CN105955752A - Method and system for controlling system online change - Google Patents

Method and system for controlling system online change Download PDF

Info

Publication number
CN105955752A
CN105955752A CN201610318034.4A CN201610318034A CN105955752A CN 105955752 A CN105955752 A CN 105955752A CN 201610318034 A CN201610318034 A CN 201610318034A CN 105955752 A CN105955752 A CN 105955752A
Authority
CN
China
Prior art keywords
change
workflow activities
unit
relation
perform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610318034.4A
Other languages
Chinese (zh)
Other versions
CN105955752B (en
Inventor
何洋
童海涛
汪维
许笠
张小彪
张欣
王莹
吴晗
彭耀东
唐业祎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Bank Corp
Original Assignee
China Construction Bank Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Bank Corp filed Critical China Construction Bank Corp
Priority to CN201610318034.4A priority Critical patent/CN105955752B/en
Publication of CN105955752A publication Critical patent/CN105955752A/en
Application granted granted Critical
Publication of CN105955752B publication Critical patent/CN105955752B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a system for controlling system online change. The method comprises the steps of importing a change control table; generating a workflow activity graph according to the change control table; executing change items based on a sequential execution relationship among the change items from the first change item according to the workflow activity graph; after the execution of one change item is finished, executing a check script corresponding to the change item and displaying a check result on a display interface; if the check result displays that the change succeeds, executing the remaining change items based on the sequential execution relationship among the change items according to the workflow activity graph; and if the check result displays that the change fails, performing exception prompting on the display interface, pausing the influenced rear change items, and after exception processing succeeds, executing the subsequent change items based on the sequential execution relationship among the change items according to the workflow activity graph. The system change items are automatically executed by utilizing a computer and whether errors exist or not in the system change is checked, so that the manual operation errors can be reduced and the labor can be saved.

