Summary of the invention
The invention aims to overcome above-mentioned a kind of Intelligent charging method for electromobile of not enough offer.
The present invention comprises the following steps:
001. first charging station 2 sends charging and conversion electric inquiry request to new-energy automobile 1, and described charging and conversion electric inquiry request includes: ask
Ask whether new-energy automobile 1 has charging and conversion electric purpose;New-energy automobile 1 receives after charging and conversion electric inquiry request to the first charging station 2
Send information about power and the travel information of new-energy automobile 1;
Whether 002. first charging station 2 can cover stroke according to described driving information about power judges described new-energy automobile 1 whether
Needing to carry out charging and conversion electric, if described driving information about power can not cover stroke, the first charging station 2 then judges that new-energy automobile 1 needs
Charging and conversion electric to be carried out;
003. when judging that described new-energy automobile 1 needs to carry out charging and conversion electric, and described first charging station 2 is to described new-energy automobile
1 sends charging and conversion electric invites, and sends the positional information of described first charging station 2 to described new-energy automobile 1.
The present invention needs charging and conversion electric without allowing driver select, but the first charging station passes through inquiry request, it is judged that new forms of energy
Whether automobile can cover stroke, if stroke can not be covered, then judges that new-energy automobile needs to carry out charging and conversion electric.As such, it is possible to not
With affecting the attention of driver driving, and the new-energy automobile that originally there is no need to be charged can be avoided to pour into first and to fill
Power station, thus increase the load of the first charging station.The present invention can monitor whether the volume peaks of new-energy automobile reaches in real time
Safety transfinites value, when reach safe transfinite value time switch to gain to wait in line plus the first charging station with the fastest speed
New-energy automobile quantity, effectively prevent the frequent of state that whether transfinite caused when signal peak changes near separation
Switching, makes data collecting system more stable.And when super appearance, detection process is all resetted, for output valid data be simultaneously
The construction of new-energy automobile data base later provides foundation.Query performance of the present invention is greatly improved, and does not results in extra internal memory
Expense, does not results in increasing of conflict chain, can realize the number-plate number and the Rapid matching of charging pile numbering.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is further illustrated:
A kind of Intelligent charging method for electromobile, comprises the following steps:
001. first charging station 2 sends charging and conversion electric inquiry request to new-energy automobile 1, and described charging and conversion electric inquiry request includes: ask
Ask whether new-energy automobile 1 has charging and conversion electric purpose;New-energy automobile 1 receives after charging and conversion electric inquiry request to the first charging station 2
Send information about power and the travel information of new-energy automobile 1;
Whether 002. first charging station 2 can cover stroke according to described driving information about power judges described new-energy automobile 1 whether
Needing to carry out charging and conversion electric, if described driving information about power can not cover stroke, the first charging station 2 then judges that new-energy automobile 1 needs
Charging and conversion electric to be carried out;
003. when judging that described new-energy automobile 1 needs to carry out charging and conversion electric, and described first charging station 2 is to described new-energy automobile
1 sends charging and conversion electric invites, and sends the positional information of described first charging station 2 to described new-energy automobile 1.
Described 001 comprises the following steps:
011, after new-energy automobile 1 receives the charging and conversion electric inquiry request that the first charging station 2 sends, new-energy automobile 1 passes through
The GPS of self sends information of vehicles to the first charging station 2, and described information of vehicles includes the real-time position signal of self, license plate number
Code and vehicle;
New-energy automobile 1 in described step 003 sends charging and conversion electric invitation and includes mating with this vehicle and being in idle condition
Charging pile numbering and described new-energy automobile 1 arrive used time of this first charging station 2 the shortest path.
After described step 003 further comprising the steps of:
S01: the first charging station 2 starts to detect the new-energy automobile 1 being sent to information of vehicles in real time
Volume peaks analog quantity;
S02: the maximum being in the charging pile quantity of idle condition is set to the value that transfinites;
S03: whether the volume peaks of the new-energy automobile 1 that detection sends information of vehicles reaches the value that transfinites,
If reaching the value that transfinites, go to S04, if the value that is not up to transfinite goes to S07;
S04: be now judged as that signal transfinites, because part new-energy automobile 1 can be waited in line to the first charging station 2, so
Using new-energy automobile 1 quantity waited in line to the first charging station 2 plus being in the charging pile quantity of idle condition as safety
Transfinite value;
S05: whether detection signal reaches the safe value that transfinites again, if reaching to transfinite safely value, going to S06, otherwise going to S07;
S06: be now judged as still transfiniting under safety transfinites value, be therefore judged as over capacity, and go to S05;
S07: now signal is normal, completes analog digital conversion;
S08: export the charging pile data of idle condition to new-energy automobile 1;
S09: continue detection and be sent to the new-energy automobile 1 number signal peak value of information of vehicles;
S10: receive signal peak result and store, foundation is in the data of new-energy automobile 1 quantity of the first charging station 2 charging and conversion electric
Storehouse;
S11: whether detection signal reaches the value that transfinites again, if reaching the value that transfinites, going to S13, otherwise going to S07;
S12: signal has transfinited, now all resets detection process, for detecting and judging ready next time, and goes to
S04。
After the numbering of new-energy automobile 1 number-plate number and charging pile being matched, new-energy automobile 1 is filled by charging pile
Electricity, if this charging pile also needs to continue to mate other new-energy automobiles 1, will continue to search for mark and put 1, i.e. need by first
Charging station 2 continues to send charging and conversion electric inquiry request to remaining new-energy automobile 1, now by forwarding mark and abandon mark and set to 0,
Then set up a unsaturated index, the most unsaturated index comprises the most matched number-plate number and charging pile is compiled
Number, and unsaturated index is sent to each new-energy automobile 1, follow-up need the new-energy automobile 1 of charging and conversion electric by license plate number
Code be sent to the first charging station 2, be associated with the unsaturated index of charging pile, charging pile mate new-energy automobile 1 time, as
Really new-energy automobile 1 number-plate number is identical with in unsaturated index, the most directly skips, and need not again apply for internal memory
The number-plate number that space storage repeats, because the volume of the charging pile in this new-energy automobile 1 number-plate number and unsaturated index
Number match information is identical, but now needs the corresponding unsaturated index of amendment, forwarding mark is put 1, shows to match phase
Can directly forward or abandon after the same number-plate number.
The present invention needs charging and conversion electric without allowing driver select, but the first charging station 2 passes through inquiry request, it is judged that new forms of energy
Whether automobile 1 can cover stroke, if stroke can not be covered, then judges that new-energy automobile 1 needs to carry out charging and conversion electric.As such, it is possible to
The attention of driver driving need not be affected, and the new-energy automobile 1 that originally there is no need to be charged can be avoided to pour into
One charging station 2, thus increase the load of the first charging station 2.
The present invention can monitor whether the volume peaks of new-energy automobile 1 reaches the safe value that transfinites, when reaching safety in real time
With the fastest speed, gain is switched to new-energy automobile 1 quantity waited in line plus the first charging station 2, effectively during the value that transfinites
Prevent the frequent switching of the state that whether transfinites caused when signal peak changes near separation, make data collecting system
More stable.And super hold time detection process is all resetted, simultaneously for output valid data be later new-energy automobile 1 number
Foundation is provided according to the construction in storehouse.
Query performance of the present invention is greatly improved, and does not results in extra memory cost, does not results in increasing of conflict chain, energy
Realize the number-plate number and the Rapid matching of charging pile numbering.