CN105986644A - Overturning and hoisting construction device for ultralong arched metal roofing boards - Google Patents
Overturning and hoisting construction device for ultralong arched metal roofing boards Download PDFInfo
- Publication number
- CN105986644A CN105986644A CN201510082152.5A CN201510082152A CN105986644A CN 105986644 A CN105986644 A CN 105986644A CN 201510082152 A CN201510082152 A CN 201510082152A CN 105986644 A CN105986644 A CN 105986644A
- Authority
- CN
- China
- Prior art keywords
- metal roofing
- dome
- nose girder
- thrust
- shaped nose
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides an overturning and hoisting construction device for ultralong arched metal roofing boards. The overturning and hoisting construction device comprises at least one arched guide beam, a stand column, oblique supports, a plate collecting trough, sliding discs and anti-thrust blocking seats, wherein the stand column supports the top of each arched guide beam, the oblique supports are located on the left and right sides of the stand column, the plate collecting trough is formed in the upper end of the stand column, the arched guide beams are sleeved with the sliding discs, and the anti-thrust blocking seats are located at arched feet of the left and right sides of each arched metal roofing board; the bottoms of the arched guide beams, the bottom of the stand column and the bottoms of the left and right oblique supports are all welded to respective bottom plates and are fixed to a concrete foundation through cast-in fixing bolts; the anti-thrust blocking seats are also fixed to the concrete foundation through sill anchors; and in the overturning process of the arched metal roofing boards, due to the reaction thrust effect of the anti-thrust blocking seats, the arched metal roofing boards are overturned gradually along the arched guide beams and are collected in the plate collecting trough, and the basic arch shape of the metal roofing boards in the overturning process keeps not changed. By means of the overturning and hoisting construction device, mounting engineering of the arched metal roofing boards in a large-span building is simple, convenient and quick to operate, and good integrity and airtightness of an arched metal roofing board system in the large-span building are guaranteed.
Description
Technical field
The present invention relates to arch metal roofing board turnniing over and lifting technical field of construction, in particular it relates to
A kind of overlength degree arch metal roofing board turnniing over and lifting constructing device.
Background technology
Long span building metal roof board system need to consider temperature telescopic variation, the problem easily producing seepage.For
This, generally use special fixing seat to connect die mould roof boarding.Die mould roof boarding then by its male and female rib between
Fasten or occlusion is linked to be entirety.When roofing is dome-shaped, then need to pass through secondary in type plane formula roof boarding
Roll-in again, the dome-shaped required for being formed, it is only possible to make between roof boarding, to carry out buckle-type or biting connecions construction.Cause
Secondary roll-in makes roof boarding become arch, therefore by lateral, roof boarding can only be erect mode rolling formation.But will arch
Before shape metal roofing board is lifted on roofing installation, should be (otherwise unstable or broken by the bundle lifting of arch collection by roof boarding
Bad arch).During to this end, the roof boarding laterally erect is stood up into horizontal plane, the arch metal roofing board weight of self
The trend that amount makes arch metal roofing board have a collapse-deformation and damages.Therefore under regular situation, making monolithic can only be made
The length of arch metal roofing board is less than 12 meters.So, need very between long span building then roof boarding
Many lapped configuration, and the construction of lapped configuration and antiseep construction make the construction costs of Roof system greatly increase
Add.
Content of the invention
The technical problem to be solved is to provide a kind of overlength degree arch metal roofing board turnniing over and lifting construction
Device so that the installing engineering of the arch metal roofing board in long span building is simple and efficient to handle, it is ensured that large span
Globality that in building, arch metal roof board system is good, sealing.
For solving above-mentioned technical problem, the present invention provides a kind of overlength degree arch metal roofing board turnniing over and lifting construction
Device, including at least one dome-shaped nose girder, support the column at described dome-shaped nose girder top, be positioned at described column
Left and right sides bearing diagonal, the long-pending board slot being positioned at described column upper end, the sliding plate being set on described dome-shaped nose girder and
The thrust block seat being positioned at the arch springing of the arch metal roofing board left and right sides;
Wherein, described dome-shaped nose girder, described column and around two described bearing diagonals bottom all with each
Base plate welding, be fixed in concrete foundation by cast-in fixing bolt;Described thrust block seat is also solid by sill anchor
It is scheduled in described concrete foundation;Described arch metal roofing board during standing up by described thrust block seat propulsive thrust
Effect, gradually stands up along described dome-shaped nose girder and collects in described long-pending board slot, keeping its base during standing up
This arch is constant.
Alternatively, the described base plate of bottom ribbed stiffener welding of described dome-shaped nose girder;Described dome-shaped nose girder
Top is by angle steel and is bolted on described column.
Alternatively, the welded top of described column has connection top board, and described column is by described connection top board, institute
State angle steel and described bolt to be connected with described dome-shaped nose girder.
Alternatively, connecting plate is passed through at the top of described bearing diagonal and described bolt is connected with described column.
Alternatively, described long-pending board slot collects and supports the described arch metal roofing board having stood up;Described long-pending board slot
Web be connected with described long-pending board slot connecting plate angle welding;The directly edge of a wing with described column, the edge of a wing of described long-pending board slot
Connect with butt weld;The termination of described long-pending board slot is connected with the montant three face weld all around of described long-pending board slot.
Alternatively, described sliding plate is become flute profile by steel plate bending, then makes the edge of a wing of described flute profile curve with hot bending process
The curvature identical with described dome-shaped nose girder, is welded with one piece at the flange edges of the described flute profile having bent and curves
The sheet metal of same curvature, to form box, is enclosed within described dome-shaped nose girder.
Alternatively, described sliding plate is welded with catch and is positioned at described cunning to block described arch metal roofing board
On dish;It is also welded with handle on described sliding plate, hold described sliding plate as workman and be used.
Alternatively, described thrust block seat includes at the bottom of thrust baffle, thrust diagonal brace and the thrust being welded to each other
Plate;
Wherein, described thrust baffle and vertical plane have one first angle, the angle of described first angle and described arch
The termination of shape metal roofing board is corresponding with one second angle of horizontal plane, makes the termination of described arch metal roofing board
Cross section remains orthogonal contact with the plate face of described thrust baffle.
Alternatively, the described concrete foundation located bottom described dome-shaped nose girder has groove foundation ditch, makes workman
Do not stopped by ground when starting the described handle mentioning described sliding plate;Described base plate bottom described dome-shaped nose girder
It with the described cast-in fixing bolt system arranged off-centre in described concrete foundation, and is connected as a single entity with described groove foundation ditch, with
Described groove foundation ditch is stretched in outside the half edge of a wing ensureing described dome-shaped nose girder.
Alternatively, the connecting structure of described bolt, described cast-in fixing bolt and/or described sill anchor is detachably
Construction.
Compared with prior art, the invention have the advantages that
The key technology point of the present invention includes: 1) utilizes the propulsive thrust arranging thrust baffle to offset, overcome arch gold
Belong to internal force and the deformation of the Gravitative Loads generation of roof boarding;2) sliding plate is used to make arch metal roofing board along dome-shaped
Nose girder gradually stands up, and remains shape invariance.Additionally, according to the shape of arch metal roofing board with certainly reset
Meter, the degree of depth calculating long-pending board slot, deformation when making arch metal roofing board collect is in the elastic small deformation model of setting
Within enclosing.
The hoisting construction device of the present invention can make to protect all the time during overlength degree arch metal roofing board turnniing over and lifting effectively
Hold arch and be in the situation of elastic small deformation, overcome conventional lifting method unavoidable arch metal roofing board and exist
METHOD FOR LARGE DEFORMATION ELASTOPLASTIC is occurred to roll over bad problem when standing up.Successfully use overlength degree arch metal roofing board so that
The overall tightness of metal Roof containment system greatly enhances, it is to avoid necessary to little length roof boarding between plate
Lapped configuration and antiseep trouble so that roof boarding installing engineering is simple and efficient to handle, reduces construction costs,
There is good economic benefit.
Sum it up, the present invention with little cost by solve overlength degree arch metal roofing board turnniing over and lifting
Construct this key technology difficult problem so that the installing engineering operation of the arch metal roofing board in long span building becomes
Simple and efficient, it is ensured that the good globality of the arch metal roof board system of long span building, sealing, display
The superiority of its uniqueness.
Brief description
The above and other features of the present invention, character and advantage will be by below in conjunction with the accompanying drawings and embodiment
Description and become readily apparent from, wherein:
Figure 1A is the vertical of the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
Body structural representation;
Figure 1B is the plane of the overlength degree arch metal roofing board turnniing over and lifting constructing device of Figure 1A illustrated embodiment
Arrange schematic diagram;
Fig. 2 be Figure 1B illustrated embodiment overlength degree arch metal roofing board turnniing over and lifting constructing device in along A-A
The side structure schematic diagram of the dome-shaped nose girder of line line of vision;
Fig. 3 A and Fig. 3 B is respectively the overlength degree arch metal roofing board turnniing over and lifting construction of embodiment illustrated in fig. 2
Structure for amplifying schematic diagram to A position and B position in device;
Fig. 4 A be Figure 1B illustrated embodiment overlength degree arch metal roofing board turnniing over and lifting constructing device in edge
The column of line B-B line of vision and the attachment structure schematic diagram of bearing diagonal;
Fig. 4 B is standing in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 4 A illustrated embodiment
Post or bearing diagonal are along the cross section structure schematic diagram of line C-C line of vision;
Fig. 4 C be Fig. 4 A illustrated embodiment overlength degree arch metal roofing board turnniing over and lifting constructing device in D
The structure for amplifying schematic diagram at position;
Fig. 5 A be embodiment illustrated in fig. 2 overlength degree arch metal roofing board turnniing over and lifting constructing device in C
The structure for amplifying schematic diagram at position;
Fig. 5 B is standing in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 5 A illustrated embodiment
Post and long-pending board slot are along the cross section structure schematic diagram of F-F line line of vision;
Fig. 6 A is in the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
The side structure schematic diagram of sliding plate;
Fig. 6 B is the cunning in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 6 A illustrated embodiment
Dish is along the cross section structure schematic diagram of E-E line line of vision;
Fig. 7 A is in the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
The side structure schematic diagram of thrust block seat;
Fig. 7 B is stopping in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 7 A illustrated embodiment
Push and block seat is along the cross section structure schematic diagram of G-G line line of vision;
Fig. 8 is the circular arch in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 3 B illustrated embodiment
Shape nose girder is along the cross section structure schematic diagram of line D-D line of vision.
Reference is concentrated and is illustrated:
1: dome-shaped nose girder 2: column 3: bearing diagonal
4: angle steel 5: long-pending board slot 6: montant
7: connection top board 8: bolt 9: base plate
10: cast-in fixing bolt 12: ribbed stiffener 12 ': long-pending board slot connecting plate
13: connecting plate 15: groove foundation ditch 21: sliding plate
23: catch 24: handle 31: thrust baffle
32: thrust diagonal brace 33: thrust base plate 34: sill anchor
41: arch metal roofing board
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, the invention will be further described, elaborates in the following description
More details in order to fully understand the present invention, but the present invention obviously can be different from that this describes with multiple its
Its mode is implemented, and those skilled in the art can be according to reality application feelings in the case of without prejudice to intension of the present invention
Condition is made similar popularization, is deduced, and therefore should not limit the scope of the invention with the content of this specific embodiment.
Figure 1A is the vertical of the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
Body structural representation;Figure 1B is the overlength degree arch metal roofing board turnniing over and lifting construction of Figure 1A illustrated embodiment
The horizontal layout schematic diagram of device.It should be noted that these and other accompanying drawing follow-up are all only used as example,
It is not to draw according to the condition of equal proportion, and should be in this, as the protection to actual requirement of the present invention
Scope is construed as limiting.As shown in FIG. 1A and 1B, this overlength degree arch metal roofing board turnniing over and lifting construction dress
Put and mainly include that the 1st, at least one dome-shaped nose girder supports the column at dome-shaped nose girder 1 top and the 2nd, be positioned at column 2
The 3rd, left and right sides bearing diagonal is positioned at the sliding plate 21 that the 5th, the long-pending board slot of column 2 upper end is set on dome-shaped nose girder 1
With the thrust block seat 30 being positioned at the arch springing of arch metal roofing board 41 left and right sides.
Wherein, dome-shaped nose girder the 1st, column 2 and around two bearing diagonals 3 bottom all with respective base plate 9
Welding, is fixed in concrete foundation by cast-in fixing bolt 10.Thrust block seat 30 is also solid by sill anchor 34
It is scheduled in concrete foundation.The arch metal roofing board 41 of overlength degree is pushed away by thrust block seat 30 is counter during standing up
Power effect, gradually stands up along dome-shaped nose girder 1 and collects in long-pending board slot 5, keeping it basic during standing up
Arch is constant, and expendable being plastically deformed will not be occurred to damage.
Fig. 2 be Figure 1B illustrated embodiment overlength degree arch metal roofing board turnniing over and lifting constructing device in along A-A
The side structure schematic diagram of the dome-shaped nose girder of line line of vision;Fig. 3 A and Fig. 3 B is respectively embodiment illustrated in fig. 2
Structure for amplifying schematic diagram to A position and B position in overlength degree arch metal roofing board turnniing over and lifting constructing device.
Such as Fig. 2 and combine shown in Fig. 3 A and Fig. 3 B, which show dome-shaped nose girder 1 and column 2 and long-pending board slot 5
Relevance.The bottom of this dome-shaped nose girder 1 ribbed stiffener 12 (Fig. 3 B) welds base plate 9;Dome-shaped nose girder 1
Top be connected on column 2 by angle steel 4 and bolt 8.And the welded top of column 2 has connection top board 7,
Column 2 is connected with dome-shaped nose girder 1 by connecting top board the 7th, angle steel 4 and bolt 8.
More specifically, this dome-shaped nose girder 1 can use HZ140 hot-rolled steel section, and its radius of curvature can be by
According to the arch camber height of arch metal roofing board 41, along the flange width direction employing hot bending one-tenth of HZ140 hot-rolled steel section
Shape.Can be holed 2 φ 18 on the top Mei Bian edge of a wing of dome-shaped nose girder 1, and pitch-row is 50mm.Its upper end is passed through
The bolt 8 of M16 is connected to column 2 top;Its lower end and 20mm base plate 9 and 16mm ribbed stiffener 12 use 6mm
High angle welding connects;It is connected with concrete foundation by M16 cast-in fixing bolt 10.Dome-shaped nose girder 1 need to be ensured
The half of flange width overhang base plate 9, enable the handle 24 of the hand-held sliding plate of workman.
As shown in Figure 3 A and Figure 3 B, which show the connection at dome-shaped nose girder 1 top and arch springing.Column 2 is used
In the top of supporting dome-shaped nose girder 1, can use HZ140 hot-rolled steel section, its upper end is welded with one piece of 16mm even
Connect the connecting plate 13 of top board 7 and two pieces of bearing diagonals 3.Connect and be symmetrically welded two blocks of angle steel 4 of L70X4 on top board 7,
Clear spacing between two angle steel 4 is that the width of dome-shaped nose girder 1 adds 3mm, is taken as 143mm.Every block of angle steel 4
Hole 2 φ 18, and pitch-row is 50mm, for connecting dome-shaped nose girder 1 by the bolt 8 of 4 M16.Column
The upper position of 2 is welded with long-pending board slot 5;Lower end 16mm base plate 9 and M16 cast-in fixing bolt 10 configuration node is even
Connect.Column 2 is all adopted with being connected top board the 7th, connecting plate the 13rd, long-pending board slot connecting plate 12 ', all weld seams of base plate 9
Connect by the high angle welding of 6mm;The angle welding that 4mm is high is used to be connected with the weld seam of angle steel 4.
Fig. 4 A be Figure 1B illustrated embodiment overlength degree arch metal roofing board turnniing over and lifting constructing device in edge
The column of line B-B line of vision and the attachment structure schematic diagram of bearing diagonal;Fig. 4 B is the overlength of Fig. 4 A illustrated embodiment
Column in degree arch metal roofing board turnniing over and lifting constructing device or bearing diagonal are along the cross section structure of line C-C line of vision
Schematic diagram;Fig. 4 C is in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 4 A illustrated embodiment
Structure for amplifying schematic diagram to D position.As shown in Fig. 4 A to Fig. 4 C, this bearing diagonal 3 is used for stabilizer column 2,
Its top is connected with column 2 by connecting plate 13 and bolt 8.This bearing diagonal 3 can use HZ200 hot-rolled steel section,
Keep its stability for support post 2, the connecting plate 13 connecting through 16mm of its top and column 2 and
The bolt 8 of 2 M16, connecting plate 13 respectively with the edge of a wing of column 2 and be connected top board 7 and use twin fillet wolt
Connect.Column 2 bottom is connected by twin fillet wolt with base plate 9, is connected by the cast-in fixing bolt 10 of 2 M16
In concrete foundation.This all angle weldings are 6mm height.
Fig. 5 A be embodiment illustrated in fig. 2 overlength degree arch metal roofing board turnniing over and lifting constructing device in C
The structure for amplifying schematic diagram at position;Fig. 5 B is that the overlength degree arch metal roofing board of Fig. 5 A illustrated embodiment stands up
Column in hoisting construction device and long-pending board slot are along the cross section structure schematic diagram of F-F line line of vision.Such as Fig. 5 A and Fig. 5 B
Shown in, this long-pending board slot 5 is for collecting and supporting the arch metal roofing board 41 having stood up.The web of long-pending board slot 5
It is connected with long-pending board slot connecting plate 12 ' angle welding.The edge of a wing of long-pending board slot 5 is directly and the edge of a wing of column 2 is with butt welding
Seam connects.The termination of long-pending board slot 5 is connected with the montant 6 three face weld all around of long-pending board slot 5.
More specifically, this long-pending board slot 5 bottom girder uses that [14a shaped steel, a length of 800mm are welded on from vertical
At the about 300mm~400m of post 2 top, the horizontal length of corresponding arch metal roofing board 41 is 36m~50mm.
The edge of a wing of long-pending board slot 5 bottom girder is directly and the edge of a wing butt welding of column 2;The upper surface of its web and long-pending board slot connecting plate
12 ' use 6mm angle of elevation solder design;Long-pending board slot 5 bottom girder termination is directly and 6 three solder design of montant, two wings
Edge is butt weld, and web is 4mm high angle welding.Montant 6 uses [14a shaped steel, a length of 500mm.
Fig. 6 A is in the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
The side structure schematic diagram of sliding plate;Fig. 6 B is that the overlength degree arch metal roofing board of Fig. 6 A illustrated embodiment stands up
Sliding plate in hoisting construction device is along the cross section structure schematic diagram of E-E line line of vision.As shown in Figure 6 A and 6 B,
This sliding plate 21 is bent into flute profile by sheet metal, then makes the edge of a wing of flute profile curve and dome-shaped nose girder 1 with hot bending process
Identical curvature, is welded with one block of sheet metal 22 curving same curvature at the flange edges of the flute profile having bent
It to form box, is enclosed within dome-shaped nose girder 1.This sliding plate 21 can carry arch metal roofing board 41 along dome-shaped
Nose girder 1 moves and stands up, and the kiln crown keeping arch metal roofing board 41 during it is constant.This sliding plate 21
The upper solderable catch 23 that is connected to is positioned on sliding plate 21 to block arch metal roofing board 41.Can be also on sliding plate 21
It is welded with handle 24, hold sliding plate 21 as workman and be used.
More specifically, this sliding plate 21 can use the sheet metal that 2mm is thick to be bent into channel member, a length of
600mm, depth of section is 158mm, and flange width is 85mm, to the channel-section steel of cold bending along flange width
Direction uses hot bending mode to shape according to the identical curvature bending of dome-shaped nose girder 1.Again by same curvature bending one
Block 2mm thin plate 22, a length of 600mm, width is 164mm, high with aforesaid channel member 3mm
Angle welding is welded into the sliding plate 21 of box-type section.In the rear end of sliding plate 21 with 3mm angle welding connect one piece of 6mm thickness,
The catch 23 that 80mm is high, 164mm is wide.Connect the handle of a φ 34X2 at catch 23 back with arc weldering
24.This sliding plate 21 should pack in dome-shaped nose girder 1 before dome-shaped nose girder 1 is fixed on column 2,
Hereafter, sliding plate 21 can only constrained movement on dome-shaped nose girder 1.
Fig. 7 A is in the overlength degree arch metal roofing board turnniing over and lifting constructing device of one embodiment of the invention
The side structure schematic diagram of thrust block seat;Fig. 7 B is the overlength degree arch metal roofing board of Fig. 7 A illustrated embodiment
Thrust block seat in turnniing over and lifting constructing device is along the cross section structure schematic diagram of G-G line line of vision.Such as Fig. 7 A and figure
Shown in 7B, this thrust block seat 30 can include thrust baffle the 31st, thrust diagonal brace 32 and being welded to each other
Thrust base plate 33.Wherein, thrust baffle 31 and vertical plane have one first angle, the angle of the first angle and arch
The termination of metal roofing board 41 is corresponding with one second angle of horizontal plane, makes the termination of arch metal roofing board 41
Cross section remains orthogonal contact with the plate face of thrust baffle 31.
More specifically, a set of thrust baffle 31 is particularly important device, is provided arch metal Roof by it
Horizontal reverse thrust at plate 41 arch springing is so that arch keeps constant.Three block lengths can be used to be 550mm, and cross section is high
Degree is 250mm, and thickness is that the light gauge cold-formed steel shape arc butt welding composition one of 2mm includes that one piece of width is
750mm, the thrust block seat 30 of the thrust baffle 31 that height is 550mm, its thrust baffle 31 and vertical plane
First angle identical with the second angle of arch metal roofing board 41 termination and horizontal plane or bigger little by little, can make
Arch metal roofing board 41 termination cross section is essentially orthogonal contact with the plate face of thrust baffle 31.Thrust baffle 31
Upper end and the thrust diagonal brace 32 thick solder design of 2mm;It is 150mm that two thrust diagonal braces 32 use depth of section
Light gauge cold-formed steel shape.Thrust baffle 31 and thrust diagonal brace 32 are all high with 3mm with the thrust base plate 33 of 20mm
Angle welding connect.It is connected in concrete foundation by two M20 sill anchors 34.Thrust baffle 31 with
The horizontal range of arch metal roofing board 41 termination is about 50~80mm (level of corresponding arch metal roofing board
A length of 36m~50m).
In the present embodiment, this arched roof panel 41 is rely and is shaped a part of propulsive thrust of necessary end and pass through
Thrust baffle 31 weld seam reaches thrust diagonal brace 32, and thrust diagonal brace 32 bottom weld seam reaches horizontal reacting force at the bottom of thrust
On plate 33, all of horizontal reverse thrust reaches concrete foundation finally by sill anchor 34.
Fig. 8 is the circular arch in the overlength degree arch metal roofing board turnniing over and lifting constructing device of Fig. 3 B illustrated embodiment
Shape nose girder is along the cross section structure schematic diagram of line D-D line of vision.As shown in Figure 8, place bottom this dome-shaped nose girder 1
Have groove foundation ditch 15 in concrete foundation, make workman when starting the handle 24 mentioning sliding plate 21 not by ground
Stop.Base plate 9 bottom dome-shaped nose girder 1 and the cast-in fixing bolt 10 in concrete foundation are arranged off-centre, and
It is connected as a single entity with groove foundation ditch 15, to ensure to stretch in recess-based hole 15 outside the half edge of a wing of dome-shaped nose girder 1.
More specifically, this groove foundation ditch 15 is obtained by excavating earth surface face, is trapezoid cross section: a vertical plane,
Three about 45 ° of inclined-planes and a planar base surface composition.The wide 150mm in bottom, top width 250mm, deep 100mm,
Long 500mm;Connect together with the lower end concrete foundation of dome-shaped nose girder 1.And require dome-shaped nose girder 1 with
Connecting of concrete foundation arranges that extending recess-based outside the edge of a wing ensureing to there are about a half width cheats 15, to facilitate workman
Hold the handle 24 of sliding plate 21.Groove foundation ditch 15 should use cement sand plaster, with earth in easy cleaning hole
Rubbish etc..
In apparatus above, all of component material can be alternatively Q235 steel for Q345 steel.In addition, in connected mode
On, dome-shaped nose girder 1 is connected by bolt 8 with the angle steel 4 that connects through of column 2;Bearing diagonal 3 and column 2
Connect through connecting plate 13 to be connected by bolt 8;The connection of dome-shaped nose girder 1 and concrete foundation, column 2 with
Bottom the connection of concrete foundation, bearing diagonal 3 with the connection of concrete foundation all by base plate 9 by cast-in fixing bolt
10 connect;Horizontal thrust obtained by thrust baffle 31 is produced by the connection of sill anchor 34.Above-mentioned all
Bolt can be all plain bolt, the connection of the bolt of the present invention the 8th, cast-in fixing bolt 10 and/or sill anchor 34
Construction is detachable construction, facilitates device dismounting, displacement install and reuse.
When arch metal roofing board 41 horizontal length is less than 12m, technical scheme can not be used;
When arch metal roofing board 41 horizontal length more than 12m and less than 36m when, it is possible to use the skill of the present invention
Art scheme;When arch metal roofing board 41 horizontal length is more than 36m but less than 50m, except setting at span centre
Put outside dome-shaped nose girder 1, can also respectively set a corresponding metal roofing board arch camber height at 1/4th spans
Dome-shaped nose girder 1.Use technical scheme, it is proposed that the maximum veneer horizontal length of metal roofing board does not surpasses
Cross 50m.
The technical scheme is that, for light-weight roof slab, the deadweight of plate is less than 3.6kg/m.For plate from
Weight person bigger than normal, can suitably increase the quantity of dome-shaped nose girder 1.By mentioned above principle estimation, bear a heavy burden about at span centre nose girder
Half for arch metal roofing board 41 deadweight adds sliding plate 21 weight again, is usually no more than 70kg.At operation arch
When shape metal roofing board 41 stands up construction, a workman can be respectively arranged to bear at the arch springing of arch metal roofing board 41
Duty guides roof boarding 41 to be in tram;Two workmans should be arranged arch gold in dome-shaped nose girder 1 position
Belong to roof boarding 41 to be placed on sliding plate 21;Then, respectively hold one end of the handle 24 of sliding plate 21, lead along dome-shaped
Beam 1 moves arch metal roofing board 41 to dome-shaped nose girder 1 top, then shelves arch metal roofing board 41
In long-pending board slot 5, after plate to be amassed extremely some pieces (being less than 10 pieces), binding lifting.Plate level length is not
During more than 36m, available 4 lifting methods, hoisting point position from the plate level length less than 10% for the termination distance,
Remaining hoisting point position is divided equally;And plate level length more than 36m when, 6 lifting methods can be used, suspension centre is from termination
The plate level length less than 5% for the distance, remaining hoisting point position is divided equally.
For coordinating what workman moved overlength degree arch metal roofing board 41 to stand up movement, need to build temporary platform building
Ladder rung, at the top of dome-shaped nose girder 1, the height that the absolute altitude of platform is preferably dome-shaped nose girder 1 deducts 1m,
Mark time every grade high 180~200mm, wide 250mm.
When frictional force is bigger between sliding plate 21 and dome-shaped nose girder 1, a little oil lubricating can be smeared.
It when wind-force is bigger, is unfit to do the turnniing over and lifting construction of arch metal roofing board 41.
In sum, the key technology point of the present invention includes: 1) utilize the propulsive thrust that thrust baffle is set to offset,
Overcome the internal force that the Gravitative Loads of arch metal roofing board produces and deformation;2) sliding plate is used to make arch metal Roof
Plate gradually stands up along dome-shaped nose girder, and remains shape invariance.Additionally, according to the shape of arch metal roofing board
Shape and deadweight design, the degree of depth calculating long-pending board slot, deformation when making arch metal roofing board collect is in the bullet of setting
Within the scope of property small deformation.
The hoisting construction device of the present invention can make to protect all the time during overlength degree arch metal roofing board turnniing over and lifting effectively
Hold arch and be in the situation of elastic small deformation, overcome conventional lifting method unavoidable arch metal roofing board and exist
METHOD FOR LARGE DEFORMATION ELASTOPLASTIC is occurred to roll over bad problem when standing up.Successfully use overlength degree arch metal roofing board so that
The overall tightness of metal Roof containment system greatly enhances, it is to avoid necessary to little length roof boarding between plate
Lapped configuration and antiseep trouble so that roof boarding installing engineering is simple and efficient to handle, reduces construction costs,
There is good economic benefit.
Sum it up, the present invention with little cost by solve overlength degree arch metal roofing board turnniing over and lifting
Construct this key technology difficult problem so that the installing engineering operation of the arch metal roofing board in long span building becomes
Simple and efficient, it is ensured that the good globality of the arch metal roof board system of long span building, sealing, display
The superiority of its uniqueness.
Although the present invention is open as above with preferred embodiment, but it is not for limiting the present invention, any ability
Field technique personnel without departing from the spirit and scope of the present invention, can make possible variation and modification.Therefore,
Every content without departing from technical solution of the present invention, according to appointing that above example is made by the technical spirit of the present invention
What modification, equivalent variations and modification, each fall within the protection domain that the claims in the present invention are defined.
Claims (10)
1. an overlength degree arch metal roofing board turnniing over and lifting constructing device, including at least one dome-shaped nose girder
(1), support the column (2) at described dome-shaped nose girder (1) top, be positioned at described column (2) left and right sides
It bearing diagonal (3), is positioned at the long-pending board slot (5) of described column (2) upper end, is set in described dome-shaped nose girder (1)
On sliding plate (21) and the thrust block seat (30) being positioned at the arch springing of arch metal roofing board (41) left and right sides;
Wherein, described dome-shaped nose girder (1), described column (2) and two described bearing diagonals (3) around
Bottom all with respective base plate (9) welding, be fixed in concrete foundation by cast-in fixing bolt (10);Institute
State thrust block seat (30) to be also secured in described concrete foundation by sill anchor (34);Described arch metal
Roof boarding (41) during standing up by the propulsive thrust effect of described thrust block seat (30), along described dome-shaped nose girder
(1) gradually stand up and collect in described long-pending board slot (5), keeping it substantially arcuate constant during standing up.
2. turnniing over and lifting constructing device according to claim 1, it is characterised in that described dome-shaped nose girder
(1) bottom ribbed stiffener (12) welds described base plate (9);The top of described dome-shaped nose girder (1) leads to
Cross angle steel (4) and bolt (8) is connected on described column (2).
3. turnniing over and lifting constructing device according to claim 2, it is characterised in that described column (2)
Welded top has connection top board (7), and described column (2) is by described connection top board (7), described angle steel (4)
It is connected with described dome-shaped nose girder (1) with described bolt (8).
4. turnniing over and lifting constructing device according to claim 3, it is characterised in that described bearing diagonal (3)
Top pass through connecting plate (13) and described bolt (8) and be connected with described column (2).
5. turnniing over and lifting constructing device according to claim 4, it is characterised in that described long-pending board slot (5)
Collect and support the described arch metal roofing board (41) stood up;The web of described long-pending board slot (5) with described
Long-pending board slot connecting plate (12 ') angle welding connects;The edge of a wing of described long-pending board slot (5) directly with described column (2)
The edge of a wing with butt weld connect;The termination of described long-pending board slot (5) and the montant (6) of described long-pending board slot (5)
Three face weld all arounds connect.
6. turnniing over and lifting constructing device according to claim 5, it is characterised in that described sliding plate (21)
Steel plate bending is become flute profile, then makes the edge of a wing of described flute profile curve and described dome-shaped nose girder (1) with hot bending process
Identical curvature, is welded with one block of sheet metal curving same curvature at the flange edges of the described flute profile having bent
(22) it to form box, is enclosed within described dome-shaped nose girder (1).
7. turnniing over and lifting constructing device according to claim 6, it is characterised in that described sliding plate (21)
On be welded with catch (23) and be positioned on described sliding plate (21) to block described arch metal roofing board (41);
It is also welded with handle (24) on described sliding plate (21), hold described sliding plate (21) as workman and be used.
8. turnniing over and lifting constructing device according to claim 7, it is characterised in that described thrust block seat (30)
Including the thrust baffle being welded to each other (31), thrust diagonal brace (32) and thrust base plate (33);
Wherein, described thrust baffle (31) and vertical plane have one first angle, the angle of described first angle with
The termination of described arch metal roofing board (41) is corresponding with one second angle of horizontal plane, makes described arch metal
The termination cross section of roof boarding (41) remains orthogonal contact with the plate face of described thrust baffle (31).
9. turnniing over and lifting constructing device according to claim 8, it is characterised in that described dome-shaped nose girder
(1) have groove foundation ditch (15) in the described concrete foundation at bottom, make workman start to mention described cunning
Do not stopped by ground during described handle (24) of dish (21);The described end of described dome-shaped nose girder (1) bottom
Described cast-in fixing bolt (10) in plate (9) and described concrete foundation is arranged off-centre, and with described recess-based
Hole (15) is connected as a single entity, to ensure to stretch in described groove foundation ditch outside the half edge of a wing of described dome-shaped nose girder (1)
(15)。
10. turnniing over and lifting constructing device according to claim 9, it is characterised in that described bolt (8),
The connecting structure of described cast-in fixing bolt (10) and/or described sill anchor (34) is dismountable construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510082152.5A CN105986644A (en) | 2015-02-15 | 2015-02-15 | Overturning and hoisting construction device for ultralong arched metal roofing boards |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510082152.5A CN105986644A (en) | 2015-02-15 | 2015-02-15 | Overturning and hoisting construction device for ultralong arched metal roofing boards |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105986644A true CN105986644A (en) | 2016-10-05 |
Family
ID=57042524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510082152.5A Pending CN105986644A (en) | 2015-02-15 | 2015-02-15 | Overturning and hoisting construction device for ultralong arched metal roofing boards |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986644A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107864783A (en) * | 2017-12-08 | 2018-04-03 | 四川省现代农人种苗科技有限公司 | A kind of plant greenhouse ceiling installs equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5233799A (en) * | 1990-04-09 | 1993-08-10 | Toko Tekko Kabushiki Kaisha | Arched building structure |
JP2008150862A (en) * | 2006-12-18 | 2008-07-03 | Public Works Research Institute | Reinforcing structure and reinforcing method of steel floor slab |
CN203684407U (en) * | 2014-01-09 | 2014-07-02 | 重庆科创职业学院 | Roof installing structure of steel structure factory building |
CN203959663U (en) * | 2014-05-26 | 2014-11-26 | 中国建筑一局(集团)有限公司 | Large-size plate hoisting device |
CN104234437A (en) * | 2014-09-05 | 2014-12-24 | 河北钢铁股份有限公司邯郸分公司 | Method for mounting large arched roof panels |
CN204571114U (en) * | 2015-02-15 | 2015-08-19 | 美联钢结构建筑系统(上海)股份有限公司 | Overlength degree arch metal roofing board turnniing over and lifting construction equipment |
-
2015
- 2015-02-15 CN CN201510082152.5A patent/CN105986644A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5233799A (en) * | 1990-04-09 | 1993-08-10 | Toko Tekko Kabushiki Kaisha | Arched building structure |
JP2008150862A (en) * | 2006-12-18 | 2008-07-03 | Public Works Research Institute | Reinforcing structure and reinforcing method of steel floor slab |
CN203684407U (en) * | 2014-01-09 | 2014-07-02 | 重庆科创职业学院 | Roof installing structure of steel structure factory building |
CN203959663U (en) * | 2014-05-26 | 2014-11-26 | 中国建筑一局(集团)有限公司 | Large-size plate hoisting device |
CN104234437A (en) * | 2014-09-05 | 2014-12-24 | 河北钢铁股份有限公司邯郸分公司 | Method for mounting large arched roof panels |
CN204571114U (en) * | 2015-02-15 | 2015-08-19 | 美联钢结构建筑系统(上海)股份有限公司 | Overlength degree arch metal roofing board turnniing over and lifting construction equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107864783A (en) * | 2017-12-08 | 2018-04-03 | 四川省现代农人种苗科技有限公司 | A kind of plant greenhouse ceiling installs equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101435276B (en) | Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof | |
JP2022530596A (en) | Secondary lining high-speed construction structure and method in excavation tunnels with various variable cross sections | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN100362200C (en) | Supporting displacement method for lifting component and supporting system thereof | |
CN112726411A (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
CN103114754A (en) | Alternative hoisting method for conjoined coal bunker top truss girder pre-placing | |
CN204571114U (en) | Overlength degree arch metal roofing board turnniing over and lifting construction equipment | |
CN105971110A (en) | Construction method for fire control corridor steel structure supporting system | |
CN105986644A (en) | Overturning and hoisting construction device for ultralong arched metal roofing boards | |
JP7370626B2 (en) | Side span support structure for a continuous T-girder viaduct spanning the existing railway line | |
CN216839041U (en) | Simple bent frame for bridge diaphragm plate structure construction | |
CN205804178U (en) | Scalable without holder device for the liftable of bridge coping construction | |
CN212201400U (en) | Assembled steel structure external hanging type protective frame | |
CN209212239U (en) | A kind of vertical shaft concrete roof constructing device | |
CN208717939U (en) | A kind of efficiently molding building hoist foundation structure | |
CN112942809A (en) | Combined template assembling method capable of realizing mechanical construction | |
CN206846097U (en) | A kind of Men Gangyu frameworks separately-loaded pipeline support structure | |
CN115075530B (en) | Cantilever structure and construction method thereof | |
CN110952765A (en) | Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform | |
CN219732766U (en) | Large-span beam string formwork supporting structure | |
CN218405026U (en) | Section steel combined bridge | |
CN215714672U (en) | Synchronous pre-compaction reference segment bracket construction equipment | |
CN213953062U (en) | Steel guardrail bar form convenient to disassemble | |
CN220285464U (en) | Safety protection railing | |
CN221167449U (en) | Movable lower hanging operation platform structure for operation of bottom surface of bridge superposed beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161005 |