossbeam by the drive link with gear, column, the section of crossbeam is equipped with twice notch, two aluminum plugs of corresponding installation, the fabrication hole being mutually engaged with gear-driving rod at two is machined with movable aluminum plug surface, with this accurate control aluminum plug movement, gear-driving rod is close to the termination of indoor side, it is designed as triangle or polygon, it coincide with corresponding box spanner size.

Description

A kind of replaceable unit curtain wall system
Technical field
The present invention relates to a kind of replaceable unit curtain wall system.
Background technology
In recent years, as China's economic level develops rapidly, architectural engineering is largely using curtain wall construction as periphery Building decoration, wherein more representative is exactly type unitized curtain wall.According to the development trend of current construction market, will appear from More and more skyscrapers, even high-rise building, because type unitized curtain wall short construction period the characteristics of and items it is superior Performance, increasingly liked be subject to building trade.The professional person that building curtain wall is engaged in this requires us constantly summarizes warp Test, summarize construction technology problem, strengthen the design studies to type unitized curtain wall, progressively design the building list for meeting society need First formula curtain wall new product.
The maintainability of curtain wall is also Curtain Wall Design important step, and now domestic a large amount of cell cube curtain walls are in design for curtain The maintenance and replacement of wall are not given to enough attention, do not design the measure that can be changed, repair, so that in use Damage is produced, can not be recovered, the maintenance, plate to the later stage, which are replaced, brings very big inconvenience, have to use and drop low-quality face When measure.As a result, directly resulting in waste of human resource, architectural appearance is defective, and curtain wall service life is limited, and comprehensive cost carries Height, does not meet the requirement that country advocates " economical and practical, energy saving, low-carbon " yet.
The damage of cell cube curtain wall has many factors, such as glass self-explosion, component service life, keel damage, typhoon, earthquake Etc. all kinds of situations, therefore unit plate carries out maintainability, removable transsexual design is a urgent problem to be solved.
Cell cube curtain wall is the trend trend of top-grade building peripheral protective.The a large amount of Super Highs in city, the building of modern design Designed to type unitized curtain wall properties and propose requirements at the higher level.Therefore watertightness, air-tightness heat insulating ability, the antidetonation of curtain wall are being ensured And outside the excellent performance such as anti-deformation d esign, using the maintenance scheme of cell curtain wall, to change measure as design requirement be necessary.
The content of the invention
The purpose of the present invention is designing a kind of replaceable unit curtain wall system, try hard to make unit plate from design consider early period Maintenance scheme, replace measure, reaches maintenance, changes fast reliably, while save comprehensive cost.So as to ensure that cell cube curtain wall makes The integrality of various functions, quality and maintenance during.
Replaceable unit curtain wall system of the present invention includes:It is column A, column B and bottom end rail, upper beam, movable Aluminum plug, band gear-driving rod, box spanner, adhesive tape;
Column A, column B and bottom end rail, the section material section of upper beam are the cloudy frame material with notch, adjacent column, Movable aluminum plug is installed, movable aluminum plug is elongated, and surfaces externally and internally is plugged with adhesive tape, is led in wherein one side notch of crossbeam Cross the drive link with gear to be fixed on aluminum plug in the notch of column and crossbeam, column, the section of crossbeam are equipped with twice groove Mouthful, it is corresponding that two aluminum plugs are installed, it is machined with the technique being mutually engaged with gear-driving rod at two on movable aluminum plug surface Hole, with this accurate control aluminum plug movement, gear-driving rod is close to the termination of indoor side, is designed as triangle or polygon, and Corresponding box spanner size is coincide.Such as need to change unit plate, only need construction personnel indoors operating sleeve spanner by design Direction rotates band gear-driving rod, and the movement of movable aluminum plug is driven by the rotation with gear-driving rod, make aluminum plug with Reach the switching for being closed into by grafting and departing from open state between left and right and upper and lower plate, see Fig. 5, Fig. 6 operation signal.Unit plate After four sides and periphery plate are disconnected, enough gap spaces are left, under hanging device operation, easily plate can be carried out Mobile dismounting.Plate maintenance finish or new plate it is in place after, coordinated by hanging device, plate installation with vacancy hole at, Construction personnel's operating sleeve spanner allows movable aluminum plug to be in grafting closure state, see Fig. 7 illustrate, unit plate remove and more The process changed is completed.
1. replaceable unit curtain wall system is inserted using the fixation on movable aluminum plug substitution normal cells curtain wall middle-jiao yang, function of the spleen and stomach frame Muscle so that grafting closure, the open two states of disengaging can realize that manual operation switches between plate.To meet aluminum plug activity space Requirement, cloudy frame material must be designed as in cellular system to section material section, and can mutually perfect collocation.
2. gear-driven theory of mechanics used in system controlled with gear-driving rod rotation the moving direction of aluminum plug And distance, processing teeth on aluminium inserted block must be at a fully engaged with the gear of drive link, is precisely operated with the rotating angle of drive link The transmission distance of aluminum plug, control plate that can be fabulous, which interleaves, to be connect size, eliminates construction error.
3. gear-driving rod termination is designed as triangle or polygon, and the box spanner size coordinated is coincide.Construction personnel The drive link rotation of side operating sleeve spanner driving indoors, it is simple and convenient, safe and efficient.
4. being different from the inserting mode of normal cells curtain wall, replaceable unit curtain wall system can be not necessary to pacify by exact sequence Dress.Such as common one module unit plate numbering E of curtain wall is not mounted to position, adjacent volume because of undressed or transport, scene damage reason Number unit plate F, G etc. just smooth cannot be carried out.Normal cells system erection sequence cannot be adjusted, and be bound to cause in special circumstances Extend construction period, reduce project installation progress and benefit.The superior connection design of replaceable cell curtain wall is determined and can be not required to Limited by erection sequence, the flexibility of installation brings great convenience to unit block organization of production, duration control.
The replaceable cellular system of this research and development controls movable aluminium to insert fast movement by the rotation of gear-driving rod, with Grafting closes, departs from the switching freely for opening two states between realizing unit plate, it repairs the convenience changed, fundamentally Solve type unitized curtain wall maintenance, change the problem of plate inconvenience.The superiority of the system, which is embodied in building unit curtain wall, to be made The integrality of various functions, quality and maintenance during is guaranteed, and reduces maintenance cost cost in future, fabulous The call of current energy-saving and environmental protection is responded.In view of extensive use of the type unitized curtain wall in modern society, the new technology of the system, Design studies of the application of technique for reinforcement unit curtain wall, and promote development and improve building curtain wall industrialization, green construction all It is of great significance.
Brief description of the drawings
The cross-sectional schematic diagrames of Fig. 1
Fig. 2, which is erected, cuts open schematic diagram
Fig. 3 a, Fig. 3 b are in column A and bottom end rail installation aluminium inserted block, drive link schematic diagram
The sawtooth of Fig. 4 drive links and the perforate teeth of aluminium inserted block are meshed schematic diagram
Fig. 5 operation spanners rotate counterclockwise, unit plate column the right and left closure, embedded schematic diagram
Fig. 6 operation spanners rotate counterclockwise, both sides closure, embedded schematic diagram above and below unit plate crossbeam
Fig. 7 replaces plate schematic representation and is intended to
In figure:1. column A, 2. column B, 3. bottom end rails, 4. upper beams, 5. movable aluminum plugs, 6. band gear-driving rods, 7. box spanner, 8. adhesive tape;
Fig. 8 standard block plate group frame schematic diagrames
Fig. 9 standard block plate relevant connection plate schematic diagrames
Embodiment
Replaceable unit curtain wall system of the present invention includes:Column A 1, column B 2 and bottom end rail 3, upper beam 4, Movable aluminum plug 5, band gear-driving rod 6, box spanner 7, adhesive tape 8;Each standard block plate is produced in factory-assembled, on Crossbeam 3, bottom end rail 4 are connected on column A 1, column B 2 by screw left and right ends, and the panel of last installation unit is in unit On keel, so far, a standard block plate production is completed, and sees that Fig. 8 illustrates., must be in column A1 with after unit group frame The movable aluminum plug of installation, band gear-driving rod in the groove of crossbeam.Every 5 inside and outside two sides of aluminum plug penetrates adhesive tape 8, leads to Cross two drive links 6 with gear to be fixed on aluminum plug in the notch of column and crossbeam, Fig. 3 a, Fig. 3 b are shown in installation signal.Example Damaged unit plate-B is such as needed to change, Fig. 9 is seen, needs that four side of upper and lower, left and right with cell board-B is had be connected four first Module unit plate releases grafting.The right and left of cell board-B is cell board-A, cell board-C, and upper and lower is cell board-D, unit Plate-E.Operating sleeve spanner rotates band gear-driving rod to construction personnel by design direction indoors, by with gear-driving rod Rotation drives the movement of movable aluminum plug, makes to reach between aluminum plug and left and right and upper and lower plate and is closed into disengaging by grafting and opens The switching of state.After each plate in four side of unit plate and periphery is disconnected, then the connection of lifting unit plate-B and structural beams is (logical Often to mechanically connect, bolt is laid down).Meanwhile under hanging device operation, easily plate can be carried out to move dismounting. Plate maintenance finish or new plate it is in place after, coordinated by hanging device, plate installation with vacancy hole at, unit connector After the installation of first and structural beams is firm, construction personnel's operating sleeve spanner is closed by the movable aluminum plug on four side of cell board in grafting Conjunction state, so far, cell board, which is replaced, to be completed.

Claims (1)

1. a kind of replaceable unit curtain wall system, including:Column A, column B and bottom end rail, upper beam, movable aluminum plug, band Gear-driving rod, box spanner, adhesive tape;It is characterized in that:
Column A, column B and bottom end rail, the section material section of upper beam are the cloudy frame material with notch, in adjacent column, crossbeam Wherein one side notch in movable aluminum plug is installed, movable aluminum plug is elongated, and surfaces externally and internally is plugged with adhesive tape, passes through band The drive link of gear is fixed on aluminum plug in the notch of column and crossbeam, and column, the section of crossbeam are equipped with twice notch, corresponding Two aluminum plugs are installed, the fabrication hole being mutually engaged with gear-driving rod at two is machined with movable aluminum plug surface, with this essence Really the movement of control aluminum plug, gear-driving rod are close to the termination of indoor side, are designed as triangle, and corresponding box spanner ruler It is very little to coincide.
CN201610523783.0A 2016-07-05 2016-07-05 A kind of replaceable unit curtain wall system Expired - Fee Related CN106013557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610523783.0A CN106013557B (en) 2016-07-05 2016-07-05 A kind of replaceable unit curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610523783.0A CN106013557B (en) 2016-07-05 2016-07-05 A kind of replaceable unit curtain wall system

Publications (2)

Publication Number Publication Date
CN106013557A CN106013557A (en) 2016-10-12
CN106013557B true CN106013557B (en) 2018-05-11

Family

ID=57107289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610523783.0A Expired - Fee Related CN106013557B (en) 2016-07-05 2016-07-05 A kind of replaceable unit curtain wall system

Country Status (1)

Country Link
CN (1) CN106013557B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836584A (en) * 2017-03-17 2017-06-13 深圳市广田方特幕墙科技有限公司 A kind of energy-saving replaceable units curtain wall system
CN110409706A (en) * 2018-04-28 2019-11-05 黄郁珺 A kind of photoelectric surface template curtain wall unit plate
CN112681578A (en) * 2020-12-15 2021-04-20 珠海兴业绿色建筑科技有限公司 Unit type curtain wall system
CN113073921B (en) * 2021-03-05 2022-08-02 佛山市金砥柱建筑装饰材料有限公司 Door and window frame mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2683739Y (en) * 2004-01-19 2005-03-09 陕西艺林实业有限责任公司 Combined unit curtain wall
CA2599966A1 (en) * 2005-03-08 2006-09-14 Muridal Inc. Curtain wall system
CN101949186A (en) * 2010-08-27 2011-01-19 杜军桦 Mounting and adjusting structure of building curtain wall vertical column and building body
CN202706267U (en) * 2011-11-16 2013-01-30 广东金刚幕墙工程有限公司 Freestanding type sideslip energy-saving unit curtain wall system
CN104179277A (en) * 2014-08-15 2014-12-03 深圳市广田方特幕墙科技有限公司 Water diversion and drainage system for mixing frame curtain wall
CN205804727U (en) * 2016-07-05 2016-12-14 深圳市广田方特幕墙科技有限公司 A kind of replaceable unit curtain wall system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2683739Y (en) * 2004-01-19 2005-03-09 陕西艺林实业有限责任公司 Combined unit curtain wall
CA2599966A1 (en) * 2005-03-08 2006-09-14 Muridal Inc. Curtain wall system
CN101949186A (en) * 2010-08-27 2011-01-19 杜军桦 Mounting and adjusting structure of building curtain wall vertical column and building body
CN202706267U (en) * 2011-11-16 2013-01-30 广东金刚幕墙工程有限公司 Freestanding type sideslip energy-saving unit curtain wall system
CN104179277A (en) * 2014-08-15 2014-12-03 深圳市广田方特幕墙科技有限公司 Water diversion and drainage system for mixing frame curtain wall
CN205804727U (en) * 2016-07-05 2016-12-14 深圳市广田方特幕墙科技有限公司 A kind of replaceable unit curtain wall system

Also Published As

Publication number Publication date
CN106013557A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013557B (en) A kind of replaceable unit curtain wall system
CN206289813U (en) A kind of big lattice type unitized curtain wall with central post
CN107476508B (en) A kind of intelligence sunshade trellis system
CN206800733U (en) A kind of energy-saving replaceable units curtain wall system
CN205804727U (en) A kind of replaceable unit curtain wall system
CN115839148B (en) Anti-seepage combined type archaize building brick wood
CN215254968U (en) Vertical lifting type stereo garage
CN210316926U (en) Three-point locking type passenger car translation cabin door
CN211714248U (en) Assembled area window wallboard
CN112252519B (en) Connecting structure and construction method of prefabricated wall panel
CN210117853U (en) Combined light wall board
CN110306714B (en) Assembled partition wall furred ceiling structure
CN106836584A (en) A kind of energy-saving replaceable units curtain wall system
CN221073121U (en) Electric metal external wall panel
CN212224563U (en) Suspended ceiling plate with coordinates on back surface and mounting equipment thereof
CN206625455U (en) A kind of steel construction assembled wallboard
CN210342301U (en) Metal fireproof plugging grid
CN106836633A (en) Steel construction assembled wallboard
CN211644641U (en) Secondary water supply scheduling control device for water plant
CN214899910U (en) Indoor and outdoor dual-purpose cable bridge with reinforcing structure
CN221346983U (en) Special-shaped section temporary supporting device for high-pressure composite top plate
CN220014141U (en) Environment-friendly curtain wall for building engineering
CN208056455U (en) A kind of combined type GRC double-layer curtain wall plates
CN221798826U (en) ALC light partition board clamping structure
CN209758943U (en) A lifting machine for calcium silicate board production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518108 Guangdong Baoan District Shenzhen Shiyan Street Ru rented community Huang Feng Ling Industrial Zone 2 big two, three floors.

Patentee after: SHENZHEN GRANDLAND FANGTE TECHNOLOGY CONSTRUCTION GROUP Co.,Ltd.

Address before: 518108 B, Fangda Second Industrial Park, Baoan District, Shenzhen, Guangdong.

Patentee before: SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180511