CN105956163A - Method and device for managing graph database - Google Patents

Method and device for managing graph database Download PDF

Info

Publication number
CN105956163A
CN105956163A CN201610333358.5A CN201610333358A CN105956163A CN 105956163 A CN105956163 A CN 105956163A CN 201610333358 A CN201610333358 A CN 201610333358A CN 105956163 A CN105956163 A CN 105956163A
Authority
CN
China
Prior art keywords
storage
model
storage scheme
graph data
scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610333358.5A
Other languages
Chinese (zh)
Inventor
刘宏斌
国铁龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LeTV Holding Beijing Co Ltd
LeTV Information Technology Beijing Co Ltd
Original Assignee
LeTV Holding Beijing Co Ltd
LeTV Information Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LeTV Holding Beijing Co Ltd, LeTV Information Technology Beijing Co Ltd filed Critical LeTV Holding Beijing Co Ltd
Priority to CN201610333358.5A priority Critical patent/CN105956163A/en
Publication of CN105956163A publication Critical patent/CN105956163A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/51Indexing; Data structures therefor; Storage structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a method and a device for managing a graph database. The method comprises the following steps of loading and displaying a logic model of a storage scheme after detecting an operation for the storage scheme, wherein the logic model is used for storing created graphic data; when detecting a conversion operation, converting the logic model into a physical model corresponding to a basic storage and converting the graphic data recorded by the logic model into a graphic model corresponding to the basic storage; and writing the graphic data into the basic storage according to the converted physical model and the graphic model. According to the method and the device, the operations, such as new construction, query, modification and deletion, to the storage scheme can be completed in a visual management tool, and the input graphic data is written into the basic storage, so that the operations of the new storage scheme are simplified, the operations are completed without a command or a code, and thus the management efficiency of the graphic data is improved.

Description

The management method of graphic data base and device
Technical field
The invention belongs to computer realm, specifically, relate to a kind of graphic data base management method and Device.
Background technology
Along with the fast development of the Internet, a lot of Internet firms have accumulated the data of TB magnitude the most. Graphic data base is a kind of non-relational database, the relation letter between its Graphics Application theory storage entity Breath.Relevant database is used for storing the effect of " relationship type " data bad, inquiry is complicated, slowly, Particularly when the distance inquired about between data, this problem is the most prominent, and the uniqueness of graphic data base sets Meter exactly compensate for this defect.
Chart database is made up of a series of nodes and border, and each node represents a data entity, Each border represents a kind of connection between two nodes or relation, it is common that have directive Node and border also have attribute, are used for representing the incidental attribute information of node and border.
At present graphic data base is managed typically by the mode inputting order or code, The operations such as inquiry, process is relatively complicated and inefficient.
Summary of the invention
In view of this, embodiments provide management method and the device of a kind of graphic data base, use To solve prior art is managed troublesome, inefficient technical problem to graphic data base.
In order to solve above-mentioned technical problem, the invention discloses the management method of a kind of graphic data base, bag Include: after detecting for the operation of storage scheme, the logical model of storage scheme described in loaded and displayed, institute State logical model for preserving the graph data being transfused to;When conversion operation being detected, by described logic Model conversation is the physical model corresponding with bottom storage, and the graph data of described logical model record converts For storing graph of a correspondence model with bottom;According to convert after physical model and graphical model by described figure Graphic data writes the storage of described bottom.
In order to solve above-mentioned technical problem, the invention also discloses the management method of a kind of graphic data base, Including: display module, after detecting for the operation of storage scheme, storage side described in loaded and displayed The logical model of case, described logical model is for preserving the graph data being created;First conversion module, For when conversion operation being detected, described logical model is converted into the physics mould corresponding with bottom storage Type, the graph data of described logical model record is converted into and stores graph of a correspondence model with bottom;The One writing module, for writing institute according to the physical model after converting and graphical model by described graph data State bottom storage.
Compared with prior art, the management method of the graphic data base that the embodiment of the present invention provides and device, Achieve complete in visualized management instrument for the various operation of storage scheme (as newly-built, inquire about, repair Change, deletion etc.) and the graph data of establishment is written to bottom storage, simplify newly-built storage scheme and The operation of graph data, it is no longer necessary to complete operation by the way of order or code, improve figure figurate number According to the efficiency of management.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that under, Accompanying drawing during face describes is some embodiments of the present invention, for those of ordinary skill in the art, On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the flow chart of the management method of a kind of graphic data base that the embodiment of the present invention provides;
Fig. 2 is the flow chart of the management method of a kind of graphic data base that the embodiment of the present invention provides;
Fig. 3 is the flow chart of the management method of a kind of graphic data base that the embodiment of the present invention provides;
Fig. 4 is the flow chart of the management method of a kind of graphic data base that the embodiment of the present invention provides;
Fig. 5 is the flow chart of the management method of a kind of graphic data base that the embodiment of the present invention provides;
Fig. 6 is the block diagram of the managing device of a kind of graphic data base that the embodiment of the present invention provides.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with this Accompanying drawing in bright embodiment, is clearly and completely described the technical scheme in the embodiment of the present invention, Obviously, described embodiment is a part of embodiment of the present invention rather than whole embodiments.Based on Embodiment in the present invention, those of ordinary skill in the art are obtained under not making creative work premise The every other embodiment obtained, broadly falls into the scope of protection of the invention.
Embodiments provide the visualized management instrument of graphic data base, can be managed by this visualization Science and engineering tool browses to bottom and stores existing storage scheme, existing storage scheme can be modified, Inquiry, deletion etc. operate, and can also modify the graph data in existing storage scheme, deletion etc. Operation, it is also possible to by this newly-built storage scheme of visualized management instrument and add in newly-built storage scheme Add graph data.By this visualized management instrument, more intuitively graphic data base can be managed behaviour Making, improve the efficiency of management, the configuration operation to graph data also becomes to be more prone to, it is not necessary to grasp Much the relevant knowledge about bottom storage can also complete operation.
The visualized management instrument of graphic data base can use WEB application framework, C/S (Client/Server) any one in framework and B/S (Browser/Server) framework.
The management method of a kind of graphic data base as shown in Figure 1, comprises the following steps.
S10, after detecting for the operation of storage scheme, the logical model of loaded and displayed storage scheme, Logical model is for preserving the graph data being created;
S11, when conversion operation being detected, is converted into the physics corresponding with bottom storage by logical model Model, the graph data of logical model record is converted into and stores graph of a correspondence model with bottom;
S12, writes bottom according to the physical model after converting and graphical model by graph data and stores.
In visualized management instrument, the operation for storage scheme includes: for existing storage scheme Carry out inquiring about, revise, the operation such as deletion;New storage scheme can also be created and in the storage side created During in case, input graphics data is saved in bottom storage;And too may be used for the storage scheme after creating To carry out inquiring about, to revise, the operation such as deletion.
Visualized management instrument is set up corresponding by logical model and physical model with bottom storage Relation.Bottom storage is included in internal memory the graph data of caching and persists the figure to disk file Graphic data.Bottom storage can use the storage of one or more figures to service, such as GraphSQL, Neo4j, GraphDB etc., and may further include in every kind of figure storage service and be respectively directed to Multiple storage schemes of different business, the graph data of in store corresponding business in each storage scheme. In visualized management instrument, the storage scheme being present in bottom storage is realized visual process such as Under.
After visualized management instrument reads bottom storage, corresponding according to the figure storage service creation used Physical model.Physical model corresponding to different figure storage services is different, physical model include for The graphical model of carrying view data.Such as, the figure such as GraphSQL, Neo4j and GraphDB Storage service is each respectively provided with the graphical model of user record graph data.Therefore, for different figures The physical model that shape storage service is generated is the most different.
The physical model of generation is converted into logical model.Logical model is positioned at corresponding interface development framework Under logical layer, can be loaded display in the middle of the interface of visualized management instrument, logical model includes Storage scheme model under storage scheme list and graph data editing area.In conversion process, will deposit The title of storage scheme is converted into character type, with display in storage scheme model, is converted into by graphical model The view model corresponding with the application programming interface (such as, Java-API) that logical layer is preset, in order to aobvious Show in graph data editing area and developer interacts and (i.e. accepts the editor behaviour of developer Make).
The interface of visualized management instrument includes but not limited to storage scheme list and graph data editor Region.The storage scheme read from each storage service is shown in the form of a list.Detection To when opening the operation of certain storage scheme, show in graph data editing area in this storage scheme Graph data.
When the operation inquiring about existing storage scheme being detected, above-mentioned by existing figure figurate number in bottom storage Existing visual process is as in figure 2 it is shown, comprise the following steps factually.
S100, reads the graph data in bottom storage;
S101, generates corresponding physical model according to the storage scheme belonging to graph data;
S102, is converted into logical model by the physical model of storage scheme, and the graph data of reading is saved In logical model;
S103, shows the logical model of storage scheme in storage scheme list.
Achieve already present storage scheme and the visualization of graph data therein during bottom is stored Management, makes user's (user of this visualized management instrument, it is common that developer) can be intuitively Browse to each storage scheme in bottom storage and graph data therein.
User can choose in storage scheme list and open an existing storage scheme.This visualization pipe After science and engineering tool detects the operation opening existing storage scheme, loaded and displayed in graph data editing area The graph data preserved in the logical model of this storage scheme.Graph data can also be traveled through by user (Traversal) operation, carries out the shortest path between graph data library inquiry, such as two nodes of inquiry Footpath.Make user be no longer necessary in bottom stores by the mode of order or code to inquire about, looking into of simplification Ask operation, and result is browsed the most directly perceived.
If the graph data in existing storage scheme is modified or deletion action, then by above-mentioned Step S11-S12 by modified or delete after graph data be written to bottom storage in.
In this visualized management instrument, it is also possible to newly-built storage scheme, defeated in newly-built storage scheme Enter graph data and the graph data of input be written in bottom storage.This process is as it is shown on figure 3, wrap Include following steps.
S20, after the operation creating storage scheme being detected, the logic of the storage scheme that loaded and displayed creates Model, logical model is for preserving the graph data being created;
S21, when conversion operation being detected, is converted into the physics corresponding with bottom storage by logical model Model, the graph data of logical model record is converted into and stores graph of a correspondence model with bottom;
S22, writes bottom according to the physical model after converting and graphical model by graph data and stores.
In step S20, after the operation creating storage scheme being detected, can show in storage scheme list Show a new storage scheme model, user can be this storage scheme title is set.Choose this newly-built Storage scheme after, user can create in the Graphical Data Model of graph data editing area need protect The graph data deposited.Graph data can be by user's manual creation, it is also possible to import from default file. During user's manual creation graph data, limit between node, node can be created at graph data editing area Boundary, and input the attribute information on node and border.
In the step s 21, conversion operation can be preserve, confirm, the operation such as write, its effect be by User confirms to be written to by the graph data created in bottom storage.When this conversion operation being detected Time, i.e. proceed by the conversion from logical layer to physical layer.
Logical model is converted into the physical model corresponding with bottom storage.Used according to bottom storage Figure storage service, is converted into the physical model corresponding with the storage service of this figure, the graph data of establishment It is converted into the graphical model that the storage service of this figure is supported.
In one embodiment, when bottom storage is simultaneously used the storage service of multiple figure, in detection After conversion operation, can show the selection prompting of correspondence, prompting user selects institute for newly-built storage scheme Figure storage service to be used.The operation that selects according to user determines selected a kind of figure storage clothes After business, proceed by the logical layer conversion to physical layer.Logical model is converted into and selected storage The physical model that service is corresponding, the graph data of record is converted into the figure that selected storage service is supported Shape model.
The ablation process of step S22 is equivalent to arrive graph data according to physical model and graphical model materialization In internal memory or disk.
In visualized management instrument newly-built storage scheme the figure that will create is achieved by said process Graphic data is written to bottom storage, simplifies the operation of newly-built storage scheme and graph data, no longer needs By the way of order or code, to complete operation, to improve the efficiency of management of graph data.
For newly-built storage scheme, it is also possible to modify, inquire about, the operation such as deletion.Described inquiry Operation, looks into the graph data of existing storage scheme in visualized management instrument with previously mentioned Ask, open, the mode of the operation such as traversal identical, be not repeated.
Described amendment operation, relates to the amendment to storage scheme title and graph data.At logical layer Remodify title or the graph data of storage scheme, be required for re-starting conversion operation.For depositing The amendment of storage scheme, comprises the following steps as shown in Figure 4
S30, after the operation of amendment storage scheme being detected, preserves amended figure in logical model Data.
S31, when conversion operation being detected, it is right with bottom storage to be converted into by amended graph data The graphical model answered;
S32, writes bottom according to the physical model after converting and graphical model by amended graph data Storage.
Process to the graph data being modified, identical with the graph data inputted time newly-built, be converted into The physical model that bottom storage is corresponding, is written to bottom storage according to corresponding graphical model.
Described deletion action, comprises the following steps as shown in Figure 5.
S40, after the operation deleting storage scheme being detected, deletes the logical model of storage scheme;
S41, when conversion operation being detected, deletes the physical model that logical model is corresponding;
S42, deletes storage scheme corresponding in bottom stores for physical model.
Delete storage scheme logical model can by storage scheme model corresponding in storage scheme list with And the graph data in graph data editing area all deletes.So corresponding physical model and the end of at In layer storage, corresponding storage scheme is deleted the most therewith, thus can discharge internal memory that this storage scheme takies or Disk space.
In the visualization tool existing storage scheme and graph data therein are modified and deleted The process of operation is identical with the process shown in Fig. 4 and Fig. 5, is not repeated.
By this visualized management instrument achieve the inquiry to graph data, revise, the operation such as deletion, Make these graphical data operations operation can intuitively, be simply done, promote graphic data base further The efficiency of management.
It is hereafter assembly of the invention embodiment, for performing the said method embodiment of the present invention.
Fig. 6 is the managing device of a kind of graphic data base that the embodiment of the present invention provides, including:
Display module 50, after detecting for the operation of storage scheme, loaded and displayed storage scheme Logical model, logical model is for preserving the graph data being created;
First conversion module 51, for when conversion operation being detected, is converted into logical model and bottom The physical model that storage is corresponding, the graph data of logical model record is converted into corresponding with bottom storage Graphical model;
First writing module 52, for writing graph data according to the physical model after converting and graphical model Enter the storage of described bottom.
In one embodiment, display module 50 farther includes:
First display sub-module, after the operation creating storage scheme being detected, loaded and displayed creates The logical model of storage scheme.
In one embodiment, the first conversion module 51 farther includes:
Select submodule, for when bottom storage have employed the storage service of multiple figure, according to selecting behaviour Make to determine selected a kind of figure storage service;
First transformant module, corresponding with the storage service of selected figure for logical model is converted into Physical model, the graph data of logical model record is converted into selected figure storage service right The graphical model answered.
In one embodiment, the managing device of graphic data base also includes:
Preserve module, after operation amendment storage scheme being detected, logical model preserves amendment After graph data;
Second conversion module, for when conversion operation being detected, is converted into amended graph data Graph of a correspondence model is stored with bottom;
Second writing module, for according to convert after physical model and graphical model by amended figure Data write bottom storage.
In one embodiment, the managing device of graphic data base also includes:
First removing module, after the operation deleting storage scheme being detected, deletes patrolling of storage scheme Collect model;
Second removing module, for when conversion operation being detected, deletes the physics mould that logical model is corresponding Type;
3rd removing module, deletes for the storage scheme that physical model is corresponding in bottom stores.
In one embodiment, display module 50 farther includes:
Reading submodule, after the operation inquiring about existing storage scheme being detected, reads in bottom storage Graph data;
Generate submodule, for generating corresponding physical model according to the storage scheme belonging to graph data;
Second transformant module, for the physical model of storage scheme is converted into logical model, reading Graph data is stored in logical model;
Second display sub-module, for showing the logical model of storage scheme in storage scheme list.
In one embodiment, display module 50 also includes:
3rd display sub-module, after the operation opening existing storage scheme being detected, loaded and displayed is deposited The graph data preserved in the logical model of storage scheme.
Come real additionally, the embodiment of the present invention can be passed through hardware processor (hardware processor) Existing each functional module above-mentioned.
The embodiment of the present invention additionally provides a kind of terminal unit, and this terminal unit can be computer, distribution The equipment such as the control station of formula data-storage system, this terminal unit includes: include processor;For storing The memorizer of processor executable;Wherein, processor is configured to: detect for storage scheme Operation after, the logical model of storage scheme described in loaded and displayed, described logical model for preserve is created The graph data built;When conversion operation being detected, it is right with bottom storage to be converted into by described logical model The physical model answered, the graph data of described logical model record is converted into the figure corresponding with bottom storage Shape model;According to the physical model after converting and graphical model, the described graph data described bottom of write is deposited Storage.
In one embodiment, described in detect for the operation of storage scheme after, deposit described in loaded and displayed The logical model of storage scheme includes: after the operation creating storage scheme being detected, creates described in loaded and displayed The logical model of storage scheme.
In one embodiment, described when conversion operation being detected, described logical model is converted into The physical model that bottom storage is corresponding, the graph data of described logical model record is converted into and stores with bottom Graph of a correspondence model includes: when bottom storage have employed the storage service of multiple figure, according to selecting behaviour Make to determine selected a kind of figure storage service;Described logical model is converted into selected with described The physical model that figure storage service is corresponding, is converted into the graph data of described logical model record and institute State selected figure storage service graph of a correspondence model.
In one embodiment, this processor is configured to: the described storage scheme of amendment detected Operation after, logical model preserves amended graph data;When conversion operation being detected, will Amended graph data is converted into and stores graph of a correspondence model with bottom;According to the physics mould after converting Amended graph data is write the storage of described bottom by type and graphical model.
In one embodiment, this processor is configured to: the described storage scheme of deletion detected Operation after, delete the logical model of described storage scheme;When conversion operation being detected, delete described The physical model that logical model is corresponding;The storage scheme that described physical model is corresponding in bottom stores is deleted Remove.
In one embodiment, described in detect for the operation of storage scheme after, deposit described in loaded and displayed The logical model of storage scheme includes: after the operation inquiring about existing storage scheme being detected, reads bottom storage In graph data;Corresponding physical model is generated according to the storage scheme belonging to described graph data;Will The physical model of described storage scheme is converted into logical model, and the graph data of described reading is stored in institute State in logical model;The logical model of described storage scheme is shown in storage scheme list.
In one embodiment, described in detect for the operation of storage scheme after, deposit described in loaded and displayed The logical model of storage scheme also includes: after the operation opening described existing storage scheme being detected, loads aobvious Show the graph data preserved in the logical model of described storage scheme.
Device embodiment described above is only schematically, wherein said illustrates as separating component Unit can be or may not be physically separate, the parts shown as unit can be or Person may not be physical location, i.e. may be located at a place, or can also be distributed to multiple network On unit.Some or all of module therein can be selected according to the actual needs to realize the present embodiment The purpose of scheme.Those of ordinary skill in the art are not in the case of paying performing creative labour, the most permissible Understand and implement.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive each reality The mode of executing can add the mode of required general hardware platform by software and realize, naturally it is also possible to by firmly Part.Based on such understanding, the portion that prior art is contributed by technique scheme the most in other words Dividing and can embody with the form of software product, this computer software product can be stored in computer can Read in storage medium, such as ROM/RAM, magnetic disc, CD etc., including some instructions with so that one Computer equipment (can be personal computer, server, or the network equipment etc.) performs each to be implemented The method described in some part of example or embodiment.
Last it is noted that above example is only in order to illustrate technical scheme, rather than to it Limit;Although the present invention being described in detail with reference to previous embodiment, the ordinary skill of this area Personnel it is understood that the technical scheme described in foregoing embodiments still can be modified by it, or Person carries out equivalent to wherein portion of techniques feature;And these amendments or replacement, do not make corresponding skill The essence of art scheme departs from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (14)

1. the management method of a graphic data base, it is characterised in that including:
After detecting for the operation of storage scheme, the logical model of storage scheme described in loaded and displayed, institute State logical model for preserving the graph data being created;
When conversion operation being detected, described logical model is converted into the physics mould corresponding with bottom storage Type, the graph data of described logical model record is converted into and stores graph of a correspondence model with bottom;
According to the physical model after converting and graphical model, described graph data is write described bottom to store.
Method the most according to claim 1, it is characterised in that described in detect for storage side After the operation of case, the logical model of storage scheme described in loaded and displayed includes:
After the operation of establishment storage scheme being detected, the logic mould of the storage scheme created described in loaded and displayed Type.
Method the most according to claim 2, it is characterised in that described when conversion operation being detected Time, described logical model is converted into the physical model corresponding with bottom storage, described logical model record Graph data be converted into bottom storage graph of a correspondence model include:
When bottom storage have employed the storage service of multiple figure, determine selected one according to selecting operation Plant figure storage service;
Described logical model is converted into the physical model corresponding with described selected figure storage service, The graph data of described logical model record is converted into corresponding with described selected figure storage service Graphical model.
Method the most according to claim 2, it is characterised in that described method also includes:
Detect after revising the operation of described storage scheme, logical model preserves amended figure figurate number According to;
When conversion operation being detected, amended graph data is converted into the figure corresponding with bottom storage Shape model;
According to the physical model after converting and graphical model, amended graph data is write described bottom Storage.
Method the most according to claim 2, it is characterised in that described method also includes:
Detect after deleting the operation of described storage scheme, delete the logical model of described storage scheme;
When conversion operation being detected, delete the physical model that described logical model is corresponding;
Storage scheme corresponding in bottom stores for described physical model is deleted.
Method the most according to claim 1, it is characterised in that described in detect for storage side After the operation of case, the logical model of storage scheme described in loaded and displayed includes:
Detect after inquiring about the operation of existing storage scheme, read the graph data in bottom storage;
Corresponding physical model is generated according to the storage scheme belonging to described graph data;
The physical model of described storage scheme is converted into logical model, and the graph data of described reading is protected Exist in described logical model;
The logical model of described storage scheme is shown in storage scheme list.
Method the most according to claim 6, it is characterised in that described in detect for storage side After the operation of case, the logical model of storage scheme described in loaded and displayed also includes:
Detect after opening the operation of described existing storage scheme, the logic of storage scheme described in loaded and displayed The graph data preserved in model.
8. the managing device of a graphic data base, it is characterised in that including:
Display module, after detecting for the operation of storage scheme, storage scheme described in loaded and displayed Logical model, described logical model is for preserving the graph data that is created;
First conversion module, for when conversion operation being detected, is converted into described logical model and the end The physical model that layer storage is corresponding, the graph data of described logical model record is converted into and stores with bottom Graph of a correspondence model;
First writing module, for according to convert after physical model and graphical model by described graph data Write the storage of described bottom.
Device the most according to claim 8, it is characterised in that described display module includes:
First display sub-module, after the operation creating storage scheme being detected, creates described in loaded and displayed The logical model of the storage scheme built.
Device the most according to claim 9, it is characterised in that described first conversion module includes:
Select submodule, for when bottom storage have employed the storage service of multiple figure, according to selecting behaviour Make to determine selected a kind of figure storage service;
First transformant module, for being converted into described logical model and described selected figure storage The physical model that service is corresponding, is converted into selected with described by the graph data of described logical model record Figure storage service graph of a correspondence model.
11. devices according to claim 9, it is characterised in that described device also includes:
Preserve module, after the operation revising described storage scheme being detected, preserve in logical model Amended graph data;
Second conversion module, for when conversion operation being detected, is converted into amended graph data Graph of a correspondence model is stored with bottom;
Second writing module, for according to convert after physical model and graphical model by amended figure Data write the storage of described bottom.
12. devices according to claim 9, it is characterised in that described device also includes:
First removing module, after the operation deleting described storage scheme being detected, deletes described storage The logical model of scheme;
Second removing module, for when conversion operation being detected, deletes the thing that described logical model is corresponding Reason model;
3rd removing module, for deleting the storage scheme that described physical model is corresponding in bottom stores Remove.
13. devices according to claim 8, it is characterised in that described display module includes:
Reading submodule, after the operation inquiring about existing storage scheme being detected, reads in bottom storage Graph data;
Generate submodule, for generating corresponding physics mould according to the storage scheme belonging to described graph data Type;
Second transformant module, for the physical model of described storage scheme is converted into logical model, institute The graph data stating reading is stored in described logical model;
Second display sub-module, for showing the logic mould of described storage scheme in storage scheme list Type.
14. devices according to claim 13, it is characterised in that described display module also includes:
3rd display sub-module, after the operation opening described existing storage scheme being detected, loads aobvious Show the graph data preserved in the logical model of described storage scheme.
CN201610333358.5A 2016-05-19 2016-05-19 Method and device for managing graph database Pending CN105956163A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610333358.5A CN105956163A (en) 2016-05-19 2016-05-19 Method and device for managing graph database

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610333358.5A CN105956163A (en) 2016-05-19 2016-05-19 Method and device for managing graph database

Publications (1)

Publication Number Publication Date
CN105956163A true CN105956163A (en) 2016-09-21

Family

ID=56911933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610333358.5A Pending CN105956163A (en) 2016-05-19 2016-05-19 Method and device for managing graph database

Country Status (1)

Country Link
CN (1) CN105956163A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107817996A (en) * 2017-10-13 2018-03-20 贵州白山云科技有限公司 A kind of optimization method and system of GraphQL requests
CN106406910B (en) * 2016-10-24 2018-06-22 北京亚控科技发展有限公司 Configuration method and device
CN108446327A (en) * 2018-02-12 2018-08-24 平安科技(深圳)有限公司 Operation system dynamic creation method, device, computer equipment and storage medium
CN113013879A (en) * 2021-03-31 2021-06-22 国网福建省电力有限公司电力科学研究院 Neo4 j-based power distribution network voltage sag influence domain analysis method and visualization system thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102402522A (en) * 2010-09-09 2012-04-04 中国移动通信集团上海有限公司 Data query system and method
CN103729460A (en) * 2014-01-10 2014-04-16 中国南方电网有限责任公司 Graphical data model managing method and system based on metadata
CN104657475A (en) * 2015-02-16 2015-05-27 百度在线网络技术(北京)有限公司 Method and system for data analysis
CN105205085A (en) * 2014-06-30 2015-12-30 中兴通讯股份有限公司 Multi-dimensional analysis method and device for mass data
CN105354266A (en) * 2015-10-23 2016-02-24 北京航空航天大学 Rich graph model RichGraph based graph data management method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102402522A (en) * 2010-09-09 2012-04-04 中国移动通信集团上海有限公司 Data query system and method
CN103729460A (en) * 2014-01-10 2014-04-16 中国南方电网有限责任公司 Graphical data model managing method and system based on metadata
CN105205085A (en) * 2014-06-30 2015-12-30 中兴通讯股份有限公司 Multi-dimensional analysis method and device for mass data
CN104657475A (en) * 2015-02-16 2015-05-27 百度在线网络技术(北京)有限公司 Method and system for data analysis
CN105354266A (en) * 2015-10-23 2016-02-24 北京航空航天大学 Rich graph model RichGraph based graph data management method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106406910B (en) * 2016-10-24 2018-06-22 北京亚控科技发展有限公司 Configuration method and device
CN107817996A (en) * 2017-10-13 2018-03-20 贵州白山云科技有限公司 A kind of optimization method and system of GraphQL requests
CN108446327A (en) * 2018-02-12 2018-08-24 平安科技(深圳)有限公司 Operation system dynamic creation method, device, computer equipment and storage medium
CN113013879A (en) * 2021-03-31 2021-06-22 国网福建省电力有限公司电力科学研究院 Neo4 j-based power distribution network voltage sag influence domain analysis method and visualization system thereof

Similar Documents

Publication Publication Date Title
JP4796185B2 (en) Business flow diagram generation program, business flow diagram generation device, and business flow diagram generation method
CN105956163A (en) Method and device for managing graph database
US20110107246A1 (en) Undo/redo operations for multi-object data
Jankun-Kelly et al. A model for the visualization exploration process
CN109821242B (en) Map visual editing method and system
US8127269B2 (en) Transforming a flow graph model to a structured flow language model
US20150142726A1 (en) System and Method for Decision Driven Business Performance Management
CN105809389A (en) Method and apparatus for generating BOM trees
CN106708941B (en) The online synergic editing method of power grid multitask
CN103678585A (en) User data screening method and system
CN106156306A (en) A kind of template rendering intent and device
US8291380B2 (en) Methods for configuring software package
CN106021488A (en) Key value database management method and apparatus
CN108228846A (en) Resource file management method and device
CN103778154B (en) The retrography method and device of form attributes
JP4051765B2 (en) Version management apparatus and management method
US20200160192A1 (en) Creation of scope definitions
CN107220044B (en) Method and device for driving business object based on meta-model
CN105074590A (en) Engineering tool and engineering system
Cruz et al. Deriving Integrated Software Design Models from BPMN Business Process Models.
CN102880681A (en) Method for displaying and managing grid-based vector data with large data size
CN110502219B (en) Enterprise-level IT architecture asset management system and method
JP2018194944A (en) Display program, display method and display device
JP5868766B2 (en) Plant data storage device, plant data storage method, and plant data storage program
US20150254373A1 (en) Graphical top-down planning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160921