CN105976113A - Early warning control method and system for intensive use of construction land - Google Patents

Early warning control method and system for intensive use of construction land Download PDF

Info

Publication number
CN105976113A
CN105976113A CN201610299536.7A CN201610299536A CN105976113A CN 105976113 A CN105976113 A CN 105976113A CN 201610299536 A CN201610299536 A CN 201610299536A CN 105976113 A CN105976113 A CN 105976113A
Authority
CN
China
Prior art keywords
construction land
early warning
construction
data
overlapped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610299536.7A
Other languages
Chinese (zh)
Inventor
张建召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Original Assignee
JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN filed Critical JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Priority to CN201610299536.7A priority Critical patent/CN105976113A/en
Publication of CN105976113A publication Critical patent/CN105976113A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an early warning control method and system for intensive use of construction land. The method includes collecting construction land area data or construction land space data; calculating and obtaining a construction land area change value or a construction land overlapping cover area change value; comparing the two change values with corresponding preset standard change values respectively; judging an early warning degree according to the comparison result and generating early warning information according to the judged early warning degree; sending the generated early warning information; and performing monitoring on construction land use according to the received early warning information. The system includes a data extraction unit, a data collection unit, a computation unit, a comparison unit, a sending unit and an upper server. According to the invention, monitoring and control of intensive use of construction land can be realized simply and effectively, judgment accuracy can be improved through objective indicator factors, so that reasonable early warning control of construction land use is realized, construction land normalization level is improved and a problem of extensive utilization of land can be solved.

Description

The pre-warning and control method of a kind of construction land intensive utilization and system
Technical field
The present invention relates to pre-warning and control method and the system of a kind of construction land intensive utilization, belong to land used for urban and rural construction projects rule Draw the technical field of management.
Background technology
At present, the extensive use problem of construction land has become as that current we are the most urgent but be difficult to the city cracked One of development problem, although national legislation specification Statutory Planning relevant to each city specify that a city is following certain Available construction land total amount, per capita standard area of land for the use of construction in period and forbid restricted area, but it is broken repeatly, cannot Control.
Currently, the related art scheme of existing construction land planning is primarily present 3 problems that are mutually related:
1, to control monitoring system, monitoring index the most complicated, simple and clear not for construction land intensive utilization, and operability is the highest.
2, the index factor chosen, more variation, but fail to catch " whether construction land area exceeds standard, builds per capita Whether land area exceeds standard, whether present situation conflicts with Jin Jian district and Xian Jian district with the locus of newly-increased construction land " etc. several Core index, causes existing method or system accuracy during intensive planning not enough.
3, on the basis of complicated index system, such as analytic hierarchy process (AHP), PCA, fuzzy synthesis is used to judge The methods such as method carry out result and collect, but due to method itself imperfection, therefore analysis result has certain subjectivity, causes visitor Sight is not enough.
Therefore, there is constructive constraint in existing construction land in intensive utilization, is unfavorable for solving soil extensive Problem, it is impossible to rationally and effectively accomplish the intensive control of construction land, is not easy to carry out construction land service condition the most in advance Alert.
Summary of the invention
The technical problem to be solved is to overcome the deficiencies in the prior art, it is provided that a kind of intensive profit of construction land Pre-warning and control method and system, solve existing construction land intensive utilization exists constructive constraint, it is impossible to construction The problem that land used service condition carries out timely early warning.
The present invention solves above-mentioned technical problem the most by the following technical solutions:
A kind of pre-warning and control method of construction land intensive utilization, the method comprising the steps of:
Step 1, collection construction land area data or construction land spatial data;
Step 2, the difference calculating gathered construction land area data and historical record construction land area data are built Land area changing value;Or by gathered construction land spatial data with forbid and limit construction area being overlapped comparison, when When there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass, and according to construction land pressed and overlapped capping long-pending with The mathematic interpolation that the construction land pressed and overlapped capping of historical record amasss obtains construction land pressed and overlapped lid area change numerical value;
Step 3, gained construction land area change value and default construction land area change standard value are contrasted, or gained is built If land used pressed and overlapped lid area change numerical value contrasts with default construction land pressed and overlapped lid area change standard value;Respectively according to right Judge early warning degree than result and generate early warning information according to judged early warning degree;
Step 4, generated early warning information is transmitted;
Step 5, according to receive early warning information to construction land utilize be monitored.
Further, as a preferred technical solution of the present invention: in described step 1, construction land area data includes The current year present situation construction land area data or present situation in current year construction land area data per capita.
Further, as a preferred technical solution of the present invention: in described step 1, construction land spatial data includes The current year present situation construction land spatial data or newly-increased construction land spatial data.
The present invention also proposes the pre-alarming control system of a kind of construction land intensive utilization, including:
Data extracting unit, for extracting the construction land area data of historical record or the construction land pressed and overlapped of historical record Capping volume data;
Data acquisition unit, is used for gathering construction land area data or construction land spatial data;
Computing unit, for calculating the gathered construction land area data historical record construction land area data with extraction Difference obtains construction land area change value, or by gathered construction land spatial data with forbid and limit construction area carrying out Superposition comparison, when there is overlapping gland, then extracts and calculates construction land pressed and overlapped capping and amass, and calculate itself and historical record The difference that construction land pressed and overlapped capping amasss obtains construction land pressed and overlapped lid area change numerical value;
Comparing unit, for gained construction land area change value is contrasted with default construction land area change standard value, or Gained construction land pressed and overlapped lid area change numerical value is contrasted with default construction land pressed and overlapped lid area change standard value, point Do not judge early warning degree according to comparing result, and generate early warning information according to judged early warning degree;
Transmitting element, for being transmitted described early warning information;
Upper server, is used for receiving and storing early warning information, and early warning information is shown.
Further, as a preferred technical solution of the present invention: also include that mobile terminal, described mobile terminal are used for Receive the early warning information sent from upper server or transmitting element.
Further, as a preferred technical solution of the present invention: described mobile terminal is PC terminal or mobile phone terminal.
The present invention uses technique scheme, can produce following technique effect:
(1) pre-warning and control method of construction land intensive utilization provided by the present invention and system, utilize Automated condtrol means, The most effectively intensive utilization to construction land can be monitored and retrain;According to the changing value situation contrast calculated, utilize Objective indicator carries out constructive constraint to the intensive utilization of the land used for urban and rural construction projects in city, and the reference index factor being determined by carries The high accuracy judged;And, judge early warning degree according to comparing result respectively and generate early warning according to judged early warning degree Information, and early warning information layering is sent, control so that construction land obtains reasonable early warning, improve the rule of construction land Model degree.
(2) method of the present invention or system, by being concisely and efficiently control program, can realize profit intensive to construction land With carrying out early warning, advantageously account for soil extensive problem, both help central authorities, province of portion to strengthen over the ground, the construction in county town city is used The intensive control in ground, it helps the construction land service condition of self is understood by local government.And it is possible to increase urban construction The sensitivity of land used intensive utilization change, strengthens the supervision to local government and control, promotes city health benign development.
Accompanying drawing explanation
The schematic flow sheet of the pre-warning and control method that Fig. 1 provides for the embodiment of the present invention one.
The schematic flow sheet of the pre-warning and control method that Fig. 2 provides for the embodiment of the present invention two.
The schematic flow sheet of the pre-warning and control method that Fig. 3 provides for the embodiment of the present invention three.
Fig. 4 is the schematic diagram calculating overlapping area in the embodiment of the present invention three.
The schematic flow sheet of the pre-warning and control method that Fig. 5 provides for the embodiment of the present invention four.
The structural representation of the pre-alarming control system that Fig. 6 provides for the embodiment of the present invention five.
Detailed description of the invention
Below in conjunction with Figure of description, embodiments of the present invention are described.
The pre-warning and control method of the present invention a kind of construction land intensive utilization, the method can be used for urban and rural residents' point and builds use Ground, regional traffic Facilities Construction land used, region public utility construction land used, special construction land, mining construction land and other Construction land, unit be square kilometre or hectare.The method specifically includes step:
Step 1, collection construction land area data or construction land spatial data;
Step 2, the difference calculating gathered construction land area data and historical record construction land area data are built Land area changing value;Or by gathered construction land spatial data with forbid and limit construction area being overlapped comparison, when When there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass, and according to construction land pressed and overlapped capping long-pending with The mathematic interpolation that historical record construction land pressed and overlapped capping amasss obtains construction land pressed and overlapped lid area change numerical value;
Step 3, gained construction land area change value and default construction land area change standard value are contrasted, or gained is built If land used pressed and overlapped lid area change numerical value contrasts with default construction land pressed and overlapped lid area change standard value;Respectively according to right Judge early warning degree than result and generate early warning information according to judged early warning degree;
Step 4, generated early warning information is transmitted;
Step 5, according to receive early warning information to construction land utilize be monitored.
The pre-warning and control method of the construction land intensive utilization according to the present invention, now enumerates embodiment and carries out this method in detail Describe in detail bright.
Embodiment one,
The present embodiment be in application and construction land area data the current year present situation construction land area data as index factor, A basic index as monitoring construction land extensive degree.The present embodiment method flow signal as it is shown in figure 1, its Concrete steps include the following:
Step S11, collection present situation construction land area data in the current year.Wherein, described year was calendar year, such as 2016. Described present situation construction land area, uses including urban and rural residents' point construction land, regional traffic facilities land, region public utility Ground, special use area, mining lease and other construction lands, unit be square kilometre or hectare.Wherein, urban and rural residents' point is built and is used Ground includes town site, town construction land, township's construction land, village construction land, especially city, city construction land, is Enclose the land, hoard land, the severely afflicated area of extensive construction, be the key object of current city planning construction management and monitoring.
Step S12, calculating present situation construction land area data changing value in the current year.In the present embodiment, historical record construction Land area data are set to the construction land area data of previous year.The most described changing value, refers to deduct 1 year the current year The difference spent and obtain.
From the point of view of formula, it may be assumed that
ΔJ=Jn-Jn-1
In above-mentioned formula, n is calendar year in the current year, JnFor the present situation construction land area figures in the current year, Jn-1For previous year Present situation construction land area figures, Δ J is then present situation construction land area change value in the current year.
Step S13, by gained present situation in current year construction land area change value and default construction land area change standard Value contrast, i.e. comparison delta data in the current year whether higher than the normal data preset, according to comparing result judge early warning degree and Early warning information is generated according to judged early warning degree.If i.e. exceeded, carry out different brackets early warning journey according to the numerical range that exceeds standard Degree judges.
Wherein, in described default construction land area change standard value is project period, the year of available construction land area puts down Average.The time limit as recent in current city overall planning is the year two thousand twenty with the time limit of overall plan for land use, it assumes that planning rule Determining in the five-year, the town site having 15 square kilometres is available, then preset construction land area change standard value It it is 3 square kilometres.
With formula express, the expression formula of described default construction land area change standard value i.e.:
Jb=(Jq-Jn-1)/(q-(n-1))
In above-mentioned formula, q is planning year in time limit, JbFor the Annual Land-for-urban-construction area standard numerical value after previous year, by it As default construction land area change standard value;JqFor planning the construction land area figures in the end of term;Jn-1For previous year Present situation construction land area figures.
Above-mentioned steps is expressed the most further with formula, it may be assumed that
If Δ J > Jb, then need judge early warning degree and generate early warning information according to judged early warning degree, i.e. start pre- Alarm system and issue early warning information.Otherwise, do not start.Described carry out different brackets early warning degree according to the numerical range that exceeds standard and sentence Fixed, can be such that
If (Δ J-Jb)/Jb≤ 20%, then it is judged to slightly alert;
If 20% < is (Δ J-Jb)/Jb≤ 50%, then it is judged to that moderate alerts;
If 50% < is (Δ J-Jb)/Jb≤ 90%, then it is judged to that severe alerts;
If 90% < is (Δ J-Jb)/Jb, then grave warning it is judged to.
With this, after determining early warning degree according to different numerical rangies, generate early warning information.
Step S14, transmit above-mentioned generated early warning information.
Step S15, according to receive early warning information to construction land utilize be monitored.
Embodiment two,
The present embodiment be in application and construction land area data the current year present situation construction land area data per capita as index The factor, as another basic index of monitoring construction land extensive degree.The method flow of the present embodiment is illustrated such as Fig. 2 Shown in, its concrete steps include the following:
Step S21, collection present situation demographic data in the current year.Wherein, described demographic data, it is permanent resident population's data, including The total population of this area, the urban population in each town and the urban population of inner city.
Step S22, present situation construction land area data changing value per capita in the calculating current year.Wherein, described construction per capita Land used numerical value, refer to incity, city construction land area divided by the permanent resident population's quantity in the range of this, unit is square metre/people.
From the point of view of equally with formula, it may be assumed that
ΔR=Rn-Rn-1
In above-mentioned formula, n is calendar year in the current year, RnFor the construction land area figures of present situation per capita in the current year, Rn-1For upper one The present situation construction land area figures in year, Δ R is then present situation construction land area change value per capita in the current year.
Step S23, by gained present situation construction land area data changing value per capita in the current year and default construction land area Whether change standard value contrast, i.e. comparison delta data in the current year, higher than the normal data preset, judge pre-according to comparing result Alert degree and according to judged early warning degree generation early warning information.If i.e. exceeded, according to exceeding standard, numerical range carries out the most equal Level early warning deciding degree.
Wherein, described default construction land area change standard value needs the construction land per capita reduced in being project period Mean annual value.As current city overall planning is limited to the year two thousand thirty project period, it is assumed that present situation Per Capita Urban Land in 2016 Area is 150 square metres/people, and planning requirement to project period terminates the year two thousand thirty, it is necessary to be up to state standards, i.e. 115 square metres/ People, then must reduce by 2.33 square metres/people every year in following 15 years, these data are the construction land area per capita of 2016 Change standard value.
Express with formula, it may be assumed that
Rb=(Rq-Rn-1)/(q-(n-1))
In above-mentioned formula, q is planning year in time limit, RbFor the standard value of the construction land area per capita of the year after previous year, And it is regarded as the year construction land area change standard value per capita preset;RqFor planning the construction land area per capita in the end of term Numerical value;Rn-1Present situation construction land area figures for previous year.
Above-mentioned steps is expressed the most further with formula, it may be assumed that
If Δ R > Rb, then need judge early warning degree and generate early warning information according to judged early warning degree, i.e. start pre- Alarm system and issue early warning information.Otherwise, do not start.Described carry out different brackets early warning degree according to the numerical range that exceeds standard and sentence Fixed, can be such that
If (Δ R-Rb)/Jb≤ 20%, then it is slight warning,
If 20% < is (Δ R-Rb)/Rb≤ 50%, then alert for moderate,
If 50% < is (Δ R-Rb)/Rb≤ 90%, then alert for severe,
If 90% < is (Δ R-Rb)/Rb, then for grave warning.
With this, after determining early warning degree according to different numerical rangies, generate early warning information.
Step S24, transmit above-mentioned generated early warning information.
Step S25, according to receive early warning information to construction land utilize be monitored.
Embodiment three,
The pre-warning and control method of the present embodiment, with the present situation construction land spatial data in the current year in construction land spatial data be Index factor, carries out calculating and early warning control, and the flow process of the method is illustrated as it is shown on figure 3, concrete steps include the following:
Step S31, collection present situation construction land spatial data in the current year.Wherein, described present situation construction land spatial data, refer to The vector drawing of present situation construction land, comprises coordinate information accurately.
Step S32, by gathered construction land spatial data with forbid and limit construction area being overlapped comparison.
Wherein, described forbids and limits construction area, refers to plan region, the restriction forbidding carrying out building of clear stipulaties The region of specific construction.Except blue line, green line etc., also include important nature reserve area, potable water source district, basic farmland etc., all Clear and definite construction is had to control requirement.Described superposition contrast, is mainly judged by coordinate data.
From the point of view of formula, it is assumed that the coordinates regional of present situation construction land spatial data in the current year is (Xn, Yn), forbid and limit build district coordinates regional be (Xj, Yj), then:
If there is XnMax > Xj, there is Y in min simultaneouslynMax > YjThe situation of min;
Or there is XnMin < Xj, there is Y in max simultaneouslynMin < YjThe situation of max;
Max in above-mentioned formula refers to that maximum, min refer to minima;
If meeting above-mentioned situation, then illustrate that both have overlap, i.e. present situation construction land has gland to forbidding and limiting construction district Territory.Otherwise then do not have.
During as there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass.Wherein, described overlapping gland Extract, preservation is still completed by coordinate data with areal calculation.
From the point of view of formula, it is assumed that overlapping region is (XΔ, YΔ), then:
If there is XnMax > XjMin, simultaneously YnMax > YjMin, then XΔmin=XjMin, XΔmax= XnMax, YΔmin= YjMin, YΔmax= Ynmax ;
If there is XnMin < XjMax, simultaneously YnMin < YjMax, then XΔmin=XnMin, XΔmax= XjMax, YΔmin= YnMin, YΔmax= Yjmax ;
Further, if overlapping region is multiple, then carry out computing one by one and expression by above-mentioned formula, the overlapping gross area then by Each overlapping area is added and sues for peace.
On this basis, amass and historical record construction land pressed and overlapped according to calculated construction land pressed and overlapped capping The difference that capping amasss obtains construction land pressed and overlapped lid area change numerical value.
Step S33, gained construction land pressed and overlapped lid area change numerical value is amassed with default construction land pressed and overlapped capping Change standard value contrast;Judge early warning degree according to comparing result and generate early warning information according to judged early warning degree.The most such as Fruit exceeds, and carries out different brackets early warning deciding degree according to the numerical range that exceeds standard.
Wherein, described default construction land pressed and overlapped lid area change standard value needs the overlap reduced to use in being project period The mean annual value on ground.As current city overall planning is limited to the year two thousand thirty project period, it is assumed that present situation present situation overlapping region in 2016 Area be 30 square kilometres, and planning requirement to project period terminates the year two thousand thirty, it is necessary to all remove, then every in following 15 years Year must reduce 2 square kilometres, and these data are the construction land pressed and overlapped lid area change standard value of 2016.Formula principle With embodiment one and two, after determining early warning degree thus according to different numerical rangies, generate early warning information.
Step S34, transmit above-mentioned generated early warning information.
Step S35, according to receive early warning information to construction land utilize be monitored.
Embodiment four,
The further analysis that the present embodiment does on the basis of embodiment three, in this embodiment application and construction land used spatial data Newly-increased construction land spatial data refers to substantially as index factor, another as monitoring construction land extensive degree Mark.The method flow of the present embodiment is illustrated as it is shown in figure 5, concrete steps include:
Step S41, the newly-increased construction land spatial data of collection.Wherein, described newly-increased construction land spatial data, refer to newly-increased construction The vector drawing of land used, has coordinate information accurately.
Step S42, gained is increased newly construction land spatial data and forbid build and limit construction area be overlapped ratio Right.During as there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass;On this basis, according to being calculated The long-pending difference long-pending with historical record construction land pressed and overlapped capping of construction land pressed and overlapped capping obtain construction land pressed and overlapped Lid area change numerical value, its process is with described in embodiment three.
Step S43, gained construction land pressed and overlapped lid area change numerical value is amassed with default construction land pressed and overlapped capping Change standard value contrast;Judge early warning degree according to comparing result and generate early warning information according to judged early warning degree.The most such as Fruit exceeds, and carries out different brackets early warning deciding degree according to the numerical range that exceeds standard.
Step S44, transmit above-mentioned generated early warning information.
Step S45, according to receive early warning information to construction land utilize be monitored.
Thus, the method for above-described embodiment one to four, utilize automation control method, can be the most effectively to construction land Intensive utilization be monitored and retrain;Objective indicator is utilized to carry out constructive to the intensive utilization of the land used for urban and rural construction projects in city Constraint, the reference index factor being determined by improves the accuracy judged so that construction land obtains reasonable early warning and controls, and improves The standardized degree of construction land.
Embodiment five,
The present embodiment provides the pre-alarming control system of a kind of construction land intensive utilization, and this control system can be used for above-described embodiment In the pre-warning and control method of to four, this system as shown in Figure 6, specifically includes: data extracting unit 1, data acquisition unit 2, Computing unit 3, comparing unit 4, transmitting element 5, upper server 6.
Wherein, described data extract single 1 yuan, for extracting building of historical record construction land area data or historical record If land used pressed and overlapped capping volume data;Described data acquisition unit 2, is used for gathering construction land area data or construction land is empty Between data;Described computing unit 3, for calculating the historical record construction land of construction land area data and the extraction gathered The difference of area data obtains construction land area change value, or by gathered construction land spatial data with forbid and restriction is built If region is overlapped comparison, when there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass, and calculate it The difference long-pending with historical record construction land pressed and overlapped capping obtains construction land pressed and overlapped lid area change numerical value;Described comparison Unit 4, for gained construction land area change value being contrasted with default construction land area change standard value, or builds gained If land used pressed and overlapped lid area change numerical value contrasts with default construction land pressed and overlapped lid area change standard value, respectively according to right Judge early warning degree than result, and generate early warning information according to judged early warning degree;Described transmitting element 5, for by described Early warning information is transmitted.
And, in system, upper server 6, is used for receiving and storing early warning information, and early warning information is shown.
Further, this system can also include mobile terminal 7, and described mobile terminal is for receiving from upper server Or the early warning information that transmitting element sends.Preferably, described mobile terminal is PC terminal or mobile phone terminal.Mobile terminal is utilized to make Obtain early warning information to transmit and share, improve early warning effect further.
The system of the present invention, by being concisely and efficiently control program, can realize carrying out pre-to construction land intensive utilization Alert, advantageously account for soil extensive problem.
To sum up, the present invention improves the accuracy judged by the objective reference index factor so that construction land is closed Reason early warning controls, and improves the standardized degree of construction land, can increase the sensitivity to the change of town site intensive utilization Property, strengthen the supervision to local government and control, promote city health benign development.
Above in conjunction with accompanying drawing, embodiments of the present invention are explained in detail, but the present invention is not limited to above-mentioned enforcement Mode, in the ken that those of ordinary skill in the art are possessed, it is also possible on the premise of without departing from present inventive concept Make a variety of changes.

Claims (6)

1. the pre-warning and control method of a construction land intensive utilization, it is characterised in that the method comprising the steps of:
Step 1, collection construction land area data or construction land spatial data;
Step 2, the difference calculating gathered construction land area data and historical record construction land area data are built Land area changing value;Or by gathered construction land spatial data with forbid and limit construction area being overlapped comparison, when When there is overlapping gland, then extract and calculate construction land pressed and overlapped capping and amass, and according to construction land pressed and overlapped capping long-pending with The mathematic interpolation that the construction land pressed and overlapped capping of historical record amasss obtains construction land pressed and overlapped lid area change numerical value;
Step 3, gained construction land area change value and default construction land area change standard value are contrasted, or gained is built If land used pressed and overlapped lid area change numerical value contrasts with default construction land pressed and overlapped lid area change standard value;Respectively according to right Judge early warning degree than result and generate early warning information according to judged early warning degree;
Step 4, generated early warning information is transmitted;
Step 5, according to receive early warning information to construction land utilize be monitored.
The pre-warning and control method of construction land intensive utilization the most according to claim 1, it is characterised in that: described step 1 Middle construction land area data includes present situation construction land area data in the current year or present situation in current year construction land area per capita Data.
The pre-warning and control method of construction land intensive utilization the most according to claim 1, it is characterised in that: described step 1 Middle construction land spatial data includes present situation construction land spatial data in the current year or newly-increased construction land spatial data.
4. the pre-alarming control system of a construction land intensive utilization, it is characterised in that including:
Data extracting unit, for extracting the construction land area data of historical record or the construction land pressed and overlapped of historical record Capping volume data;
Data acquisition unit, is used for gathering construction land area data or construction land spatial data;
Computing unit, for calculating the gathered construction land area data historical record construction land area data with extraction Difference obtains construction land area change value, or by gathered construction land spatial data with forbid and limit construction area carrying out Superposition comparison, when there is overlapping gland, then extracts and calculates construction land pressed and overlapped capping and amass, and calculate itself and historical record The difference that construction land pressed and overlapped capping amasss obtains construction land pressed and overlapped lid area change numerical value;
Comparing unit, for gained construction land area change value is contrasted with default construction land area change standard value, or Gained construction land pressed and overlapped lid area change numerical value is contrasted with default construction land pressed and overlapped lid area change standard value, point Do not judge early warning degree according to comparing result, and generate early warning information according to judged early warning degree;
Transmitting element, for being transmitted described early warning information;
Upper server, is used for receiving and storing early warning information, and early warning information is shown.
The pre-alarming control system of construction land intensive utilization the most according to claim 4, it is characterised in that: also include mobile Terminal, described mobile terminal is for receiving the early warning information sent from upper server or transmitting element.
The pre-alarming control system of construction land intensive utilization the most according to claim 5, it is characterised in that: described mobile whole End is PC terminal or mobile phone terminal.
CN201610299536.7A 2016-05-09 2016-05-09 Early warning control method and system for intensive use of construction land Pending CN105976113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610299536.7A CN105976113A (en) 2016-05-09 2016-05-09 Early warning control method and system for intensive use of construction land

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610299536.7A CN105976113A (en) 2016-05-09 2016-05-09 Early warning control method and system for intensive use of construction land

Publications (1)

Publication Number Publication Date
CN105976113A true CN105976113A (en) 2016-09-28

Family

ID=56992209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610299536.7A Pending CN105976113A (en) 2016-05-09 2016-05-09 Early warning control method and system for intensive use of construction land

Country Status (1)

Country Link
CN (1) CN105976113A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1987906A (en) * 2005-12-22 2007-06-27 中国煤炭地质总局航测遥感局 Method for dynamicaly predicting land use change
CN101794413A (en) * 2009-12-30 2010-08-04 武汉大学 Sustainable utilization regulating and controlling method of village and town land
CN103049517A (en) * 2012-12-17 2013-04-17 上海市房屋土地资源信息中心 Method and system for discriminating changeable graphic spot in dynamic monitoring of present situation of land use
CN104463442A (en) * 2014-11-25 2015-03-25 中国科学院地理科学与资源研究所 Detection method of town and country construction clustering
CN105225009A (en) * 2015-10-10 2016-01-06 深圳市数字城市工程研究中心 A kind of urban land use space method for early warning and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1987906A (en) * 2005-12-22 2007-06-27 中国煤炭地质总局航测遥感局 Method for dynamicaly predicting land use change
CN101794413A (en) * 2009-12-30 2010-08-04 武汉大学 Sustainable utilization regulating and controlling method of village and town land
CN103049517A (en) * 2012-12-17 2013-04-17 上海市房屋土地资源信息中心 Method and system for discriminating changeable graphic spot in dynamic monitoring of present situation of land use
CN104463442A (en) * 2014-11-25 2015-03-25 中国科学院地理科学与资源研究所 Detection method of town and country construction clustering
CN105225009A (en) * 2015-10-10 2016-01-06 深圳市数字城市工程研究中心 A kind of urban land use space method for early warning and device

Similar Documents

Publication Publication Date Title
CN103175513B (en) System and method for monitoring hydrology and water quality of river basin under influence of water projects based on Internet of Things
CN107798876B (en) Road traffic abnormal jam judging method based on event
CN102136194B (en) Road traffic condition detection device based on panorama computer vision
CN104200667B (en) A kind of traffic congestion hierarchical detection method based on mobile phone signal data
CN107543580A (en) A kind of urban waterlogging monitoring early-warning system
CN101465059B (en) Early-warning system for inspecting and judging urban road traffic safety situation
CN109933637B (en) Flood risk dynamic display and analysis system
CN113902168B (en) Flood emergency evacuation method based on real-time crowd data fusion
CN109767086A (en) A kind of Trunk highway pavement of road technology status intelligent decision system
CN109684774A (en) A kind of beam bridge safety monitoring and assessment device
CN116824807B (en) Multi-disaster early warning and alarming method and system
CN106408936B (en) A kind of highway anomalous event real-time detection method based on data in mobile phone
CN117152935A (en) Tunnel flood early warning system and method based on fluid three-dimensional dynamic simulation
CN104751615B (en) A kind of level method for early warning based on mud-rock flow evolution process
CN108364129A (en) A kind of region ecology safety early alarming and forecasting method based on remote sensing big data
CN102564414B (en) Method for automatically updating navigation channel chart according to water level change
CN105976113A (en) Early warning control method and system for intensive use of construction land
CN116433008A (en) Database-based highway slope risk early warning method and system
CN106027668A (en) Manhole cover addressing system and method
CN203055179U (en) Parking stall detecting device and parking stall detecting system
Song et al. A Sensor-Based Smart Urban Flood Warning and Management System
CN115063019A (en) Water flow monitoring system for intelligent sponge city construction evaluation
CN112116513A (en) Management method and system for territorial space planning monitoring and early warning
CN101950324A (en) River-health intelligent diagnosis method and equipment
CN110189029A (en) A kind of bicycle cycling and parking demand appraisal procedure based on extensive mobile phone location data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication