CN105959187A - Remote timing task control method and system - Google Patents
Remote timing task control method and system Download PDFInfo
- Publication number
- CN105959187A CN105959187A CN201610341361.1A CN201610341361A CN105959187A CN 105959187 A CN105959187 A CN 105959187A CN 201610341361 A CN201610341361 A CN 201610341361A CN 105959187 A CN105959187 A CN 105959187A
- Authority
- CN
- China
- Prior art keywords
- electrical equipment
- preset
- instruction
- timed task
- operating conditions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2803—Home automation networks
- H04L12/2816—Controlling appliance services of a home automation network by calling their functionalities
- H04L12/2818—Controlling appliance services of a home automation network by calling their functionalities from a device located outside both the home and the home network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2803—Home automation networks
- H04L12/2823—Reporting information sensed by appliance or service execution status of appliance services in a home automation network
- H04L12/2825—Reporting to a device located outside the home and the home network
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Selective Calling Equipment (AREA)
Abstract
The invention provides a remote timing task control method and system. The method and system are applied to a cloud platform of electrical equipment so that a user can control the electrical equipment remotely via the cloud platform. Present time is determined; if the present time satisfies a preset time condition, a present operation state is determined further; and if the present operation state and a timing task control instruction corresponding to the preset time condition do not repel each other, the preset timing task control instruction is sent to the electrical equipment, and the instruction is used to control the electrical equipment to operate according to a preset program. When a user needs to change a preset task of the electrical equipment temporarily, the preset task can be adjusted by only changing the preset timing task control instruction in the cloud platform, and thus, the preset task of the electrical equipment adapts to the changed present condition. The problem of relatively bad user experience can be overcome.
Description
Technical field
The present invention relates to automatic control technology field, particularly relate to the controlling party of a kind of remote timing task
Method and system.
Background technology
Along with the development of computer technology, a lot of electrical equipments add intelligence control system, Based Intelligent Control
System can control plant equipment according to preset task program and be automatically performed corresponding task, so that using
Family can obtain predetermined task object in the case of nonintervention or few intervention.Such as, in field of household appliances,
User can arrange preplanned mission to Smart Home electrical equipment, and electrical equipment is then when current time meets preset
Between condition time automatically perform, such as in the case of setting in advance, user does washing function during operation
Enough being automatically performed laundry drying, water heater is burned by hot water before user goes home, and air conditioning system with
Environment in family has been adjusted to comfortable temperature before entering house by family.
But, current user wants to realize to need during above-mentioned mesh electrical equipment equipment is carried out site setup,
Electrical equipment then can be performed by the task parameters set automatically.But, when conditions present changes,
Electrical equipment still can be followed the prescribed order operation according to original setting, user cannot the preset task of Iterim Change,
Cause Consumer's Experience poor.
Summary of the invention
In view of this, the invention provides control method and the system of a kind of remote timing task, be used for
When conditions present changes, the preset task of Iterim Change electrical equipment, poor to solve Consumer's Experience
Problem.
In order to solve the problems referred to above, the technical scheme that the invention discloses is as follows:
The control method of a kind of remote timing task, is applied to the cloud platform of electrical equipment, described long-range control
Method processed includes step:
Current time is judged;
When described current time meets preset time condition, report described electrical equipment in advance is current
Running status judges;
If described current operating conditions and the timed task corresponding to described preset time condition control to refer to
Order does not repels each other, then send preset timed task control instruction to described electrical equipment;
Described timed task control instruction is used for controlling described electrical equipment and runs by preset program.
Optionally, described timed task control instruction includes instruction encoding, order parameter and execution sequence.
Optionally, further comprise the steps of:
Receive and store the current operating conditions information of described electrical equipment feedback, described current operating conditions
Electrical equipment described in message reflection has performed the current operating conditions after described preset program.
Optionally, further comprise the steps of:
Receiving the object information of described electrical equipment feedback, described object information includes reflection sends whether to become
The transmission object information of merit and/or reflect that described electrical equipment performs the most successfully execution result information.
Optionally, further comprise the steps of:
When user is connected with the foundation of described cloud platform by intelligent terminal, push institute to described intelligent terminal
State current operating conditions information.
Optionally, the pre-setting method of described timed task control instruction includes step:
The connection request that response user is sent by intelligent terminal;
The connection with described intelligent terminal is set up according to described connection request;
Receive user by the described data initialization instruction connecting and sending;
According to described data initialization instruction, described timed task control instruction is carried out preset.
Optionally, the described connection according to the foundation of described connection request with described intelligent terminal, including step:
Verify the binding relationship of described intelligent terminal and described electrical equipment;
If described binding relationship is effective, then set up described connection according to described connection request;
If described binding relationship is invalid, then refusal sets up described connection.
