CN105975598A - Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval - Google Patents
Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval Download PDFInfo
- Publication number
- CN105975598A CN105975598A CN201610304955.5A CN201610304955A CN105975598A CN 105975598 A CN105975598 A CN 105975598A CN 201610304955 A CN201610304955 A CN 201610304955A CN 105975598 A CN105975598 A CN 105975598A
- Authority
- CN
- China
- Prior art keywords
- data
- input
- early warning
- data acquisition
- switching requirement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
Landscapes
- Engineering & Computer Science (AREA)
- Databases & Information Systems (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The invention discloses an event early warning method for obtaining data on the basis of a simulation operation way of condition retrieval. The event early warning method successively comprises the following steps: through a data exchange requirement entering device, inputting the specific requirement of data exchange; carrying out verification code recognition through a verification code recognition device; then, logging in a specific application system through a simulation login device; then, through a data acquisition time and frequency setting device, controlling the data acquisition time and frequency of the simulation login device to be stored into a data acquisition path input and storage device; outputting the data acquisition time and frequency of the simulation login device to a data integration management device; and carrying out reading and inquiry through various ways. The method has the advantages that each application system can be subjected to data acquisition without compiling an interface, implementation speed is higher than an interface compiling work amount after a scale is formed, and implementation cost is drastically lowered.
Description
Technical field
The present invention relates to simulated operation mode based on conditional information retrieval and obtain the event method for early warning of data.
Background technology
Power system application is numerous, and for Safe Production Supervision, it is right that main obstacle is quickly to realize
The data acquisition of each application system.Current major technique is to carry out interface exploitation for each application system,
And interface exploitation quantities is big, the support needing developer to provide is a lot, and implementation cost is too high.
Summary of the invention
It is an object of the invention to provide simulated operation mode based on conditional information retrieval and obtain the event early warning of data
Method, it is possible to effectively solve each application of existing power system and have different interfaces, data acquisition cost mistake
High problem.
In order to solve above-mentioned technical problem, the present invention is achieved by the following technical solutions: examines based on condition
The simulated operation mode of rope obtains the event method for early warning of data, comprises the following steps successively:
A, by data switching requirement input device, it is achieved to be manually entered, data-interface input in the way of pair
The real needs of data exchange input, and then hand over according to the data of data switching requirement input device typing
Change demand, it is judged that whether the system currently with logon rights can meet this switching requirement, if be unsatisfactory for,
Feeding back to data switching requirement input device, if met, entering next step;
B, by checking code recognition device, the system that login interface is provided with identifying code carries out identifying code identification,
And be transferred to simulate entering device by recognition result;
C, simulation entering device combine the letter of checking code recognition device output according to the account given in advance and password
Breath, logs in concrete application system by goal systems entering device;
D, controlled time of the data acquisition of simulation logon device by data acquisition time and frequency setting device
And frequency;
E, input and store the collection path of concrete data in device acquisition step D by data acquisition path and enter
Row input and storage;
F, by step E data acquisition path input and storage device data export data integration managing device,
Each application system is carried out data acquisition and integrated management;
G1, by the data in natural language recognition device for reading data prior-warning device, accept with natural language
Method input data query order and submit to data integration managing device output data query result;
G2, read the data in data early warning device by data query arrangement, each system is inquired about
The data monitoring of formula;
G3, by the data in data early warning device for reading data prior-warning device, the number to each system automatically
According to being associated analysis, find that early warning situation carries out early warning by voice and note;
G4, by the data in report output device for reading data prior-warning device, carry out form according to masterplate defeated
Go out.
Preferably, in step F, input from data acquisition path and storage device be to data integration managing device,
Need to resolve html label and obtain each label substance, the tag path of data is set, obtains need according to path
The data content wanted, row filter of going forward side by side, and need to carry out required data file derivation, obtain literary composition
Part stream, is read file stream.
Preferably, in step A, give device by system login authority and judge that data switching requirement typing fills
Whether the data putting typing meet switching requirement.
Compared with prior art, the invention have the advantage that and realize multiple by data switching requirement input device
The data inputting of different modes, improves the data inputting efficiency of this device, is more easy to realize automation mechanized operation,
Add checking code recognition device permissible simultaneously, improve the adaptability of system, data acquisition time and frequency
Setting device only inputs simulation entering device and data acquisition path and storage device is controlled, and simplifies
Control flow, this method, without writing interface, can directly carry out data acquisition to each application system, is formed
Implementing the quantities that speed is write higher than interface after scale, implementation cost is also greatly lowered.
Accompanying drawing explanation
Fig. 1 is the stream that present invention simulated operation based on conditional information retrieval mode obtains the event method for early warning of data
Cheng Tu.
Detailed description of the invention
It is the event method for early warning that present invention simulated operation based on conditional information retrieval mode obtains data refering to Fig. 1
Embodiment, simulated operation mode based on conditional information retrieval obtains the event method for early warning of data, includes successively
Following steps:
A, by data switching requirement input device, it is achieved to be manually entered, data-interface input in the way of pair
The real needs of data exchange input, and then hand over according to the data of data switching requirement input device typing
Changing demand, system login authority imparting device judges that the data of data switching requirement input device typing are the fullest
Foot switching requirement, if be unsatisfactory for, feeds back to data switching requirement input device, if met, under entering
One step;
B, by checking code recognition device, the system that login interface is provided with identifying code carries out identifying code identification,
And be transferred to simulate entering device by recognition result;
C, simulation entering device combine the letter of checking code recognition device output according to the account given in advance and password
Breath, logs in concrete application system by goal systems entering device;
D, controlled time of the data acquisition of simulation logon device by data acquisition time and frequency setting device
And frequency;
E, input and store the collection path of concrete data in device acquisition step D by data acquisition path and enter
Row input and storage;
F, by step E data acquisition path input and storage device data export data integration managing device,
Each application system is carried out data acquisition and integrated management, inputs from data acquisition path and storage device is to number
According to integrated management device, need to resolve html label and obtain each label substance, the tag path of data is set,
Obtain the data content needed, row filter of going forward side by side according to path, and need required data are carried out literary composition
Part is derived, and obtains file stream, is read file stream;
G1, by the data in natural language recognition device for reading data prior-warning device, accept with natural language
Method input data query order and submit to data integration managing device output data query result;
G2, read the data in data early warning device by data query arrangement, each system is inquired about
The data monitoring of formula;
G3, by the data in data early warning device for reading data prior-warning device, the number to each system automatically
According to being associated analysis, find that early warning situation carries out early warning by voice and note;
G4, by the data in report output device for reading data prior-warning device, carry out form according to masterplate defeated
Go out.
G1 to G4 belongs to operation arranged side by side, and client carries out selecting operation according to actual needs.
Realized the data inputting of multitude of different ways by data switching requirement input device, improve this device
Data inputting efficiency, be more easy to realize automation mechanized operation, add simultaneously checking code recognition device permissible, carry
The high adaptability of system, data acquisition time and frequency setting device are only to simulation entering device and data acquisition
The input of collection path and storage device are controlled, and simplify control flow, and this method, can without writing interface
Each application system is directly carried out data acquisition, after formation scale, implements the engineering that speed is write higher than interface
Amount, implementation cost is also greatly lowered.
The foregoing is only the specific embodiment of the present invention, but the technical characteristic of the present invention be not limited thereto,
Any those skilled in the art is in the field of the invention, and change or the modification made all are contained in the present invention
The scope of the claims among.
Claims (3)
1. simulated operation mode based on conditional information retrieval obtains the event method for early warning of data, it is characterised in that: successively
Comprise the following steps:
A, by data switching requirement input device, it is achieved to be manually entered, data-interface input in the way of pair
The real needs of data exchange input, then according to the data of data switching requirement input device typing
Switching requirement, it is judged that whether the system currently with logon rights can meet this switching requirement, if discontented
Sufficient then feed back to data switching requirement input device, if met, enter next step;
B, by checking code recognition device, the system that login interface is provided with identifying code carries out identifying code identification,
And be transferred to simulate entering device by recognition result;
C, simulation entering device combine the letter of checking code recognition device output according to the account given in advance and password
Breath, logs in concrete application system by goal systems entering device;
D, controlled time of the data acquisition of simulation logon device by data acquisition time and frequency setting device
And frequency;
E, input and store the collection path of concrete data in device acquisition step D by data acquisition path and enter
Row input and storage;
F, by step E data acquisition path input and storage device data export data integration managing device,
Each application system is carried out data acquisition and integrated management;
G1, by the data in natural language recognition device for reading data prior-warning device, accept with natural language side
Method input data query order and submit to data integration managing device output data query result;
G2, read the data in data early warning device by data query arrangement, each system is carried out query formulation
Data monitoring;
G3, by the data in data early warning device for reading data prior-warning device, the data to each system automatically
It is associated analyzing, finds that early warning situation carries out early warning by voice and note;
G4, by the data in report output device for reading data prior-warning device, carry out report output according to masterplate.
2. simulated operation mode based on conditional information retrieval as claimed in claim 1 obtains the pre-police of event of data
Method, it is characterised in that: in step F, input from data acquisition path and storage device is to data integration pipe
Reason device, needs to resolve html label and obtains each label substance, arrange the tag path of data, according to
Path obtains the data content needed, row filter of going forward side by side, and needs required data are carried out file
Derive, obtain file stream, file stream is read.
3. simulated operation mode based on conditional information retrieval as claimed in claim 1 obtains the pre-police of event of data
Method, it is characterised in that: in step A, give device by system login authority and judge data switching requirement
Whether the data of input device typing meet switching requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610304955.5A CN105975598A (en) | 2016-05-10 | 2016-05-10 | Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610304955.5A CN105975598A (en) | 2016-05-10 | 2016-05-10 | Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105975598A true CN105975598A (en) | 2016-09-28 |
Family
ID=56992131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610304955.5A Pending CN105975598A (en) | 2016-05-10 | 2016-05-10 | Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105975598A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108989427A (en) * | 2018-07-20 | 2018-12-11 | 北京开普云信息科技有限公司 | A kind of public service system and its construction method based on multi-source information polymerization |
CN109614532A (en) * | 2018-11-26 | 2019-04-12 | 上海阿米特数据系统有限公司 | A kind of retail website data auto acquisition system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101997925A (en) * | 2010-11-22 | 2011-03-30 | 北京亮点时间科技有限公司 | Server monitoring method with early warning function and system thereof |
CN102238195A (en) * | 2011-08-11 | 2011-11-09 | 成都勤智数码科技有限公司 | Running monitoring method of application system |
CN103226606A (en) * | 2013-04-28 | 2013-07-31 | 浙江核新同花顺网络信息股份有限公司 | Inquiry selection method and system |
CN104239471A (en) * | 2014-09-03 | 2014-12-24 | 陈飞 | Data query/ exchange device in behavior simulation mode and method thereof |
CN104852916A (en) * | 2015-05-08 | 2015-08-19 | 西安石油大学 | Social engineering-based webpage verification code recognition method and system |
CN105335457A (en) * | 2015-09-22 | 2016-02-17 | 武汉达策信息技术有限公司 | Early warning monitoring system and method thereof |
-
2016
- 2016-05-10 CN CN201610304955.5A patent/CN105975598A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101997925A (en) * | 2010-11-22 | 2011-03-30 | 北京亮点时间科技有限公司 | Server monitoring method with early warning function and system thereof |
CN102238195A (en) * | 2011-08-11 | 2011-11-09 | 成都勤智数码科技有限公司 | Running monitoring method of application system |
CN103226606A (en) * | 2013-04-28 | 2013-07-31 | 浙江核新同花顺网络信息股份有限公司 | Inquiry selection method and system |
CN104239471A (en) * | 2014-09-03 | 2014-12-24 | 陈飞 | Data query/ exchange device in behavior simulation mode and method thereof |
CN104852916A (en) * | 2015-05-08 | 2015-08-19 | 西安石油大学 | Social engineering-based webpage verification code recognition method and system |
CN105335457A (en) * | 2015-09-22 | 2016-02-17 | 武汉达策信息技术有限公司 | Early warning monitoring system and method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108989427A (en) * | 2018-07-20 | 2018-12-11 | 北京开普云信息科技有限公司 | A kind of public service system and its construction method based on multi-source information polymerization |
CN109614532A (en) * | 2018-11-26 | 2019-04-12 | 上海阿米特数据系统有限公司 | A kind of retail website data auto acquisition system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108519770B (en) | Experimental platform for flotation process operation control | |
CN103473056B (en) | A kind of remote measurement configuration file automatic generation method | |
CN104484558B (en) | The analysis report automatic generation method and system of biological information project | |
CN102411540B (en) | Automatic management system of workflow-based common software testing process | |
CN109492059B (en) | Multi-source heterogeneous data fusion and model correction process control method | |
CN104933588A (en) | Data annotation platform for expanding merchandise varieties and data annotation method | |
CN110083639A (en) | A kind of method and device that the data blood relationship based on clustering is intelligently traced to the source | |
CN101887410B (en) | File conversion device, file conversion method, and file conversion program | |
EP0985992A3 (en) | Simultaneous manufacturing and product engineering integrated with knowledge networking | |
CN104463355A (en) | Mini-satellite testing and planning system based on testing model | |
KR101984760B1 (en) | Self-designing modeling system and method using artificial intelligence | |
CN105975598A (en) | Event early warning method for obtaining data on the basis of simulation operation way of condition retrieval | |
CN105824979A (en) | Course recommendation method and system of same | |
US20080300715A1 (en) | System for carrying out automatic drilling / riveting process in aeronautical assembly pieces | |
CN112884164B (en) | Federal machine learning migration method and system for intelligent mobile terminal | |
CN105045948A (en) | Method for automatically batch generating configuration diagrams of transmitter protection box | |
CN106844490A (en) | The structuring of BIM non-geometry information databases and the method and system for interacting | |
CN106569944A (en) | Constraint-tree-based onboard software test data analysis method | |
CN113986730A (en) | Method, device, equipment and storage medium for testing offer file | |
CN113626285A (en) | Model-based job monitoring method and device, computer equipment and storage medium | |
CN109634215B (en) | Nuclear power plant operation procedure design method based on planar graph coding technology | |
CN104850484B (en) | A kind of character terminal interaction mode automatic judging method based on bitmap analysis | |
CN105573972A (en) | Report check formula generation method and apparatus | |
KR101565499B1 (en) | Data processing apparatus, data processing program, recording medium | |
CN104793372B (en) | The defects of different producing line liquid crystal modules grade decision method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160928 |