CN105978008B - A kind of redox flow battery energy storage system and its working method with wind field black starting-up function - Google Patents

A kind of redox flow battery energy storage system and its working method with wind field black starting-up function Download PDF

Info

Publication number
CN105978008B
CN105978008B CN201510837505.8A CN201510837505A CN105978008B CN 105978008 B CN105978008 B CN 105978008B CN 201510837505 A CN201510837505 A CN 201510837505A CN 105978008 B CN105978008 B CN 105978008B
Authority
CN
China
Prior art keywords
flow battery
management system
energy storage
battery
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510837505.8A
Other languages
Chinese (zh)
Other versions
CN105978008A (en
Inventor
邵家云
张华民
马相坤
徐世博
韩乐聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Rongke Power Co Ltd
Original Assignee
Dalian Rongke Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Rongke Power Co Ltd filed Critical Dalian Rongke Power Co Ltd
Priority to CN201510837505.8A priority Critical patent/CN105978008B/en
Publication of CN105978008A publication Critical patent/CN105978008A/en
Application granted granted Critical
Publication of CN105978008B publication Critical patent/CN105978008B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/386
    • H02J3/387
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Fuel Cell (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The invention discloses a kind of redox flow battery energy storage system and its working method with wind field black starting-up function, the redox flow battery energy storage system includes:Flow battery system;First transformer;The energy storage inverter being connected with the flow battery system and first transformer;Battery management system;The Energy Management System being connected with the battery management system, energy storage inverter and the first bus;The Energy Management System is after knowing the power-off of the first bus, judge whether the flow battery system present battery SOC of battery management system feedback meets certain predetermined condition, and is issued according to the judging result that flow battery system present battery SOC meets certain predetermined condition into black starting-up mode control instruction;The present invention can be after the stoppage in transit of entire wind field power loss, under conditions of other grid transmissions can not be relied on to restore, and unit and sub-load by flow battery system to wind field without starting ability are powered, and gradually expands the recovery range of system.

Description

A kind of redox flow battery energy storage system and its working method with wind field black starting-up function
Technical field
The present invention relates to a kind of flow battery technology field, specially a kind of flow battery with wind field black starting-up function Energy-storage system and its working method.
Background technique
Flow battery has that flexible design (power and capacity can independent design), long service life, charge-discharge performance be good, choosing Not available for other conventional batteries such as location freedom, energy efficiency height, safety and environmental protection, the low and easy realization scale electric power storage of maintenance cost Plurality of advantages.When practical application, flow battery can be widely applied to the renewable energy systems such as wind energy, solar energy work For energy-storage system, enable the output of the electric power continuous-stable generated;It can also be used to carry out peak load shifting to power grid, by electricity consumption The electric power of low ebb stores, and exports in peak of power consumption, carrys out balancing electric power supply and demand with this;Furthermore it is also possible to as urgent telegram is answered Source system and stand-by station etc., it is considered to be one of most commercial prospects energy storage technology.
Wind energy has been obtained for being widely applied at present as a kind of new energy, still, sets for being only configured with blower For standby wind power plant, after entire network system is because of failure power-off, the wind power generating set of non self starting is in nothing In the case that method is restored by grid transmission, it will be unable to work normally, to limit the large-scale application of wind power plant. In order to effectively take precautions against similar situation, need the mating relevant device of wind power plant can oneself " black starting-up " it is independent reliable to load Power supply.Black starting-up refers to the unit that non self starting is driven by the starting with self-startup ability unit, then gradually expands The recovery range of big system.Black starting-up power supply in the prior art is mainly the following:1) diesel-driven generator;2) combustion gas wheel Machine;3) UPS uninterruptible power supply.But for diesel-driven generator, consumption of fossil fuels, unclean environmental protection are needed;For combustion For gas-turbine, the device is complicated, and installation is complicated, and maintenance cost is high;UPS electrification time is limited to its capacity and cost, It is impossible to meet long-times to carry out the condition of black starting-up under no electric condition.
Summary of the invention
The it is proposed of the present invention in view of the above problems, and develop a kind of flow battery energy storage system with wind field black starting-up function System and its working method.