Description

A kind of control system is reached the standard grade variation and system
Technical field
The present invention relates to computer control field, the change more particularly, it relates to a kind of control system is reached the standard grade Method and system.
Background technology
Along with the development of financial business, Financial Information construction is constantly brought forth new ideas, and banking core business System Construction occupy an important position especially, be mainly concerned with the change of reaching the standard grade of sorts of systems, in system Line change needs to tackle safety upgrade production system, shorten system downtime, control Change risk etc. respectively The problem of kind.
At present, online implementing change mode is relatively simple, prepares Variation control table in initial go-live period, reaches the standard grade Item in period manual operation Variation control table, uses double review mechanism to reduce risk after change.
And manual operation easily makes mistakes, substantial amounts of human cost can be wasted simultaneously, therefore, need one badly and subtract Few manual operation makes mistakes, saves artificial online implementing variation.
Summary of the invention
In view of this, the present invention provides a kind of control system to reach the standard grade variation and system, artificial to solve Processing ease is made mistakes, the problem that simultaneously can waste substantial amounts of human cost.
For solving above-mentioned technical problem, present invention employs following technical scheme:
A kind of control system is reached the standard grade variation, and the method includes:
Import Variation control table, wherein, described Variation control table includes: change, change it Before and after between perform relation, perform main frame, perform user, change perform script, the time started and The inspection script that change is corresponding;
Generating workflow activities figure according to described Variation control table, wherein, described workflow activities figure is to use The oriented flow chart that change is linked together by directed arc;
Start according to before and after between change from Section 1 change according to described workflow activities figure Execution relation performs change;
After a change has performed, perform inspection script corresponding to described change and aobvious Show that interface display checks result;
If check result display change successfully, then according to described workflow activities figure according to change between Before and after perform relation perform remaining change;
If checking, result display change is unsuccessful, then carry out abnormal prompt at display interface, suspend rearmounted being subject to Impact change, abnormality processing success after, according to described workflow activities figure according to change it The relation that performs before and after between performs follow-up change.
Preferably, described change includes: preposition item and follow-up item, wherein, and described preposition thing Item is for being positioned at one section of directed arc change in front, and described follow-up item is for being positioned at described one section of directed arc The change of back.
Preferably, described generate after workflow activities figure according to Variation control table, described according to described work Make stream activity diagram to start to perform change according to performing relation before and after between change from Section 1 change Before more item, also include:
Start node and terminal node is inserted in described workflow activities figure.
Preferably, described in described workflow activities figure, insert start node and terminal node after, institute State and start to hold before and after between change from Section 1 change according to described workflow activities figure Before row relation performs change, also include:
Select the change in critical path;
When the change in critical path changes unsuccessful, while display interface carries out abnormal prompt Control phonation unit and send tweeting sound.
Preferably, select the change in critical path, specifically include:
From the beginning of start node, before and after between described change, perform relation to described workflow Activity diagram carries out topological sorting traversal, calculates the earliest start time of each change;
Elect the path of the change that free float is 0 included with last change as pass Key path;
Select the change in critical path.
A kind of control system is reached the standard grade altering system, and this system includes:
Import unit, is used for importing Variation control table;
Workflow activities figure forms unit, for generating workflow activities figure according to described Variation control table;
Change performance element, for according to described workflow activities figure from Section 1 change start according to After before and after between change, execution relation execution change, inspection result display are changed successfully, depend on Before and after between change, the relation remaining change of execution is performed according to described workflow activities figure And after abnormality processing success, perform before and after between change according to described workflow activities figure Relation performs follow-up change;
Inspection unit, for after a change has performed, performs described change corresponding Check script;
Display unit, for checking result in display interface display;
Abnormal prompt and time-out unit, be used for checking when result display change is unsuccessful, enter at display interface Row abnormal prompt, suspends rearmounted affected change.
Preferably, described system also includes:
Insert unit, for forming unit according to described Variation control table generation work at workflow activities figure Stream activity diagram after, change performance element according to described workflow activities figure from the beginning of Section 1 change Before performing change according to the relation that performs before and after between change, at described workflow activities figure Middle insertion start node and terminal node.
Preferably, described system also includes:
Select unit, be used for inserting unit in described workflow activities figure, insert start node and terminal node After Dian, change performance element starts according to change from Section 1 change according to described workflow activities figure Before the relation that performs before and after between more item performs change, select the change thing in critical path ?;
Phonation unit, for when the change in critical path changes unsuccessful, abnormal prompt and temporarily Stop unit and send tweeting sound while display interface carries out abnormal prompt.
Preferably, described selection unit includes:
Computing unit, for from the beginning of start node, performs pass before and after between described change System carries out topological sorting traversal to described workflow activities figure, when calculating the early start of each change Between;
Critical path selects unit, and being used for including the free float with last change is 0 The path of change elect critical path as;
In critical path, change selects unit, for selecting the change in critical path.
Compared to prior art, the method have the advantages that
By above it can be seen that the invention provides a kind of control system and reach the standard grade variation and system, tool Body, import Variation control table, generate workflow activities figure according to Variation control table, live according to workflow Cardon starts to perform relation execution change thing before and after between change from Section 1 change , after a change has performed, perform inspection script corresponding to described change and aobvious Show that interface display checks result;If check result display change successfully, then foundation workflow activities figure according to The relation that performs before and after between change performs remaining change;If checking result display change not Success, then carry out abnormal prompt at display interface, suspend rearmounted affected change, abnormality processing After success, before and after between change, perform the relation follow-up change of execution according to workflow activities figure Item.So can utilize computer automatic execution system variation item and check whether system variation exists Mistake, it is possible to reduce manual operation and make mistakes saving simultaneously manually.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only embodiments of the invention, for those of ordinary skill in the art, not On the premise of paying creative work, it is also possible to obtain other accompanying drawing according to the accompanying drawing provided.
Fig. 1 reaches the standard grade for the control system that the embodiment of the present invention one provides the flow chart of variation;
Fig. 2 reaches the standard grade for the control system that the embodiment of the present invention two provides the flow chart of variation;
Fig. 3 reaches the standard grade altering system for the control system that the embodiment of the present invention three provides;
Fig. 4 reaches the standard grade altering system for the control system that the embodiment of the present invention four provides;
Fig. 5 reaches the standard grade flow chart for cost system 20150613 version that the embodiment of the present invention five provides.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not doing Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of protection of the invention.
This application provides a kind of control system to reach the standard grade variation, referring in particular to Fig. 1, the method includes Following steps:
S11, importing Variation control table;
It should be noted that Variation control table is typically preset by technical staff and control at needs Manually being filled in by technical staff during online implementing processed, Variation control table includes: change, change thing Before and after between Xiang perform relation, perform main frame, perform user, change perform script, the time started, And the inspection script that change is corresponding.Time started is for estimating the change time started.
S12, according to Variation control table generate workflow activities figure;
It should be noted that workflow activities figure be with directed arc change is linked together oriented Flow chart, wherein, each node on workflow activities figure is each change, and directed arc represents change Dependence before and after more item.
S13, start according to before between change from Section 1 change according to workflow activities figure Rear execution relation performs change i;
It should be noted that master control machine is issued an order, execution main frame and the execution user of correspondence perform change Perform script.
S14, after change i has performed, perform inspection script corresponding to described change and Display interface display checks result;
S15, according to checking that result judges change whether success, if successfully, then performing S17;If it is unsuccessful Then perform S16;
S16, carry out abnormal prompt at display interface, suspend rearmounted affected change, treat exception After processing successfully, perform S17;
S17, foundation workflow activities figure perform relation i-th change of execution before and after between change More item, wherein i=i+1.
After S17 has performed, return to S14, perform inspection script corresponding to described change also Result is checked in display interface display.
It should be noted that after all of change successfully changes, this change terminates.
The control system provided for the embodiment of the present invention one above is reached the standard grade variation, by this embodiment party Formula, it is possible to utilize computer automatic execution system variation item and check whether system variation exists mistake, Manual operation can be reduced and make mistakes saving simultaneously manually.
This application provides another control system to reach the standard grade variation, referring in particular to Fig. 2.The method Comprise the following steps:
S21, importing Variation control table;
Wherein, Variation control table includes: performs relation before and after between change, change, hold The inspection foot that row main frame, execution user, time started, change execution script and change are corresponding This.Change includes: preposition item and follow-up item, and wherein, preposition item is oriented for being positioned at one section Arc change in front, follow-up item is to be positioned at the change of this section of directed arc back.
S22, according to Variation control table generate workflow activities figure;
S23, in workflow activities figure, insert start node and terminal node;
Wherein, start node and terminal node are intended merely to indicate beginning and the end of workflow activities figure, Do not affect the change of change.
S24, from the beginning of start node, according to performing relation before and after between change, workflow is lived Cardon carries out topological sorting traversal, calculates the earliest start time of each change;
Wherein, the computational methods of earliest start time are the (earliest start time of preposition item+preposition thing Change required time) maximum.
S25, the path of the change that free float is 0 that will include with last change Elect critical path as;
S26, the change selected in critical path;
S27, start according to before between change from Section 1 change according to workflow activities figure Rear execution relation performs change i;
S28, after change i has performed, perform inspection script corresponding to described change and Display interface display checks result;
S29, according to checking that result judges change whether success, if successfully, then performing S213;If not becoming Merit then performs S210;
S210, judge whether it is that the change in critical path does not changes successfully, if in critical path Change do not change successfully, then perform S211, if not the change in critical path does not changes Success, then perform S212;
S211, carry out abnormal prompt at display interface and control phonation unit and send tweeting sound, suspending rearmounted Affected change, after abnormality processing success, performs S213;
S212, carry out abnormal prompt at display interface, suspend rearmounted affected change, exception After managing successfully, perform S213;
S213, foundation workflow activities figure perform relation execution i-th before and after between change Change, wherein, i=i+1.
After S213 has performed, return to S28, perform inspection script corresponding to described change also Result is checked in display interface display.
It should be noted that after all of change successfully changes, this change terminates
In the present embodiment, generate after workflow activities figure, insert in workflow activities figure start node and Terminal node can be used to beginning and the end of mark change, selects key according to earliest start time Path, and when the change in critical path changes unsuccessful, control phonation unit sends and pipes Sound, in such manner, it is possible to process the change fault in critical path in time, reduces the change thing in critical path Item changes the unsuccessful impact bringing the whole change time.
This application provides a kind of control system to reach the standard grade altering system, refer to Fig. 3, specifically include importing Unit 11, workflow activities figure form unit 12, change performance element 13, inspection unit 14, display Unit 15, abnormal prompt and time-out unit 16.
Concrete, import unit 11, it is used for importing Variation control table;
Workflow activities figure forms unit 12, for generating workflow activities figure according to Variation control table;
Change performance element 13, for starting according to change from Section 1 change according to workflow activities figure After before and after between more item, execution relation execution change, inspection result display are changed successfully, foundation Workflow activities figure performs remaining change and different according to the relation that performs before and after between change After often processing successfully, according to workflow activities figure according to execution relation execution before and after between change after Continuous change;
Inspection unit 14, for after a change has performed, performs described change corresponding Inspection script;
Display unit 15, for checking result in display interface display;
Abnormal prompt and time-out unit 16, be used for checking when result display change is unsuccessful, at display interface Carry out abnormal prompt, suspend rearmounted affected change.
It should be noted that when, after abnormality processing success, change performance element 13 performs remaining change After item and a change have performed, it is corresponding that inspection unit 14 performs described change Check script.
Control system disclosed in the present embodiment is reached the standard grade altering system, and import unit 11 imports Variation control Table, workflow activities figure forms unit 12 and generates workflow activities figure according to Variation control table, and change is held Row unit 13 starts according to before between change from Section 1 change according to workflow activities figure Rear execution relation performs change, and after a change has performed, inspection unit 14 performs Inspection script and display unit 15 that described change is corresponding check result in display interface display;If Check that result display is changed successfully, then change performance element 13 according to workflow activities figure according to change thing The relation that performs before and after between Xiang performs remaining change;If checking, result display change is unsuccessful, Then abnormal prompt and time-out unit 16 carry out abnormal prompt at display interface, suspend rearmounted affected change More item, after abnormality processing success, changes performance element 13 according to workflow activities figure according to change thing The relation that performs before and after between Xiang performs follow-up change.So can utilize computer automatic execution system System change also checks whether system variation exists mistake, it is possible to minimizing manual operation makes mistakes and saves simultaneously Manually.
The tool of unit in altering system it should be noted that control system disclosed in the present embodiment is reached the standard grade Body running process, refers to the content of embodiment 1, and here is omitted.
This application provides another control system to reach the standard grade altering system, refer to Fig. 4.Specifically include Import unit 11, workflow activities figure formed unit 12, change performance element 13, inspection unit 14, Display unit 15, abnormal prompt and time-out unit 16, insertion unit 17, selection unit 18, sounding list Unit 19.Unit 18 is wherein selected to include that computing unit 181, critical path select unit 182, critical path On footpath, change selects unit 183.
