CN105971839A - Split combination mounting method of vacuum pump - Google Patents

Split combination mounting method of vacuum pump Download PDF

Info

Publication number
CN105971839A
CN105971839A CN201610398594.5A CN201610398594A CN105971839A CN 105971839 A CN105971839 A CN 105971839A CN 201610398594 A CN201610398594 A CN 201610398594A CN 105971839 A CN105971839 A CN 105971839A
Authority
CN
China
Prior art keywords
vacuum pump
welding
lifting
section
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610398594.5A
Other languages
Chinese (zh)
Other versions
CN105971839B (en
Inventor
徐峥
孔炯
周金龙
施光涛
金仁才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610398594.5A priority Critical patent/CN105971839B/en
Publication of CN105971839A publication Critical patent/CN105971839A/en
Application granted granted Critical
Publication of CN105971839B publication Critical patent/CN105971839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B23/00Pumping installations or systems
    • F04B23/04Combinations of two or more pumps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Geology (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Metallurgy (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a split combination mounting method of a vacuum pump. The split combination mounting method comprises the steps of step I, construction preparation; step II, hoisting; and step III, welding. Compared with other traditional mounting methods, the split combination mounting method has the main beneficial effects that the normal construction progress of plant building is not influenced, the method is well linked with the construction process of steel structures, the construction steps of hoisting and after hoisting are saved, the holding time of large hoisting devices is saved, the structure of an original steel structure plant is prevented from being disassembled and damaged in a large area, in conclusion, the method causes less influence to the progress and process of the plant structure, the construction progress is quick, the utilization amount of machinery is less, the mounting manner of combination of multiple-splitting and positive-inverted mounting is adopted, the efficiency is relatively high, the investment is saved, the practical hoisting time is short, and the practicability is high.