Technological means of the invention is as follows:
A kind of redox flow battery energy storage system with wind field black starting-up function, the wind field include the first bus, the second mother Main transformer between line, the first bus and the second bus and a plurality of blower route being connected with the first bus, the liquid Galvanic battery energy-storage system includes:
Flow battery system;The flow battery system include pile, positive fluid reservoir, cathode fluid reservoir, circulating pump and Electrolyte circulation line;
The first transformer being connected with first bus;
The energy storage inverter being connected with the flow battery system and first transformer;The energy storage inverter will The direct current of flow battery system output is exported by the boosting of the first transformer to first bus after carrying out inversion, and will Alternating current on first bus carries out rectification output to the flow battery by energy storage inverter after the first transformer pressure-reducing System charging;
The battery management system being connected with the flow battery system;The battery management system is for monitoring liquid stream electricity The operating status of cell system simultaneously obtains operating parameter;The operating parameter includes at least battery SOC;
The Energy Management System being connected with the battery management system, energy storage inverter and the first bus;The energy Management system know the first bus power-off after, to battery management system feedback flow battery system present battery SOC whether Meet certain predetermined condition to be judged, and meets the judgement of certain predetermined condition according to flow battery system present battery SOC As a result it issues into black starting-up mode control instruction;It issues in Energy Management System into after black starting-up mode control instruction, The energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer liter The voltage obtained after pressure meets the power quality requirement of power quality national standard defined;
Further, the Energy Management System connects the energy storage inverter and flow battery by monitoring system on the spot System;The operating parameter further includes cell voltage;It issues in the Energy Management System into black starting-up mode control instruction Later, the entrance black starting-up mode control instruction that monitoring system is issued according to Energy Management System on the spot starts flow battery system System, it is pre- whether the Energy Management System is more than or equal to the flow battery system current battery level that battery management system is fed back If voltage is judged, it is that energy storage inverter changes into V/F control model by PQ control model, and adjust output voltage to make The power quality requirement that the voltage obtained after the boosting of the first transformer meets power quality national standard defined is obtained, otherwise energy Management system continues to whether the flow battery system current battery level that battery management system is fed back is more than or equal to predeterminated voltage Judged;
Further, the voltage obtained after energy storage inverter adjustment output voltage makes the first transformer boost is full After the power quality of sufficient power quality national standard defined requires, any wind-driven generator in the blower route is opened It is dynamic;The wind-driven generator is connected with control device;The control device detects current first busbar voltage, and judges current the Whether one busbar voltage is normal, is, controls the wind-driven generator and carries out limit Power operation, and otherwise the control device continues Carry out above-mentioned judgement;
Further, the flow battery system at least 2, and be mutually backups;There are two the first transformer tools Primary coil;Each flow battery system is connected via an energy storage inverter with a primary coil of first transformer; When the flow battery system in any be currently running breaks down, another flow battery system as backup starts and transports Row;
Further, the redox flow battery energy storage system further includes UPS and the second transformer for being connected with the first bus; When first bus does not power off, the second transformer exports electric energy to Energy Management System, liquid after converting to the first busbar voltage Galvanic electricity cell system, energy storage inverter, on the spot monitoring system and battery management system provide working power, when the first bus powers off, It is mentioned by the UPS to Energy Management System, flow battery system, energy storage inverter, on the spot monitoring system and battery management system For working power;
In addition, the wind field further includes a plurality of charge circuit being connected with the first bus, a plurality of charge circuit according to etc. Grade sequence is divided into important load route and insignificant charge circuit, control the wind-driven generator carry out limit Power operation it Afterwards, the microgrid that the wind-driven generator, flow battery system and the energy storage inverter of reruning are constituted, and it is full in microgrid voltage After the power quality of sufficient power quality national standard defined requires, successively start each important load line according to hierarchal order Road;
Further, the generated output of the wind-driven generator is lower than the 80% of flow battery rated power.
A kind of a kind of working method of the redox flow battery energy storage system with wind field black starting-up function as described above, including Following steps:
1. the operating status of battery management system monitoring flow battery system simultaneously obtains operating parameter, the operating parameter is extremely Less include battery SOC, executes 2.;
2. Energy Management System judges whether the first bus powers off, it is, executes 3., otherwise returns 2.;
3. Energy Management System judges whether the flow battery system present battery SOC of battery management system feedback meets one Determine preset condition, be, execute 4., otherwise returns 2.;
4. Energy Management System is issued into black starting-up mode control instruction, execute 5.;
5. energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first change The voltage obtained after depressor boosting meets the power quality requirement of power quality national standard defined;
Further, the operating parameter further includes cell voltage;The working method step 4. and step 5. between Also there are following steps:
Start flow battery system;
Whether Energy Management System is more than or equal to the flow battery system current battery level that battery management system is fed back Predeterminated voltage is judged, is, is executed 5., the flow battery system that otherwise Energy Management System feeds back battery management system Whether current battery level, which is more than or equal to predeterminated voltage, continues to judge;
Further, 5. the working method also has following steps in step later:
Start any wind-driven generator in the blower route;
Control device detects current first busbar voltage, and judges whether current first busbar voltage is normal, is to control The wind-driven generator carries out limit Power operation, otherwise continues whether to be normally carried out judgement to current first busbar voltage.