The control system of a kind of remote timing task, is applied to the cloud platform of electrical equipment, described control system
System includes:
Time judgment module, for judging current time;
When time judgment module, condition judgment module, for judging that described current time meets preset time bar
During part, the current operating conditions reported described electrical equipment in advance judges;
When described condition judgment module, instruction sending module, for judging that described current operating conditions is with described
When timed task control instruction corresponding to preset time condition is not repelled each other, send pre-to described electrical equipment
The timed task control instruction put;
Described timed task control instruction is used for controlling described electrical equipment and runs by preset program.
Optionally, described timed task control instruction includes instruction encoding, order parameter and execution sequence.
Optionally, also include:
State receiver module, for receiving and store the current operating conditions letter of described electrical equipment feedback
Breath, it is current that electrical equipment described in described current operating conditions message reflection has performed after described preset program
Running status.
Optionally, described state receiver module is additionally operable to receive the object information of described electrical equipment feedback,
Described object information includes reflection to send the most successfully sending that object information and/or reflect described electrically sets
Standby execution the most successfully execution result information.
Optionally, also include:
Info push module, is used for when user is connected with the foundation of described cloud platform by intelligent terminal, to
Described intelligent terminal pushes described current operating conditions information.
Optionally, preset for timed task control instruction is carried out preset instruction in described cloud platform
Module includes:
Request-response unit, for responding the connection request that user is sent by intelligent terminal;
Connection establishment unit, for setting up the connection with described intelligent terminal according to described connection request;
Instruction reception unit, for receiving user by the described data initialization instruction connecting and sending;
Data initialization unit, for entering described timed task control instruction according to described data initialization instruction
Row is preset.
Optionally, described connection establishment unit includes:
Checking subelement, for verifying the binding relationship of described intelligent terminal and described electrical equipment;
When described checking subelement, connexon unit, for determining that described binding relationship is effective, then according to institute
Stating connection request and set up described connection, if described binding relationship is invalid, then refusal sets up described connection.
From technique scheme it can be seen that the invention provides the long-range control method of a kind of timed task
With system, the method and system are applied to the cloud platform of electrical equipment, it is used for making user pass through cloud platform real
The now long-range control to electrical equipment.It is specially and first current time is judged;Full in current time
Foot preset time condition time, further current operating conditions is judged, if current operating conditions with
Timed task control instruction corresponding to preset time condition is not repelled each other, then send preset determining to electrical equipment
Time task control instruction, timed task control instruction is used for controlling electrical equipment and runs by preset program.When
When user needs the preset task of Iterim Change electrical equipment, only need to be to timed task preset in cloud platform
Control instruction is changed realizing the adjustment to preset task, so that the preset task of electrical equipment is fitted
The conditions present that should change such that it is able to solve the problem that Consumer's Experience is poor.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality
Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below,
Accompanying drawing in description is only some embodiments of the present invention, for those of ordinary skill in the art,
On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
The steps flow chart of the control method embodiment of a kind of remote timing task that Fig. 1 provides for the present invention
Figure;
The steps flow chart of the control method embodiment of the another kind of remote timing task that Fig. 2 provides for the present invention
Figure;
The flow chart of steps of the pre-setting method of a kind of timed task control instruction that Fig. 3 provides for the present invention;
The structured flowchart of the control system embodiment of a kind of remote timing task that Fig. 4 provides for the present invention;
The structural frames of the control system embodiment of the another kind of remote timing task that Fig. 5 provides for the present invention
Figure.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and
It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not doing
Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of protection of the invention.
Embodiment one
The steps flow chart of the control method embodiment of a kind of remote timing task that Fig. 1 provides for the present invention
Figure.
With reference to shown in Fig. 1, the long-range control method of the timed task that the present invention provides is applied to electrical equipment
Cloud platform, realize the long-range control to electrical equipment for making user pass through cloud platform.Electrical equipment energy
Enough realize being connected with cloud platform by communication network, it is possible to send various data to cloud platform, and can connect
Receive Various types of data or instruction that cloud platform sends.
S101: judge whether current time meets preset time condition.
Preset time condition is that user passes through the intelligent terminal such as smart mobile phone, panel computer or desktop computer and exists
In cloud platform preset pre-conditioned, real-time time that current time is the most current, it is judged that purpose be really
Determine current time whether have arrived at user wish electrical equipment perform certain operation time point.
S102: the current operating conditions reported electrical equipment in advance judges.
Electrical equipment is when bringing into operation every time or the timing that is in operation reports current operation to cloud platform
State, when judging that current time meets preset time condition, enters the current operating conditions of electrical equipment
Row judges, i.e. judges that the timed task control instruction that this current operating conditions is corresponding with preset time condition is
No mutual exclusion, i.e. judges that timed task control instruction controls state and the current operation that electric task will enter
Whether state repels each other, if both repel each other, does not sends this timed task control instruction to electrical equipment.
The such as current operating conditions of intelligent air condition equipment if dehumidifying running status if be to enter
Trip temperature regulation controls.The instruction mutual exclusion table of multiple electrical equipment can be preset, wherein in cloud platform
Show mutually exclusive instruction, such as, have a kind more than 200 corresponding to the state of intelligent air condition equipment, and intelligence
Also kind more than 100 can be reached by the relatively simple equipment of this operation of refrigerator.Timed task control instruction is used for
Control electric equipment to run by preset program, the most also include instruction encoding, order parameter and execution sequence
Etc. operational factor, manufacturer can be by reaching to upgrade electrical equipment to the amendment of these operational factors
Purpose.
S103: send timed task control instruction to electrical equipment.
If through above-mentioned judgement, the current operating conditions of electrical equipment does not repels each other with task-performance instructions,
I.e. both can be compatible, at this moment sends this preset timed task control instruction to electrical equipment..
From technique scheme it can be seen that present embodiments provide the remote control method of a kind of timed task
Method, the method is applied to the cloud platform of electrical equipment, is used for making user pass through cloud platform and realizes electrically setting
Standby long-range control.The method is specially and first judges current time;Meet pre-in current time
When putting time conditions, further current operating conditions is judged, if current operating conditions is with preset
The timed task control instruction that time conditions is corresponding is not repelled each other, then send preset timing to electrical equipment and appoint
Business control instruction, timed task control instruction is used for controlling electrical equipment and runs by preset program.Work as user
When needing the preset task of Iterim Change electrical equipment, only timed task preset in cloud platform need to be controlled
Instruction is changed realizing the adjustment to preset task, so that the preset task of electrical equipment adapts to send out
The raw conditions present changed such that it is able to solve the problem that Consumer's Experience is poor.
Embodiment two
The steps flow chart of the control method embodiment of the another kind of remote timing task that Fig. 2 provides for the present invention
Figure.
With reference to shown in Fig. 2, the long-range control method that the present embodiment provides specifically includes following steps:
S201: judge whether current time meets preset time condition.
Preset time condition is that user passes through the intelligent terminal such as smart mobile phone, panel computer or desktop computer and exists
In cloud platform preset pre-conditioned, real-time time that current time is the most current, it is judged that purpose be really
Determine current time whether have arrived at user wish electrical equipment perform certain operation time point.
S202: the current operating conditions reported electrical equipment in advance judges.
Electrical equipment is when bringing into operation every time or the timing that is in operation reports current operation to cloud platform
State, when judging that current time meets preset time condition, enters the current operating conditions of electrical equipment
Row judges, i.e. judges that the timed task control instruction that this current operating conditions is corresponding with preset time condition is
No mutual exclusion, i.e. judges that timed task control instruction controls state and the current operation that electric task will enter
Whether state repels each other, if both repel each other, does not sends this timed task control instruction to electrical equipment.
S203: send timed task control instruction to electrical equipment.
If through above-mentioned judgement, the current operating conditions of electrical equipment does not repels each other with task-performance instructions,
I.e. both can be compatible, at this moment sends this preset timed task control instruction to electrical equipment.
S204: receive the object information of electrical equipment feedback.
Object information includes that the transmission reflecting timed task control instruction the most successfully sends object information,
Also include reflecting that electrical equipment performs the most successfully execution result information.After obtaining above-mentioned information, can
To reissue, until running succeeded, so it can be avoided that electrical equipment occurs controlling failed problem.
S205: receive the current operating conditions information of electrical equipment feedback.
Electrical equipment is when being in connection status with cloud platform, and timing or fixed cycle send reflection to cloud platform
The current operating conditions information of current operating conditions, cloud platform then receives and preserves this current operating conditions letter
Breath, and as can issue the foundation of timed task control instruction to electrical equipment such that it is able to keep away
Exempt to issue the timed task control instruction repelled each other with current operating conditions.
S206: push current operating conditions information to intelligent terminal.
When user is set up even with cloud platform by intelligent terminal such as smart mobile phone, panel computers or desktop computer
When connecing, push the current operating conditions information of respective electric equipment in time to this intelligent terminal, so that user
The current operating conditions of this electrical equipment can be grasped in time.
From to the narration of above example it is recognised that user can be by intelligent terminal to cloud platform
Timed task control instruction carries out preset, the most preset includes initial setting up, revises, deletes, increases
Projects etc. operate such that it is able to make user change timed task control instruction, with this according to the demand of oneself
Realize controlling purpose accordingly, shown in Figure 3 to the initialization step of timed task control instruction.
S301: the connection request that response user is sent by intelligent terminal.
When user sends connection request by intelligent terminal, respond this request so that user confirms cloud platform
Receive this connection request.
S302: set up with this intelligent terminal according to shown connection request and be connected.
I.e. set up with the intelligent terminal sending this connection request and be connected.When setting up connection in order to avoid illegally
Timed task control instruction resets by user, revise or the preset operation such as deletion, also includes that binding is closed
It is verification operation, specifically comprises the following steps that
Step 1: checking intelligent terminal and the binding relationship of electrical equipment.
Purpose is to verify the validated user whether user is electrical equipment, and this binding relationship can lead in advance
The mode such as short-message verification or website registration of crossing is bound in advance, if binding relationship is invalid, shows this use
Family is disabled user, does not the most set up with electrical equipment and is connected.
Step 2: if binding relationship is effective, sets up with electrical equipment and is connected.
S303: receive the data initialization instruction that user is sent by intelligent terminal.
S304: timed task control instruction is carried out preset according to this data initialization instruction.
If the user with legal bind relation is many people, the most each per capita can be to timed task control
Instruction carries out preset, but the timed task control instruction being stored in the task list of cloud platform is only one
Part, the most preset all it can be updated, say, that last preset be just the most preset.
In the embodiment above, cloud platform can also develop and the business function more than electrical equipment itself,
Such as batch instruction, logic-based rule-based scheduling etc., by the upgrading to the data in cloud platform, electricity can be made
The subsequent upgrade of gas equipment is unrelated with equipment itself, can realize the function to equipment by cloud platform and carry out
Extend, revise or strengthen, inconceivable when this is former.
It addition, the unified management of the data to electrical equipment can also be realized by cloud platform, user is made to set
Any data put will not be affected because of the damage of electrical equipment itself or maintenance, and also
Can solve the problem that the problem of detached island of information of electrical equipment.
It should be noted that for embodiment of the method, in order to be briefly described, therefore it is all expressed as one it be
The combination of actions of row, but those skilled in the art should know, and the embodiment of the present invention is not by described
The restriction of sequence of movement because according to the embodiment of the present invention, some step can use other orders or
Person is carried out simultaneously.Secondly, those skilled in the art also should know, embodiment described in this description
Belong to preferred embodiment, necessary to the involved action not necessarily embodiment of the present invention.
Embodiment three
The structured flowchart of the control system embodiment of a kind of remote timing task that Fig. 4 provides for the present invention.
With reference to shown in Fig. 4, the control system of the remote timing task that the present invention provides is in electrical equipment
Cloud platform, realize the long-range control to electrical equipment for making user pass through cloud platform.Electrical equipment energy
Enough realize being connected with cloud platform by communication network, it is possible to send various data to cloud platform, and can connect
Receiving Various types of data or instruction that cloud platform sends, this system includes time judgment module 10, condition adjudgement mould
Block 20 and instruction sending module 30.
Time judgment module 10 is used for judging whether current time meets preset time condition.
Preset time condition is that user passes through the intelligent terminal such as smart mobile phone, panel computer or desktop computer and exists
In cloud platform preset pre-conditioned, real-time time that current time is the most current, it is judged that purpose be really
Determine current time whether have arrived at user wish electrical equipment perform certain operation time point.
Condition judgment module 20 judges for the current operating conditions reported electrical equipment in advance.
Electrical equipment is when bringing into operation every time or the timing that is in operation reports current operation to cloud platform
State, when time judgment module judges that current time meets preset time condition, condition judgment module 20
Further the current operating conditions of electrical equipment is judged, i.e. judge that this current operating conditions is with preset
The whether mutual exclusion of timed task control instruction corresponding to time conditions, is specially and judges timed task control instruction
Control whether the state that electric task will enter repels each other with current operating conditions, if both repel each other, then
This timed task control instruction is not sent to electrical equipment.
The such as current operating conditions of intelligent air condition equipment if dehumidifying running status if be to enter
Trip temperature regulation controls.The instruction mutual exclusion table of multiple electrical equipment can be preset, wherein in cloud platform
Show mutually exclusive instruction, such as, have a kind more than 200 corresponding to the state of intelligent air condition equipment, and intelligence
Also kind more than 100 can be reached by the relatively simple equipment of this operation of refrigerator.Timed task control instruction is used for
Control electric equipment to run by preset program, the most also include instruction encoding, order parameter and execution sequence
Etc. operational factor, manufacturer can be by reaching to upgrade electrical equipment to the amendment of these operational factors
Purpose.
Instruction sending module 30 is for judging the current operating conditions of electrical equipment when condition judgment module 20
Do not repel each other with task-performance instructions, i.e. both be can compatible time, send this preset determining to electrical equipment
Time task control instruction.
From technique scheme it can be seen that present embodiments provide a kind of timed task remotely control be
System, this system is applied to the cloud platform of electrical equipment, is used for making user pass through cloud platform and realizes electrically setting
Standby long-range control.This system is specially and first judges current time;Meet pre-in current time
When putting time conditions, further current operating conditions is judged, if current operating conditions is with preset
The timed task control instruction that time conditions is corresponding is not repelled each other, then send preset timing to electrical equipment and appoint
Business control instruction, timed task control instruction is used for controlling electrical equipment and runs by preset program.Work as user
When needing the preset task of Iterim Change electrical equipment, only timed task preset in cloud platform need to be controlled
Instruction is changed realizing the adjustment to preset task, so that the preset task of electrical equipment adapts to send out
The raw conditions present changed such that it is able to solve the problem that Consumer's Experience is poor.
Embodiment four
The structural frames of the control system embodiment of the another kind of remote timing task that Fig. 5 provides for the present invention
Figure.
With reference to shown in Fig. 5, the control system that the present embodiment provides is to set up on the basis of a upper embodiment
State receiver module 40 and info push module 50.
State receiver module 40 is for receiving the object information of electrical equipment feedback.
Object information includes that the transmission reflecting timed task control instruction the most successfully sends object information,
Also include reflecting that electrical equipment performs the most successfully execution result information.After obtaining above-mentioned information, refer to
Sending module 30 is made to reissue, until running succeeded, so it can be avoided that electrical equipment occurs
Control failed problem.
State receiver module 40 is additionally operable to receive the current operating conditions information of electrical equipment feedback.
Electrical equipment is when being in connection status with cloud platform, and timing or fixed cycle send reflection to cloud platform
The current operating conditions information of current operating conditions, cloud platform then receives and preserves this current operating conditions letter
Breath, and as can issue the foundation of timed task control instruction to electrical equipment such that it is able to keep away
Exempt to issue the timed task control instruction repelled each other with current operating conditions.
Information push module 50 is for pushing current operating conditions information to intelligent terminal.
When user is built with cloud platform 100 by intelligent terminal such as smart mobile phone, panel computers or desktop computer
Vertical when connecting, info push module currently runs shape to what this intelligent terminal pushed respective electric equipment in time
State information, allows the user to grasp in time the current operating conditions of this electrical equipment.
From to the narration of above example it is recognised that user can be by intelligent terminal to cloud platform
Timed task control instruction carries out preset, the most preset includes initial setting up, revises, deletes, increases
Projects etc. operate such that it is able to make user change timed task control instruction, with this according to the demand of oneself
Realize controlling purpose accordingly, for timed task control instruction carries out preset instruction preset module bag
Include request-response unit, connection establishment unit, instruction reception unit and data preset unit.
Request-response unit is for responding the connection request that user is sent by intelligent terminal.
When user sends connection request by intelligent terminal, respond this request so that user confirms cloud platform
Receive this connection request.
Connection establishment unit is connected for setting up with this intelligent terminal according to shown connection request.
I.e. set up with the intelligent terminal sending this connection request and be connected.When setting up connection in order to avoid illegally
Timed task control instruction resets by user, revise or the preset operation such as deletion, also includes that binding is closed
It is verification operation, specifically includes checking subelement and connexon unit.
Checking subelement is for verifying the binding relationship of intelligent terminal and electrical equipment.
Purpose is to verify the validated user whether user is electrical equipment, and this binding relationship can lead in advance
The mode such as short-message verification or website registration of crossing is bound in advance, if binding relationship is invalid, shows this use
Family is disabled user, does not the most set up with electrical equipment and is connected.
Connexon unit then when verifying that subelement judges that binding relationship is effective, is set up even with electrical equipment
Connect.
Instruction reception unit receives the data initialization instruction that user is sent by intelligent terminal.
Data initialization unit instructs timed task for the data initialization received according to instruction reception unit
Control instruction carries out preset.
If the user with legal bind relation is many people, the most each per capita can be to timed task control
Instruction carries out preset, but the timed task control instruction being stored in the task list of cloud platform is only one
Part, the most preset all it can be updated, say, that last preset be just the most preset.
In the embodiment above, cloud platform can also develop and the business function more than electrical equipment itself,
Such as batch instruction, logic-based rule-based scheduling etc., by the upgrading to the data in cloud platform, electricity can be made
The subsequent upgrade of gas equipment is unrelated with equipment itself, can realize the function to equipment by cloud platform and carry out
Extend, revise or strengthen, inconceivable when this is former.
It addition, the unified management of the data to electrical equipment can also be realized by cloud platform, user is made to set
Any data put will not be affected because of the damage of electrical equipment itself or maintenance, and also
Can solve the problem that the problem of detached island of information of electrical equipment.
For device embodiment, due to itself and embodiment of the method basic simlarity, so the comparison described
Simply, relevant part sees the part of embodiment of the method and illustrates.
Each embodiment in this specification all uses the mode gone forward one by one to describe, and each embodiment stresses
Be all the difference with other embodiments, between each embodiment, identical similar part sees mutually
?.
Those skilled in the art are it should be appreciated that the embodiment of the embodiment of the present invention can be provided as method, dress
Put or computer program.Therefore, the embodiment of the present invention can use complete hardware embodiment, completely
Software implementation or the form of the embodiment in terms of combining software and hardware.And, the embodiment of the present invention
Can use and can be situated between with storage at one or more computers wherein including computer usable program code
The upper computer journey implemented of matter (including but not limited to disk memory, CD-ROM, optical memory etc.)
The form of sequence product.
The embodiment of the present invention is with reference to method according to embodiments of the present invention, terminal unit (system) and meter
The flow chart of calculation machine program product and/or block diagram describe.It should be understood that can be by computer program instructions
Each flow process in flowchart and/or block diagram and/or square frame and flow chart and/or square frame
Flow process in figure and/or the combination of square frame.Can provide these computer program instructions to general purpose computer,
The processor of special-purpose computer, Embedded Processor or other programmable data processing terminal equipment is to produce
One machine so that performed by the processor of computer or other programmable data processing terminal equipment
Instruction produce for realizing at one flow process of flow chart or multiple flow process and/or one square frame of block diagram or
The device of the function specified in multiple square frames.
These computer program instructions may be alternatively stored in and computer or other programmable datas can be guided to process
In the computer-readable memory that terminal unit works in a specific way so that be stored in this computer-readable
Instruction in memorizer produces the manufacture including command device, and this command device realizes flow chart one
The function specified in flow process or multiple flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded into computer or other programmable data processing terminals set
Standby upper so that on computer or other programmable terminal equipment, to perform sequence of operations step in terms of producing
The process that calculation machine realizes, thus the instruction performed on computer or other programmable terminal equipment provides and uses
In realizing in one flow process of flow chart or multiple flow process and/or one square frame of block diagram or multiple square frame
The step of the function specified.
Although having been described for the preferred embodiment of the embodiment of the present invention, but those skilled in the art being once
Know basic creative concept, then these embodiments can be made other change and amendment.So,
Claims are intended to be construed to include preferred embodiment and fall into the institute of range of embodiment of the invention
There are change and amendment.
Finally, in addition it is also necessary to explanation, in this article, the relational terms of such as first and second or the like
It is used merely to separate an entity or operation with another entity or operating space, and not necessarily requires
Or imply relation or the order that there is any this reality between these entities or operation.And, art
Language " includes ", " comprising " or its any other variant are intended to comprising of nonexcludability, so that
Process, method, article or terminal unit including a series of key elements not only include those key elements, and
Also include other key elements being not expressly set out, or also include for this process, method, article or
The key element that person's terminal unit is intrinsic.In the case of there is no more restriction, statement " include one
It is individual ... " key element that limits, it is not excluded that including the process of described key element, method, article or end
End equipment there is also other identical element.
Above technical scheme provided by the present invention is described in detail, used herein the most individual
Principle and the embodiment of the present invention are set forth by example, and the explanation of above example is only intended to help
Understand method and the core concept thereof of the present invention;Simultaneously for one of ordinary skill in the art, foundation
The thought of the present invention, the most all will change, in sum,
This specification content should not be construed as limitation of the present invention.
Claims (14)
1. the control method of a remote timing task, it is characterised in that be applied to the cloud of electrical equipment
Platform, described long-range control method includes step:
Current time is judged;
When described current time meets preset time condition, report described electrical equipment in advance is current
Running status judges;
If described current operating conditions and the timed task corresponding to described preset time condition control to refer to
Order does not repels each other, then send preset timed task control instruction to described electrical equipment;
Described timed task control instruction is used for controlling described electrical equipment and runs by preset program.
2. control method as claimed in claim 1, it is characterised in that described timed task controls to refer to
Order includes instruction encoding, order parameter and execution sequence.
3. control method as claimed in claim 1 or 2, it is characterised in that further comprise the steps of:
Receive and store the current operating conditions information of described electrical equipment feedback, described current operating conditions
Electrical equipment described in message reflection has performed the current operating conditions after described preset program.
4. control method as claimed in claim 3, it is characterised in that further comprise the steps of:
Receiving the object information of described electrical equipment feedback, described object information includes reflection sends whether to become
The transmission object information of merit and/or reflect that described electrical equipment performs the most successfully execution result information.
5. control method as claimed in claim 3, it is characterised in that further comprise the steps of:
When user is connected with the foundation of described cloud platform by intelligent terminal, push institute to described intelligent terminal
State current operating conditions information.
6. control method as claimed in claim 1, it is characterised in that described timed task controls to refer to
The pre-setting method of order includes step:
The connection request that response user is sent by intelligent terminal;
The connection with described intelligent terminal is set up according to described connection request;
Receive user by the described data initialization instruction connecting and sending;
According to described data initialization instruction, described timed task control instruction is carried out preset.
7. control method as claimed in claim 6, it is characterised in that described please according to described connection
Ask the connection set up with described intelligent terminal, including step:
Verify the binding relationship of described intelligent terminal and described electrical equipment;
If described binding relationship is effective, then set up described connection according to described connection request;
If described binding relationship is invalid, then refusal sets up described connection.
8. the control system of a remote timing task, it is characterised in that be applied to the cloud of electrical equipment
Platform, described control system includes:
Time judgment module, for judging current time;
When time judgment module, condition judgment module, for judging that described current time meets preset time bar
During part, the current operating conditions reported described electrical equipment in advance judges;
When described condition judgment module, instruction sending module, for judging that described current operating conditions is with described
When timed task control instruction corresponding to preset time condition is not repelled each other, send pre-to described electrical equipment
The timed task control instruction put;
Described timed task control instruction is used for controlling described electrical equipment and runs by preset program.
9. control system as claimed in claim 8, it is characterised in that described timed task controls to refer to
Order includes instruction encoding, order parameter and execution sequence.
10. control system as claimed in claim 8 or 9, it is characterised in that also include:
State receiver module, for receiving and store the current operating conditions letter of described electrical equipment feedback
Breath, it is current that electrical equipment described in described current operating conditions message reflection has performed after described preset program
Running status.
11. control systems as claimed in claim 10, it is characterised in that described state receiver module
Being additionally operable to receive the object information of described electrical equipment feedback, described object information includes whether reflection sends
Successfully send object information and/or reflect that described electrical equipment performs the most successfully execution result information.
12. control systems as claimed in claim 10, it is characterised in that also include:
Info push module, is used for when user is connected with the foundation of described cloud platform by intelligent terminal, to
Described intelligent terminal pushes described current operating conditions information.
13. control systems as claimed in claim 8, it is characterised in that for right in described cloud platform
The preset instruction preset module that carries out of timed task control instruction includes:
Request-response unit, for responding the connection request that user is sent by intelligent terminal;
Connection establishment unit, for setting up the connection with described intelligent terminal according to described connection request;
Instruction reception unit, for receiving user by the described data initialization instruction connecting and sending;
Data initialization unit, for entering described timed task control instruction according to described data initialization instruction
Row is preset.
14. tele-control systems as claimed in claim 13, it is characterised in that described connection establishment
Unit includes:
Checking subelement, for verifying the binding relationship of described intelligent terminal and described electrical equipment;
When described checking subelement, connexon unit, for determining that described binding relationship is effective, then according to institute
Stating connection request and set up described connection, if described binding relationship is invalid, then refusal sets up described connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610341361.1A CN105959187A (en) | 2016-05-19 | 2016-05-19 | Remote timing task control method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610341361.1A CN105959187A (en) | 2016-05-19 | 2016-05-19 | Remote timing task control method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105959187A true CN105959187A (en) | 2016-09-21 |
Family
ID=56910473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610341361.1A Pending CN105959187A (en) | 2016-05-19 | 2016-05-19 | Remote timing task control method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105959187A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107870571A (en) * | 2016-09-26 | 2018-04-03 | 北京京东尚科信息技术有限公司 | Control the method, apparatus and smart machine of smart machine |
CN107995260A (en) * | 2017-11-15 | 2018-05-04 | 深圳市叮咚互联科技有限公司 | Reservation control method, system and computer-readable recording medium |
CN109419354A (en) * | 2017-08-31 | 2019-03-05 | 芜湖美的厨卫电器制造有限公司 | Water dispenser and its control method and control device |
CN110300038A (en) * | 2018-03-23 | 2019-10-01 | 中兴通讯股份有限公司 | A kind of communication means of smart home device, line card, equipment and storage medium |
CN110493091A (en) * | 2019-08-26 | 2019-11-22 | 珠海格力电器股份有限公司 | A kind of control method and device of smart home device |
CN110501915A (en) * | 2019-08-12 | 2019-11-26 | 珠海格力电器股份有限公司 | A kind of method and server controlling equipment |
CN110545222A (en) * | 2019-08-23 | 2019-12-06 | 珠海格力电器股份有限公司 | Method and device for controlling equipment, computing equipment and storage medium |
CN110830334A (en) * | 2018-08-13 | 2020-02-21 | 珠海格力电器股份有限公司 | Household appliance control method, device, system, server and household appliance |
CN112804307A (en) * | 2020-12-31 | 2021-05-14 | 青岛海信智慧生活科技股份有限公司 | Linkage scene execution method and device |
CN112882393A (en) * | 2021-01-12 | 2021-06-01 | 广州三星通信技术研究有限公司 | Electrical device, method of controlling electrical device, and controller |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1673960A (en) * | 2004-03-24 | 2005-09-28 | 联想(北京)有限公司 | Method for finishing fixed time task by domestic electric equipment |
CN103676814A (en) * | 2012-10-11 | 2014-03-26 | 国网电力科学研究院 | Remote power control method, system thereof and remote power management server |
CN103777604A (en) * | 2014-01-17 | 2014-05-07 | 杭州天丽科技有限公司 | Intelligent equipment cloud platform control method based on SDMP protocol |
CN103916690A (en) * | 2014-03-20 | 2014-07-09 | 小米科技有限责任公司 | Smart television set remote control method and device |
CN103957249A (en) * | 2014-04-23 | 2014-07-30 | 华为终端有限公司 | Remote control method, server and control device and system |
CN105338040A (en) * | 2014-08-12 | 2016-02-17 | 小米科技有限责任公司 | Water dispenser control methods, devices and system |
-
2016
- 2016-05-19 CN CN201610341361.1A patent/CN105959187A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1673960A (en) * | 2004-03-24 | 2005-09-28 | 联想(北京)有限公司 | Method for finishing fixed time task by domestic electric equipment |
CN103676814A (en) * | 2012-10-11 | 2014-03-26 | 国网电力科学研究院 | Remote power control method, system thereof and remote power management server |
CN103777604A (en) * | 2014-01-17 | 2014-05-07 | 杭州天丽科技有限公司 | Intelligent equipment cloud platform control method based on SDMP protocol |
CN103916690A (en) * | 2014-03-20 | 2014-07-09 | 小米科技有限责任公司 | Smart television set remote control method and device |
CN103957249A (en) * | 2014-04-23 | 2014-07-30 | 华为终端有限公司 | Remote control method, server and control device and system |
CN105338040A (en) * | 2014-08-12 | 2016-02-17 | 小米科技有限责任公司 | Water dispenser control methods, devices and system |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107870571B (en) * | 2016-09-26 | 2021-09-03 | 北京京东尚科信息技术有限公司 | Method and device for controlling intelligent equipment and intelligent equipment |
CN107870571A (en) * | 2016-09-26 | 2018-04-03 | 北京京东尚科信息技术有限公司 | Control the method, apparatus and smart machine of smart machine |
CN109419354A (en) * | 2017-08-31 | 2019-03-05 | 芜湖美的厨卫电器制造有限公司 | Water dispenser and its control method and control device |
CN107995260A (en) * | 2017-11-15 | 2018-05-04 | 深圳市叮咚互联科技有限公司 | Reservation control method, system and computer-readable recording medium |
CN110300038A (en) * | 2018-03-23 | 2019-10-01 | 中兴通讯股份有限公司 | A kind of communication means of smart home device, line card, equipment and storage medium |
CN110830334A (en) * | 2018-08-13 | 2020-02-21 | 珠海格力电器股份有限公司 | Household appliance control method, device, system, server and household appliance |
CN110501915A (en) * | 2019-08-12 | 2019-11-26 | 珠海格力电器股份有限公司 | A kind of method and server controlling equipment |
CN110545222A (en) * | 2019-08-23 | 2019-12-06 | 珠海格力电器股份有限公司 | Method and device for controlling equipment, computing equipment and storage medium |
WO2021036512A1 (en) * | 2019-08-26 | 2021-03-04 | 珠海格力电器股份有限公司 | Method and apparatus for controlling smart home device |
CN110493091A (en) * | 2019-08-26 | 2019-11-22 | 珠海格力电器股份有限公司 | A kind of control method and device of smart home device |
CN112804307A (en) * | 2020-12-31 | 2021-05-14 | 青岛海信智慧生活科技股份有限公司 | Linkage scene execution method and device |
CN112804307B (en) * | 2020-12-31 | 2022-06-24 | 青岛海信智慧生活科技股份有限公司 | Linkage scene execution method and device |
CN112882393A (en) * | 2021-01-12 | 2021-06-01 | 广州三星通信技术研究有限公司 | Electrical device, method of controlling electrical device, and controller |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105959187A (en) | Remote timing task control method and system | |
CN105683845B (en) | System and method for device detection and APP configuration | |
CN105159122B (en) | A kind of intelligent home control system and control method | |
CN106302448B (en) | Remote access control method and device | |
CN105652675A (en) | Control method for intelligent household equipment, device, terminal and system | |
CN103914039A (en) | Control method and system for household appliances | |
CN105629744A (en) | Control method of smart home, control system, terminal and smart home system | |
CN105404258A (en) | Intelligent household management method and platform | |
CN104852990A (en) | Information processing method and intelligent household control system | |
CN105052077B (en) | The method and apparatus of information processing in a kind of M2M | |
CN109474692A (en) | A kind of intelligent household appliance remote control method, apparatus and system | |
CN104618228A (en) | Intelligent household gateway and system for automatically accessing cloud server by strategy based on intelligent household gateway and application method thereof | |
CN103595717A (en) | Household appliance control protocol conversion method and control terminal | |
CN103716161B (en) | It is capable of the method and device of smart machine certification in server of remote control | |
CN105739321A (en) | Voice control system and voice control method based on KNX bus | |
EP3007385B1 (en) | Terminal peripheral control method, m2m gateway, and communications system | |
CN105306320A (en) | Method and device for binding clients to intelligent device | |
CN113485134A (en) | Device control method and apparatus, storage medium, and electronic device | |
CN107367946B (en) | Method and device for controlling equipment | |
CN104767756A (en) | Equipment information processing method, client side device and server side device | |
CN105629786A (en) | Method and device for sending household electrical appliance control order | |
CN105791063A (en) | Method and device for controlling intelligent household appliance | |
CN101656692A (en) | Remote cooperative system and method | |
CN110703621A (en) | Household appliance control method, household appliance control device, server and computer readable storage medium | |
CN104730977B (en) | A kind of method and air-conditioning stored and read air conditioning capacity code |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170123 Address after: 266000 Shandong Province, Qingdao city Laoshan District Songling Road No. 399 Applicant after: Poly Polytron Technologies Inc Address before: 266100 Laoshan, Qingdao province Hongkong District No. East Road, room 248, room 131 Applicant before: Hisense Media Networks Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160921 |
|
RJ01 | Rejection of invention patent application after publication |