CN105986699A - Line changing construction method for double circuit lines on the same tower in power outage state at different time - Google Patents

Line changing construction method for double circuit lines on the same tower in power outage state at different time Download PDF

Info

Publication number
CN105986699A
CN105986699A CN201510038138.5A CN201510038138A CN105986699A CN 105986699 A CN105986699 A CN 105986699A CN 201510038138 A CN201510038138 A CN 201510038138A CN 105986699 A CN105986699 A CN 105986699A
Authority
CN
China
Prior art keywords
tower
shaft
towers
electricity
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510038138.5A
Other languages
Chinese (zh)
Inventor
张波
刘立
杨军永
边芙蓉
王立新
张岩
李岩
贾从云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAIWU KAIYUAN ELECTRIC POWER PROSPECTING AND DESIGN Co Ltd
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
LAIWU KAIYUAN ELECTRIC POWER PROSPECTING AND DESIGN Co Ltd
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAIWU KAIYUAN ELECTRIC POWER PROSPECTING AND DESIGN Co Ltd, State Grid Corp of China SGCC, Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical LAIWU KAIYUAN ELECTRIC POWER PROSPECTING AND DESIGN Co Ltd
Priority to CN201510038138.5A priority Critical patent/CN105986699A/en
Publication of CN105986699A publication Critical patent/CN105986699A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a line changing construction method for double circuit lines on the same tower in a power outage state at different time. The method includes the following steps: a first power transmission line is in outage, a second power transmission line normally transmits power, and the first power transmission line between a first original tower and a second original tower is arranged on a first temporary tower, a second new tower, a third new tower, and a second temporary tower; the second power transmission line is in outage, the first power transmission line transmits power, and the second power transmission line between the first original tower and the second original tower is arranged on a first new tower, the second new tower, the third new tower and a fourth new tower; the second power transmission line transmits power, the first power transmission line is in outage, the first temporary tower and the second temporary tower are removed, the first power transmission line between the first original tower and the second new tower is arranged on the first new tower, and the first power transmission line between the second original tower and the third new tower is arranged on the fourth new tower; and the first power transmission line transmits power, and line changing construction is finished.

Description

Multiple-circuit on same tower construction method of relocating during power down mode when difference
Technical field
When the present invention relates to a kind of multiple-circuit on same tower transformation, the processing method having a power failure during the difference of two lines road, it is a kind of processing method avoiding two lines road simultaneously to have a power failure, belongs to power supply unit technical field, a kind of multiple-circuit on same tower construction method of relocating during power down mode when difference.
Background technology
In the national basis facility power construction of present stage, high-voltage fence is along with expanding economy, and also fast development is got up.Dotted electrical network is interspersed in big ground, and line corridor is more nervous, gets more and more with shaft tower double loop, multi circuit transmission lines.To same shaft tower double-circuit line, the two-way power supply of the most same transformer station, for avoiding affecting enterprise's production and resident's daily life, two lines road can not have a power failure simultaneously.Owing to being affected by local plan and urban development, power circuit much needs to transform, current multiple-circuit on same tower is relocated when constructing, must carry out under power-off condition, then carry out organizing tower and putting stringing below original circuit, this production that certainly will affect periphery enterprise and the daily life of resident.If considering again to set up a road temporary source, the then former circuit of further conversion to this transformer station, one is that cost is at a relatively high, is far longer than the cost that double-circuit line has a power failure;Two is that plant-grid connection system need to be examined, and examines and the erection time is the longest;The most again a road temporary source is set up inadvisable.
By retrieval, have not yet to see in multiple-circuit on same tower transformation process, during the difference of two lines road, under power down mode, carry out the report constructed of relocating.
Summary of the invention
It is an object of the invention to provide a kind of in multiple-circuit on same tower, when transformer station does not has a power failure, ensure user's normal electricity consumption, by increasing interim shaft tower, realize double-circuit line to have a power failure by stages, finally make transmission line of electricity walk around the multiple-circuit on same tower of building construction method of relocating when difference during power down mode.
In order to reach object above, the technical solution adopted in the present invention is: this multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower, No. two former shaft towers, a transmission line of electricity and No. two transmission lines of electricity, a transmission line of electricity and No. two transmission lines of electricity it are designed with on a number former shaft tower and No. two former shaft towers, it is provided with building between a number former shaft tower and No. two former shaft towers, it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity has a power failure, No. two normal power transmissions of transmission line of electricity, a number interim shaft tower, No. two new shaft towers, No. three new shaft towers and No. two interim shaft towers are set between a former shaft tower and No. two former shaft towers, change into a transmission line of electricity between a former shaft tower and No. two former shaft towers setting up on an interim shaft tower, No. two new shaft towers, No. three new shaft towers and No. two interim shaft towers;
(2), No. two transmission lines of electricity have a power failure, a number transmission line of electricity power transmission, a number new shaft tower and No. four new shaft towers are set between a former shaft tower and No. two former shaft towers, change into No. two transmission lines of electricity between a former shaft tower and No. two former shaft towers setting up on a new shaft tower, No. two new shaft towers, No. three new shaft towers and No. four new shaft towers;And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity power transmissions, a number transmission line of electricity has a power failure, remove an interim shaft tower and No. two interim shaft towers, and change into setting up on a new shaft tower by a transmission line of electricity between a former shaft tower and No. two new shaft towers, meanwhile, a transmission line of electricity between No. two former shaft towers and No. three new shaft towers changes into setting up on No. four new shaft towers;
(4), a transmission line of electricity power transmission, construction of relocating completes.
A described interim shaft tower and No. two interim shaft towers use angle tower, and the concrete corner number of degrees are depending on practical situation, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated, and the basic scope of new frame tower avoided by shaft tower.
The beneficial effects of the present invention is: in multiple-circuit on same tower, by increasing interim shaft tower, realize double-circuit line to have a power failure by stages, transmission line of electricity is finally made to walk around building, the most interim repeatable utilization of shaft tower, in the case of not increasing construction investment, it is achieved that has a power failure during multiple-circuit on same tower difference, ensure during track remodelling, do not interfere with enterprise and produce and resident's daily life.
Accompanying drawing explanation
Fig. 1 is the former place on line schematic diagram of the present invention.
Fig. 2 is interim shaft tower and the stringing schematic diagram of new shaft tower of the present invention.
Fig. 3 is the new line position view after the present invention relocates.
In figure: 1, a former shaft tower;2, No. two former shaft towers;3, a transmission line of electricity;4, No. two transmission lines of electricity;5, a new shaft tower;6, No. two new shaft towers;7, No. three new shaft towers;8, No. four new shaft towers;9, an interim shaft tower;10, No. two interim shaft towers.
Detailed description of the invention
This multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower 2, transmission line of electricity 3 of 1, No. two former shaft towers and No. two transmission lines of electricity 4, it is designed with a transmission line of electricity 3 and No. two transmission lines of electricity 4 on a number former shaft tower 1 and No. two former shaft towers 2, it is provided with building between a number former shaft tower 1 and No. two former shaft towers 2, such as Fig. 1, it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity 3 has a power failure, No. two normal power transmissions of transmission line of electricity 4, a number interim shaft tower 6, No. three new shaft towers 7 of 9, No. two new shaft towers and No. two interim shaft towers 10 are set between a former shaft tower 1 and No. two former shaft towers 2, change into a transmission line of electricity 3 between a former shaft tower 1 and No. two former shaft towers 2 setting up on an interim shaft tower 6, No. three new shaft towers 7 of 9, No. two new shaft towers and No. two interim shaft towers 10, such as Fig. 2;
(2), No. two transmission lines of electricity 4 have a power failure, number transmission line of electricity 3 power transmission, a number new shaft tower 5 and No. four new shaft towers 8 are set between a former shaft tower 1 and No. two former shaft towers 2, change into No. two transmission lines of electricity 4 between a former shaft tower 1 and No. two former shaft towers 2 setting up on a new shaft tower 6, No. three new shaft towers 7 of 5, No. two new shaft towers and No. four new shaft towers 8, such as Fig. 2;And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity 4 power transmissions, a number transmission line of electricity 3 has a power failure, remove an interim shaft tower 9 and No. two interim shaft towers 10, and change into setting up on a new shaft tower 5 by a transmission line of electricity 3 between a former shaft tower 1 and No. two new shaft towers 6, meanwhile, a transmission line of electricity 3 between No. two former shaft towers 2 and No. three new shaft towers 7 changes into setting up on No. four new shaft towers 8;
(4), transmission line of electricity 3 power transmission, construction of relocating completes, such as Fig. 3.
A described interim shaft tower 9 and No. two interim shaft towers 10 use angle tower, and the concrete corner number of degrees are depending on practical situation, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated, and the basic scope of new frame tower avoided by shaft tower.
According to building and the requirement of construction environment, between a new shaft tower 6, No. three new shaft towers 7 of 5, No. two new shaft towers and No. four new shaft towers 8, new shaft tower can also be added as requested.

Claims (2)

1. multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower (1), No. two former shaft towers (2), a transmission line of electricity (3) and No. two transmission lines of electricity (4), a transmission line of electricity (3) and No. two transmission lines of electricity (4) it are designed with on a number former shaft tower (1) and No. two former shaft towers (2), it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity (3) has a power failure, No. two normal power transmissions of transmission line of electricity (4), a number interim shaft tower (9), No. two new shaft towers (6), No. three new shaft towers (7) and No. two interim shaft towers (10) are set between a former shaft tower (1) and No. two former shaft towers (2), change into a transmission line of electricity (3) between a former shaft tower (1) and No. two former shaft towers (2) setting up on an interim shaft tower (9), No. two new shaft towers (6), No. three new shaft towers (7) and No. two interim shaft towers (10);
(2), No. two transmission lines of electricity (4) have a power failure, number transmission line of electricity (3) power transmission, a number new shaft tower (5) and No. four new shaft towers (8) are set between a former shaft tower (1) and No. two former shaft towers (2), change into No. two transmission lines of electricity (4) between a former shaft tower (1) and No. two former shaft towers (2) setting up on a new shaft tower (5), No. two new shaft towers (6), No. three new shaft towers (7) and No. four new shaft towers (8);And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity (4) power transmissions, a number transmission line of electricity (3) has a power failure, remove an interim shaft tower (9) and No. two interim shaft towers (10), and change into setting up on a new shaft tower (5) by a transmission line of electricity (3) between a former shaft tower (1) and No. two new shaft towers (6), meanwhile, a transmission line of electricity (3) between No. two former shaft towers (2) and No. three new shaft towers (7) changes into setting up on No. four new shaft towers (8);
(4), transmission line of electricity (3) power transmission, construction of relocating completes.
Multiple-circuit on same tower the most according to claim 1 construction method of relocating during power down mode when difference, it is characterised in that: a described interim shaft tower (9) and No. two interim shaft towers (10) use angle towers, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated.
CN201510038138.5A 2015-01-27 2015-01-27 Line changing construction method for double circuit lines on the same tower in power outage state at different time Pending CN105986699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510038138.5A CN105986699A (en) 2015-01-27 2015-01-27 Line changing construction method for double circuit lines on the same tower in power outage state at different time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510038138.5A CN105986699A (en) 2015-01-27 2015-01-27 Line changing construction method for double circuit lines on the same tower in power outage state at different time

Publications (1)

Publication Number Publication Date
CN105986699A true CN105986699A (en) 2016-10-05

Family

ID=57035503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510038138.5A Pending CN105986699A (en) 2015-01-27 2015-01-27 Line changing construction method for double circuit lines on the same tower in power outage state at different time

Country Status (1)

Country Link
CN (1) CN105986699A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786157A (en) * 2016-12-31 2017-05-31 浙江省送变电工程公司 Transmission line of electricity Great span above the navigation water surface tears aging method open

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001186616A (en) * 1999-12-24 2001-07-06 Showa Electric Wire & Cable Co Ltd Bypassing method for overhead wire
CN103132766A (en) * 2013-03-05 2013-06-05 山东电力集团公司淄博供电公司 Truss for lifting power transmission line tower connecting leg and erection method
CN104594696A (en) * 2014-12-19 2015-05-06 国家电网公司 Construction method for assembling 1000 kV tangent suspension tower through double holding poles

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001186616A (en) * 1999-12-24 2001-07-06 Showa Electric Wire & Cable Co Ltd Bypassing method for overhead wire
CN103132766A (en) * 2013-03-05 2013-06-05 山东电力集团公司淄博供电公司 Truss for lifting power transmission line tower connecting leg and erection method
CN104594696A (en) * 2014-12-19 2015-05-06 国家电网公司 Construction method for assembling 1000 kV tangent suspension tower through double holding poles

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨军永等: "同塔双回线路改造中不能同时停电的处理", 《第四届全国架空输电线路技术交流研讨会论文集》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786157A (en) * 2016-12-31 2017-05-31 浙江省送变电工程公司 Transmission line of electricity Great span above the navigation water surface tears aging method open

Similar Documents

Publication Publication Date Title
CN105986699A (en) Line changing construction method for double circuit lines on the same tower in power outage state at different time
CN204597358U (en) A kind of 10kV overhead transmission line uninterrupted operation device
CN204228890U (en) Multichannel overhead distribution fault and locating device
CN203218848U (en) Plug-in separable shielding connector
CN206992492U (en) A kind of stand for power transmission and distribution
CN206441991U (en) A kind of electric pole lightning protection device
CN205721130U (en) Smart Home platform
CN205104017U (en) System of checking meter is concentrated to intelligence
CN204597230U (en) One is high voltage distribution installation line framework arrangement within doors
CN204349398U (en) Cable termination tower
CN207472457U (en) Wireless remote transmission pressure sensor based on NB-IOT
CN206480476U (en) A kind of cross frame shape transformer structure
CN111064185A (en) Site selection and volume fixing design method for park building attached substation
CN203456828U (en) Overhead wire type terminal wire pulling device
CN203310885U (en) Electric energy meter 485 communication connection port connecting structure
CN205104769U (en) Double -deck built on stilts GIS combined electrical apparatus of being qualified for next round of competitions and distribution lines layout structure thereof
CN204834910U (en) Equipotential grounding of power plant equipment
CN204794354U (en) DC power supply cabinet supervisory equipment
CN204012925U (en) Distribution Network Equipment work condition inspection system
CN203895986U (en) Outdoor intelligent reactive compensation case
CN204030389U (en) 110/220kV integrated transformer substation
CN204230648U (en) Based on the outdoor power distribution unit of Novel tank-type circuit breaker
CN203800929U (en) All-electric carrier communication remote integrated meter reading system
CN101299788B (en) Central power supply, pull far complicant integration group network
CN203104107U (en) Monitoring system for 35kV box type transformer station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161005