CN105956816A - Cargo transportation information intelligent processing method - Google Patents

Cargo transportation information intelligent processing method Download PDF

Info

Publication number
CN105956816A
CN105956816A CN201610573282.3A CN201610573282A CN105956816A CN 105956816 A CN105956816 A CN 105956816A CN 201610573282 A CN201610573282 A CN 201610573282A CN 105956816 A CN105956816 A CN 105956816A
Authority
CN
China
Prior art keywords
monitoring
monitor terminal
time
value
overload
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610573282.3A
Other languages
Chinese (zh)
Inventor
郭建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jingjie Technology Co Ltd
Original Assignee
Chengdu Jingjie Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jingjie Technology Co Ltd filed Critical Chengdu Jingjie Technology Co Ltd
Priority to CN201610573282.3A priority Critical patent/CN105956816A/en
Publication of CN105956816A publication Critical patent/CN105956816A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a cargo transportation information intelligent processing method. The method comprises the following steps: monitoring each monitoring target included in each node of a cloud platform; and collating and storing monitored logistics business data, and reducing network load through an optimizing strategy. The provided cargo transportation information intelligent processing method optimizes logistics routes for logistics enterprises, improves resource utilization rate and reduces overload risk, and provides high-quality logistics supply experience for each user.

Description

Material Transportation information intelligent processing method
Technical field
The present invention relates to big data process, particularly to a kind of Material Transportation information intelligent processing method.
Background technology
Along with social networks, electricity the developing rapidly of business, the trading volume sharp increase of the Internet online shopping, nothing Opinion is for electricity commercial business industry, consumer or logistics provider, a series of logistics transportation problem days that magnanimity waybill brings Benefit is protruded.Owing to traditional logistics management mode lacks unified management, between each loglstics enterprise, lack cooperation, The Scheduling System that neither one is unified, in the face of increasing Product transport amount, human and material resources, financial resources etc. The resource input of repeatability causes huge waste, and such management mode also exists substantial amounts of blind spot, such as Trans-regional transport, vehicle are unloaded, the most traditional logistics management mode cannot meet current efficiently, The logistics transportation requirement of low cost.Cloud computing platform is collected efficiently, is stored, processed material stream information, it is ensured that The real-time of Logistic Scheduling solution formulation and the efficient and rational configuration of resource, thus maximize reduction cost. But how existing cloud computing system is ensureing the supply of material of quickly and orderly, keeps continual and steady supply chain, with Guarantee to yet suffer from problem in the real-time of the unobstructed of logistics and information.Because logistics supply Chain System scale is more Big and become increasingly complex, in the case of having people up to ten thousand to submit logistics list to the most simultaneously, common relational database Operational efficiency becomes bottleneck;And existing cloud computing operation monitoring layer be mostly to physical resource or some The monitoring of specific function, is not suitable for logistics logistics information cloud that is huge and that have height virtualized nature Platform.
Summary of the invention
For solving the problem existing for above-mentioned prior art, the present invention proposes a kind of Material Transportation information intelligent Processing method, including:
The monitoring objective comprising each node in cloud platform is monitored, and gathers and store monitored thing Stream business datum, and utilize optimisation strategy to reduce offered load.
Preferably, described monitoring includes monitoring in real time and non real-time monitoring, at the operation monitoring layer of cloud platform In real time in monitoring, monitor terminal is collecting monitoring data, in real time monitoring data is sent to operation monitoring layer; Under non real-time monitoring, after the physical machine of monitor terminal and virtual machine harvester collect logistics business data, Logistics business data are stored in the data base of this locality;State threshold is set for monitoring objective;When monitoring mesh When target portfolio exceedes predetermined threshold value, monitor terminal and operation monitoring layer carry out data interaction, it is judged that be No needs triggers status alert;When operation monitoring layer determines local transmission status alert, warning message is sent out Give logistics information cloud platform;
The optimization of the most non real-time monitoring includes adding up overload amount, so that determine the need for ought Front transient state overload status information is sent to operation monitoring layer;The local each monitoring objective of monitor terminal taken at regular intervals Portfolio and by obtained monitoring value with preset local threshold value compare, monitor terminal i self protect Deposit accumulated value Si(t) and accumulation threshold Hi;As accumulated value SiT () is more than accumulation threshold H presetiTime, monitoring is eventually Hold accumulated value from (w-1) HiTo wHiTime loss Δ t and weighted average overload degree LiReport is to running prison Control layer, wherein, weights coefficient w=1,2,3 ... Li, monitor terminal i is at the accumulated value S of tiT () is calculated as:
S i ( t ) = Σ x = t 0 t m i ( x ) - T i f
miThe monitoring value of x each monitoring objective that () expression monitor terminal i is gathered at time point x, t0Represent prison The initial time of the monitoring value continuous over loading state threshold of each monitoring objective of control terminal i, TiRepresent monitor terminal The state threshold of each monitoring objective of i, f is the frequency that monitor terminal gathers local performance parameter;
The accumulated value of monitor terminal i is from (w-1) HiTo wHiWeighted average overload degree LiIt is calculated as:
L i = w k - 1 ( S k - S k - 1 ) Δ t
Δ t=tk-tk-1Accumulated value S for monitor terminal iiT () is from (w-1) HiTo wHiTime loss, tk、tk-1 It is respectively the accumulated value S of monitor terminal iiT () exceedes kth HiWith more than (k-1) individual HiTime point, Sk、 Sk-1Represent the accumulated value S of monitor terminal i respectivelyiT () exceedes kth HiWith (k-1) individual HiTime actual value;
As accumulated value SiT () is more than HiIntegral multiple time, send local state overload-alarm letter to operation monitoring layer Breath;Operation monitoring layer is at time point tkAfter receiving information, according to the number of the overload messages of monitor terminal report According to, calculate time interval (tk-Δt,tkThe overall overload degree of monitoring objective in):
L (t)=L ' (t)+Li,
tkRepresenting that operation monitoring layer receives the time point of the transient state overload-alarm of certain monitor terminal, Δ t is temporary The time loss value of transmission in state overload-alarm, L ' (t) is the value before updating;
If monitor terminal meets Si(k-1) > (k-1) * Hi, then at time point tkTime, local state overload terminates, I.e. mi(tk)<Ti, calculate Δ t=tk-tk-1, and calculate weighted average overload degree L of this localityi, then by Δ t and LiLast information as this transient state overload-alarm is sent to operation monitoring layer.
The present invention compared to existing technology, has the advantage that
The present invention proposes a kind of Material Transportation information intelligent processing method, optimizes logistics route for loglstics enterprise, Improve resource utilization and reduce overload risk, providing the user high-quality logistics supply and experience.
Accompanying drawing explanation
Fig. 1 is the flow chart of Material Transportation information intelligent processing method according to embodiments of the present invention.
Detailed description of the invention
Hereafter provide one or more embodiment of the present invention together with the accompanying drawing of the diagram principle of the invention is detailed Thin description.Describe the present invention in conjunction with such embodiment, but the invention is not restricted to any embodiment.This Bright scope is limited only by the appended claims, and the present invention contains many replacements, amendment and equivalent.? Middle elaboration many detail is described below to provide thorough understanding of the present invention.For exemplary purposes And these details are provided, and can also be according to right without some in these details or all details Claim realizes the present invention.
An aspect of of the present present invention provides a kind of Material Transportation information intelligent processing method.Fig. 1 is according to this The Material Transportation information intelligent process flow figure of bright embodiment.
The logistics information cloud platform that the present invention proposes, is deployed in high in the clouds by data base, receives from multiple parallel The waybill data of electricity business website, and carry out storage tube reason.Platform architecture include acquisition layer, data persistence layer, Computation layer, off-line update step, operation monitoring layer, alternation of bed.
Acquisition layer, as the Data Source of logistics information cloud platform, receives electricity business website and submits to loglstics enterprise Waybill, after electricity business website submits Air Way Bill No. success to, with this Air Way Bill No. as major key records by acquisition layer, Being automatically added to a node in the data-base cluster of system, utilize distributed treatment framework, acquisition layer is permissible Receive the submission of extensive record, the mass data being manually entered simultaneously, enter data into also by acquisition layer In data base.This acquisition layer is also by Data Migration, the fortune in storage loglstics enterprise self relational database Single information.For the data from different electric business websites, carry out pretreatment by acquisition layer, according in advance Set storage organization and carry out form normalization, then be input to data persistence layer.Acquisition layer preserves data-base cluster Address and the information such as serve port, with this with Database connects and data input.
After data input base server, it is necessary first to perform to write daily record write operation, it is used for recording logarithm According to insertion and deletion, the most just write data in the internal memory of actual storage data.Data are written to internal memory After, when size of data reaches the threshold value set, trigger refresh operation and content brush therein is entered distributed literary composition In part, final storage is to distributed data base.
Data persistence layer permanently stores for waybill data.Data-base cluster is by being distributed in each loglstics enterprise Memory node build, user submits every logistics record to, all stores logistics information cloud platform data base set In one node database of group.Data base uses the mode of backup to store data.On database structure, Every logistics record is exactly a line in the table of certain node database in data-base cluster, the data in data base The distributed file system relying on bottom stores.
The data of database purchase are counted by computation layer by scheduling based on MapReduce programming framework Calculation processes, and according to the transit node positional information of GIS-Geographic Information System, calculates the transit route of each vehicle, Scheduling scheme is stored in corresponding vehicle management information table simultaneously.When processing initial data, pass through MapReduce Carry out distributed treatment, cloud platform cluster arranges a main controlled node, control data as namenode Distribution, remaining slave node, as back end, stores and analyzes and processes the data distributed by namenode. Main controlled node is by pending deblocking, and arranges two backups, then by cloud platform framework by data base It is stored in back end, carries out the further process of data.
Off-line update step is used for warehouse and the real-time update of information of vehicles, uses GIS-Geographic Information System location vehicle With the current location of product, every product warehouse entry delivers from godown, and the scan data got off of getting on the bus, by storage amount, fortune The real time position of throughput rate, vehicle and product updates data base, in order to scheduling process calls latest data.
Operation monitoring layer is used for using monitoring in real time and non real-time monitoring, utilizes optimisation strategy to reduce network and bears Carry.Using each node in logistics information cloud platform as the monitor terminal comprising monitoring objective.Monitoring mesh Mark includes calculating resource, storage resource, Internet resources.Monitor terminal is for monitoring collection and this locality of data Storage.Operation monitoring layer obtains the logistics business data of local all monitor terminals, and provides data analysis, The monitoring data pulled from each monitor terminal, it is provided that state analysis, predict, report to the police and store.Logistics is believed Breath cloud platform provides monitoring data exhibiting and supervisor control function.Data exhibiting can present logistics to user The current operating conditions of information cloud platform, system controls then to do supervisory layers according to current operating conditions Go out suitably adjustment.
Alternation of bed calls correlation function inquiry data base according to the transport inquiry request that logistics manufacturer user submits to, The result returned is fed back to query interface after treatment, finally shows user.When cloud platform receives solution During inquiry request after analysis, arrive first in internal memory and inquire about, if inquiring about unsuccessfully entrance block caching query, if Still there is no successful inquiring, branch to inquire about on hard disk, and the data inquired are stored in block caching, as Really block caching be fully written, use Exchange rings delete legacy data, the result finally inquired after treatment in Now give user.
In further embodiment, cloud platform Logistic Scheduling is regarded as a many mesh of multiple constraint by the computation layer of the present invention The problem of mark decision-making, clusters large-scale transportation network, according to the freight volume of each cluster, utilizes External constraint weights, are balanced, and then reduce clustering number of times, and then optimize logistics transportation road Footpath.
The scheduling process that the present invention uses is divided into two stages: the first stage passes through K mean algorithm, by demand Node clusters according to position and freight volume, is finally divided into k class, and distributes to k vehicle transport;Second Stage, for each cluster areas, calculates the optimal route of this region vehicle.
In cluster process, the input point set D containing n user's request node, each node therein, It is assumed to be d1, d2, d3......dn, then total gross trafficIf this batch of product is come by k vehicle It is transmitted, obtains k point set D by cluster1, D2, D3......Dk, detailed process is:
First, space plane is chosen k client node d1, d2, d3......dk;Form initial clustering D '1, D’2, D '3......D’k;For the dot matrix being made up of n the two dimension weighted point with weight w and coordinate x, y Set D 'k, calculate weighting center of gravity and the total weight value of each initial clustering respectively, produce new cluster centre:
xk=∑ xiyi/∑xi, yk=∑ wiyi/∑yi, wherein i is traversal D 'kIn nodes, D 'kTotal weight value For wk=∑ wi
All of point in set D is clustered again, d is put for eachn, calculate it to clustering D 'k's Weighting division distance:
Wherein r is weights attenuation quotient;
D can be calculated by this formulai1, di2,di3......dikThe distance of k weighting, chooses wherein altogether Minimum distance dif, then node d is added cluster D 'f, after each node is clustered again, form new gathering Class D "1, D "2, D "3......D”k
Calculate weighted cluster center and the total weight value of each cluster;Then steps be repeated alternatively until cluster to receive Hold back, export final cluster result D1, D2, D3......Dk
Wherein, realizing in the concrete parallelization of K mean algorithm cluster, the present invention uses MapReduce Programming model, reads data from data base, produces k initial cluster center, and is saved in distributed document In file in system, as the global variable of MapReduce programming model;By all data set piecemeals and Cluster centre global variable is sent collectively to each mapping node, calculates in data block each node in global variable The distance of k cluster centre, thus judge which cluster this node belongs to, after forming k cluster areas, The node belonging to this cluster areas is included around each cluster centre node, thus with cluster centre as key, This cluster areas, originally as value, forms middle key-value pair and passes to stipulations node;Belong to same cluster centre All key-value pairs as the input of same stipulations, it is calculated weighting center of gravity and total weight value, produces new Cluster centre, covers original global variable, clusters iteration the most next time;In the newest cluster The heart is the most consistent with previous cluster centre or reaches the difference value being previously set, if meeting condition, i.e. receives Holding back, cluster completes, and otherwise needs to return iteration again.
Logistics data, after the clustering processing of first stage, solves optimal path to each cluster areas. I.e. in limited solution space, from the root node of solution space tree, find the weights between each node The route that sum is minimum, using the distance between two nodes as its weights in Logistic Scheduling, namely finds Article one, the shortest transport circuit, according to the relation with bound, from present node, selection one is best Node, as expanding node, calculates a functional value, Approach by inchmeal optimal solution to each extended node.
The process wherein solving lower limit and the upper limit includes: for n summit in figure V, define Di(1<i<n) For with vertex viThe limit weights sum of two beelines being connected, calculates the D on n summitiSum ∑ Cij, And except 2 obtain lower limit, i.e. lower limit minD=∑ Cij/2;Greedy algorithm is utilized to obtain the proprietary rights of fullpath Value summation is as the upper limit.If present node solves the lower limit obtained or owns from root node to this node Limit weights sum more than this higher limit, give up this node.The node selecting Least-cost preferentially extends, To optimal path.
Further, in the monitoring in real time of operation monitoring layer, monitor terminal is collecting monitoring data, in real time Monitoring data are sent to operation monitoring layer.Under non real-time monitoring, physical machine and the virtual machine of monitor terminal are adopted After storage collects logistics business data, logistics business data are stored in the data base of this locality.Monitoring is eventually End arranges Condition Monitoring Unit, and sets state threshold for monitoring objective.When the portfolio of monitoring objective exceedes During predetermined threshold value, the Condition Monitoring Unit number of the Condition Monitoring Unit of monitor terminal and operation monitoring layer According to alternately, it may be judged whether need to trigger status alert.When operation monitoring layer determines local transmission status alert, Warning message is sent to logistics information cloud platform, and the system alarm device of logistics information cloud platform is responsible for realizing system System warning function.
The optimization of non real-time monitoring includes using the mode adding up overload amount to suppress transient state to transship The quantity reported to the police.Determine the need for current transient state overload status information is sent to operation monitoring layer.Prison The portfolio of the local each monitoring objective of control terminal taken at regular intervals by obtained monitoring value and the local threshold preset Value compares.Monitor terminal i self preserves accumulated value Si(t) and accumulation threshold Hi.Wherein, Si(t) accumulation amount Affected by time and two factors of overload quantity, be 0 time initial.As accumulated value SiT () is more than the accumulation threshold preset HiTime, monitor terminal by accumulated value from (w-1) HiTo wHi(weights coefficient w=1,2,3 ... Li) time loss Δ t With weighted average overload degree LiReport is to operation monitoring layer, and wherein, monitor terminal i is at the accumulated value of t SiT () computing formula is:
S i ( t ) = &Sigma; x = t 0 t m i ( x ) - T i f
miThe monitoring value of x each monitoring objective that () expression monitor terminal i is gathered at time point x, t0Represent prison The initial time of the monitoring value continuous over loading state threshold of each monitoring objective of control terminal i, TiRepresent monitor terminal The state threshold of each monitoring objective of i, f is the frequency that monitor terminal gathers local performance parameter.
The accumulated value of monitor terminal i is from (w-1) HiTo wHiWeighted average overload degree LiIt is calculated as:
L i = w k - 1 ( S k - S k - 1 ) &Delta; t
Δ t=tk-tk-1Accumulated value S for monitor terminal iiT () is from (w-1) HiTo wHiTime loss, tk、tk-1 It is respectively the accumulated value S of monitor terminal iiT () exceedes kth HiWith more than (k-1) individual HiTime point, Sk、 Sk-1Represent the accumulated value S of monitor terminal i respectivelyiT () exceedes kth HiWith (k-1) individual HiTime actual value.
As accumulated value SiT () is more than HiIntegral multiple time, send local state overload-alarm letter to operation monitoring layer Breath.Operation monitoring layer is at time point tkAfter receiving information, according to the number of the overload messages of monitor terminal report According to, calculate time interval (tk-Δt,tkThe overall overload degree of monitoring objective in):
L (t)=L ' (t)+Li,
tkRepresenting that operation monitoring layer receives the time point of the transient state overload-alarm of certain monitor terminal, Δ t is temporary The time loss value of transmission in state overload-alarm, L ' (t) is the value before updating.If at certain time point, run prison Control layer is simultaneously received the transient state overload-alarm information of multiple monitor terminal, then be required for each monitoring eventually The transient state overload-alarm information of end once calculates.
If monitor terminal meets Si(k-1) > (k-1) * Hi, then at time point tkTime, local state overload terminates, I.e. mi(tk)<Ti, calculate Δ t=tk-tk-1, and calculate weighted average overload degree L of this localityi, then by Δ t and LiLast information as this transient state overload-alarm is sent to operation monitoring layer.
In sum, the present invention proposes a kind of Material Transportation information intelligent processing method, excellent for loglstics enterprise Compound flow path, improves resource utilization and reduces overload risk, providing the user high-quality logistics supply Experience.
Obviously, it should be appreciated by those skilled in the art, each module or each step of the above-mentioned present invention are permissible Realizing by general calculating system, they can concentrate in single calculating system, or is distributed in many On the network that individual calculating system is formed, alternatively, they can use the executable program code of calculating system Realize, it is thus possible to be stored in storage system being performed by calculating system.So, this Bright be not restricted to any specific hardware and software combine.
It should be appreciated that the above-mentioned detailed description of the invention of the present invention is used only for exemplary illustration or explains this The principle of invention, and be not construed as limiting the invention.Therefore, without departing from the spirit and scope of the present invention In the case of any modification, equivalent substitution and improvement etc. done, should be included in protection scope of the present invention Within.Additionally, claims of the present invention be intended to fall into scope and border or Whole in the equivalents on this scope of person and border change and modifications example.

Claims (2)

1. Material Transportation information intelligent processing method, it is characterised in that including:
The monitoring objective comprising each node in cloud platform is monitored, and gathers and store monitored thing Stream business datum, and utilize optimisation strategy to reduce offered load.
Method the most according to claim 1, it is characterised in that described monitoring includes monitoring in real time with non- Monitoring in real time, in the monitoring in real time of the operation monitoring layer of cloud platform, monitor terminal is collecting monitoring data, In real time monitoring data are sent to operation monitoring layer;Under non real-time monitoring, the physical machine of monitor terminal and void After plan machine harvester collects logistics business data, logistics business data are stored in the data base of this locality; State threshold is set for monitoring objective;When the portfolio of monitoring objective exceedes predetermined threshold value, monitor terminal Data interaction is carried out, it may be judged whether need to trigger status alert with operation monitoring layer;When operation monitoring layer determines During local transmission status alert, warning message is sent to logistics information cloud platform;
The optimization of the most non real-time monitoring includes adding up overload amount, so that determine the need for ought Front transient state overload status information is sent to operation monitoring layer;The local each monitoring objective of monitor terminal taken at regular intervals Portfolio and by obtained monitoring value with preset local threshold value compare, monitor terminal i self protect Deposit accumulated value Si(t) and accumulation threshold Hi;As accumulated value SiT () is more than accumulation threshold H presetiTime, monitoring is eventually Hold accumulated value from (w-1) HiTo wHiTime loss Δ t and weighted average overload degree LiReport is to running prison Control layer, wherein, weights coefficient w=1,2,3 ... Li, monitor terminal i is at the accumulated value S of tiT () is calculated as:
S i ( t ) = &Sigma; x = t 0 t m i ( x ) - T i f
miThe monitoring value of x each monitoring objective that () expression monitor terminal i is gathered at time point x, t0Represent prison The initial time of the monitoring value continuous over loading state threshold of each monitoring objective of control terminal i, TiRepresent monitor terminal The state threshold of each monitoring objective of i, f is the frequency that monitor terminal gathers local performance parameter;
The accumulated value of monitor terminal i is from (w-1) HiTo wHiWeighted average overload degree LiIt is calculated as:
L i = w k - 1 ( S k - S k - 1 ) &Delta; t
Δ t=tk-tk-1Accumulated value S for monitor terminal iiT () is from (w-1) HiTo wHiTime loss, tk、tk-1 It is respectively the accumulated value S of monitor terminal iiT () exceedes kth HiWith more than (k-1) individual HiTime point, Sk、 Sk-1Represent the accumulated value S of monitor terminal i respectivelyiT () exceedes kth HiWith (k-1) individual HiTime actual value;
As accumulated value SiT () is more than HiIntegral multiple time, send local state overload-alarm letter to operation monitoring layer Breath;Operation monitoring layer is at time point tkAfter receiving information, according to the number of the overload messages of monitor terminal report According to, calculate time interval (tk-Δt,tkThe overall overload degree of monitoring objective in):
L (t)=L ' (t)+Li,
tkRepresenting that operation monitoring layer receives the time point of the transient state overload-alarm of certain monitor terminal, Δ t is temporary The time loss value of transmission in state overload-alarm, L ' (t) is the value before updating;
If monitor terminal meets Si(k-1) > (k-1) * Hi, then at time point tkTime, local state overload terminates, I.e. mi(tk)<Ti, calculate Δ t=tk-tk-1, and calculate weighted average overload degree L of this localityi, then by Δ t and LiLast information as this transient state overload-alarm is sent to operation monitoring layer.
CN201610573282.3A 2016-07-19 2016-07-19 Cargo transportation information intelligent processing method Pending CN105956816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610573282.3A CN105956816A (en) 2016-07-19 2016-07-19 Cargo transportation information intelligent processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610573282.3A CN105956816A (en) 2016-07-19 2016-07-19 Cargo transportation information intelligent processing method

Publications (1)

Publication Number Publication Date
CN105956816A true CN105956816A (en) 2016-09-21

Family

ID=56900622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610573282.3A Pending CN105956816A (en) 2016-07-19 2016-07-19 Cargo transportation information intelligent processing method

Country Status (1)

Country Link
CN (1) CN105956816A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108022060A (en) * 2016-10-31 2018-05-11 菜鸟智能物流控股有限公司 Load parameter optimization method and device of logistics network
CN108171356A (en) * 2016-12-07 2018-06-15 北京金风科创风电设备有限公司 Spare part warehouse layout method and system
CN108876243A (en) * 2018-06-20 2018-11-23 广州市公安局白云区分局 Logistics information method for early warning, device and electronic equipment
CN110400113A (en) * 2019-08-06 2019-11-01 三江学院 Part real-time scheduling method and system are pulled in a kind of logistics

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110202657A1 (en) * 2010-02-12 2011-08-18 Elitegroup Computer Systems Co., Ltd. Method for scheduling cloud-computing resource and system applying the same
CN103679316A (en) * 2012-09-21 2014-03-26 中国移动通信集团公司 Real-time dispatching and delivery method and device
CN103825779A (en) * 2014-02-21 2014-05-28 南京邮电大学 Method for monitoring state of cloud data center
CN104850593A (en) * 2015-04-27 2015-08-19 张凌 Big data-based emergency supplies data storage and circulation monitoring method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110202657A1 (en) * 2010-02-12 2011-08-18 Elitegroup Computer Systems Co., Ltd. Method for scheduling cloud-computing resource and system applying the same
CN103679316A (en) * 2012-09-21 2014-03-26 中国移动通信集团公司 Real-time dispatching and delivery method and device
CN103825779A (en) * 2014-02-21 2014-05-28 南京邮电大学 Method for monitoring state of cloud data center
CN104850593A (en) * 2015-04-27 2015-08-19 张凌 Big data-based emergency supplies data storage and circulation monitoring method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108022060A (en) * 2016-10-31 2018-05-11 菜鸟智能物流控股有限公司 Load parameter optimization method and device of logistics network
CN108022060B (en) * 2016-10-31 2022-08-16 菜鸟智能物流控股有限公司 Load parameter optimization method and device of logistics network
CN108171356A (en) * 2016-12-07 2018-06-15 北京金风科创风电设备有限公司 Spare part warehouse layout method and system
CN108171356B (en) * 2016-12-07 2021-05-07 北京金风科创风电设备有限公司 Spare part warehouse layout method and system
CN108876243A (en) * 2018-06-20 2018-11-23 广州市公安局白云区分局 Logistics information method for early warning, device and electronic equipment
CN110400113A (en) * 2019-08-06 2019-11-01 三江学院 Part real-time scheduling method and system are pulled in a kind of logistics
CN110400113B (en) * 2019-08-06 2022-01-11 三江学院 Real-time scheduling method and system for logistics package

Similar Documents

Publication Publication Date Title
CN105956723A (en) Logistics information management method based on data mining
CN106228263A (en) Materials stream informationization methods based on big data
CN110199273B (en) System and method for loading, aggregating and bulk computing in one scan in a multidimensional database environment
CN104169950B (en) Utilize the Database Systems of the calculating towards batch processing
Yang et al. A spatiotemporal compression based approach for efficient big data processing on cloud
Ota et al. Stars: Simulating taxi ride sharing at scale
Massobrio et al. Towards a cloud computing paradigm for big data analysis in smart cities
CN103548019B (en) Method and system for providing statistical information according to data warehouse
CN103412897B (en) A kind of parallel data processing method based on distributed frame
CN111768030B (en) Bank transportation distribution line planning method, device, equipment and medium
CN104036029B (en) Large data consistency control methods and system
CN106462578A (en) Method for querying and updating entries in database
CN105956816A (en) Cargo transportation information intelligent processing method
CN102750367A (en) Big data checking system and method thereof on cloud platform
CN109063153A (en) The search system and method for bottom-up optimization
Li et al. Top-$ k $ k Vehicle Matching in Social Ridesharing: A Price-Aware Approach
Lu et al. A multi-objective humanitarian pickup and delivery vehicle routing problem with drones
CN109074304A (en) The data distribution system of optimization
Cao et al. Spatio‐temporal land use multi‐objective optimization: A case study in Central China
CN109903050A (en) Transaction De-weight method, transaction building method, equipment and storage medium
CN111680382A (en) Grade prediction model training method, grade prediction device and electronic equipment
Keenan et al. A strategic oscillation simheuristic for the time capacitated arc routing problem with stochastic demands
Minis et al. Real-time management of vehicle breakdowns in urban freight distribution
Kong et al. The method and application of big data mining for mobile trajectory of taxi based on MapReduce
Li et al. Efficient adaptive matching for real-time city express delivery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921

RJ01 Rejection of invention patent application after publication