CN105986699A - Line changing construction method for double circuit lines on the same tower in power outage state at different time - Google Patents
Line changing construction method for double circuit lines on the same tower in power outage state at different time Download PDFInfo
- Publication number
- CN105986699A CN105986699A CN201510038138.5A CN201510038138A CN105986699A CN 105986699 A CN105986699 A CN 105986699A CN 201510038138 A CN201510038138 A CN 201510038138A CN 105986699 A CN105986699 A CN 105986699A
- Authority
- CN
- China
- Prior art keywords
- tower
- shaft
- towers
- electricity
- transmission line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a line changing construction method for double circuit lines on the same tower in a power outage state at different time. The method includes the following steps: a first power transmission line is in outage, a second power transmission line normally transmits power, and the first power transmission line between a first original tower and a second original tower is arranged on a first temporary tower, a second new tower, a third new tower, and a second temporary tower; the second power transmission line is in outage, the first power transmission line transmits power, and the second power transmission line between the first original tower and the second original tower is arranged on a first new tower, the second new tower, the third new tower and a fourth new tower; the second power transmission line transmits power, the first power transmission line is in outage, the first temporary tower and the second temporary tower are removed, the first power transmission line between the first original tower and the second new tower is arranged on the first new tower, and the first power transmission line between the second original tower and the third new tower is arranged on the fourth new tower; and the first power transmission line transmits power, and line changing construction is finished.
Description
Technical field
When the present invention relates to a kind of multiple-circuit on same tower transformation, the processing method having a power failure during the difference of two lines road, it is a kind of processing method avoiding two lines road simultaneously to have a power failure, belongs to power supply unit technical field, a kind of multiple-circuit on same tower construction method of relocating during power down mode when difference.
Background technology
In the national basis facility power construction of present stage, high-voltage fence is along with expanding economy, and also fast development is got up.Dotted electrical network is interspersed in big ground, and line corridor is more nervous, gets more and more with shaft tower double loop, multi circuit transmission lines.To same shaft tower double-circuit line, the two-way power supply of the most same transformer station, for avoiding affecting enterprise's production and resident's daily life, two lines road can not have a power failure simultaneously.Owing to being affected by local plan and urban development, power circuit much needs to transform, current multiple-circuit on same tower is relocated when constructing, must carry out under power-off condition, then carry out organizing tower and putting stringing below original circuit, this production that certainly will affect periphery enterprise and the daily life of resident.If considering again to set up a road temporary source, the then former circuit of further conversion to this transformer station, one is that cost is at a relatively high, is far longer than the cost that double-circuit line has a power failure;Two is that plant-grid connection system need to be examined, and examines and the erection time is the longest;The most again a road temporary source is set up inadvisable.
By retrieval, have not yet to see in multiple-circuit on same tower transformation process, during the difference of two lines road, under power down mode, carry out the report constructed of relocating.
Summary of the invention
It is an object of the invention to provide a kind of in multiple-circuit on same tower, when transformer station does not has a power failure, ensure user's normal electricity consumption, by increasing interim shaft tower, realize double-circuit line to have a power failure by stages, finally make transmission line of electricity walk around the multiple-circuit on same tower of building construction method of relocating when difference during power down mode.
In order to reach object above, the technical solution adopted in the present invention is: this multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower, No. two former shaft towers, a transmission line of electricity and No. two transmission lines of electricity, a transmission line of electricity and No. two transmission lines of electricity it are designed with on a number former shaft tower and No. two former shaft towers, it is provided with building between a number former shaft tower and No. two former shaft towers, it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity has a power failure, No. two normal power transmissions of transmission line of electricity, a number interim shaft tower, No. two new shaft towers, No. three new shaft towers and No. two interim shaft towers are set between a former shaft tower and No. two former shaft towers, change into a transmission line of electricity between a former shaft tower and No. two former shaft towers setting up on an interim shaft tower, No. two new shaft towers, No. three new shaft towers and No. two interim shaft towers;
(2), No. two transmission lines of electricity have a power failure, a number transmission line of electricity power transmission, a number new shaft tower and No. four new shaft towers are set between a former shaft tower and No. two former shaft towers, change into No. two transmission lines of electricity between a former shaft tower and No. two former shaft towers setting up on a new shaft tower, No. two new shaft towers, No. three new shaft towers and No. four new shaft towers;And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity power transmissions, a number transmission line of electricity has a power failure, remove an interim shaft tower and No. two interim shaft towers, and change into setting up on a new shaft tower by a transmission line of electricity between a former shaft tower and No. two new shaft towers, meanwhile, a transmission line of electricity between No. two former shaft towers and No. three new shaft towers changes into setting up on No. four new shaft towers;
(4), a transmission line of electricity power transmission, construction of relocating completes.
A described interim shaft tower and No. two interim shaft towers use angle tower, and the concrete corner number of degrees are depending on practical situation, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated, and the basic scope of new frame tower avoided by shaft tower.
The beneficial effects of the present invention is: in multiple-circuit on same tower, by increasing interim shaft tower, realize double-circuit line to have a power failure by stages, transmission line of electricity is finally made to walk around building, the most interim repeatable utilization of shaft tower, in the case of not increasing construction investment, it is achieved that has a power failure during multiple-circuit on same tower difference, ensure during track remodelling, do not interfere with enterprise and produce and resident's daily life.
Accompanying drawing explanation
Fig. 1 is the former place on line schematic diagram of the present invention.
Fig. 2 is interim shaft tower and the stringing schematic diagram of new shaft tower of the present invention.
Fig. 3 is the new line position view after the present invention relocates.
In figure: 1, a former shaft tower;2, No. two former shaft towers;3, a transmission line of electricity;4, No. two transmission lines of electricity;5, a new shaft tower;6, No. two new shaft towers;7, No. three new shaft towers;8, No. four new shaft towers;9, an interim shaft tower;10, No. two interim shaft towers.
Detailed description of the invention
This multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower 2, transmission line of electricity 3 of 1, No. two former shaft towers and No. two transmission lines of electricity 4, it is designed with a transmission line of electricity 3 and No. two transmission lines of electricity 4 on a number former shaft tower 1 and No. two former shaft towers 2, it is provided with building between a number former shaft tower 1 and No. two former shaft towers 2, such as Fig. 1, it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity 3 has a power failure, No. two normal power transmissions of transmission line of electricity 4, a number interim shaft tower 6, No. three new shaft towers 7 of 9, No. two new shaft towers and No. two interim shaft towers 10 are set between a former shaft tower 1 and No. two former shaft towers 2, change into a transmission line of electricity 3 between a former shaft tower 1 and No. two former shaft towers 2 setting up on an interim shaft tower 6, No. three new shaft towers 7 of 9, No. two new shaft towers and No. two interim shaft towers 10, such as Fig. 2;
(2), No. two transmission lines of electricity 4 have a power failure, number transmission line of electricity 3 power transmission, a number new shaft tower 5 and No. four new shaft towers 8 are set between a former shaft tower 1 and No. two former shaft towers 2, change into No. two transmission lines of electricity 4 between a former shaft tower 1 and No. two former shaft towers 2 setting up on a new shaft tower 6, No. three new shaft towers 7 of 5, No. two new shaft towers and No. four new shaft towers 8, such as Fig. 2;And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity 4 power transmissions, a number transmission line of electricity 3 has a power failure, remove an interim shaft tower 9 and No. two interim shaft towers 10, and change into setting up on a new shaft tower 5 by a transmission line of electricity 3 between a former shaft tower 1 and No. two new shaft towers 6, meanwhile, a transmission line of electricity 3 between No. two former shaft towers 2 and No. three new shaft towers 7 changes into setting up on No. four new shaft towers 8;
(4), transmission line of electricity 3 power transmission, construction of relocating completes, such as Fig. 3.
A described interim shaft tower 9 and No. two interim shaft towers 10 use angle tower, and the concrete corner number of degrees are depending on practical situation, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated, and the basic scope of new frame tower avoided by shaft tower.
According to building and the requirement of construction environment, between a new shaft tower 6, No. three new shaft towers 7 of 5, No. two new shaft towers and No. four new shaft towers 8, new shaft tower can also be added as requested.
Claims (2)
1. multiple-circuit on same tower construction method of relocating during power down mode when difference, including a former shaft tower (1), No. two former shaft towers (2), a transmission line of electricity (3) and No. two transmission lines of electricity (4), a transmission line of electricity (3) and No. two transmission lines of electricity (4) it are designed with on a number former shaft tower (1) and No. two former shaft towers (2), it is characterised in that: it has comprised the following steps:
(1), a transmission line of electricity (3) has a power failure, No. two normal power transmissions of transmission line of electricity (4), a number interim shaft tower (9), No. two new shaft towers (6), No. three new shaft towers (7) and No. two interim shaft towers (10) are set between a former shaft tower (1) and No. two former shaft towers (2), change into a transmission line of electricity (3) between a former shaft tower (1) and No. two former shaft towers (2) setting up on an interim shaft tower (9), No. two new shaft towers (6), No. three new shaft towers (7) and No. two interim shaft towers (10);
(2), No. two transmission lines of electricity (4) have a power failure, number transmission line of electricity (3) power transmission, a number new shaft tower (5) and No. four new shaft towers (8) are set between a former shaft tower (1) and No. two former shaft towers (2), change into No. two transmission lines of electricity (4) between a former shaft tower (1) and No. two former shaft towers (2) setting up on a new shaft tower (5), No. two new shaft towers (6), No. three new shaft towers (7) and No. four new shaft towers (8);And whole former circuits in the range of demolition of buildings;
(3), No. two transmission line of electricity (4) power transmissions, a number transmission line of electricity (3) has a power failure, remove an interim shaft tower (9) and No. two interim shaft towers (10), and change into setting up on a new shaft tower (5) by a transmission line of electricity (3) between a former shaft tower (1) and No. two new shaft towers (6), meanwhile, a transmission line of electricity (3) between No. two former shaft towers (2) and No. three new shaft towers (7) changes into setting up on No. four new shaft towers (8);
(4), transmission line of electricity (3) power transmission, construction of relocating completes.
Multiple-circuit on same tower the most according to claim 1 construction method of relocating during power down mode when difference, it is characterised in that: a described interim shaft tower (9) and No. two interim shaft towers (10) use angle towers, and cross-arm uses arranged vertically;Shaft tower shaft is positioned at outside circuit, and cross-arm conducting wire hanging point is consistent with the circuit relocated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510038138.5A CN105986699A (en) | 2015-01-27 | 2015-01-27 | Line changing construction method for double circuit lines on the same tower in power outage state at different time |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510038138.5A CN105986699A (en) | 2015-01-27 | 2015-01-27 | Line changing construction method for double circuit lines on the same tower in power outage state at different time |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105986699A true CN105986699A (en) | 2016-10-05 |
Family
ID=57035503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510038138.5A Pending CN105986699A (en) | 2015-01-27 | 2015-01-27 | Line changing construction method for double circuit lines on the same tower in power outage state at different time |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986699A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106786157A (en) * | 2016-12-31 | 2017-05-31 | 浙江省送变电工程公司 | Transmission line of electricity Great span above the navigation water surface tears aging method open |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001186616A (en) * | 1999-12-24 | 2001-07-06 | Showa Electric Wire & Cable Co Ltd | Bypassing method for overhead wire |
CN103132766A (en) * | 2013-03-05 | 2013-06-05 | 山东电力集团公司淄博供电公司 | Truss for lifting power transmission line tower connecting leg and erection method |
CN104594696A (en) * | 2014-12-19 | 2015-05-06 | 国家电网公司 | Construction method for assembling 1000 kV tangent suspension tower through double holding poles |
-
2015
- 2015-01-27 CN CN201510038138.5A patent/CN105986699A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001186616A (en) * | 1999-12-24 | 2001-07-06 | Showa Electric Wire & Cable Co Ltd | Bypassing method for overhead wire |
CN103132766A (en) * | 2013-03-05 | 2013-06-05 | 山东电力集团公司淄博供电公司 | Truss for lifting power transmission line tower connecting leg and erection method |
CN104594696A (en) * | 2014-12-19 | 2015-05-06 | 国家电网公司 | Construction method for assembling 1000 kV tangent suspension tower through double holding poles |
Non-Patent Citations (1)
Title |
---|
杨军永等: "同塔双回线路改造中不能同时停电的处理", 《第四届全国架空输电线路技术交流研讨会论文集》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106786157A (en) * | 2016-12-31 | 2017-05-31 | 浙江省送变电工程公司 | Transmission line of electricity Great span above the navigation water surface tears aging method open |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105986699A (en) | Line changing construction method for double circuit lines on the same tower in power outage state at different time | |
CN204597358U (en) | A kind of 10kV overhead transmission line uninterrupted operation device | |
CN204228890U (en) | Multichannel overhead distribution fault and locating device | |
CN203218848U (en) | Plug-in separable shielding connector | |
CN206992492U (en) | A kind of stand for power transmission and distribution | |
CN206441991U (en) | A kind of electric pole lightning protection device | |
CN205721130U (en) | Smart Home platform | |
CN205104017U (en) | System of checking meter is concentrated to intelligence | |
CN204597230U (en) | One is high voltage distribution installation line framework arrangement within doors | |
CN204349398U (en) | Cable termination tower | |
CN207472457U (en) | Wireless remote transmission pressure sensor based on NB-IOT | |
CN206480476U (en) | A kind of cross frame shape transformer structure | |
CN111064185A (en) | Site selection and volume fixing design method for park building attached substation | |
CN203456828U (en) | Overhead wire type terminal wire pulling device | |
CN203310885U (en) | Electric energy meter 485 communication connection port connecting structure | |
CN205104769U (en) | Double -deck built on stilts GIS combined electrical apparatus of being qualified for next round of competitions and distribution lines layout structure thereof | |
CN204834910U (en) | Equipotential grounding of power plant equipment | |
CN204794354U (en) | DC power supply cabinet supervisory equipment | |
CN204012925U (en) | Distribution Network Equipment work condition inspection system | |
CN203895986U (en) | Outdoor intelligent reactive compensation case | |
CN204030389U (en) | 110/220kV integrated transformer substation | |
CN204230648U (en) | Based on the outdoor power distribution unit of Novel tank-type circuit breaker | |
CN203800929U (en) | All-electric carrier communication remote integrated meter reading system | |
CN101299788B (en) | Central power supply, pull far complicant integration group network | |
CN203104107U (en) | Monitoring system for 35kV box type transformer station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161005 |