Wherein, import unit 11, workflow activities figure form unit 12, change performance element 13, inspection The concrete function of verification certificate unit 14, display unit 15, abnormal prompt and time-out unit 16 is with reference to embodiment Three, do not repeat them here.
Insert unit 17, generate work for forming unit 12 at workflow activities figure according to Variation control table After making stream activity diagram, change performance element 13 is opened from Section 1 change according to workflow activities figure Before beginning to perform change according to the relation that performs before and after between change, in workflow activities figure Insert start node and terminal node;
Select unit 18, be used for inserting unit 17 in workflow activities figure, insert start node and termination After node, change performance element 13 according to workflow activities figure from Section 1 change start according to Before the relation that performs before and after between change performs change, select the change in critical path Item;
Computing unit 181, for from the beginning of start node, performs pass before and after between change System carries out topological sorting traversal to workflow activities figure, calculates the earliest start time of each change;
Critical path selects unit 182, for including the free float with last change It is that critical path is elected in the path of the change of 0 as;
In critical path, change selects unit 183, for selecting the change thing in critical path ?;
Phonation unit 19, for when in critical path change change unsuccessful time, abnormal prompt and Suspend unit 16 and send tweeting sound while display interface carries out abnormal prompt.
It should be noted that when, after abnormality processing success, change performance element 13 performs remaining change After item and a change have performed, it is corresponding that inspection unit 14 performs described change Check script.
In the present embodiment, after workflow activities figure formation unit 12 generates workflow activities figure, insert single Unit 17 inserts start node and terminal node in workflow activities figure, can be used to opening of mark change Begin and terminate, selecting unit 18 to select critical path according to earliest start time, and at critical path When change on footpath changes unsuccessful, phonation unit 19 sends tweeting sound, in such manner, it is possible in time Process the change fault in critical path, reduce the change change in critical path unsuccessful to whole The impact that the change time brings.
The tool of unit in altering system it should be noted that control system disclosed in the present embodiment is reached the standard grade Body running process, refers to the content of embodiment 2, and here is omitted.
In order to those skilled in the art clearer can understand this programme, name cost system The example that 20150613 versions are reached the standard grade illustrates, and refers to Fig. 5, and wherein Variation control table includes change Perform relation before and after between item, change, perform main frame, execution user, change execution foot The inspection script that basis, time started and change are corresponding.As shown in the table.
Wherein the time started is point 13 days 14 June in 2015, during by the beginning of each change Between and the end time may determine that execution sequence before and after change.It should be noted that each change One time of the time started of item and end time simply prediction, when a change has performed it After, it is possible to perform the change of back.Wherein, change is 101-108 item change.
Variation control table is imported and generates workflow activities figure by main control computer, and workflow activities figure sees figure 5。
According to performing relation before and after between change, workflow activities figure is carried out topological sorting traversal, Calculate the earliest start time of each change.Concrete, during the early start of 101 changes Between be 14:30, the earliest start time of 102 changes is 14:30, and 107 changes are Early the time started is 14:30, and the earliest start time of 103 changes is 14:50,104 changes The earliest start time of item is 15:10, and the earliest start time of 105 changes is 15:40,106 The earliest start time of item change is 15:50, and the earliest start time of 108 changes is 14:40.Because the earliest start time of 106 changes is the most the latest, so by 106 change things Item, as last change, will comprise 102,103,104,105,106 these several change things Critical path is elected in the path of item as.
It is first begin to 101,102,107 changes of executed in parallel, when one of which has performed it After, start perform inspection script corresponding to this change and on computer desktop, show inspection result.Example As, after 101 changes have performed, perform to check script cis_check_ap81.sh, if not going out It is normal that mistake, i.e. script return inspection value, after treating that 102 changes have performed and checked correctly, holds 103 changes of row, if there is mistake, then at computer desktop during performing in 101 changes On carry out abnormal prompt, the most do not perform 103 changes, when abnormality processing success after, treat 102 After item change has performed and checked correctly, perform 103 changes.When 102 are changed thing Item checks after having performed when there is mistake, because 102 changes are changes in critical path Item, then, while computer desktop display abnormal prompt, computer sends tweeting sound.When abnormality processing becomes After merit, perform 103 changes.
In like manner, the execution tandem of 103,104,105,106,108 changes is with reference to figure 5, the concrete execution process performing same 101,102 changes of process.When 106 changes become When merit performs change, system variation terminates.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses The present invention.Multiple amendment to these embodiments will be aobvious and easy for those skilled in the art Seeing, generic principles defined herein can be in the situation without departing from the spirit or scope of the present invention Under, realize in other embodiments.Therefore, the present invention is not intended to be limited to these realities shown in this article Execute example, and be to fit to the widest scope consistent with principles disclosed herein and features of novelty.

Claims (9)

1. a control system is reached the standard grade variation, it is characterised in that the method includes:
Import Variation control table, wherein, described Variation control table includes: change, change it Before and after between perform relation, perform main frame, perform user, change perform script, the time started and The inspection script that change is corresponding;
Generating workflow activities figure according to described Variation control table, wherein, described workflow activities figure is to use The oriented flow chart that change is linked together by directed arc;
Start according to before and after between change from Section 1 change according to described workflow activities figure Execution relation performs change;
After a change has performed, perform inspection script corresponding to described change and aobvious Show that interface display checks result;
If check result display change successfully, then according to described workflow activities figure according to change between Before and after perform relation perform remaining change;
If checking, result display change is unsuccessful, then carry out abnormal prompt at display interface, suspend rearmounted being subject to Impact change, abnormality processing success after, according to described workflow activities figure according to change it The relation that performs before and after between performs follow-up change.
Online implementing variation the most according to claim 1, it is characterised in that described change Item includes: preposition item and follow-up item, wherein, before described preposition item is for being positioned at one section of directed arc The change on limit, described follow-up item is to be positioned at the change of described one section of directed arc back.
Online implementing variation the most according to claim 1, it is characterised in that described basis Variation control table generates after workflow activities figure, described becomes from Section 1 according to described workflow activities figure Before more item starts to perform change according to the relation that performs before and after between change, also include:
Start node and terminal node is inserted in described workflow activities figure.
Online implementing variation the most according to claim 3, it is characterised in that described in institute State after workflow activities figure inserts start node and terminal node, described according to described workflow activities Figure from Section 1 change start according to the relation that performs before and after between change perform change it Before, also include:
Select the change in critical path;
When the change in critical path changes unsuccessful, while display interface carries out abnormal prompt Control phonation unit and send tweeting sound.
Online implementing variation the most according to claim 4, it is characterised in that select pass Change on key path, specifically includes:
From the beginning of start node, before and after between described change, perform relation to described work Stream activity diagram carries out topological sorting traversal, calculates the earliest start time of each change;
Elect the path of the change that free float is 0 included with last change as pass Key path;
Select the change in critical path.
6. a control system is reached the standard grade altering system, it is characterised in that this system includes:
Import unit, is used for importing Variation control table;
Workflow activities figure forms unit, for generating workflow activities figure according to described Variation control table;
Change performance element, for according to described workflow activities figure from Section 1 change start according to After before and after between change, execution relation execution change, inspection result display are changed successfully, depend on Before and after between change, the relation remaining change of execution is performed according to described workflow activities figure And after abnormality processing success, perform before and after between change according to described workflow activities figure Relation performs follow-up change;
Inspection unit, for after a change has performed, performs described change corresponding Check script;
Display unit, for checking result in display interface display;
Abnormal prompt and time-out unit, be used for checking when result display change is unsuccessful, enter at display interface Row abnormal prompt, suspends rearmounted affected change.
System the most according to claim 6, it is characterised in that described system also includes:
Insert unit, for forming unit according to described Variation control table generation work at workflow activities figure Stream activity diagram after, change performance element according to described workflow activities figure from the beginning of Section 1 change Before performing change according to the relation that performs before and after between change, at described workflow activities figure Middle insertion start node and terminal node.
System the most according to claim 7, it is characterised in that described system also includes:
Select unit, be used for inserting unit in described workflow activities figure, insert start node and terminal node After Dian, change performance element starts according to change from Section 1 change according to described workflow activities figure Before the relation that performs before and after between more item performs change, select the change thing in critical path ?;
Phonation unit, for when the change in critical path changes unsuccessful, abnormal prompt and temporarily Stop unit and send tweeting sound while display interface carries out abnormal prompt.
System the most according to claim 8, it is characterised in that described selection unit includes:
Computing unit, for from the beginning of start node, performs pass before and after between described change System carries out topological sorting traversal to described workflow activities figure, when calculating the early start of each change Between;
Critical path selects unit, and being used for including the free float with last change is 0 The path of change elect critical path as;
In critical path, change selects unit, for selecting the change in critical path.
CN201610318034.4A 2016-05-13 2016-05-13 A kind of online variation of control system and system Active CN105955752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610318034.4A CN105955752B (en) 2016-05-13 2016-05-13 A kind of online variation of control system and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610318034.4A CN105955752B (en) 2016-05-13 2016-05-13 A kind of online variation of control system and system

Publications (2)

Publication Number Publication Date
CN105955752A true CN105955752A (en) 2016-09-21
CN105955752B CN105955752B (en) 2019-01-25

Family

ID=56911786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610318034.4A Active CN105955752B (en) 2016-05-13 2016-05-13 A kind of online variation of control system and system

Country Status (1)

Country Link
CN (1) CN105955752B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110471821A (en) * 2019-08-07 2019-11-19 深圳市腾讯计算机系统有限公司 Abnormal alteration detection method, server and computer readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method
CN101403964A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type software configuration management method based on transaction management
CN102486730A (en) * 2010-12-06 2012-06-06 上海协讯软件有限公司 Workflow realization method and workflow system capable of customizing flow in user-defined manner
CN105302542A (en) * 2014-07-14 2016-02-03 柯尼卡美能达株式会社 Workflow system, workflow executing device, workflow executing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method
CN101403964A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type software configuration management method based on transaction management
CN102486730A (en) * 2010-12-06 2012-06-06 上海协讯软件有限公司 Workflow realization method and workflow system capable of customizing flow in user-defined manner
CN105302542A (en) * 2014-07-14 2016-02-03 柯尼卡美能达株式会社 Workflow system, workflow executing device, workflow executing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110471821A (en) * 2019-08-07 2019-11-19 深圳市腾讯计算机系统有限公司 Abnormal alteration detection method, server and computer readable storage medium
CN110471821B (en) * 2019-08-07 2023-10-13 深圳市腾讯计算机系统有限公司 Abnormality change detection method, server, and computer-readable storage medium

Also Published As

Publication number Publication date
CN105955752B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN106506283B (en) Business test method and device of bank and enterprise docking system
US20140325480A1 (en) Software Regression Testing That Considers Historical Pass/Fail Events
US9734045B2 (en) Generating test cases
CN108121543B (en) Software code compiling processing method and device
US8214245B2 (en) Method and system for synchronizing inclusive decision branches
Derezinska et al. Experimental evaluation of mutation testing approaches to python programs
KR102160780B1 (en) Bug fixing system and bug fixing method
JP2021525914A5 (en)
CN110599341A (en) Transaction calling method and system
TW201616377A (en) Reorganizing and presenting data fields with erroneous inputs
CN106022912A (en) Evaluation model updating method and evaluation model updating system
CN113448380A (en) Method and device for synchronously switching accounting dates
CN104158905B (en) The creation method of web container
CN105930226A (en) Data processing method and apparatus
CN105955752A (en) Method and system for controlling system online change
CN110597688A (en) Monitoring information acquisition method and system
CN103034553B (en) Intelligent verification algorithm, method and device for report designer
JP2016143134A (en) Relevant information distribution method, relevant information distribution system and relevant information distribution program
CN114064012B (en) Dynamic and static combined interface code generation method and system and electronic equipment
JP2014106912A (en) Constraint extraction program, constraint extraction device and constraint extraction method
CN110912743B (en) Method and device for executing configuration instruction
CN115080382A (en) Code testing method, device, equipment and medium
US8510342B1 (en) Automatic conversion of build processes to use streaming input
CN110992448A (en) Animation processing method and device, electronic equipment and storage medium
CN106815034A (en) A kind of data updating method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant