CN105972614B - A kind of sludge treatment equipment - Google Patents

A kind of sludge treatment equipment Download PDF

Info

Publication number
CN105972614B
CN105972614B CN201610511473.7A CN201610511473A CN105972614B CN 105972614 B CN105972614 B CN 105972614B CN 201610511473 A CN201610511473 A CN 201610511473A CN 105972614 B CN105972614 B CN 105972614B
Authority
CN
China
Prior art keywords
casing
main shaft
combustion chamber
spacing
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610511473.7A
Other languages
Chinese (zh)
Other versions
CN105972614A (en
Inventor
李启仁
曹文波
明永刚
舒志强
魏凌敏
唐武才
李文龙
何加良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Weiming Environmental Protection Technology Co.,Ltd.
Original Assignee
Anhui Weiming Dinghe Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Weiming Dinghe Environmental Protection Co Ltd filed Critical Anhui Weiming Dinghe Environmental Protection Co Ltd
Priority to CN201610511473.7A priority Critical patent/CN105972614B/en
Publication of CN105972614A publication Critical patent/CN105972614A/en
Application granted granted Critical
Publication of CN105972614B publication Critical patent/CN105972614B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/001Incinerators or other apparatus for consuming industrial waste, e.g. chemicals for sludges or waste products from water treatment installations
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2201/00Pretreatment
    • F23G2201/10Drying by heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2209/00Specific waste
    • F23G2209/12Sludge, slurries or mixtures of liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses a kind of sludge treatment equipments, including:Furnace body, the first spiral feeding mechanism and the second spiral feeding mechanism, it includes combustion chamber and smoke evacuation room that furnace body, which has furnace chamber, furnace chamber,;First spiral feeding mechanism includes the first casing and the first main shaft, and furnace chamber is stretched into one end of the first casing, and side wall is equipped with feed inlet and has discharge port;First main shaft is located in the first casing, spacing A is reserved between one end of the first main shaft and the inner wall of the first casing, and spacing A is located on the extending direction of discharge port;Axially extending bleed-off passage is equipped in first main shaft;Second spiral feeding mechanism includes the second casing and the second main shaft, and furnace chamber is stretched into one end of the second casing, and its feed inlet is connected to the discharge port of the first casing, discharge port and combustion chamber;Second main shaft is located in the second casing.The present invention is economic and environment-friendly also so that sludge is able to recycling as resource not only it is possible to prevente effectively from the problem of environmental pollution.

Description

A kind of sludge treatment equipment
Technical field
The present invention relates to technical field of sludge treatment more particularly to a kind of sludge treatment equipments.
Background technology
Currently, the municipal sewage plant for being more than in the world 90% uses activated sludge process or biofilm, handling A large amount of excess sludge is generated in the process.Existing sewage treatment plant's processing sludge practices well is concentrated, dehydration and stabilizes After be used further to fill out sea or land use etc..But sludge of sewage treatment plant amount is big, moisture content is high, complicated component and perishable, sludge Processing procedure high energy consumption, input are big, cause a large amount of untreated sludge to be piled up arbitrarily or simply fill, and due to containing in sludge There are a large amount of flammable organic matters not only to be polluted the environment if directly filled, also wastes the useful resources in sludge.
Invention content
Based on above-mentioned background technology, the present invention proposes a kind of sludge treatment equipment.
The present invention proposes a kind of sludge treatment equipment, including:Furnace body, the first spiral feeding mechanism and the second screw feeder Mechanism, wherein:
It includes combustion chamber and the smoke evacuation room positioned at combustion chamber side that furnace body, which has furnace chamber, furnace chamber, and fire grate is equipped in combustion chamber, It is equipped with discharge flue between combustion chamber and smoke evacuation room;
First spiral feeding mechanism includes the first casing and the first main shaft, and furnace chamber is stretched into and by burning in one end of the first casing Room, which passes through, stretches into smoke evacuation room, and the other end is located at the outside of furnace chamber;First casing is located at the top of fire grate, the side wall of the first casing And the side outside furnace chamber is equipped with feed inlet, the side wall of the first casing and the one end for being located remotely from feed inlet, which are equipped with, to discharge Mouthful;
First main shaft is located in the first casing and extends along the extending direction of the first casing, and spiral is equipped on the first main shaft Blade, the first main shaft are reserved with spacing A between the inner wall of one end and the first casing far from feed inlet one end far from feed inlet, and Spacing A is located on the extending direction of discharge port;Axially extending bleed-off passage, one end of the bleed-off passage are equipped in first main shaft It is connected to spacing A, the other end is in communication with the outside;
Second spiral feeding mechanism includes the second casing and the second main shaft, and the second casing has inlet port and outlet port, the One end of two casings, which is stretched into furnace chamber and passed through by room of discharging fume, stretches into combustion chamber, and the other end is located at the outside of furnace chamber;Second casing Positioned at the lower section of the first casing, and the feed inlet of the second casing is connected to the discharge port of the first casing, the discharge port of the second casing Positioned at the top of fire grate and and combustion chamber;
Second main shaft is located in the second casing and extends along the extending direction of the second casing, and spiral is equipped on the second main shaft Blade, the second main shaft and helical blade cooperate for the material in its second casing to be delivered to combustion chamber.
Preferably, preheating channel is additionally provided in the first main shaft, preheating channel is in the first main shaft along the extension of the first main shaft Direction extends, and its one end and combustion chamber close to combustion chamber, and one end close to smoke evacuation room is in communication with the outside.
Preferably, axially extending preheating channel, one end of the preheating channel and combustion chamber are equipped in the second main shaft, Its other end is in communication with the outside.
Preferably, one end that the preheating channel in the first main shaft, the preheating channel in the second main shaft are in communication with the outside is each other Connection.
Preferably, bleed-off passage is equipped in the second main shaft, the bleed-off passage is in the second main shaft along the extension of the second main shaft Direction extends, which is connected to close to one end of spacing A with spacing A, and one end far from spacing A is in communication with the outside.
Preferably, sidewall of the furnace body is equipped with the observation panel being connected to the first casing for observing solid accumulation situation at spacing A.
Preferably, furnace body includes inner furnace body and external furnace body, and inner furnace body is made by refractory material, and external furnace body is by thermal insulating material Material is made.
In the present invention, sludge is delivered to the second spiral feeding mechanism, the second screw(-type) feeder by the first spiral feeding mechanism Structure is used to sludge being delivered to combustion chamber, since the first spiral feeding mechanism and the second spiral feeding mechanism transport path are in stove Intracavitary, and the side wall of the first casing and side outside the furnace chamber is equipped with feed inlet, the first machine in the first spiral feeding mechanism The side wall of shell and be located remotely from feed inlet one end be equipped with discharge port;The first main shaft is located at the first machine in first spiral feeding mechanism Extend in shell and along the extending direction of the first casing, the one end of the first main shaft far from feed inlet is with the first casing far from feed inlet one Spacing A is reserved between the inner wall at end, and spacing A is located on the extending direction of discharge port;Axial prolong is equipped in first main shaft Bleed-off passage is stretched, one end of the bleed-off passage is connected to spacing A, and the other end is in communication with the outside;Make the first screw(-type) feeder During conveying sludge, sludge is constantly toasted by furnace high-temperature structure by feed inlet to discharge port direction, makes the water in sludge Divide and gasify and be discharged by bleed-off passage, when the sludge after removing water is transferred at spacing A, then automatically falls into the second screw feeder Mechanism, and by the second spiral feeding mechanism combustion is used as until being transferred into combustion chamber to transmit to make it be further dried Material uses.
In conclusion a kind of sludge treatment equipment proposed by the invention, not only it is possible to prevente effectively from environmental pollution is asked Topic, it is economic and environment-friendly also so that sludge is able to recycling as resource.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of sludge treatment equipment proposed by the present invention.
Specific implementation mode
In the following, technical scheme of the present invention is described in detail by specific embodiment.
As shown in FIG. 1, FIG. 1 is a kind of structural schematic diagrams of sludge treatment equipment proposed by the present invention.
Referring to Fig.1, a kind of sludge treatment equipment that the embodiment of the present invention proposes, including:Furnace body 1, the first screw(-type) feeder Structure 2 and the second spiral feeding mechanism 3, wherein:
Furnace body 1 includes inner furnace body and external furnace body, and inner furnace body is made by refractory material, and external furnace body is made by thermal insulation material It forming, it includes combustion chamber and the smoke evacuation room positioned at combustion chamber side that furnace body 1, which has furnace chamber, furnace chamber, and fire grate 5 is equipped in combustion chamber, It is equipped with discharge flue between combustion chamber and smoke evacuation room.
First spiral feeding mechanism 2 includes the first casing 21 and the first main shaft 22, and furnace chamber is stretched into one end of the first casing 21 And passed through by combustion chamber and stretch into smoke evacuation room, the other end is located at the outside of furnace chamber;First casing 21 is located at the top of fire grate 5, the The side wall of one casing 21 and the side outside the furnace chamber are equipped with feed inlet 211, the side wall of the first casing 21 and be located remotely from into One end of material mouth 211 is equipped with discharge port 212;First main shaft 22 is located in the first casing 21 and along the extending direction of the first casing 21 Extend, helical blade is installed on the first main shaft 22, the one end of the first main shaft 22 far from feed inlet 211 and the first casing 21 are separate Spacing A is reserved between the inner wall of 211 one end of feed inlet, and spacing A is located on the extending direction of discharge port 212;First master Axially extending bleed-off passage is equipped in axis 22, one end of the bleed-off passage is connected to spacing A, and the other end is in communication with the outside.
Second spiral feeding mechanism 3 includes the second casing 31 and the second main shaft 32, and the second casing 31 has feed inlet and goes out Material mouth, one end of the second casing 31, which is stretched into furnace chamber and passed through by room of discharging fume, stretches into combustion chamber, and the other end is located at the outside of furnace chamber; Second casing 31 is located at the lower section of the first casing 21, and the discharge port 212 of the feed inlet of the second casing 31 and the first casing 21 connects Logical, the discharge port of the second casing 31 is located at top and and the combustion chamber of fire grate 5;Second main shaft 32 is located in the second casing 31 And extend along the extending direction of the second casing 31, helical blade, the second main shaft 32 and helical blade are installed on the second main shaft 32 It cooperates for the material in its second casing 31 to be delivered to combustion chamber.
The present invention works in this way, and sludge is delivered to the second spiral feeding mechanism 3 by the first spiral feeding mechanism 2, the Two spiral feeding mechanisms 3 are used to sludge being delivered to combustion chamber, due to the first spiral feeding mechanism 2 and the second spiral feeding mechanism 3 transport paths are in furnace chamber, and the side wall of the first casing 21 and the side outside furnace chamber in the first spiral feeding mechanism 2 Equipped with feed inlet 211, the side wall of the first casing 21 and be located remotely from feed inlet 211 one end be equipped with discharge port 212;First spiral First main shaft 22 is located in the first casing 21 and extends along the extending direction of the first casing 21, the first main shaft 22 in feeder 2 Spacing A is reserved between one end and the first inner wall of the casing 21 far from 211 one end of feed inlet far from feed inlet 211, and between this It is located at away from A on the extending direction of discharge port 212;It is equipped with axially extending bleed-off passage in first main shaft 22, the one of the bleed-off passage End is connected to spacing A, and the other end is in communication with the outside;Make the first spiral feeding mechanism 2 during conveying sludge, sludge It is constantly toasted by furnace high-temperature by feed inlet 211 to 212 direction of discharge port, makes the moisture vaporization in sludge and arranged by bleed-off passage Go out, when the sludge after removing water is transferred at spacing A, then automatically falls into the second spiral feeding mechanism 3, and given by the second spiral Material mechanism 3 uses until being transferred into combustion chamber as fuel to transmit to make it be further dried.
In addition, in the present embodiment, it is additionally provided with preheating channel in the first main shaft 22, preheating channel is in the first main shaft 22 along the The extending direction of one main shaft 22 extends, and its one end and combustion chamber close to combustion chamber, close to smoke evacuation room one end with External world's connection;Axially extending preheating channel, one end of the preheating channel and combustion chamber are equipped in second main shaft 32, it is another One end is in communication with the outside, and the preheating channel in the first main shaft 22, the preheating channel in the second main shaft 32 be in communication with the outside one End communicates with each other;Preheating channel in first main shaft 22 and the second main shaft 32 is used to extract the indoor flue gas that burns, and utilizes height The first main shaft of flue gas pair 22 of temperature heats, to further speed up the heat exchange effect of sludge.
In the present embodiment, bleed-off passage is equipped in the second main shaft 32, the bleed-off passage is in the second main shaft 32 along the second master The extending direction of axis 32 extends, which be connected to close to one end of spacing A with spacing A, one end far from spacing A and outside Boundary is connected to;The setting of bleed-off passage in second main shaft 32, the discharge effect for improving steam, to further speed up sludge Remove water speed.
In the present embodiment, 1 side wall of furnace body is equipped with is connected to observation panel 4 with the first casing 21, for observing material heap at spacing A Product situation.
From the foregoing, it will be observed that a kind of sludge treatment equipment proposed by the invention, not only it is possible to prevente effectively from environmental pollution is asked Topic, it is economic and environment-friendly also so that sludge is able to recycling as resource.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of sludge treatment equipment, which is characterized in that including:Furnace body (1), the first spiral feeding mechanism (2) and the second spiral Feeder (3), wherein:
It includes combustion chamber and the smoke evacuation room positioned at combustion chamber side that furnace body (1), which has furnace chamber, furnace chamber, and fire grate is equipped in combustion chamber (5), it is equipped with discharge flue between combustion chamber and smoke evacuation room;
First spiral feeding mechanism (2) includes the first casing (21) and the first main shaft (22), and one end of the first casing (21) is stretched into Furnace chamber is simultaneously located at the outside of furnace chamber by combustion chamber across smoke evacuation room, the other end is stretched into;First casing (21) is located at fire grate (5) Top, the side wall of the first casing (21) and the side outside furnace chamber are equipped with feed inlet (211), the side wall of the first casing (21) And the one end for being located remotely from feed inlet (211) is equipped with discharge port (212);
First main shaft (22) is located in the first casing (21) and extends along the extending direction of the first casing (21), the first main shaft (22) On helical blade is installed, the one end of the first main shaft (22) far from feed inlet (211) is with the first casing (21) far from feed inlet (211) spacing A is reserved between the inner wall of one end, and spacing A is located on the extending direction of discharge port (212);First main shaft (22) axially extending bleed-off passage is equipped in, one end of the bleed-off passage is connected to spacing A, and the other end is in communication with the outside;
Second spiral feeding mechanism (3) includes the second casing (31) and the second main shaft (32), and the second casing (31) has feed inlet And discharge port, one end of the second casing (31), which is stretched into furnace chamber and passed through by room of discharging fume, stretches into combustion chamber, and the other end is located at furnace chamber Outside;Second casing (31) is located at the lower section of the first casing (21), and the feed inlet and the first casing of the second casing (31) (21) discharge port of discharge port (212) connection, the second casing (31) is located at top and and the combustion chamber of fire grate (5);
Second main shaft (32) is located in the second casing (31) and extends along the extending direction of the second casing (31), the second main shaft (32) On helical blade is installed, the second main shaft (32) and helical blade cooperate for the material in its second casing (31) is defeated It send to combustion chamber;
Preheating channel is additionally provided in first main shaft (22), preheating channel is in the first main shaft (22) along the extension of the first main shaft (22) Direction extends, and its one end and combustion chamber close to combustion chamber, and one end close to smoke evacuation room is in communication with the outside.
2. sludge treatment equipment according to claim 1, which is characterized in that be equipped in the second main shaft (32) axially extending Preheating channel, one end of the preheating channel and combustion chamber, the other end are in communication with the outside.
3. sludge treatment equipment according to claim 2, which is characterized in that preheating channel in the first main shaft (22), One end that preheating channel in two main shafts (32) is in communication with the outside communicates with each other.
4. sludge treatment equipment according to claim 1, which is characterized in that bleed-off passage is equipped in the second main shaft (32), The bleed-off passage extends in the second main shaft (32) along the extending direction of the second main shaft (32), and the bleed-off passage is close to spacing A's One end is connected to spacing A, and one end far from spacing A is in communication with the outside.
5. sludge treatment equipment according to claim 1, which is characterized in that furnace body (1) side wall is equipped with and the first casing (21) observation panel (4) of the connection for observing solid accumulation situation at spacing A.
6. sludge treatment equipment according to claim 1, which is characterized in that furnace body (1) includes inner furnace body and external furnace body, interior Furnace body is made by refractory material, and external furnace body is made by thermal insulation material.
CN201610511473.7A 2016-06-30 2016-06-30 A kind of sludge treatment equipment Active CN105972614B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610511473.7A CN105972614B (en) 2016-06-30 2016-06-30 A kind of sludge treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610511473.7A CN105972614B (en) 2016-06-30 2016-06-30 A kind of sludge treatment equipment

Publications (2)

Publication Number Publication Date
CN105972614A CN105972614A (en) 2016-09-28
CN105972614B true CN105972614B (en) 2018-09-07

Family

ID=56954299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610511473.7A Active CN105972614B (en) 2016-06-30 2016-06-30 A kind of sludge treatment equipment

Country Status (1)

Country Link
CN (1) CN105972614B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202350055U (en) * 2011-12-16 2012-07-25 奚亚明 Multi-layer multi-segment sludge drying and incinerating integrated furnace
CN102889599A (en) * 2012-10-24 2013-01-23 潍坊金丝达环境工程股份有限公司 Wet sewage sludge combustion furnace
CN103288320A (en) * 2013-06-17 2013-09-11 江苏全能机械设备有限公司 Screw-propulsion-type sludge pyrolyzing furnace
CN205909295U (en) * 2016-06-30 2017-01-25 安徽未名鼎和环保有限公司 Sludge treatment device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58224217A (en) * 1982-06-22 1983-12-26 Asahi Glass Co Ltd Sludge combustion process
JPH11197700A (en) * 1998-01-14 1999-07-27 Nippon Tokushu Kogyo Kk Method and apparatus for treating waste sludge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202350055U (en) * 2011-12-16 2012-07-25 奚亚明 Multi-layer multi-segment sludge drying and incinerating integrated furnace
CN102889599A (en) * 2012-10-24 2013-01-23 潍坊金丝达环境工程股份有限公司 Wet sewage sludge combustion furnace
CN103288320A (en) * 2013-06-17 2013-09-11 江苏全能机械设备有限公司 Screw-propulsion-type sludge pyrolyzing furnace
CN205909295U (en) * 2016-06-30 2017-01-25 安徽未名鼎和环保有限公司 Sludge treatment device

Also Published As

Publication number Publication date
CN105972614A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN206244626U (en) Pyrolyzing sludge device
CN102476907A (en) Equipment and method of high-efficiency high-speed environmentally-friendly energy-saving sludge treatment system
CN105546548B (en) A kind of device and its solid waste substance treating method of multi-functional processing solid waste
CZ379896A3 (en) Process of treating waste with fuel properties and apparatus for making the same
JP6649657B2 (en) Manufacturing method of fuel bamboo
CN205137477U (en) Half solid -state dangerous waste incineration processing apparatus
CN206478647U (en) House refuse dehumidifying pyrolysis gasifying device
CN105972614B (en) A kind of sludge treatment equipment
CN106090938A (en) Danger wastes CIU
CN209165440U (en) A kind of rice husk burning device
CN205909295U (en) Sludge treatment device
CN207405125U (en) A kind of horizontal biomass reacting furnace
CN203718788U (en) Household refuse innocuous pyrolysis treatment system
CN105927989B (en) A kind of pretreatment type Disposal System of Mud Burning
CN105972615B (en) A kind of sludge incineration formula processing unit
CN210001755U (en) Device for harmlessly treating and utilizing oil sludge
CN103776034A (en) Household garbage harmless pyrolysis treatment system
CN106122979B (en) A kind of self contained sludge treatment equipment of fuel
CN108050522B (en) A kind of serialization greasy filth environment-friendly treating process
CN205874169U (en) Well drilling sludge treatment system
CN105923979B (en) A kind of sludge high-efficient treatment device
CN205933593U (en) Mud high -efficiency processing device
CN205909297U (en) Sludge incineration formula processing apparatus
CN106016298B (en) A kind of Disposal System of Mud Burning
CN205807435U (en) Danger wastes CIU

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210908

Address after: 418000 Huangbai village, Shuangjiang Town, Tongdao Dong Autonomous County, Huaihua City, Hunan Province (industrial concentration area)

Patentee after: Hunan Weiming Environmental Protection Technology Co.,Ltd.

Address before: 230000 room 406, South 4th floor, management committee of Chaohu Economic Development Zone, Hefei, Anhui

Patentee before: ANHUI WEIMING DINGHE ENVIRONMENTAL PROTECTION Co.,Ltd.

TR01 Transfer of patent right