By adopting the above-described technical solution, a kind of flow battery storage with wind field black starting-up function provided by the invention Energy system and its working method, can be after the stoppage in transit of entire wind field power loss, in the condition that other grid transmissions can not be relied on to restore Under, it is directly unit and sub-load power supply of the wind field without starting ability by flow battery system, and then gradually expand step by step The recovery range of wind power system finally realizes the recovery of entire wind farm system power supply;Due to without additional configuration diesel-driven generator, The startup power supplies such as gas turbine or UPS and corresponding ancillary equipment, without being improved to wind field energy-storage system and structure, the system Compared with prior art, have that structure is simple, cost is greatly lowered, fast, the system such as energy-storage system utilization rate height that starts speed Column advantage.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of redox flow battery energy storage system of the present invention;
Fig. 2 is the exemplary structural schematic diagram of wind field of the present invention;
Fig. 3 is Energy Management System, on the spot monitoring system, battery management system, energy storage inverter and liquid stream electricity of the present invention Connection schematic diagram between cell system;
Fig. 4 is the flow chart of working method of the present invention;
In figure:1, the first bus, the 2, first transformer, 3, energy storage inverter, 4, flow battery system, the 5, second transformation Device, 6, UPS, the 7, second bus, 8, No. 1 blower routes, 9, No. 2 blower routes, 10, No. 3 blower routes, 11, main transformer, 12, No. 1 charge circuit, 13, No. 2 charge circuits, 14, PT line, 15, SVG route.
Specific embodiment
A kind of redox flow battery energy storage system with wind field black starting-up function as shown in Figure 1, Figure 2 and Figure 3, the wind field Including between the first bus 1, the second bus 7, the first bus 1 and the second bus 7 main transformer 11 and with the first bus 1 The a plurality of blower route being connected, the redox flow battery energy storage system include:Flow battery system 4;The flow battery system 4 Including pile, positive fluid reservoir, cathode fluid reservoir, circulating pump and electrolyte circulation line;It is connected with first bus 1 First transformer 2;The energy storage inverter 3 being connected with the flow battery system 4 and first transformer 2;The energy storage The direct current that inverter 3 exports flow battery system 4 is exported by the boosting of the first transformer 2 to described first after carrying out inversion Bus 1, and the alternating current on the first bus 1 is subjected to rectification output by energy storage inverter 3 after the decompression of the first transformer 2 It charges to the flow battery system 4;The battery management system being connected with the flow battery system 4;The battery management System is used to monitor the operating status of flow battery system 4 and obtains operating parameter;The operating parameter includes at least battery SOC;The Energy Management System being connected with the battery management system, energy storage inverter 3 and the first bus 1;The energy pipe Reason system know the first bus 1 power-off after, to battery management system feedback 4 present battery SOC of flow battery system whether Meet certain predetermined condition to be judged, and meets the judgement of certain predetermined condition according to 4 present battery SOC of flow battery system As a result it issues into black starting-up mode control instruction;It issues in Energy Management System into after black starting-up mode control instruction, The energy storage inverter 3 changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer 2 The voltage obtained after boosting meets the power quality requirement of power quality national standard defined;Further, the energy pipe Reason system connects the energy storage inverter 3 and flow battery system 4 by monitoring system on the spot;The operating parameter further includes electricity Cell voltage;It issues in the Energy Management System into after black starting-up mode control instruction, monitoring system is according to energy on the spot What management system issued enters black starting-up mode control instruction starting flow battery system 4, and the Energy Management System is to battery Whether 4 current battery level of flow battery system of management system feedback, which is more than or equal to predeterminated voltage, is judged, is then energy storage Inverter 3 changes into V/F control model by PQ control model, and adjusts after output voltage makes the first transformer 2 boost and obtain To voltage meet power quality national standard defined power quality requirement, otherwise Energy Management System is to battery management system Whether the flow battery system current battery level of system feedback, which is more than or equal to predeterminated voltage, continues to judge;Further, exist The energy storage inverter 3 adjusts the voltage obtained after output voltage makes the first transformer 2 boost and meets power quality country mark Any wind-driven generator starting after the power quality of quasi- defined requires, in the blower route;The wind-driven generator It is connected with control device;The control device detects current first busbar voltage, and whether just to judge current first busbar voltage It often, is to control the wind-driven generator to carry out limit Power operation, otherwise the control device continues above-mentioned judgement;Into one Step ground, the flow battery system 4 at least 2, and be mutually backups;There are two primary coils for the tool of first transformer 2;Often One flow battery system 4 is connected via an energy storage inverter 3 with a primary coil of first transformer 2;When it is any just When flow battery system 4 in operation breaks down, another flow battery system as backup starts and runs;Further Ground, the redox flow battery energy storage system further include UPS6 and the second transformer 5 for being connected with the first bus 1;First bus 1 is not When power-off, the second transformer 5 exports electric energy to Energy Management System, flow battery system after converting to 1 voltage of the first bus System 4, energy storage inverter 3, on the spot monitoring system and battery management system provide working power, when the first bus 1 powers off, by described UPS6 provides work to Energy Management System, flow battery system 4, energy storage inverter 3, on the spot monitoring system and battery management system Make power supply;In addition, the wind field further includes a plurality of charge circuit being connected with the first bus 1, a plurality of charge circuit according to etc. Grade sequence is divided into important load route and insignificant charge circuit, control the wind-driven generator carry out limit Power operation it Afterwards, the microgrid that the wind-driven generator, flow battery system 4 and the energy storage inverter 3 of reruning are constituted, and in microgrid voltage After meeting the power quality requirement of power quality national standard defined, successively start each important load line according to hierarchal order Road;Further, the generated output of the wind-driven generator is lower than the 80% of flow battery rated power.
A kind of a kind of flow battery energy storage system with wind field black starting-up function as described above as shown in Figures 1 to 4 The working method of system, includes the following steps:
1. the operating status of battery management system monitoring flow battery system 4 simultaneously obtains operating parameter, the operating parameter Including at least battery SOC, execute 2.;
2. Energy Management System judges whether the first bus 1 powers off, it is to execute 3., otherwise returns 2.;
3. Energy Management System judges whether the 4 present battery SOC of flow battery system of battery management system feedback meets Certain predetermined condition is to execute 4., otherwise returns 2.;
4. Energy Management System is issued into black starting-up mode control instruction, execute 5.;
5. energy storage inverter 3 changes into V/F control model by PQ control model, and adjusts output voltage and make the first change The voltage that depressor 2 obtains after boosting meets the power quality requirement of power quality national standard defined;
Further, the operating parameter further includes cell voltage;The working method step 4. and step 5. between Also there are following steps:
Start flow battery system 4;
Whether Energy Management System is more than or equal to 4 current battery level of flow battery system that battery management system is fed back Predeterminated voltage is judged, is, is executed 5., the flow battery system 4 that otherwise Energy Management System feeds back battery management system Whether current battery level, which is more than or equal to predeterminated voltage, continues to judge;
Further, 5. the working method also has following steps in step later:
Start any wind-driven generator in the blower route;
Control device detects current first bus, 1 voltage, and judges whether current first bus, 1 voltage is normal, is to control It makes the wind-driven generator and carries out limit Power operation, otherwise continue whether to be normally carried out judgement to current first bus, 1 voltage.
Wind field of the present invention further includes the PT line 14 and SVG route 15 being connected with the first bus 1;Wherein, load line Road includes load, air box change, emergency lighting etc. in wind field;PT line 14 is mainly used for examining the same period or checkout voltage;SVG route 15 is main Compensation system reactive power is wanted, power factor is provided, maintains 1 voltage of the first bus, strengthen the system voltage stability.Institute of the present invention Energy Management System is stated after knowing the power-off of the first bus 1, to the flow battery system present battery of battery management system feedback Whether SOC, which meets certain predetermined condition, is judged;The certain predetermined condition is > 2%;The Energy Management System is also right Whether the flow battery system current battery level of battery management system feedback, which is more than or equal to predeterminated voltage, is judged, here Predeterminated voltage is that the work of energy storage inverter 3 starts voltage;The electrolyte circulation line includes pipeline and is mounted on pipeline On electrically operated valve, flow sensor, pressure sensor and temperature sensor etc..The present invention issues entrance in Energy Management System After black starting-up mode control instruction, the energy storage inverter 3 changes into V/F control model by PQ control model, and adjusts The power quality that the voltage that output voltage obtains after the first transformer 2 is boosted meets power quality national standard defined is wanted It asks, in addition, carrying out limit Power operation and then the operation wind-driven generator, flow battery controlling the wind-driven generator The microgrid that system 4 and energy storage inverter 3 are constituted, and meet the electric energy of power quality national standard defined in microgrid voltage After quality requirement, successively start each important load route according to hierarchal order, power quality national standard here specifically may be used Think《GB/T 12325-2008 power quality supply voltage deviation》With《GB/T14549-1993 power quality utility network is humorous Wave》, the present invention carries out limit Power operation in the control wind-driven generator and then the operation wind-driven generator, liquid stream are electric The microgrid that cell system 4 and energy storage inverter 3 are constituted is briefly described below the process that the microgrid is established and run, works as wind speed More than wind-driven generator incision wind speed when, pitch controller adjust blade pitch angle start wind-driven generator, when wind-force send out When the closely synchronized revolving speed of the revolving speed of motor, field regulator work, direction wind-driven generator provides excitation, and it is big to adjust exciting current Whether the small voltage for making wind-driven generator meets grid-connected conditions, adjusts close to microgrid voltage, fan converter detection microgrid parameter The parameter of rectification campaign power generator, it is ensured that with microgrid with frequency with identical pressure;After grid-connected, wind-force is gradually increased by adjusting exciting current The grid-connected power of generator, while the amplitude variation of microgrid voltage and frequency is monitored, certain fluctuation range is in microgrid voltage After interior, successively start each important load route according to hierarchal order;Pitch controller, field regulator and blower therein become Stream device starts after control device judges current first bus, 1 voltage normally;The first current mother of the control device judgement Whether 1 voltage of line normal, be specifically as follows the frequency for judging current first busbar voltage and phase whether with the first busbar voltage Frequency when normal power supply is consistent with phase, when whether the amplitude for judging current first busbar voltage is the first bus normal power supply Voltage ± default fluctuation range, default fluctuation range here can be 10%, and flow battery system 4 of the invention can have 2, and be mutually backups, each flow battery system 4 includes pile, positive fluid reservoir, cathode fluid reservoir, circulating pump and electrolysis Liquid circulation line;Circuit, fluid path are mutually indepedent between two flow battery systems, and can individually be scheduled, when wherein When one flow battery system breaks down, a flow battery system in addition can continue to run, and improve the benefit of energy-storage system With rate;First transformer 2 can be using double transformer with split windings;Flow battery system 4 becomes via energy storage inverter 3, first Depressor 2 is connected to the first bus 1;Between Energy Management System and on the spot monitoring system and on the spot monitoring system and cell tube MODBUS_TCP communications protocol is used between reason system;It is realized between monitoring system and energy storage inverter 3 using CAN bus on the spot Communication;Control device of the present invention is used to detect amplitude, frequency and the phase of current first busbar voltage, and for judging to work as Whether amplitude, frequency and the phase of preceding first busbar voltage are consistent with amplitude of first busbar voltage when normal, frequency and phase, And amplitude, frequency and phase when amplitude, frequency and the phase of current first busbar voltage and the first busbar voltage are normal Limit Power operation is carried out for controlling the wind-driven generator when consistent, when amplitude, frequency and the phase of current first busbar voltage Position with when amplitude of first busbar voltage when normal, frequency and inconsistent phase for continuing the width to current first busbar voltage Value, frequency and phase whether with amplitude of first busbar voltage when normal, frequency and phase is consistent is judged;The control dress It sets and is connected with each blower route and the first bus 1;Contain wind-driven generator in each blower route.
Energy Management System of the present invention also detects energy storage inverter 3 while knowing whether the first bus 1 powers off It exchanges whether side voltage is zero, and whether detection 11 high-pressure side alternating voltage of main transformer is zero, is knowing that the first bus 1 is disconnected Electricity, energy storage inverter 3 exchange side voltage be zero and detection 11 high-pressure side alternating voltage of main transformer be zero after, to battery Whether the 4 present battery SOC of flow battery system of management system feedback, which meets certain predetermined condition, is judged, and according to liquid stream The judging result that 4 present battery SOC of battery system meets certain predetermined condition is issued into black starting-up mode control instruction;This hair The generated output of the bright wind-driven generator is lower than the 80% of flow battery rated power, because working as the power generation function of wind-driven generator When rate is greater than flow battery rated power, the frequency of microgrid voltage and amplitude fluctuations are very big at this time, far more than power quality country The power quality requirement of prescribed by standard, fan converter are exited due to low voltage crossing protection;The gradually hair of wind-driven generator Electrical power monitors the power quality of microgrid voltage, when the generated output of wind-driven generator is less than flow battery rated power 80%, the amplitude of microgrid voltage and rate-adaptive pacemaker are stablized at this time, and the power quality for meeting power quality national standard defined is wanted It asks.
The present invention meets electric power code requirement with device powers down sequence in the wind field of black starting-up function and first breaks load again The principle in power-off source;As shown in Fig. 2, after the power-off of the first bus 1, successively disconnect first each blower route and the first bus 1 it Between connection, specifically, wind field include No. 1 blower route 8 of blower route 9 and No. 3 blower route 10,1 of blower route 8,2 It is connected by switch S1 with the first bus 1, No. 2 blower routes 9 are connected by switch S2 with the first bus 1, No. 3 blower routes 10 It is connected by switch S3 with the first bus 1, then switch S1, switch S2 and switch S3 is successively disconnected, in each blower route and first Connection between bus 1 disconnects and then successively disconnects the connection between each charge circuit and the first bus 1, specifically, wind field It is connected by switch S4 with the first bus 1 including No. 1 charge circuit 12 of charge circuit 13,1 of charge circuit 12,2, No. 2 negative Lotus route 13 is connected by switch S5 with the first bus 1, then switch S4, switch S5 is successively disconnected, in each charge circuit and first After connection between bus 1 disconnects, the connection being then turned off between aforementioned PT line 14, SVG route 15 and the first bus 1, tool Body, by switch S6 connection between PT line 14 and the first bus 1, connected between SVG route 15 and the first bus 1 by switch S7 It connects, then successively disconnects switch S6, S7, finally disconnect the connection between the first bus 1 and main transformer 11, specifically, disconnection is opened Close S8.
A kind of redox flow battery energy storage system and its working method with wind field black starting-up function provided by the invention, can After the stoppage in transit of entire wind field power loss, under conditions of other grid transmissions can not be relied on to restore, directly pass through flow battery system Unit and sub-load power supply for wind field without starting ability, and then gradually expand the recovery range of wind power system step by step, finally Realize the recovery of entire wind farm system power supply;Due to without startup power supplies such as additional configuration diesel-driven generator, gas turbine or UPS And corresponding ancillary equipment, without improving to wind field energy-storage system and structure, which compared with prior art, has structure Simply, cost be greatly lowered, fast, the series of advantages such as energy-storage system utilization rate height that start speed.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of redox flow battery energy storage system with wind field black starting-up function, the wind field include the first bus, the second bus, Main transformer between first bus and the second bus and a plurality of blower route being connected with the first bus, feature exist Include in the redox flow battery energy storage system:
Flow battery system;The flow battery system includes pile, positive fluid reservoir, cathode fluid reservoir, circulating pump and electrolysis Liquid circulation line;
The first transformer being connected with first bus;
The energy storage inverter being connected with the flow battery system and first transformer;The energy storage inverter is by liquid stream The direct current of battery system output carries out after inversion through the boosting output of the first transformer to first bus, and by first Alternating current on bus carries out rectification output to the flow battery system by energy storage inverter after the first transformer pressure-reducing Charging;
The battery management system being connected with the flow battery system;The battery management system is for monitoring flow battery system The operating status of system simultaneously obtains operating parameter;The operating parameter includes at least battery SOC;
The Energy Management System being connected with the battery management system, energy storage inverter and the first bus;The energy management Whether system meets the flow battery system present battery SOC of battery management system feedback after knowing the power-off of the first bus Certain predetermined condition is judged, and meets the judging result of certain predetermined condition according to flow battery system present battery SOC It issues and enters black starting-up mode control instruction;It issues in Energy Management System into after black starting-up mode control instruction, it is described Energy storage inverter changes into V/F control model by PQ control model, and adjust output voltage make the first transformer boost after Obtained voltage meets the power quality requirement of power quality national standard defined;
The Energy Management System connects the energy storage inverter and flow battery system by monitoring system on the spot;The operation Parameter further includes cell voltage;It issues in the Energy Management System into after black starting-up mode control instruction, monitors on the spot System starts flow battery system, the energy management according to the black starting-up mode control instruction that enters that Energy Management System issues System judges whether the flow battery system current battery level that battery management system is fed back is more than or equal to predeterminated voltage, It is that energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer liter The voltage obtained after pressure meets the power quality requirement of power quality national standard defined, and otherwise Energy Management System is to battery Whether the flow battery system current battery level of management system feedback, which is more than or equal to predeterminated voltage, continues to judge;
The redox flow battery energy storage system further includes UPS and the second transformer for being connected with the first bus;First bus does not break When electric, the second transformer exports electric energy to Energy Management System, flow battery system, storage after converting to the first busbar voltage Energy inverter, on the spot monitoring system and battery management system provide working power, when the first bus powers off, by the UPS to energy Management system, flow battery system, energy storage inverter, on the spot monitoring system and battery management system offer working power are provided.
2. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 1, it is characterised in that The voltage obtained after energy storage inverter adjustment output voltage makes the first transformer boost meets power quality country mark Any wind-driven generator starting after the power quality of quasi- defined requires, in the blower route;The wind-driven generator It is connected with control device;The control device detects current first busbar voltage, and whether just to judge current first busbar voltage It often, is to control the wind-driven generator to carry out limit Power operation, otherwise the control device continues above-mentioned judgement.
3. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 1, it is characterised in that The flow battery system at least 2, and be mutually backups;There are two primary coils for the first transformer tool;Each liquid stream Battery system is connected via an energy storage inverter with a primary coil of first transformer;When in any be currently running When flow battery system breaks down, another flow battery system as backup starts and runs.
4. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 2, the wind field is also Including a plurality of charge circuit being connected with the first bus, a plurality of charge circuit according to hierarchal order be divided into important load route and Insignificant charge circuit, it is characterised in that carry out limit Power operation and then the operation wind controlling the wind-driven generator The microgrid that power generator, flow battery system and energy storage inverter are constituted, and meet power quality country in microgrid voltage After the power quality of prescribed by standard requires, successively start each important load route according to hierarchal order.
5. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 2, it is characterised in that The generated output of the wind-driven generator is lower than the 80% of flow battery rated power.
6. a kind of a kind of work side of the redox flow battery energy storage system with wind field black starting-up function as described in claim 1 Method, it is characterised in that the working method includes the following steps:
1. the operating status of battery management system monitoring flow battery system simultaneously obtains operating parameter, the operating parameter is at least wrapped Battery SOC is included, is executed 2.;
2. Energy Management System judges whether the first bus powers off, it is, executes 3., otherwise returns 2.;
3. it is certain pre- that Energy Management System judges whether the flow battery system present battery SOC of battery management system feedback meets If condition is, execute 4., otherwise returns 2.;
4. Energy Management System is issued into black starting-up mode control instruction, execute 5.;
5. energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer The voltage obtained after boosting meets the power quality requirement of power quality national standard defined;
Wherein, the operating parameter further includes cell voltage;The working method step 4. and step 5. between also have such as Lower step:Start flow battery system;The flow battery system present battery that Energy Management System feeds back battery management system Whether voltage, which is more than or equal to predeterminated voltage, is judged, is to execute 5., otherwise Energy Management System is anti-to battery management system Whether the flow battery system current battery level of feedback, which is more than or equal to predeterminated voltage, continues to judge;The flow battery energy storage System further includes UPS and the second transformer for being connected with the first bus;When first bus does not power off, the second transformer is to first Busbar voltage exports electric energy to Energy Management System, flow battery system, energy storage inverter, on the spot monitoring system after being converted Working power is provided with battery management system, when the first bus powers off, by the UPS to Energy Management System, flow battery system System, energy storage inverter, on the spot monitoring system and battery management system provide working power.
7. a kind of working method of redox flow battery energy storage system with wind field black starting-up function according to claim 6, It is characterized in that 5. the working method also has following steps in step later:
Start any wind-driven generator in the blower route;
Control device detects current first busbar voltage, and judges whether current first busbar voltage is normal, is described in then control Wind-driven generator carries out limit Power operation, otherwise continues whether to be normally carried out judgement to current first busbar voltage.
CN201510837505.8A 2015-11-26 2015-11-26 A kind of redox flow battery energy storage system and its working method with wind field black starting-up function Active CN105978008B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510837505.8A CN105978008B (en) 2015-11-26 2015-11-26 A kind of redox flow battery energy storage system and its working method with wind field black starting-up function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510837505.8A CN105978008B (en) 2015-11-26 2015-11-26 A kind of redox flow battery energy storage system and its working method with wind field black starting-up function

Publications (2)

Publication Number Publication Date
CN105978008A CN105978008A (en) 2016-09-28
CN105978008B true CN105978008B (en) 2018-11-23

Family

ID=56988437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510837505.8A Active CN105978008B (en) 2015-11-26 2015-11-26 A kind of redox flow battery energy storage system and its working method with wind field black starting-up function

Country Status (1)

Country Link
CN (1) CN105978008B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451562A (en) * 2016-12-16 2017-02-22 北京索英电气技术有限公司 Black-start system and method for wind and light power storage station
CN106652698B (en) * 2017-01-24 2019-04-30 湖南德沃普新能源有限公司 A kind of teaching demonstration system applied suitable for all-vanadium flow battery in field of renewable energy and method
CN107482661B (en) * 2017-09-07 2020-07-14 广州智光电气股份有限公司 Converter and flow battery energy storage system
DE102017127081B4 (en) * 2017-11-17 2019-05-29 Sma Solar Technology Ag Method for black start of a power supply device, bidirectional inverter and power supply device with a bidirectional inverter
CN108011117B (en) * 2017-12-01 2020-04-07 大连融科储能装备有限公司 Centralized monitoring system and monitoring method for flow battery
CN107947184B (en) * 2017-12-25 2024-02-02 国网辽宁省电力有限公司沈阳供电公司 Distributed flexible voltage regulation topological structure of power distribution network based on AC-AC converter
CN114336708A (en) * 2021-12-31 2022-04-12 杭州协能科技股份有限公司 Black start method of energy storage system and energy storage system
US11824356B1 (en) * 2022-06-30 2023-11-21 Xi'an Thermal Power Research Institute Co., Ltd. System and method of black start for new power system with energy storage configuration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794997A (en) * 2010-04-02 2010-08-04 中国海洋石油总公司 Megawatt wind power storage battery combined independent power supply system
CN103683316A (en) * 2012-09-19 2014-03-26 国电联合动力技术有限公司 Wind power generation system with off-grid and grid-connection modes and working method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794997A (en) * 2010-04-02 2010-08-04 中国海洋石油总公司 Megawatt wind power storage battery combined independent power supply system
CN103683316A (en) * 2012-09-19 2014-03-26 国电联合动力技术有限公司 Wind power generation system with off-grid and grid-connection modes and working method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卧牛石风储系统黑启动问题研究;史松杰;《沈阳工程学院工程专业学位硕士学位论文》;20150114;正文第5-8、18-20、34、37-43页 *
风储发电系统黑启动模型及仿真研究;孙峰 等;《电气应用》;20150630;521-527 *

Also Published As

Publication number Publication date
CN105978008A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105978008B (en) A kind of redox flow battery energy storage system and its working method with wind field black starting-up function
US11767603B2 (en) Modular systems for hydrogen generation and methods of operating thereof
EP3206276B1 (en) Energy storage system and management method thereof
CN112803472A (en) Direct-current coupling hydrogen production system and control method thereof
US8946933B2 (en) Power management apparatus and method of operating the same
CN104836254B (en) A kind of power grid"black-start" system and the method for photovoltaic plant participation power grid"black-start"
KR101225198B1 (en) Grid connected power conversion system
WO2013015256A1 (en) Power management system and management method
KR102306918B1 (en) Renewable energy hybrid power generation system, and power generation method therefor
WO2021196406A1 (en) Power transmission system and power supply apparatus thereof
CN104734322A (en) Energy storage charging station power supply system for off-grid new energy power generation
CN105186660A (en) Off-grid type wind power hydrogen production conversion system
KR102421893B1 (en) Energy storage system
CN110999013A (en) Energy storage system
CN114481179B (en) Medium-voltage direct-current collection type renewable energy power generation hydrogen production system and working method thereof
KR101644522B1 (en) Power supply system of ac microgrid three phase
CN111864725A (en) Wind-solar-storage integrated air conditioning system based on common direct current bus and control method thereof
KR102222560B1 (en) An energy storage system
CN109861288B (en) Photovoltaic hybrid energy storage power system based on CPS
CN113949054A (en) Power grid autonomous system and method
CN105253956A (en) Reverse osmosis sea water desalination self-adaption control system and method
CN107508320B (en) Wind power station and black start method thereof
CN112152266A (en) Nuclear power plant frequency modulation control system and method
CN112994056A (en) Off-grid power generation system and control method and application system thereof
CN218867921U (en) Fuel cell auxiliary system and fuel cell system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant