CN105973576A - Simple device applied to hinge support component manual loading compression test - Google Patents

Simple device applied to hinge support component manual loading compression test Download PDF

Info

Publication number
CN105973576A
CN105973576A CN201610186981.2A CN201610186981A CN105973576A CN 105973576 A CN105973576 A CN 105973576A CN 201610186981 A CN201610186981 A CN 201610186981A CN 105973576 A CN105973576 A CN 105973576A
Authority
CN
China
Prior art keywords
steel plate
steel
plate
pole
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610186981.2A
Other languages
Chinese (zh)
Inventor
冯然
朱伍
完海鹰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201610186981.2A priority Critical patent/CN105973576A/en
Publication of CN105973576A publication Critical patent/CN105973576A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a simple device applied to a hinge support component manual loading compression test. The simple device comprises a steel plate IV, a steel plate II and a steel plate I which are horizontally arranged in sequence from the bottom up, and is characterized in that four corners of the steel plate IV are vertically provided with long thread steel rods respectively, the long thread steel rods respectively penetrate through the steel plate II and the steel plate I so as to support the steel plate II and the steel plate I, a vertical reaction frame steel beam is arranged between the steel plate I and the steel plate II, a steel plate III is horizontally arranged between the steel plate II and the steel plate IV in a manner of sharing the same central axis, four corners of the steel plate III are vertically provided with short thread steel rods respectively, a voltage sensor is arranged between the steel plate II and the steel plate III in a clamping manner, and a hydraulic jack is arranged between the steel plate IV and the steel plate III in a clamping manner. The simple device disclosed by the invention can effectively solve a problem of carrying out the compression test on a hinge support component in part of universities and laboratories under a condition that test conditions are restricted, or the size and the bearing capacity of an existing universal testing machine cannot meet test requirements, or test items carried out in the same period are too intensive or the like.

Description

It is applied to the easy device of hinged component manual loading pressurized tests
Technical field
The present invention relates to pressurized tests device field, a kind of be applied to hinged component manual loading pressurized tests Easy device.
Background technology
It is known that test is the effective ways of inspection theoretical correctness, especially in field of civil engineering, the weight of test The property wanted is unquestionable.Expensive yet with large-scale precision instrument, or the size of existing universal testing machine and bearing capacity It is difficult to meet test requirements document, or the pilot project that contemporaneity is carried out is the most intensive, it is impossible to all of test all uses ten thousand Can load by testing machine, the most inevitably need the mode using manual loading to be further applied load, its load mode is the most flexible. Manual loading needs use hydraulic jack to be further applied load, uses pressure transducer to measure the size being further applied load in real time, Therefore, the feasibility of manual loading and accuracy are just particularly important, especially how to use relatively simple assay device to ensure It is the pressurized tests for hinged component, needs to use knife-edge supporter to simulate hinged boundary condition, the installation of whole test Journey is complex, how to maintain hydraulic jack, pressure transducer, knife-edge supporter and test component balance in process of the test And stability in the large, thus ensure that the effectiveness being further applied load just becomes a vital problem.
Summary of the invention it is an object of the invention to provide a kind of simple dress being applied to hinged component manual loading pressurized tests Put, to realize the feasibility of hinged component pressurized tests, improve its accuracy.
In order to achieve the above object, the technical solution adopted in the present invention is:
It is applied to the easy device of hinged component manual loading pressurized tests, it is characterised in that: include horizontally disposed steel plate four, Steel plate four bottom surface is provided with knife-edge supporter, and directly over steel plate four, the most concentrically axle is provided with steel plate two He of level Steel plate one, steel plate one, steel plate two, steel plate four plane are equivalently-sized, and steel plate one is identical with steel plate two thickness, described steel plate four Corner location is the most vertically-mounted to be had between long screw thread steel pole, and the corner of steel plate four and corresponding long screw thread steel pole and passes through nut Fixing, described long screw thread steel pole is each passed through steel plate two, steel plate one with supporting steel plate two and steel plate one, and steel plate one, steel plate two Relative with between long screw thread steel pole be slidably matched, be provided with between steel plate one, steel plate two stand to reaction frame girder steel, and steel plate one, Steel plate two is clamped in the above and below of reaction frame girder steel respectively, and between steel plate two, steel plate four, concentrically axle is provided with the steel plate of level Three, the planar dimension of steel plate three is less than steel plate one, two, four, and the corner location of steel plate three is the most vertically-mounted short thread steel pole, After described short thread steel pole is each passed through steel plate two, upper end is arranged in steel plate one, and short thread steel pole and steel plate three, steel plate two, Being fixed by nut between steel plate one, between steel plate two and steel plate three, clamping is provided with pressure transducer, described steel plate four and steel Between plate three, clamping is provided with hydraulic jack.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: the described edge of a knife props up Seat is perpendicular to reaction frame girder steel.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: described steel plate one, Steel plate two thickness is identical, and steel plate four thickness is more than steel plate one, two thickness, and steel plate three thickness is less than steel plate one, two thickness.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: steel plate one, steel plate Two, the corner of steel plate four is respectively equipped with the through hole passed for long screw thread steel pole, and the position, corner of steel plate one, steel plate two, steel plate four The through-hole diameter put is slightly larger than long screw-thread steel shank diameter.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: described steel plate three Corner location, steel plate one and steel plate two are respectively equipped with the through hole passed for short thread steel pole, and steel plate three corner location, steel plate One and steel plate two in through-hole diameter slightly larger than short thread steel pole diameter.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: the plane of steel plate Size determines according to the diameter of width, pressure transducer and the hydraulic jack of reaction frame girder steel;The thickness of steel plate is then according to pre- The maximum load capacity of the test component estimated and the yield strength of steel determine, to guarantee that during pressurized tests steel plate will not be because of Being deformed for the deficiency of strength and stiffness, its light plate four has knife-edge supporter owing to lower surface connects, and its thickness is relatively big, side Just arrange and hide hook bolt, and do not affect the layout of upper surface hydraulic jack.
The described easy device being applied to hinged component manual loading pressurized tests, it is characterised in that: four short threads The length of steel pole is true according to the thickness of reaction frame girder steel and the height of pressure transducer and steel plate one, steel plate two and steel plate three Fixed, to guarantee to be fixed on reaction frame girder steel steel plate one, steel plate two, steel plate three and pressure transducer;Four root length screw thread steel poles Length then according to the height of reaction frame girder steel, pressure transducer and hydraulic jack, the thickness of four pieces of high strength steel plates, Yi Jishi The axial deformation ability testing component determines, to guarantee that steel plate four has enough decline spaces in loading procedure;Additionally, four root lengths Being relatively large in diameter of screw thread steel pole, has preferable bending rigidity, prevents it from producing bending in loading procedure so that pressurized tests It is difficult to be smoothed out, directly affects the accuracy of result of the test.
Advantage of the present invention is:
The present invention has been specifically designed a set of easy device being applied to hinged component manual loading pressurized tests, in that context it may be convenient to adopt With hydraulic jack and pressure transducer, the compression member of hinged boundary condition is applied useful load, ensure that to greatest extent The accuracy of result of the test.
The present invention can effectively solve Some Universities and laboratory at the restricted or existing universal testing machine of experimental condition Size and bearing capacity is difficult to meet test requirements document or contemporaneity is carried out pilot project the most intensive when carry out The pressurized tests of hinged component.The design of this covering device is simple and convenient to operate, is prone to make, be easily installed, it is possible to iterative cycles makes With, and cheap, it is easy to promote on a large scale.
Accompanying drawing explanation
Fig. 1 is the structure three-dimensional schematic diagram of the present invention.
Fig. 2 is the structure front view of the present invention.
Fig. 3 is the structure left view of the present invention.
Fig. 4 is the structure top view of the present invention.
Detailed description of the invention
See shown in Fig. 1 ~ Fig. 4, be applied to the easy device of hinged component manual loading pressurized tests, including being horizontally disposed with Steel plate 44, steel plate 44 bottom surface is provided with knife-edge supporter 5, and directly over steel plate 44, the most concentrically axle is provided with The steel plate 22 of level and steel plate 1, steel plate 1, steel plate 22, steel plate 44 planar dimension are identical, and steel plate 1 and steel plate 22 Thickness is identical, and the corner location of steel plate 44 is the most vertically-mounted a long screw thread steel pole 6, and the corner of steel plate 44 and corresponding length Being fixed by nut between screw thread steel pole 6, long screw thread steel pole 6 is each passed through steel plate 22, steel plate 1 with supporting steel plate 22 and steel Relative between plate 1, and steel plate 1, steel plate 22 with long screw thread steel pole 6 it is slidably matched, is provided with between steel plate 1, steel plate 22 Stand to reaction frame girder steel 7, and steel plate 1, steel plate 22 be clamped in the above and below of reaction frame girder steel 7, steel plate 22, steel respectively Between plate 44, concentrically axle is provided with the steel plate 33 of level, and the planar dimension of steel plate 33 is less than steel plate one 1,22,44, steel The corner location of plate 33 is the most vertically-mounted short thread steel pole 8, and after short thread steel pole 8 is each passed through steel plate 22, upper end is installed In steel plate 1, and fixed by nut 9 between short thread steel pole 8 and steel plate 33, steel plate 22, steel plate 1, steel plate 22 with Between steel plate 33, clamping is provided with pressure transducer 10, and between steel plate 44 and steel plate 33, clamping is provided with hydraulic jack 11.
Knife-edge supporter 5 is perpendicular to reaction frame girder steel 7.
Steel plate 1, steel plate 22 thickness are identical, and steel plate 44 thickness is more than steel plate one 1,22 thickness, and steel plate 33 thickness is little In steel plate one 1,22 thickness.
Steel plate 1, steel plate 22, the corner of steel plate 44 are respectively equipped with the through hole passed for long screw thread steel pole 6, and steel plate one 1, the through-hole diameter of the corner location of steel plate 22, steel plate 44 is slightly larger than long screw thread steel pole 6 diameter.
Steel plate 33 corner location, steel plate 1 and steel plate 22 are respectively equipped with the through hole passed for short thread steel pole 8, and Through-hole diameter in steel plate 33 corner location, steel plate 1 and steel plate 22 is slightly larger than short thread steel pole 8 diameter.
The planar dimension of steel plate determines according to the diameter of width, pressure transducer and the hydraulic jack of reaction frame girder steel; The thickness of the steel plate maximum load capacity of test component and the yield strength of steel that then basis is estimated determine, to guarantee to try at pressurized During testing, steel plate will not be deformed because of the deficiency of strength and stiffness, and its light plate four has the edge of a knife owing to lower surface connects Bearing, its thickness is relatively big, and convenient layout hides hook bolt, and does not affect the layout of upper surface hydraulic jack.
The length of four short thread steel poles is according to reaction frame girder steel and the height of pressure transducer and steel plate one, steel plate Two and the thickness of steel plate three determine, to guarantee steel plate one, steel plate two, steel plate three and pressure transducer are fixed on reaction frame girder steel On;The length of four root length screw thread steel poles then according to the height of reaction frame girder steel, pressure transducer and hydraulic jack, four pieces high-strength The thickness of steel plate and the axial deformation ability of test component determine, with guarantee steel plate four have in loading procedure enough under Fall space;Additionally, being relatively large in diameter of four root length screw thread steel poles, there is preferable bending rigidity, prevent it from producing in loading procedure Raw bending so that pressurized tests is difficult to be smoothed out, and directly affects the accuracy of result of the test.
Operation principle
This set be applied to the easy device of hinged component manual loading pressurized tests mainly by four pieces of high strength steel plates, four short high-strength Screw thread steel pole and four root length high-strength screw-thread steel bars composition.Steel plate one is identical with the planar dimension of steel plate two and thickness, respectively Being positioned over the upper and lower surface of reaction frame girder steel, its width is more than the width of reaction frame girder steel.Steel plate one and four of steel plate two The position that corner is identical, opens four identical smooth circular holes of diameter inside the edge of reaction frame girder steel, and outside also opens four directly The smooth circular hole that footpath is identical, wherein the diameter of interior mother rib lateral rotundum is slightly larger than the diameter of short thread steel pole, and the diameter of outer mother rib lateral rotundum is bigger Diameter in long screw thread steel pole.Four short thread steel poles are each passed through four circular holes inside steel plate one and steel plate two, and divide Do not tighten the nut on steel plate one upper surface and four short thread steel poles of steel plate two lower surface, steel plate one and steel plate two are fixed on The upper and lower surface of reaction frame girder steel.Planar dimension and the thickness of steel plate three are the least, and its planar dimension is slightly larger than steel plate one and steel The plane that four circular holes inside plate two surround, the plane surrounded less than four circular holes outside steel plate one and steel plate two.At steel The identical smooth circle of four circular holes inside four positions and diameter and steel plate one and steel plate two is opened in four corners of plate three Hole, four circular holes that four short thread steel poles are each passed through on steel plate three, and pressure transducer is positioned over steel plate two and steel Between plate three, tighten the nut on four short thread steel poles of steel plate three lower surface respectively, pressure transducer is fixed on steel plate two And between steel plate three.The planar dimension of steel plate four is identical with the planar dimension of steel plate one and steel plate two, and thickness is more than steel plate one He The thickness of steel plate two, and steel plate four lower surface connect have knife-edge supporter, be used for simulate hinged boundary condition.At steel plate four The identical smooth circular hole of four circular holes outside four positions and diameter and steel plate one and steel plate two is opened, by four in four corners Root length screw thread steel pole is each passed through four circular holes outside steel plate one and steel plate two and on steel plate four, and hydraulic jack is put It is placed between steel plate three and steel plate four, tightens the spiral shell on steel plate one upper surface and steel plate four lower surface four root length screw thread steel pole respectively Mother, is fixed on hydraulic jack between steel plate three and steel plate four, thus the whole series easy device is fixed on reaction frame girder steel.
Before carrying out pressurized tests, first pressure transducer is placed centrally on steel plate three, tightens steel plate three respectively Nut on four short thread steel poles of lower surface, is fixed on pressure transducer between steel plate two and steel plate three.Then, by hydraulic pressure Jack is placed centrally on steel plate four, by the nut on regulation steel plate four lower surface four root length screw thread steel pole, utilizes level Steel plate four is adjusted to level by instrument, and then hydraulic jack is fixed between steel plate three and steel plate four, and tightens table on steel plate four Nut on the root length screw thread steel pole of face four, is completely fixed in steel plate four on four root length screw thread steel poles.Then, test component is pacified It is loaded on the knife-edge supporter that steel plate four lower surface connects, unclamps the nut on steel plate one upper surface four root length screw thread steel pole to steel pole End, by the deadweight of hydraulic jack, steel plate four and knife-edge supporter, test component is applied less initial load, thus The whole series easy device is fixed together with test component.Finally, it is further applied load step by step by hydraulic jack and carries out pressurized examination Testing, in process of the test, the position of steel plate one, steel plate two and steel plate three immobilizes all the time, and steel plate four fundamental rules are along with test component Vertical deformation slowly decline, owing to being retrained by four root length screw thread steel poles, steel plate four remains level, thus ensure that The effectiveness being further applied load.When test component destroys, after pressurized tests terminates, first pass through hydraulic jack unloading, then twist Nut on tight steel plate one upper surface four root length screw thread steel pole, steel plate four is slow the most upwards together with knife-edge supporter and hydraulic jack It is promoted to certain altitude, further takes out the test component of destruction, it is possible to proceed the pressurized tests of next test component.

Claims (7)

1. it is applied to the easy device of hinged component manual loading pressurized tests, it is characterised in that: include horizontally disposed steel plate Four, steel plate four bottom surface is provided with knife-edge supporter, and directly over steel plate four, the most concentrically axle is provided with the steel plate of level Two and steel plate one, steel plate one, steel plate two, steel plate four plane are equivalently-sized, and steel plate one is identical with steel plate two thickness, described steel plate The corner location of four is the most vertically-mounted to be had between long screw thread steel pole, and the corner of steel plate four and corresponding long screw thread steel pole and passes through Nut is fixed, and described long screw thread steel pole is each passed through steel plate two, steel plate one with supporting steel plate two and steel plate one, and steel plate one, steel Relative between plate two with long screw thread steel pole be slidably matched, be provided with between steel plate one, steel plate two stand to reaction frame girder steel, and steel plate One, steel plate two is clamped in the above and below of reaction frame girder steel respectively, and between steel plate two, steel plate four, concentrically axle is provided with level Steel plate three, the planar dimension of steel plate three is less than steel plate one, two, four, and the corner location of steel plate three is the most vertically-mounted short thread Steel pole, after described short thread steel pole is each passed through steel plate two, upper end is arranged in steel plate one, and short thread steel pole and steel plate three, steel Being fixed by nut between plate two, steel plate one, between steel plate two and steel plate three, clamping is provided with pressure transducer, described steel plate four And clamping is provided with hydraulic jack between steel plate three.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: Described knife-edge supporter is perpendicular to reaction frame girder steel.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: Described steel plate one, steel plate two thickness are identical, and steel plate four thickness is more than steel plate one, two thickness, and steel plate three thickness is less than steel plate one, two Thickness.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: Steel plate one, steel plate two, the corner of steel plate four are respectively equipped with the through hole passed for long screw thread steel pole, and steel plate one, steel plate two, steel plate The through-hole diameter of the corner location of four is slightly larger than long screw-thread steel shank diameter.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: Described steel plate three corner location, steel plate one and steel plate two are respectively equipped with the through hole passed for short thread steel pole, and steel plate three or four Through-hole diameter in Angle Position, steel plate one and steel plate two is slightly larger than short thread steel pole diameter.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: The planar dimension of steel plate determines according to the diameter of width, pressure transducer and the hydraulic jack of reaction frame girder steel;The thickness of steel plate The degree maximum load capacity of test component and the yield strength of steel that then basis is estimated determine, to guarantee during pressurized tests Steel plate will not be deformed because of the deficiency of strength and stiffness, and its light plate four has knife-edge supporter owing to lower surface connects, its Thickness is relatively big, and convenient layout hides hook bolt, and does not affect the layout of upper surface hydraulic jack.
The easy device being applied to hinged component manual loading pressurized tests the most according to claim 1, it is characterised in that: The length of four short thread steel poles is according to reaction frame girder steel and the height of pressure transducer and steel plate one, steel plate two and steel plate The thickness of three determines, to guarantee to be fixed on reaction frame girder steel steel plate one, steel plate two, steel plate three and pressure transducer;Four The length of long screw thread steel pole is then according to the height of reaction frame girder steel, pressure transducer and hydraulic jack, four pieces of high strength steel plates The axial deformation ability of thickness and test component determines, to guarantee that steel plate four has enough decline spaces in loading procedure; Additionally, being relatively large in diameter of four root length screw thread steel poles, there is preferable bending rigidity, prevent it from producing bending in loading procedure, Make pressurized tests be difficult to be smoothed out, directly affect the accuracy of result of the test.
CN201610186981.2A 2016-03-28 2016-03-28 Simple device applied to hinge support component manual loading compression test Pending CN105973576A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610186981.2A CN105973576A (en) 2016-03-28 2016-03-28 Simple device applied to hinge support component manual loading compression test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610186981.2A CN105973576A (en) 2016-03-28 2016-03-28 Simple device applied to hinge support component manual loading compression test

Publications (1)

Publication Number Publication Date
CN105973576A true CN105973576A (en) 2016-09-28

Family

ID=56988727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610186981.2A Pending CN105973576A (en) 2016-03-28 2016-03-28 Simple device applied to hinge support component manual loading compression test

Country Status (1)

Country Link
CN (1) CN105973576A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644443A (en) * 2016-12-23 2017-05-10 南京工程学院 Clamping base device of hollow flange steel beam stabilization test
CN107255591A (en) * 2017-05-31 2017-10-17 大连船舶重工集团有限公司 A kind of test method for testing intensity of headframe
CN109632467A (en) * 2019-01-08 2019-04-16 哈尔滨工业大学(威海) One kind being suitable for different size rectangular steel pipe pressurized tests assembled double-pole hinged-supports

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201293781Y (en) * 2008-11-28 2009-08-19 哈尔滨工业大学 Test device for resisting fire of constrained pole
CN102128773A (en) * 2010-12-07 2011-07-20 江苏省电力试验研究院有限公司 Tensile load applying device for concrete chloride ion permeability test and test method
CN104132854A (en) * 2014-07-28 2014-11-05 河海大学 Member pure-torsion experimental device and member pure-torsion experimental method
CN203981389U (en) * 2014-07-11 2014-12-03 南京晨光东螺波纹管有限公司 The multi-functional dynamic type approval test machine of type metal expansion joint
CN104502076A (en) * 2014-12-12 2015-04-08 广西科技大学 Method for arranging strain gauges in continuous beam plastic force test
CN105092222A (en) * 2015-06-19 2015-11-25 重庆大学 Loading apparatus for bearing strength test of girder integral body stability

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201293781Y (en) * 2008-11-28 2009-08-19 哈尔滨工业大学 Test device for resisting fire of constrained pole
CN102128773A (en) * 2010-12-07 2011-07-20 江苏省电力试验研究院有限公司 Tensile load applying device for concrete chloride ion permeability test and test method
CN203981389U (en) * 2014-07-11 2014-12-03 南京晨光东螺波纹管有限公司 The multi-functional dynamic type approval test machine of type metal expansion joint
CN104132854A (en) * 2014-07-28 2014-11-05 河海大学 Member pure-torsion experimental device and member pure-torsion experimental method
CN104502076A (en) * 2014-12-12 2015-04-08 广西科技大学 Method for arranging strain gauges in continuous beam plastic force test
CN105092222A (en) * 2015-06-19 2015-11-25 重庆大学 Loading apparatus for bearing strength test of girder integral body stability

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644443A (en) * 2016-12-23 2017-05-10 南京工程学院 Clamping base device of hollow flange steel beam stabilization test
CN107255591A (en) * 2017-05-31 2017-10-17 大连船舶重工集团有限公司 A kind of test method for testing intensity of headframe
CN109632467A (en) * 2019-01-08 2019-04-16 哈尔滨工业大学(威海) One kind being suitable for different size rectangular steel pipe pressurized tests assembled double-pole hinged-supports
CN109632467B (en) * 2019-01-08 2021-06-15 哈尔滨工业大学(威海) Assembled double-cutter hinged support suitable for compression tests of rectangular steel pipes of different sizes

Similar Documents

Publication Publication Date Title
CN206862607U (en) A kind of new structure slow test loading experiment frame
CN207300722U (en) A kind of bean column node Experimental Study on Seismic Behavior device
CN105973576A (en) Simple device applied to hinge support component manual loading compression test
CN201788123U (en) Bond anchorage pull-out test device
CN105699203B (en) A kind of experimental rig and method for measuring construction material compression strength under confined pressure
CN110095240A (en) Turbogenerator casing stiffness test secondary load device
CN109540442A (en) The experimental rig of phantom frame beam column interior joint receiving horizontal earthquake action
CN207882052U (en) Multifunction structure frame
CN207662730U (en) A kind of large-tonnage is vertical to be stretched and compression universal test system
CN106168536B (en) A kind of plane node stress performance test device
CN108387454A (en) A kind of novel structural elements and shield duct piece experimental system
CN106483010B (en) Support for beam-columns experimental provision
CN206399730U (en) Compression member displacement measuring means
CN205449694U (en) Static detection extension meter
CN208167836U (en) One kind being suitable for indoor small pullout tests assembled simple loading unit
CN208076290U (en) A kind of device applying prestressing force and pull-out test
CN104677581B (en) Charger and the bean column node shock test system based on the charger
CN207779702U (en) A kind of automotive engine test bench
CN203881624U (en) Pressure testing machine
CN208999223U (en) A set of large-tonnage static loading test device suitable for large scale model
CN203981494U (en) Horizontal tensile testing machine four-post frame shelf structure
CN208147342U (en) A kind of gantry machining center
CN107219068A (en) Reinforcement pole-shell structure axial compression test device
CN108760288A (en) Special-shaped type component loading device
CN204346831U (en) A kind of long-duration static charger of lightweight beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928