A kind of plastic cement pontoon bridge quickly assembled
Technical field
The present invention relates to a kind of pontoon bridge, more particularly, to a kind of plastic cement pontoon bridge quickly assembled.
Background technology
Known, pontoon bridge is a kind of interim facility that crosses the river, and generally replaces bridge pier by ship or buoyancy tank, to keep pontoon bridge axis
Position will not be offset, and cable anchorage need to be set in upstream and downstream, the light bridge kept afloat;Recently as the fast of tourist facilities
Speed exploitation, in the flourishing scenic spot of some water systems, in order that the traffic volume of visitor's rapid evacuation and raising tourist season, Hen Duojing
Temporary bridge does using plank in area, the plank that used time does not pull down can not secondary use cause serious waste;Enter rainy season in south
Afterwards, water logging bridge floor phenomenon also occurs.At this moment it is also required to the interim pontoon bridge of fast erecting to be convenient for people to go on a journey, does not have also commercially
The pontoon bridge that can quickly assemble.
The content of the invention
In order to overcome the shortcomings of in background technology, the present invention discloses a kind of plastic cement pontoon bridge quickly assembled, passes through plastic cement spiral shell
Plastic cement keg float, guardrail board and plastic cement floorings quickly can be assembled into pontoon bridge by silk, facilitated and speedily carried out rescue work or the use at scenic spot.
For achieving the above object, the present invention adopts the following technical scheme that:
A kind of plastic cement pontoon bridge quickly assembled, including plastic cement keg float A, guardrail board A, plastic cement keg float B, guardrail board B, plastic cement bridge
Panel and PLASTIC SCREWS, two clamps are provided with rectangle plastic cement keg float A upper side outside spacers, guardrail board A lower end is inserted in
In the neck formed between two clamps;Two clamps are provided with rectangle plastic cement keg float B upper side outside spacers, guardrail board B's
Lower end is inserted in the neck formed between two clamps, and the riser that polylith plastic cement floorings both ends are set withstands on plastic cement keg float A respectively
Plastic cement keg float B two clamp medial surfaces on, by multiple PLASTIC SCREWSs by the riser at plastic cement floorings both ends, plastic cement keg float A
Plastic cement keg float B two clamps and two-by-two the guardrail board A between clamp and guardrail board B are locked to form plastic cement pontoon bridge.
The plastic cement pontoon bridge of described quick assembling, mouth is respectively equipped with plastic cement keg float A and plastic cement keg float B lateral surface,
Plastic cement keg float A and plastic cement keg float B is set to form closed cavity respectively two mouthfuls of closings by two lids.
The plastic cement pontoon bridge of described quick assembling, helping for hollow-core construction is respectively equipped with guardrail board A, guardrail board B upper end
Hand, loss of weight mouth is respectively equipped with the middle part of the guardrail board A, guardrail board B.
The plastic cement pontoon bridge of described quick assembling, screw rod one end of PLASTIC SCREWS are provided with external screw thread, the screw rod of PLASTIC SCREWS
The other end, which is provided with, expands neck ring, is provided with the outer face for expanding neck ring and screws piece.
The plastic cement pontoon bridge of described quick assembling, multiple light are interval with guardrail board A and guardrail board B close lower end
Hole, plastic cement keg float A and plastic cement keg float B clamp two-by-two are provided with mutually corresponding perforation, the riser point at plastic cement floorings both ends
She You not screw;The screw rod of multiple PLASTIC SCREWSs is each passed through plastic cement keg float A and plastic cement keg float the B perforation of clamp, guardrail two-by-two
The screw of plastic cement floorings both ends riser is connected after plate A and guardrail board B unthreaded holes.
The plastic cement pontoon bridge of described quick assembling, plastic cement keg float A and plastic cement keg float B are arranged at intervals.
Due to using technical scheme as described above, the present invention has the advantages that:
The plastic cement pontoon bridge of the present invention quickly assembled, when needed, quickly can be floated plastic cement using PLASTIC SCREWS
Bucket, guardrail board and plastic cement floorings are assembled into pontoon bridge, facilitate and speedily carry out rescue work or the use at scenic spot;The suitable scenic spot of the present invention it is emergent when
Use, be equally applicable to fast passing of rainy season when speedily carrying out rescue work.
【Brief description of the drawings】
Fig. 1 is the three-dimensional assembling structure schematic diagram of the present invention;
Fig. 2 is the dimensional structure diagram of the present invention;
Fig. 3 is the PLASTIC SCREWS dimensional structure diagram of the present invention;
In figure:1st, handrail;2nd, guardrail board A;3rd, guardrail board B;4th, loss of weight mouth;5th, unthreaded hole;6th, screw;7th, riser;8th, plastic cement
Floorings;9th, screw rod;10th, neck ring is expanded;11st, piece is screwed;12nd, clamp;13rd, neck;14th, plastic cement keg float A;15th, cover;16th, plastic cement
Keg float B;17th, rope.
【Embodiment】
The present invention can be explained in more detail by the following examples, the open purpose of the present invention is intended to the protection present invention
In the range of all changes and improvements, the invention is not limited in the following examples;
The plastic cement pontoon bridge of quick assembling with reference to described in accompanying drawing 1~3, including plastic cement keg float A14, guardrail board A2, plastic cement float
Bucket B16, guardrail board B3, plastic cement floorings 8 and PLASTIC SCREWS, on plastic cement keg float A14 and plastic cement keg float B16 lateral surface respectively
Provided with mouth, plastic cement keg float A14 and plastic cement keg float B16 is set to form closed cavity respectively two mouthfuls of closings by two lids 15, plastic cement floats
Bucket A14 and plastic cement keg float B16 is arranged at intervals, and two clamps 12 are provided with rectangle plastic cement keg float A14 upper side outside spacers, is protected
Breast board A2 lower end is inserted in the neck 13 formed between two clamps 12;Between on the outside of the rectangle plastic cement keg float B16 upper side
It is inserted in every the lower end provided with two clamps 12, guardrail board B3 in the neck 13 formed between two clamps 12,8 liang of polylith plastic cement floorings
On the medial surface of two clamp 12 for the plastic cement keg float B16 that the riser 7 that end is set withstands on plastic cement keg float A14 respectively, by multiple plastic cement spiral shells
Silk is by the riser 7 at the both ends of plastic cement floorings 8, plastic cement keg float A14 plastic cement keg float B16 two clamps 12 and two-by-two between clamp 12
Guardrail board A2 and guardrail board B3 it is locked formed plastic cement pontoon bridge, be respectively equipped with hollow knot in guardrail board A2, guardrail board B3 upper end
The handrail 1 of structure, loss of weight mouth 4 is respectively equipped with the middle part of the guardrail board A2, guardrail board B3.
Further, one end of screw rod 9 with reference to the PLASTIC SCREWS of accompanying drawing 1 or 3 is provided with external screw thread, and the screw rod 9 of PLASTIC SCREWS is another
End, which is provided with, expands neck ring 10, is provided with the outer face for expanding neck ring 10 and screws piece 11;In guardrail board A2 and guardrail board B3 under
To hold and be interval with multiple unthreaded holes 5, plastic cement keg float A14 and plastic cement keg float B16 clamp two-by-two 12 are provided with mutually corresponding perforation,
The riser 7 at the both ends of plastic cement floorings 8 is respectively equipped with screw 6;The screw rod 9 of multiple PLASTIC SCREWSs be each passed through plastic cement keg float A14 and
Plastic cement keg float B16 connects the both ends riser 7 of plastic cement floorings 8 after the perforation of clamp 12, guardrail board A2 and guardrail board B3 unthreaded holes 5 two-by-two
Screw 6.
Implement the plastic cement pontoon bridge of the present invention quickly assembled, in use, 2 combining structure referring to the drawings, by one piece
Plastic cement floorings 8 are fixed on plastic cement keg float A14 and plastic cement keg float B16 middle part, are then close to another two fast plastic cement floorings 8
The both sides of first piece of plastic cement floorings 8 are fixed, and the inner side of so another two fast plastic cement floorings 8 is fixed on first piece of plastic cement floorings
8 both sides, and the outside of another two fast plastic cement floorings 8 of side is hanging and is respectively used to connection and is floated close to plastic cement keg float A14 and plastic cement
The adjacent sides of bucket B16, that is, by the use of another two fast plastic cement floorings 8 as carrier is connected, because handrail 1 is hollow-core construction,
It is through using rope 17 and two other ruggedized constructions is formed in multiple handrails 1;After plastic cement pontoon bridge is completed as needed,
Two sides are fixed on by four ends of two ropes 17, the screw 6 of outermost two plastic cement floorings 8 is fixed on also by rope
Two sides.
Part not in the detailed description of the invention is prior art.