Description

A kind of vacuum pump Split assembled installation method
Technical field
The present invention relates to technical field of buildings, be specifically related to RH refining furnace vacuum pump Split assembled installation method, vacuum pump is used the method combined along dress and upside-down mounting, it is adaptable to the installation of type refining furnace vacuum pump.
Background technology
Along with the developing rapidly of China's metallurgical industry, the progress of metallurgical technology, requirement to steel degree of purity is more and more higher, promote the renewal of steel-making furnace outer refining technology, RH is as a kind of important external refining mode, there is the external refining function that dehydrogenation, decarburization, temperature-compensating, non-uniform components and temperature, removal of inclusions etc. are powerful, have become as a kind of development trend.
RH(i.e. vacuum circulation degassing) system equipment is a kind of steel secondary refining technological equipment, mainly for the production of high-quality steel.Vacuum system equipment includes vacuum pump, main pump-line, gas cooler, watercooling elbow, hot-bending pipe, vacuum tank etc.;Its intermediate pump is the key equipment in RH vacuum system, and the stable operation of vacuum pump directly affects the carrying out in order of STEELMAKING PRODUCTION, production cost and the reasonable disposition of time and the quality assurance of product.
Vacuum pump self be structurally characterized in that U-shaped vertebral body structure, be arranged substantially at converter high across each layer platform in, due to the architectural feature that it is special, U-shaped structure cannot integral installation, irregular vertebral body structure cannot directly use upright method of hull section construction, the installation the most just needing, combining.Vacuum pump floor projection length 29.3m, maximum a diameter of φ 2400mm, a diameter of 1120mm at minimum, to pass through high across four layers of platform, lifting installation difficulty is big.
At present, fail in China national patent office searching to the patent about vacuum pump Split assembled installation method, also do not retrieve the patent that vacuum pump is installed.
Summary of the invention
The purpose of the present invention is exactly RH vacuum refining furnace vacuum pump installation method in complicated multi-storey steel structure platform, and solve special irregular vacuum pump is difficult to installation question, it is ensured that its progress, quality, safety.
The object of the present invention is achieved like this: a kind of vacuum pump Split assembled installation method, it is characterised in that carry out in following processing steps:
Step one, preparation of construction
1) technique preparation, before equipment hoisting, utilizes 3-D technology simulation lifts space, steel construction is dodged member position and quantity;
2) work facility prepare, and dynamically adjust for three-dimensional simulation, prepare corresponding steel wire rope, assembly pulley, wire clips, hoist engine, chain block etc.;
3) temporary support is set according to mounting process, with guarantee section vacuum pump part lift after the most in place;
4) require on steel structure girder, indicate vertically and horizontally centrage according to design after each layer of Steel Structure Installation, in order to need during installation.
Step 2: lifting
1) after platform one structure installation reaches equipment mounting condition, one section of interim lifting of vacuum pump is placed on platform one;
2) after platform two structure installation reaches equipment mounting condition, utilize the temporary support welded in advance to be seated on platform two vacuum pump five sections temporarily.
3) after platform three structure installation reaches equipment mounting condition, in the support lifting utilizing equipment to carry vacuum pump two-stage nitration and vacuum pump four sections respectively to this platform.
4) according to the centrage on existing design drawing, elevation data, centering vacuum pump two-stage nitration and vacuum pump four sections.
5) after centering, then vacuum pump three sections is lifted so that it is interface overlaps with vacuum pump two-stage nitration, vacuum pump four sections.
6) finally utilize the chain block upside-down mounting lifting vacuum pump one section being arranged on platform two, and control gap each other well.
7), after each section of rigging out of vacuum pump, each section is attached centering location.
Step 3: welding
Vacuum pump is that split is marched into the arena Site Welding, and design drawing requires similar Q345 welding procedure, for ensureing being smoothed out of welding, first carries out qualification of welding procedure, and formulates welding procedure guiding book, need to use double welding in the same direction when welding, and welding completes.
According to on-the-spot actual state, the lifting of vacuum pump should be carried out three-dimensional simulation, identification segmentation position, lifting mode, hanging method etc. as in a preferred technical solution of the present invention, step one before lifting.
Prepare to put in place according to the work facility that hanging method is used to lifting before lifting as in a preferred technical solution of the present invention, step one.
As in a preferred technical solution of the present invention, step one, each position of vacuum pump body without support seat is increased bearing temporarily, ensure its rear dropping place smoothly in place.
As a preferred technical solution of the present invention, step 2 intermediate pump two-stage nitration uses direct lift-on/lift-off system to four sections, and vacuum pump one section uses upside-down method of hull-section construction, vacuum pump five sections to use temporary support lift-on/lift-off system.
As a preferred technical solution of the present invention, after each section of rigging out of step 2 intermediate pump, boil on the nape opposite the mouth centering to be carried out.
As a preferred technical solution of the present invention, the welding that step 3 intermediate pump is each section uses double two-way welding in the same direction.
The present invention has following main beneficial effect compared with other conventional mounting arrangements: does not affect the construction speed of normal factory building, and is well connected tight with the working procedure of steel construction.Save the construction procedure after lifting and lifting, save the holding time of large lifting equipment.Avoid that the structure of original steel-structure factory building causes large area remove to damage.In sum, the present invention to the progress of mill construction, operation is less impacts, construction speed usage quantity fast, mechanical is few;The mounting means that repeatedly split, positive upside-down mounting combine, efficiency is relatively high, reduced investment, and the actual lifting time is short, practical.
Accompanying drawing explanation
Fig. 1 is vacuum pump Split assembled scheme of installation of the present invention;
Label in figure: 1-vacuum pump one section;2-vacuum pump two-stage nitration;3-vacuum pump three sections;4-vacuum pump four sections;5-vacuum pump five sections;6-chain block;7-temporary support;8-platform one;9-platform two;10-platform three.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention; technical scheme in the embodiment of the present invention is clearly and completely described; obviously; described embodiment is only a part of embodiment of the present invention; rather than whole embodiments; based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of protection of the invention.
A kind of vacuum pump Split assembled installation method that the present invention provides, is according to the steel-making present situation of multi-storey steel structure and vacuum pump self erose feature, vacuum pump body to carry out segmentation and carry out formal dress and form that upside-down mounting combines.Specifically perform according to the following step:
Step one: preparation of construction
1) technique preparation, before equipment hoisting, utilizes 3-D technology simulation lifts space, steel construction is dodged member position and quantity;
2) work facility prepare, and dynamically adjust for three-dimensional simulation, prepare corresponding steel wire rope, wire clips, chain block etc.;
3) setting of temporary support 7 is carried out according to hoisting;
4) require on steel structure girder, indicate vertically and horizontally centrage according to design after each layer of Steel Structure Installation, in order to need during installation.
Step 2: lifting
After platform 1 structure installation reaches equipment mounting condition, one section of 1 lifting temporarily of vacuum pump is placed on platform 1, need to put steadily.
After platform 29 structure installation reaches equipment mounting condition, utilize for five section 5 the temporary support 7 welded in advance to be seated on platform 29 vacuum pump temporarily.
After platform 3 10 structure installation reaches equipment mounting condition, in the support lifting utilizing equipment to carry for four section 4 vacuum pump two-stage nitration 2 and vacuum pump respectively to platform 3 10.
According to data such as the centrage on existing design drawing, absolute altitudes, and coordinate centering vacuum pump two-stage nitration 2 and vacuum pump four section 4.
After centering, then lift vacuum pump three section 3 so that it is interface overlaps for four section 4 with vacuum pump two-stage nitration 2, vacuum pump.
Finally utilize two groups of chain block 6 upside-down mountings lifting vacuum pumps of being arranged on platform 29 one section 1, and control gap each other well.
After each section of rigging out of vacuum pump, each section is attached centering location.
Step 3: welding
Vacuum pump is Site Welding after split mobilization and lifting centering, and design drawing requires similar Q345 welding procedure, for ensureing being smoothed out of welding, first carry out qualification of welding procedure, and formulate welding procedure guiding book, and double welding in the same direction need to be used when welding, welding completes.
Last it is noted that the foregoing is only the preferred embodiments of the present invention; it is not limited to the present invention; although the present invention being described in detail with reference to previous embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent; all within the spirit and principles in the present invention; the any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (3)

1. a vacuum pump Split assembled installation method, it is characterised in that method is as follows:
Step one, preparation of construction
1) technique preparation, before equipment hoisting, utilizes 3-D technology simulation lifts space, steel construction is dodged member position and quantity;
2) work facility prepare, and dynamically adjust for three-dimensional simulation, prepare corresponding steel wire rope, assembly pulley, wire clips, hoist engine, chain block;
3) temporary support is set according to mounting process, with guarantee section vacuum pump part lift after the most in place;
4) require on steel structure girder, indicate vertically and horizontally centrage according to design after each layer of Steel Structure Installation, in order to need during installation;
Step 2: lifting
1) after platform one structure installation reaches equipment mounting condition, one section of interim lifting of vacuum pump is placed on platform one;
2) after platform two structure installation reaches equipment mounting condition, utilize the temporary support welded in advance to be seated on platform two vacuum pump five sections temporarily;
3) after platform three structure installation reaches equipment mounting condition, in the support lifting utilizing equipment to carry vacuum pump two-stage nitration and vacuum pump four sections respectively to this platform;
4) according to the centrage on existing design drawing, elevation data, centering vacuum pump two-stage nitration and vacuum pump four sections;
5) after centering, then vacuum pump three sections is lifted so that it is interface overlaps with vacuum pump two-stage nitration, vacuum pump four sections;
6) finally utilize the chain block upside-down mounting lifting vacuum pump one section being arranged on platform two, and control gap each other well;
7), after each section of rigging out of vacuum pump, each section is attached centering location;
Step 3: welding
Vacuum pump is that split is marched into the arena Site Welding, and design drawing requires similar Q345 welding procedure, for ensureing being smoothed out of welding, first carries out qualification of welding procedure, and formulates welding procedure guiding book, need to use double welding in the same direction when welding, and welding completes.
A kind of vacuum pump Split assembled installation method the most according to claim 1, it is characterised in that according to on-the-spot actual state, the lifting of vacuum pump should be carried out three-dimensional simulation, identification segmentation position, lifting mode, hanging method etc. before lifting in step one;Prepare to put in place according to the work facility that hanging method is used to lifting before lifting;The each position of vacuum pump body without support seat is increased bearing temporarily, ensures its rear dropping place smoothly in place.
A kind of vacuum pump Split assembled installation method the most according to claim 1, it is characterised in that step 2 intermediate pump two-stage nitration uses direct lift-on/lift-off system to four sections, vacuum pump one section uses upside-down method of hull-section construction, vacuum pump five sections to use temporary support lift-on/lift-off system;After each section of rigging out of vacuum pump, boil on the nape opposite the mouth centering to be carried out;The welding that vacuum pump is each section uses double two-way welding in the same direction.
CN201610398594.5A 2016-06-07 2016-06-07 A kind of vavuum pump Split assembled installation method Active CN105971839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610398594.5A CN105971839B (en) 2016-06-07 2016-06-07 A kind of vavuum pump Split assembled installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610398594.5A CN105971839B (en) 2016-06-07 2016-06-07 A kind of vavuum pump Split assembled installation method

Publications (2)

Publication Number Publication Date
CN105971839A true CN105971839A (en) 2016-09-28
CN105971839B CN105971839B (en) 2018-04-03

Family

ID=57010862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610398594.5A Active CN105971839B (en) 2016-06-07 2016-06-07 A kind of vavuum pump Split assembled installation method

Country Status (1)

Country Link
CN (1) CN105971839B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110077963A (en) * 2019-04-30 2019-08-02 中国二十冶集团有限公司 A kind of installation method of large tank
CN116918530A (en) * 2023-05-06 2023-10-24 海南大学三亚南繁研究院 Melon crop seedling planting device with adjustable planting distance

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063177A (en) * 2006-04-29 2007-10-31 上海宝冶建设有限公司 Integral installation method for mammoth steel converter outer assemblage
CN101255480A (en) * 2008-03-21 2008-09-03 中冶京唐建设有限公司 Modular construction method for mounting blast furnace steelwork
DE202013006152U1 (en) * 2013-07-08 2013-07-31 Siemens Vai Metals Technologies Gmbh Ruhrstahl-Heraeus plant
CN104631837A (en) * 2014-12-08 2015-05-20 永升建设集团有限公司 Method for installing and constructing special-shaped large-tonnage steel castings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063177A (en) * 2006-04-29 2007-10-31 上海宝冶建设有限公司 Integral installation method for mammoth steel converter outer assemblage
CN101255480A (en) * 2008-03-21 2008-09-03 中冶京唐建设有限公司 Modular construction method for mounting blast furnace steelwork
DE202013006152U1 (en) * 2013-07-08 2013-07-31 Siemens Vai Metals Technologies Gmbh Ruhrstahl-Heraeus plant
CN104631837A (en) * 2014-12-08 2015-05-20 永升建设集团有限公司 Method for installing and constructing special-shaped large-tonnage steel castings

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110077963A (en) * 2019-04-30 2019-08-02 中国二十冶集团有限公司 A kind of installation method of large tank
CN116918530A (en) * 2023-05-06 2023-10-24 海南大学三亚南繁研究院 Melon crop seedling planting device with adjustable planting distance
CN116918530B (en) * 2023-05-06 2024-05-17 海南大学三亚南繁研究院 Melon crop seedling planting device with adjustable planting distance

Also Published As

Publication number Publication date
CN105971839B (en) 2018-04-03

Similar Documents

Publication Publication Date Title
CN103266192B (en) Hoisting method for replacing cooling wall in overhauling of blast furnace
CN104389433A (en) Integral hoisting system and construction method for steel truss support concrete heavy roof system
WO2015188694A1 (en) Method for lifting and transporting large parts of underground nuclear power station
CN106284665B (en) A kind of oblique steel column double helix space structure and its construction method
CN105971839A (en) Split combination mounting method of vacuum pump
CN107130770A (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inversion construction method
CN101698894B (en) High-altitude segmented in-position installation method for blast-furnace hot-air surrounding pipes
CN109231007A (en) A kind of electric furnace ontology handling, mounting process
CN106006425A (en) Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN104896194A (en) Installation technology of pipes and buttresses and embedded parts of pipes and buttresses in closed and narrow space
CN206859698U (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inverted construction facility
CN106836836A (en) A kind of Flue Gas Desulphurization for Coal-burning Power Plant tower transforms secondary hydraulic lifting installation method
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN106351454B (en) A kind of steel-making workshop steel structural roof combined installation method
CN204847752U (en) Be used for hanging small -size sectionalised gallows of hook type crane handling
CN105907921A (en) Relay hoisting method for gas cooler
CN106080965A (en) A kind of method for supporting always organized for boats and ships topside curved section and device
CN204080636U (en) Steel pipe arch bridge arch rib installs flat turn supporting and location platform
CN202358822U (en) Hoisting structure for oil field skid block
CN102502392A (en) Oilfield skid block hoisting structure
CN105671245B (en) A kind of method of utilization hoist engine flip-over type installing converter
CN205663226U (en) Super high -rise building thing top steel construction symmetry is hung and is drawn device
CN105350764A (en) Dual-chamber limekiln chamber work platform and installation method thereof
CN105936954B (en) A kind of converter bottom air brick combines the unit installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant