CN106013351B - A kind of pre-buried type accumulated water drainage device - Google Patents

A kind of pre-buried type accumulated water drainage device Download PDF

Info

Publication number
CN106013351B
CN106013351B CN201610539864.XA CN201610539864A CN106013351B CN 106013351 B CN106013351 B CN 106013351B CN 201610539864 A CN201610539864 A CN 201610539864A CN 106013351 B CN106013351 B CN 106013351B
Authority
CN
China
Prior art keywords
partition board
aligning part
hole
channel
inner cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610539864.XA
Other languages
Chinese (zh)
Other versions
CN106013351A (en
Inventor
彭超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Rui Tong Tong Drainage Technology Co Ltd
Original Assignee
Hunan Rui Tong Tong Drainage Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Rui Tong Tong Drainage Technology Co Ltd filed Critical Hunan Rui Tong Tong Drainage Technology Co Ltd
Priority to CN201610539864.XA priority Critical patent/CN106013351B/en
Publication of CN106013351A publication Critical patent/CN106013351A/en
Application granted granted Critical
Publication of CN106013351B publication Critical patent/CN106013351B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • E03C1/1222Arrangements of devices in domestic waste water pipe-line systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

Present invention seek to address that the problem of being difficult to after existing accumulated water drainage device is pre-buried accurately to positive soil stack, provides a kind of pre-buried type accumulated water drainage device comprising fixing piece and the first aligning part.Fixing piece has third channel;First aligning part has the first through hole through its upper and lower end face;The axis of first through hole and the axis interval of third channel;First aligning part can in third channel circumferentially rotating along third channel;First aligning part also has the first cavity;It is equipped with the first catch basin of opening upwards in first cavity and is passed through the first drainage element of the first catch basin;Under the upper edge for the first catch basin that the lower end of the first passage of first drainage element stretches to;Also there is first aligning part the first water outlet, the first water outlet to be opened in the lower face of the first aligning part;First water outlet is connected to the first cavity and third channel;First water outlet is located at except the first catch basin.The beneficial effects of the invention are as follows soil stack up and down conveniently can be accurately connected after pre-buried.

Description

A kind of pre-buried type accumulated water drainage device
Technical field
The present invention relates to building structure technology fields, in particular to a kind of pre-buried type accumulated water drainage device.
Background technology
Accumulated water drainage device is the exclusion for the ponding of caisson of toilet, kitchen or other positions.Current Building ' industry In floor in the pre-buried structure that uses of accumulated water drainage device have it is pre-buried after be difficult to proper alignment connection soil stack and ask Topic.
Invention content
The present invention is intended to provide a kind of pre-buried type accumulated water drainage device, pre- to solve accumulated water drainage device in the prior art The problem of being difficult to after burying accurately to positive soil stack.
What the embodiment of the present invention was realized in:
A kind of pre-buried type accumulated water drainage device, this pre-buried type accumulated water drainage device includes fixing piece and the first aligning part.Gu Determining part has the third channel through end face and lower face thereon.First aligning part has the through end face thereon and lower face One through-hole;First through hole is connected to third channel;The axis of first through hole and the axis of third channel are spaced;First aligning part In third channel, and the first aligning part can in third channel circumferentially rotating along third channel;First aligning part is also With the first cavity;First cavity is located at the upper end of the peripheral surface of the first aligning part, the inner peripheral surface of first through hole, the first aligning part In the space that face and the lower face of the first aligning part surround;The first catch basin of opening upwards is equipped in first cavity; First aligning part is additionally provided with the first drainage element with first passage;The upper end of the first aligning part is run through in the upper end of first passage The lower end in face, first passage stretches under the upper edge of the first catch basin;First aligning part also have the first water outlet, first Water outlet is opened in the lower face of the first aligning part;First water outlet is connected to the first cavity and third channel;First water outlet position Except the first catch basin.
Fixing piece in the present embodiment, which is fixed on when in use on the end template of floor, carries out pre-buried, upper riser and lower standing tube It is connected in the top and bottom of third channel respectively so that upper riser and lower standing tube being capable of proper drainages.The axis of first through hole with The axis of third channel is spaced, and the first aligning part can in third channel circumferentially rotating along third channel, turn When dynamic first aligning part, the axis of first through hole can be enable to be changed in any position of a circumference, it in this way can be by turning Dynamic first aligning part to facilitate positive upper riser the installation of upper riser.The lower end of the first passage of other first draining stretches to It, can be the when the ponding in floor or caisson flows into the first cavity from the first water inlet under the upper edge of first catch basin One catch basin saves a certain amount of water, forms water seal, the foul smell in third channel is avoided to return in floor, has good water seal Effect.
The advantageous effect of the embodiment of the present invention is:Soil stack up and down conveniently can be accurately connected after pre-buried, and is had Good water seal effect is not in that foul smell returns situation in floor.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the three-dimensional view of the pre-buried type accumulated water drainage device in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the fixing piece in Fig. 1;
Fig. 3 is the structural schematic diagram of the first aligning part in Fig. 1;
Fig. 4 is the A-A sectional views of Fig. 3;
Fig. 5 is the B-B sectional views of Fig. 4;
Fig. 6 is the structural schematic diagram of the second aligning part in Fig. 1;
Fig. 7 is the C-C sectional views of Fig. 6;
Fig. 8 is the D-D sectional views of Fig. 6;
Fig. 9 is the explosive view of Fig. 1;
Figure 10 is a longitudinal sectional view of Fig. 1;
Figure 11 is the structural schematic diagram of the pre-buried state of the fixing piece in Fig. 2;
Figure 12 is the structural schematic diagram of the pre-buried type accumulated water drainage device use state in the embodiment of the present invention;
Figure 13 is the structural schematic diagram at another visual angle of Figure 12.
In figure:
Fixing piece 100;
Third channel 101, annular engagement slot 102;
Upper pipeline section 110, muscle 111;
Lower tube section 120;
Linkage section 130;
Oversheath 140, ring muscle 141;
Water proof ring 150;
Connecting seat 160, connecting hole 161, empty slot 162;
First aligning part 200;
First through hole 201, the first cavity 202, the first catch basin 203, first passage 204, the first water outlet 205;
First space 206, the first matching hole 207, the first water inlet 208;
First drainage element 210;
First outer barrel 221, the first inner cylinder 222;
First roof 231, the first bottom wall 232;
First bulge loop 240;
Second bulge loop 250;
First partition 261, second partition 262;
First sealing of hole block 270, third partition board 271, the 4th partition board 272, the first compartment 273;
Second aligning part 300;
Second through-hole 301, the second cavity 302, the second catch basin 303, second channel 304, the second water outlet 305;
Second space 306, the second matching hole 307, the second water inlet 308;
Second drainage element 310;
Second outer barrel 321, the second inner cylinder 322;
Second roof 331, the second bottom wall 332;
Third bulge loop 350;
5th partition board 361, the 6th partition board 362;
Second sealing of hole block 370, the 7th partition board 371, the 8th partition board 372, the second compartment 373;
Upper riser 400;
Lower standing tube 500;
Floor 600;
Wall 700;
Lower template 810;
Protection cap 820.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this field is common The every other embodiment that technical staff is obtained without making creative work belongs to the model that the present invention protects It encloses.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the present invention, it should be noted that if occur term "center", "upper", "lower", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, Either the invention product using when the orientation or positional relationship usually put, be merely for convenience of the description present invention and simplification retouched It states, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and operation, Therefore it is not considered as limiting the invention.If being only used for distinguishing description in addition, there is term " first ", " second " etc., and It should not be understood as indicating or implying relative importance.
If being not offered as requiring component abswolute level or pendency in addition, there are the terms such as term "horizontal", "vertical", but It can be slightly tilted.It is not to indicate the structure one if "horizontal" refers to only that its direction is more horizontal with respect to for "vertical" It is calmly fully horizontal, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, if there is term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, and can also be detachably to connect for example, it may be being fixedly connected It connects, or is integrally connected;It can be mechanical connection, can also be electrical connection;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Embodiment
Fig. 1 is the three-dimensional view of the pre-buried type accumulated water drainage device in the embodiment of the present invention.Please refer to Fig. 1, the present embodiment A kind of pre-buried type accumulated water drainage device is provided, this pre-buried type accumulated water drainage device includes fixing piece 100,200 and of the first aligning part Second aligning part 300.
Fig. 2 is the structural schematic diagram of the fixing piece 100 in Fig. 1.As shown in Fig. 2, fixing piece 100 includes upper pipeline section 110, position In the lower tube section 120 of 110 lower section of upper pipeline section and the linkage section 130 of connection upper pipeline section 110 and lower tube section 120.110 He of upper pipeline section Lower tube section 120 is straight barrel;Linkage section 130 is the up big and down small conical tube of diameter.Upper pipeline section 110, linkage section 130 and The medial surface of lower tube section 120 connects the third channel 101 to form upper surface and lower face through fixing piece 100.
Continuing with referring to Fig. 2, fixing piece 100 further includes oversheath 140, and oversheath 140 is set in the outside of lower tube section 120 And there is downward opening annular engagement slot 102 between lower tube section 120.Further, the lateral surface of upper pipeline section 110 is equipped with Vertically extending muscle 111.The upper end of oversheath 140 is optionally connected on the outer wall of linkage section 130.Oversheath 140 Lateral surface on have along its circumferentially extending ring muscle 141.Further, in this embodiment oversheath 140 lateral surface on Equipped with multiple ring muscle 141 along the distribution of 140 axis of oversheath.
Referring again to Fig. 2, the lateral surface of upper pipeline section 110 is additionally provided with water proof ring 150.Water proof ring 150 is along upper pipeline section 110 It projects radially outward.
Referring again to Fig. 2, the lower end of the lateral surface of oversheath 140 is circumferentially distributed multiple connecting seats 160;Connecting seat 160 have connecting hole 161.Between one end and the axis of lower tube section 120 of axis of each connecting seat 160 far from lower tube section 120 Differ each other.The lower face of connecting seat 160 has empty slot 162, makes between 160 lower end of connecting seat and the template of floor 600 Contact area is the line style at interval, rather than an entire plane, avoids the unstable of connection.
Fig. 3 is the structural schematic diagram of the first aligning part 200 in Fig. 1, and Fig. 4 is the A-A sectional views of Fig. 3, and Fig. 5 is Fig. 4 The structure of the first aligning part 200 is presented in B-B sectional views, Fig. 3, Fig. 4, Fig. 5 jointly.
As shown in Fig. 3, Fig. 4, Fig. 5, the first aligning part 200 includes the first outer barrel 221, the first inner cylinder 222, the first roof 231 and first bottom wall 232;The medial surface of first inner cylinder 222 surrounds first through hole 201;First through hole 201 runs through the first aligning The upper surface and lower face of part 200.
First inner cylinder 222 is prejudicially set in the first outer barrel 221, is formed between the first inner cylinder 222 and the first outer barrel 221 The first space 206 being vertically open;First roof 231 and the first bottom wall 232 close off the upper end opening in the first space 206 And lower ending opening, the first outer barrel 221, the first inner cylinder 222, the first roof 231 and the first bottom wall 232 surround the first cavity jointly 202, the first cavity 202 surrounded is located at the peripheral surface of the first aligning part 200, the inner peripheral surface of first through hole 201, the first aligning In the space that the upper surface of part 200 and the lower face of the first aligning part 200 surround.
Spaced first partition 261 and second partition 262 are connected between first outer barrel 221 and the first inner cylinder 222; The lower end of first partition 261 and second partition 262 is connected to the upper surface of the first bottom wall 232 and extends upwardly to the first top The lower section of wall forms the first catch basin 203, is formed by 203 opening upwards of the first catch basin and in the first cavity 202.
There is first roof 231 first matching hole 207 of the first cavity 202 of connection and lid to close the of the first matching hole 207 One sealing of hole block 270;The lower face of first sealing of hole block 270 is connected with third partition board 271 and the 4th partition board 272,271 He of third partition board 4th partition board, 272 spaced setting;The both sides of third partition board 271 offset with the first outer barrel 221 and the first inner cylinder 222 respectively It connects, the both sides of the 4th partition board 272 are abutted against with the first outer barrel 221 and the first inner cylinder 222 respectively.The setting of first water inlet 208 exists First sealing of hole block 270, and between third partition board 271 and the 4th partition board 272.
Third partition board 271 and the 4th partition board 272 are respectively positioned in the first catch basin 203, and third partition board 271 and the 4th partition board 272 lower edge extends downward under the upper edge of first partition 261 and second partition 262;First roof 231 is located at the Part between three partition boards 271 and the 4th partition board 272 offers the first water inlet 208;First water inlet 208 with positioned at third every The first compartment 273 between plate 271, the 4th partition board 272 collectively forms first passage 204, the first passage 204 constituted it is upper Through the upper surface of the first aligning part 200, lower end stretches under the upper edge of the first catch basin 203 at end.
The first water outlet 205 is offered on first bottom wall 232, the first water outlet 205 is connected to the first cavity 202 and third is logical Road 101;First water outlet 205 is located at except the first catch basin 203.In the present embodiment, distinguish in the both sides of the first catch basin 203 First water outlet 205 there are one opening up.
The upper edge of first outer barrel 221 radially extends outward to form the first bulge loop 240.First inner cylinder 222 it is following Edge radially extends inwardly to form the second bulge loop 250.
It, can be in the first catch basin when ponding enters third channel 101 from the first water inlet 208 by the first cavity 202 203 save certain water, and the lower end of the first passage 204 of the first drainage element 210 is located at the water for the water that the first catch basin 203 is saved Under face, the foul smell in third channel can be avoided to be returned out by the first cavity 202 and the first water inlet 205, reaching can arrange Water and the water seal effect for avoiding ventilation.
Fig. 6 is the structural schematic diagram of the second aligning part 300 in Fig. 1, and Fig. 7 is the C-C sectional views of Fig. 6, and Fig. 8 is Fig. 7 The concrete structure of the first aligning part 200 is presented in D-D sectional views, Fig. 6, Fig. 7, Fig. 8 jointly.
As shown in Fig. 6, Fig. 7, Fig. 8, the second aligning part 300 includes the second outer barrel 321, the second inner cylinder 322, the second roof 331 and second bottom wall 332;The medial surface of second inner cylinder 322 surrounds the second through-hole 301;Second through-hole 301 runs through the second aligning The upper surface and lower face of part 300.
Second inner cylinder 322 is prejudicially set in the second outer barrel 321, is formed between the second inner cylinder 322 and the second outer barrel 321 The second space 306 being vertically open;Second roof 331 and the second bottom wall 332 close off the upper end opening of second space 306 And lower ending opening, the second outer barrel 321, the second inner cylinder 322, the second roof 331 and the second bottom wall 332 surround the second cavity jointly 302, the second cavity 302 surrounded is located at the peripheral surface of the second aligning part 300, the inner peripheral surface of the second through-hole 301, the second aligning In the space that the upper surface of part 300 and the lower face of the second aligning part 300 surround.
Spaced the 5th partition board 361 and the 6th partition board 362 are connected between second outer barrel 321 and the second inner cylinder 322; The lower end of 5th partition board 361 and the 6th partition board 362 is connected to the upper surface of the second bottom wall 332 and extends upwardly to the second top The lower section of plate forms the second catch basin 303, is formed by 303 opening upwards of the second catch basin and in the second cavity 302. The upper end of second inner cylinder 322 upwardly extends the upper surface of the second roof 331 of protrusion.
There is second roof 331 second matching hole 307 of the second cavity 302 of connection and lid to close the of the second matching hole 307 Two sealing of hole blocks 370;The lower face of second sealing of hole block 370 is connected with the 7th partition board 371 and the 8th partition board 372,371 He of the 7th partition board 8th partition board, 372 spaced setting;The both sides of 7th partition board 371 offset with the second outer barrel 321 and the second inner cylinder 322 respectively It connects, the both sides of the 8th partition board 372 are abutted against with the second outer barrel 321 and the second inner cylinder 322 respectively.The setting of second water inlet 308 exists Second sealing of hole block 370, and between the 7th partition board 371 and the 8th partition board 372.
7th partition board 371 and the 8th partition board 372 are respectively positioned in the second catch basin 303, and the 7th partition board 371 and the 8th partition board 372 lower edge extends downward under the upper edge of the 5th partition board 361 and the 6th partition board 362;Second roof 331 is located at the Part between seven partition boards 371 and the 8th partition board 372 offers the second water inlet 308;Second water inlet 308 with positioned at the 7th every The second compartment 373 between plate 371, the 8th partition board 372 collectively forms second channel 304, the second channel 304 constituted it is upper Through the upper surface of the second aligning part 300, lower end stretches under the upper edge of the second catch basin 303 at end.
The second water outlet 305 is offered on second bottom wall 332, the second water outlet 305 is connected to the second cavity 302 and third is logical Road 101;Second water outlet 305 is located at except the second catch basin 303.In the present embodiment, distinguish in the both sides of the second catch basin 303 Second water outlet 305 there are one opening up.
The lower edge of second inner cylinder 322 radially extends inwardly to form third bulge loop 350.
It, can be in the second catch basin when ponding enters third channel 101 from the second water inlet 308 by the second cavity 302 303 save certain water, and the lower end of the second channel 304 of the second drainage element 310 is located at the water for the water that the second catch basin 303 is saved Under face, the foul smell in third channel can be avoided to be returned out by the second cavity 302 and the second water inlet 308, reaching can arrange Water and the water seal effect for avoiding ventilation.
The fixing piece 100 of this pre-buried type accumulated water drainage device 010, the group of the first aligning part 200 and the second aligning part 300 Dress mode is to be inserted in the first aligning part 200 in the third channel 101 of fixing piece 100 from top, then by the second aligning part 300 From the first through hole 201 that the first aligning part 200 is inserted in top.The package assembly of this pre-buried type accumulated water drainage device 010 Refer to Fig. 9 and Figure 10.
The installation of pre-buried type accumulated water drainage device in the present embodiment includes mainly the pre-buried step of fixing piece, the first eccentric part With the second eccentric part installation steps and upper riser 400 and 500 Connection Step of lower standing tube.
Figure 11 is the structural schematic diagram of the pre-buried state of the fixing piece 100 of the present embodiment.In the lower template 810 of floor 600 After the completion of installing, as shown in figure 9, the fixing piece 100 of this pre-buried type accumulated water drainage device is fixedly connected in lower template 810 Appropriate location.To prevent concrete in casting process from falling into the third channel 101 of fixing piece 100, one can be arranged before pouring The lid of a protection cap 820 closes the upper end opening of fixing piece 100.
In the present embodiment, the fixed position of fixing piece 100 can be controlled by adjusting the distance between itself and wall 700 System can select suitable connecting seat 160 to contradict wall 700, pass through connection according to required distance from the wall in the present embodiment The length of seat 160 controls distance of the fixing piece 100 apart from wall 700.After the fixed position of fixing piece 100 is set, steel is used Nail hammers into from connecting hole 161, fixing piece 100 is fixed on the end template of floor 600, then can carry out floor 600 It pours.
After the completion of the concrete structure pouring of floor 600, the embedded coagulation of ring muscle 141 and muscle 111 on fixing piece 100 In soil structure, the effect of ring muscle 141 is the bonding strength for the concrete structure for reinforcing fixing piece 100 and floor 600, and can Play the displacement of limitation 100 upper and lower directions of fixing piece, it is ensured that 100 position of fixing piece is fixed after pre-buried, makes the side of fixing piece 100 Water resistance between the concrete structure of floor 600.Muscle 111 can also increase the concrete of upper pipeline section 110 and floor 600 The bonding strength of structure, and the degree of freedom that fixing piece 100 is rotated along its axis can be limited, ensure fixing piece 100 and pours The fixation of the concrete structure relative position of floor 600 afterwards, avoid the occurrence of relative displacement generate gap the case where, ensure its with Pour the bonding strength of 600 concrete of rear floor.
Figure 12 is that the pre-buried type accumulated water drainage device installation upper riser 400 of the present embodiment and the structure after lower standing tube 500 are shown It is intended to, i.e. the structural schematic diagram of the use state of the pre-buried type accumulated water drainage device of the present embodiment.Figure 13 is another of Figure 12 The schematic diagram at visual angle.
After the completion of aforementioned fixed seat is pre-buried, protection cap 820 is removed, then the first aligning part 200 and second is installed successively Aligning part 300.Figure 12, Figure 13 are please referred to, wherein the installation method of the first aligning part 200 is, by the first aligning part 200 from fixation The upper pipeline section 110 of part 100 is inserted in third channel 101 so that the upper end of the lower face fitting fixing piece 100 of the first bulge loop 240 Face, first through hole 201(First through hole refers to Fig. 9, similarly hereinafter)It is connected to third channel 101.Coordinated by cylindrical circumferential surface, the One aligning part 200 can in third channel 101 circumferentially rotating along third channel 101.In the present embodiment, first through hole The axis of 201 axis and third channel 101 is spaced, therefore when the rotation of the first aligning part 200, the movement locus of axis For the circle to rotate a circle around the axis of third channel 101.
First aligning part 200 carries out the installation of the second aligning part 300 after installation is complete.Its installation method is to be adjusted second Central member 300 is from the first through hole 201 that the first aligning part 200 is inserted in top until the lower face of the second aligning part 300 fitting the The upper surface of two bulge loops 250, and make the second through-hole 301(Second through-hole refers to Fig. 9, similarly hereinafter)It is connected to third channel 101.It is optional Ground, can make the second aligning part 300 peripheral surface be bonded first through hole 201 medial surface, with realize both sealing cooperation and Enable the second aligning part 300 circumferentially rotating along first through hole 201 in first through hole 201.The axis of second through-hole 301 with The axis of first through hole 201 is spaced, therefore when rotating the second aligning part 300, the movement of the axis of the second aligning part 300 Track is the circle to turn around around the axis rotation of first through hole 201.
After in the first aligning part 200 and the second aligning part 300, installation is complete, as described above, the first aligning part 200 can in fixing piece 100 eccentric rotary, the second aligning part 300 can in the first aligning part 200 eccentric rotary, in this way, It is fixed in fixing piece 100, the movement locus of the axis of the second through-hole 301 of the second aligning part 300(That is second axis The range that can be covered)For an annular, internal diameter is equal between the axis and the axis of first through hole 201 of third channel 101 Distance, outer diameter is equal to the axis and the distance between second through-hole 301 of third channel 101.
After in the first aligning part 200 and the second aligning part 300, installation is complete, this pre-buried type accumulated water drainage device installs At.Next this pre-buried type accumulated water drainage device can be used to connect upper riser 400 and lower standing tube 500.
Lower standing tube 500 can be from below inserted directly into annular engagement slot 102, and then injecting glue bonds.Preferably, annular engagement The width of slot 102 can be set to the thickness more than lower standing tube 500, so that when lower standing tube 500 has certain site error, It can normally be packed into.Pass through and rotate the first aligning part 200 and/or the second aligning part 300 so that the axis of the second through-hole 301 with it is upper Upper riser 400 to just, being then inserted from above into the second through-hole 301 until the lower face of upper riser 400 by the axis of standpipe 400 It is bonded the upper surface of third bulge loop 350, then injecting glue bonding upper riser 400 and the second aligning part 300.It is completed by above step The installation of upper riser 400 and lower standing tube 500.
As previously mentioned, the second through-hole 301 in the present embodiment has large-scale adjustable range, thus even if it is upper vertical The installation position of pipe 400 is equipped with larger deviation, also can make its face upper riser 400 by adjusting the position of the second through-hole 301 Position, ensure upper riser 400 vertical connection.
After upper riser 400 and lower standing tube 500 are mounted on this pre-buried type accumulated water drainage device, there are three drainings for tool altogether Channel, one be from upper riser 400 by third channel 101 enter lower standing tube 500 channel;Secondly for after the completion of pouring Floor 600 on(Include such as the ponding in caisson of toilet)By being discharged from first after first passage 204 and the first cavity 202 Mouth 205 flows into the channel of third channels 101 and lower standing tube 500.This channel can form water seal, can separate in lower standing tube 500 Foul smell prevents it from backing into the space on floor 600 by the drainage channel, influences the air in floor;Thirdly for from On floor 600 after the completion of pouring(Include such as the ponding in caisson of toilet)After second channel 304 and the second cavity 302 The channel of third channel 101 and lower standing tube 500 is flowed into from the second water outlet 305.This channel can form water seal, can separate lower vertical Foul smell in pipe 500 prevents it from backing into the space on floor 600 by the drainage channel, influences the air in floor. These three channels can be achieved at the same time draining and the floor internal water accumulation of standpipe(Including caisson internal water accumulation)Discharge, structure letter Single, practicability is high, and has water seal resistance, and the foul smell in lower standing tube 500 is avoided to enter in floor.
This pre-buried type accumulated water drainage device 010 is after installing upper riser 400 and lower standing tube 500, it is convenient to be tried Water.Its operating method is, the first water inlet 208 and the second water inlet 308 are blocked up with plug plug, then on floor 600 water storage into Row examination water.Plug is can be taken off after the completion of examination water to discharge water.This pre-buried type accumulated water drainage device 010 is using the side for taking out and filling in plug Method carries out examination water, easy to operate, and convenient for repeatedly examination water.
In the present embodiment, it is also necessary to which explanation, as described in the text, this pre-buried type accumulated water drainage device 010 is only There can be aligning, conveniently to the effect of positive upper riser 400 with fixing piece 100 and the first aligning part 200.On at this point, Standpipe 400 is connected to the first through hole 201 of the first aligning part 200.Certainly setting the second aligning part 300 after, the range of aligning or Function further enhances.

Claims (5)

1. a kind of pre-buried type accumulated water drainage device, which is characterized in that the pre-buried type accumulated water drainage device includes:
Fixing piece;The fixing piece has the third channel through end face and lower face thereon;
First aligning part;The first aligning part has the first through hole through end face and lower face thereon;The first through hole It is connected to the third channel;The axis of the first through hole and the axis of the third channel are spaced;
The first aligning part is located in the third channel, and the first aligning part can be in the third channel along institute State circumferentially rotating for third channel;
The first aligning part also has the first cavity;First cavity is located at the peripheral surface, described of the first aligning part The sky that the lower face of the inner peripheral surface of first through hole, the upper surface of the first aligning part and the first aligning part surrounds In;
The first catch basin of opening upwards is equipped in first cavity;
The first aligning part is additionally provided with the first drainage element with first passage;
The upper surface of the first aligning part is run through in the upper end of the first passage, and the lower end of the first passage stretches to described The first catch basin upper edge under;
Also there is the first aligning part the first water outlet, first water outlet to be opened in the lower end of the first aligning part Face;First water outlet is connected to first cavity and the third channel;First water outlet is located at described first and stores Except sink;
The pre-buried type accumulated water drainage device further includes the second aligning part;
The second aligning part has the second through-hole through end face and lower face thereon;Second through-hole is connected to the third Channel;The axis and the axis of the first through hole of second through-hole are spaced;
The second aligning part is located in the first through hole, and the second aligning part can be in the first through hole along institute State circumferentially rotating for first through hole;
The second aligning part also has the second cavity;Second cavity is located at the peripheral surface, described of the second aligning part The sky that the lower face of the inner peripheral surface of second through-hole, the upper surface of the second aligning part and the second aligning part surrounds In;
The second catch basin of opening upwards is equipped in second cavity;
The second aligning part is additionally provided with the second drainage element with second channel;
The upper surface of the second aligning part is run through in the upper end of the second channel, and the lower end of the second channel stretches to described The second catch basin upper edge under;
Also there is the second aligning part the second water outlet, second water outlet to be opened in the lower end of the second aligning part Face;Second water outlet is connected to second cavity and the third channel;Second water outlet is located at described second and stores Except sink;
The first aligning part includes the first outer barrel, the first inner cylinder, the first roof and the first bottom wall;
The peripheral surface of first outer barrel is bonded with the inner peripheral surface of the third channel;
The medial surface of first inner cylinder surrounds the first through hole;
First inner cylinder is prejudicially set in first outer barrel, is formed between first inner cylinder and first outer barrel The first space being vertically open;
First roof and first bottom wall close off the upper end opening and lower ending opening in first space, and described One outer barrel, first inner cylinder, first roof and first bottom wall surround first cavity jointly;
First water outlet is arranged on first bottom wall;
The second aligning part includes the second outer barrel, the second inner cylinder, the second roof and the second bottom wall;
The peripheral surface of second outer barrel is bonded with the inner peripheral surface of the first through hole;
The medial surface of second inner cylinder surrounds second through-hole;
The second inner cylinder bias is set in second outer barrel, and edge is formed between second inner cylinder and second outer barrel The second space of upper and lower opening;
Second roof and second bottom wall close off the upper end opening and lower ending opening of the second space, and described Two outer barrels, second inner cylinder, second roof and second bottom wall surround second cavity jointly;
It is connected with spaced first partition and second partition between first outer barrel and first inner cylinder;Described first The lower end of partition board and the second partition is connected to the upper surface of first bottom wall and extends upwardly to first top The lower section of wall forms first catch basin;
There is first roof the first matching hole for being connected to first cavity and lid to close the first envelope of first matching hole Hole block;The lower face of the first sealing of hole block is connected with third partition board and the 4th partition board, the third partition board and the described 4th every The spaced setting of plate, forms the first compartment between the two;The both sides of the third partition board respectively with first outer barrel and institute It states the first inner cylinder to abut against, the both sides of the 4th partition board are abutted against with first outer barrel and first inner cylinder respectively;The One water inlet is arranged in the first sealing of hole block, and between the third partition board and the 4th partition board;
The third partition board and the 4th partition board are respectively positioned in first catch basin, and the third partition board and the described 4th The lower edge of partition board extends downward under the upper edge of the first partition and the second partition;
Part of first roof between the third partition board and the 4th partition board offers the first water inlet;It is described Space between first water inlet and the third partition board, the 4th partition board collectively forms the first passage;
Spaced the 5th partition board and the 6th partition board are connected between second outer barrel and second inner cylinder;Described 5th The lower end of partition board and the 6th partition board is connected to the upper surface of second bottom wall and extends upwardly to second top The lower section of wall forms second catch basin;
There is second roof the second matching hole for being connected to second cavity and lid to close the second envelope of second matching hole Hole block;The lower face of the second sealing of hole block is connected with the 7th partition board and the 8th partition board, the 7th partition board and the described 8th every The spaced setting of plate;The both sides of 7th partition board are abutted against with second outer barrel and second inner cylinder respectively, described The both sides of 8th partition board are abutted against with second outer barrel and second inner cylinder respectively;Second water inlet is arranged described second Sealing of hole block, and between the 7th partition board and the 8th partition board;
7th partition board and the 8th partition board are respectively positioned in second catch basin, and the 7th partition board and the described 8th The lower edge of partition board extends downward under the upper edge of the 5th partition board and the 6th partition board;
Part of second roof between the 7th partition board and the 8th partition board offers the second water inlet;It is described Space between second water inlet and the 7th partition board, the 8th partition board collectively forms the second channel.
2. pre-buried type accumulated water drainage device according to claim 1, it is characterised in that:
The upper edge of first outer barrel radially extends outward to form the first bulge loop, the lower face fitting of first bulge loop The upper surface of the fixing piece;
The lower edge of first inner cylinder radially extends inwardly to form the second bulge loop, the lower face fitting of second outer barrel The upper surface of second bulge loop.
3. according to the pre-buried type accumulated water drainage device of claim 1 to 2 any one of them, it is characterised in that:
Under the fixing piece includes upper pipeline section, the lower tube section below the upper pipeline section and the connection upper pipeline section and is described The linkage section of pipeline section;
The upper pipeline section and the lower tube section are straight barrel;The linkage section is the up big and down small conical tube of diameter;
The medial surface of the upper pipeline section, the linkage section and the lower tube section connects to form the third channel;
The first aligning part is arranged in the inside of the upper pipeline section, and first bulge loop lower face is bonded the upper pipeline section Upper surface.
4. pre-buried type accumulated water drainage device according to claim 3, it is characterised in that:
The fixing piece further includes oversheath, and the oversheath is set in the outside of the lower tube section and between the lower tube section With downward opening annular engagement slot;
There is the ring muscle along its circumferentially extending on the lateral surface of the oversheath.
5. pre-buried type accumulated water drainage device according to claim 4, it is characterised in that:
The lower end of the lateral surface of the oversheath is circumferentially distributed multiple connecting seats;The connecting seat has connecting hole;
The distance between one end of each axis of the connecting seat far from the lower tube section and the axis of the lower tube section are each other Differ.
CN201610539864.XA 2016-07-11 2016-07-11 A kind of pre-buried type accumulated water drainage device Active CN106013351B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610539864.XA CN106013351B (en) 2016-07-11 2016-07-11 A kind of pre-buried type accumulated water drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610539864.XA CN106013351B (en) 2016-07-11 2016-07-11 A kind of pre-buried type accumulated water drainage device

Publications (2)

Publication Number Publication Date
CN106013351A CN106013351A (en) 2016-10-12
CN106013351B true CN106013351B (en) 2018-10-23

Family

ID=57109487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610539864.XA Active CN106013351B (en) 2016-07-11 2016-07-11 A kind of pre-buried type accumulated water drainage device

Country Status (1)

Country Link
CN (1) CN106013351B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480944A (en) * 2016-12-20 2017-03-08 湖南睿凡同层排水科技有限公司 Swirling flow generator tube and cyclone type drainage arrangement
CN108386621A (en) * 2018-04-28 2018-08-10 重庆恒信水电安装有限公司 A kind of built-in type draining pipe connector
CN111411667A (en) * 2020-04-26 2020-07-14 湖南睿凡同层排水科技有限公司 A leak protection pre-buried device for building plumbing riser installation
CN111809692A (en) * 2020-07-23 2020-10-23 湖南睿凡同层排水科技有限公司 House is not fallen board and is had layer drainage structures

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203947539U (en) * 2014-07-10 2014-11-19 柯先雨 A kind of floor drain of being with can the waterproof orientable Multifunctional sleeve of odor-proof
CN204781161U (en) * 2015-06-15 2015-11-18 南京宁淮管业有限公司 Deodorant water collector of riser
CN205024806U (en) * 2015-07-02 2016-02-10 易军 But can pre -buried landfill adjustable cast iron ponding treater
CN105714917A (en) * 2016-01-30 2016-06-29 高占文 Structural slab embedded part deodorization accumulated water processor and processing system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110101529A (en) * 2010-03-08 2011-09-16 주식회사 청완 Drainage device for pipe laying on floor whit stopwater of unit bath room

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203947539U (en) * 2014-07-10 2014-11-19 柯先雨 A kind of floor drain of being with can the waterproof orientable Multifunctional sleeve of odor-proof
CN204781161U (en) * 2015-06-15 2015-11-18 南京宁淮管业有限公司 Deodorant water collector of riser
CN205024806U (en) * 2015-07-02 2016-02-10 易军 But can pre -buried landfill adjustable cast iron ponding treater
CN105714917A (en) * 2016-01-30 2016-06-29 高占文 Structural slab embedded part deodorization accumulated water processor and processing system

Also Published As

Publication number Publication date
CN106013351A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013351B (en) A kind of pre-buried type accumulated water drainage device
CN106437033A (en) Embedded column footing of steel tube concrete column
CN208219826U (en) A kind of novel pre-buried combined type ponding processor
CN206352329U (en) Swirling flow generator tube and cyclone type drainage arrangement
CN106480944A (en) Swirling flow generator tube and cyclone type drainage arrangement
US7631659B2 (en) Fluid tank
CN107268678A (en) The installation method of pipe gallery madial wall built-in fitting
CN209011163U (en) Manhole lid device
CN110043737B (en) Pre-buried type cyclone joint with water leakage connector
CN203947682U (en) Steel column structure
CN206969398U (en) A kind of in-flanges people hole operation well
CN208415915U (en) The internal corner formwork being adjusted by rotation
CN205907794U (en) Floor drain
CN208519333U (en) Built-in fitting
KR101709287B1 (en) Water control valve having display function of water pipe specification
CN105436122A (en) Annular blade set with flushing device
CN106151714B (en) A kind of pipe connecting device
JPS6131099Y2 (en)
CN210857388U (en) Adjustable water stop joint
CN207700303U (en) A kind of mounting structure of the pedestal of drain valve and the integrated toilet with double water routes
CN205182588U (en) Ore pulp centrifugation stirred tank
CN205742475U (en) Connection structure for drain-pipe
JPS5920429Y2 (en) manhole
JP3306003B2 (en) PVC small caliber muffler with drop-in bart and its use
JPH0327111Y2 (en)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant