CN105952084A - GRC component and installing structure and method thereof - Google Patents

GRC component and installing structure and method thereof Download PDF

Info

Publication number
CN105952084A
CN105952084A CN201610422816.2A CN201610422816A CN105952084A CN 105952084 A CN105952084 A CN 105952084A CN 201610422816 A CN201610422816 A CN 201610422816A CN 105952084 A CN105952084 A CN 105952084A
Authority
CN
China
Prior art keywords
transverse strands
grc
grc component
component
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610422816.2A
Other languages
Chinese (zh)
Other versions
CN105952084B (en
Inventor
向国涛
罗丁
湛楠
刘德会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201610422816.2A priority Critical patent/CN105952084B/en
Publication of CN105952084A publication Critical patent/CN105952084A/en
Application granted granted Critical
Publication of CN105952084B publication Critical patent/CN105952084B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements

Abstract

The invention provides a GRC component which comprises a GRC component body. The cross section of the GRC component body is shaped like U; the U-shaped component body is provided with a longitudinal support containing groove; an installation surface is arranged at one tail end of the U shape of the component body; a support framework is arranged in the U-shaped component in an embedded mode; the support framework is provided with an installation part which extends out of the installation surface of the component body. According to the GRC component, potential safety hazards in the installing and using processes of the GRC component are reduced, and the water-seepage problem of the joint of the GRC component and an external wall is effectively solved. In addition, the GRC component is convenient to construct, high in safety and reliability and suitable for construction of high building exterior wall GRC components.

Description

A kind of GRC component and mounting structure thereof and method
Technical field
The present invention relates to Building decorating and repairs engineering technical field, especially relate to a kind of GRC component and mounting structure thereof And construction method.
Background technology
GRC (Glassfibre Reinforced Concrete) component, i.e. glass concrete component, full name For GRC architectural detail decoration element.The national standard promulgated according to the Ministry of Construction " advise by decoration construction inspection of quality Model " GB50210-2001, GRC architectural detail decoration element belongs to point in the fine engineering in Building decorating and repairs engineering A kind of building subassembly in item floriation.
Architectural detail is building part of the whole, and architectural Design in Details is exactly the overall relation with local of research.Perfect Building necessarily there is perfect architectural detail, it to strengthen specific architectural design effect play decisive role.
The more classical annotation of architectural detail is: architectural detail is a local of building, sees from afar, sees on the whole It does not has the strongest individual character.And people gradually press close to them, observe them, it finds that an a whole new world, such Local is exactly thin portion.
Glass concrete be a kind of with alkali-resistant glass fibre as reinforcing material, cement mortar is as matrix material Fiber cement composite material.Its outstanding feature is to have good tension and rupture strength, and preferably toughness.This material Material is especially suitable for making decorative model and for showing strong texture.
But, traditional GRC component is relatively big due to deadweight, has certain in installation process and during subsequent use Potential safety hazard, simultaneously the delivery position with metope easily becomes the seepage point of metope.
Summary of the invention
It is an object of the invention to provide a kind of GRC component and mounting structure thereof and construction method, to solve prior art Present in due to from great and there is potential safety hazard and the technical problem of easily infiltration.
For solving above-mentioned technical problem, a kind of GRC component that the present invention provides, it includes member bodies, member bodies Cross section is U-shaped;
Longitudinal support holding tank it is provided with in U-shaped member bodies;
Member bodies is provided with installed surface at a U-shaped end;
It is embedded with support frame inside U-shaped member bodies;
Support frame is provided with installation portion, and the installation portion of support frame stretches out the installed surface of member bodies.
Further, described support frame is perpendicular with support holding tank, along being longitudinally arranged side by side in described member bodies Multiple described support frames.
Further, being provided with longitudinally disposed connecting framework in described member bodies, described connecting framework will be many successively Individual described support frame is connected.
Further, described support holding tank is provided with heavy stand at the opening's edge of installed surface side, and the table top of this heavy stand is institute The installed surface stated;The installation portion of described support frame is arranged in heavy stand;The height of installation portion is not more than the height of heavy stand.
Compared with prior art, the GRC component of the present invention is provided with support holding tank, after installation, for by GRC component The installed part being fixed on body of wall is housed in this support holding tank, the most elegant in appearance and clean and tidy;Meanwhile, GRC structure The structure of part is close to channel-section steel, while rigidity is more excellent, greatly reduces own wt, thus reduces and want strength of wall body Ask, be more convenient for popularization and application.
The mounting structure of a kind of above-mentioned GRC component, it includes stress support and described GRC component;
Stress support includes even wall stand and transverse strands;
Described even wall stand abuts on body of wall, and fixing with body of wall is connected;
Transverse strands is fixed in described even wall stand;
Described transverse strands is vertically arranged with the metope of body of wall;
Described GRC component spiral-lock is in described even wall stand and described transverse strands;
Described even wall stand and described transverse strands are arranged in the support holding tank of GRC component;
Described transverse strands is resisted against the top medial surface of support holding tank, and then holds described GRC component;
The installation portion of the support frame of described GRC component is fixing with even wall stand to be connected.
Further, one end of described transverse strands is fixing with described even wall stand to be connected, and the other end of transverse strands is to away from body of wall Direction stretch out.
Further, described stress support also includes that longitudinal frame, described stress support include more than two the institute being arranged side by side Stating transverse strands, described longitudinal frame is fixedly installed on transverse strands one end away from body of wall, and multiple transverse strands is connected.
Further, described longitudinal frame is resisted against the top medial surface of described support holding tank, and then holds described GRC structure Part.
Further, it is connected by bonding glue between described transverse strands and the top medial surface of described support holding tank.
Further, it is connected by bonding glue between described longitudinal frame and the top medial surface of described support holding tank.
Further, described bonding glue is silicone adhesive or cloud stone glue.
Further, described even wall stand is connecting plate, and connecting plate is close to body of wall and is arranged, and the thickness of connecting plate is not more than described The height of heavy stand at frame holding tank opening's edge, after connecting plate is connected with installation portion, the upper and lower surface of U-shaped member bodies is completely covered by Described connecting plate and installation portion.
By arranging heavy stand at the opening's edge of support holding tank, in installation portion this heavy stand completely set up of support frame, i.e. The end of installation portion does not extends out heavy stand opening's edge, and installation portion is fixed with stress support after being connected, and the connecting plate as stress support is same Sample is arranged in this heavy stand, and the end face of the U-shaped end of member bodies is close to metope, thus, by all of fixing and mounting structure Hide in support holding tank, simple in construction, easy for installation while more attractive in appearance.
Further, it is provided with the cement-based waterproof layer for sealing at the upper side of described GRC component and wall connecting;Institute The bottom surface stating GRC component is provided with the anticracking grout layer for sealing at wall connecting.
Further, it is embedded with the alkaline-resisting grid cloth of glass in described cement-based waterproof layer and anticracking grout layer.
Further, described support frame is U-shaped.
Further, described support frame is U-shaped reinforcing bar, a diameter of Ф 5-10mm of reinforcing bar;Described transverse strands and described vertical It is made up of shaped steel to frame;Preferably, transverse strands and longitudinal frame are made up of angle bar, and the specification of angle bar is L50*50*5.
GRC component be a kind of with alkali-resistant glass fibre as reinforcing material, the cement mortar fibre cement as matrix material multiple Condensation material, is mainly composed of cement mortar, and density, weight are relatively big, if without reliable and effective connection, meeting in exterior wall installation process Produce bigger potential safety hazard.The present invention is fixedly connected sequentially by even wall stand, transverse strands and longitudinal frame, and then forms one surely Solid globality support frame, and together U-shaped reinforcing bar is set in the production process of GRC component, GRC component and company wall stand is led to Crossing welding to be reliably connected, thus mounting structure is more firm.The seam crossing up and down of GRC component Yu exterior wall is carried out waterproof place simultaneously Reason, substantially eliminates the infiltration hidden danger at this position.
The installation method of a kind of above-mentioned GRC component, it specifically comprises the following steps that
Step one: even wall stand is fixed on metope by expansion bolt;
Step 2: by transverse strands by welding or the company's of being bolted to wall stand;
Step 3: longitudinal frame by welding or is bolted to transverse strands one end away from body of wall;Longitudinal frame is by institute Some transverse strands link together;
Step 4: by described GRC component spiral-lock in transverse strands and longitudinal frame, GRC component held by transverse strands and longitudinal frame; The installation portion of GRC component is fixing with even wall stand to be connected;
Step 5: GRC component scratches cracking resistance sand at top seam blade coating cement-based waterproof layer, the lower joint of metope Alkaline-resisting grid cloth is laid in slurry, cement-based waterproof layer and anticracking grout.
Further, described transverse strands, filling bonding glue between longitudinal frame and the top medial surface of described support holding tank, Described bonding glue is silicone adhesive or cloud stone glue.
Use technique scheme, there is advantages that
A kind of GRC component of present invention offer and mounting structure thereof, simple in construction, easy for installation,
Compared with prior art, the invention have the characteristics that and beneficial effect: the present invention not only reduces GRC component peace Potential safety hazard during dress and use, but also efficiently solve the seepage problem of GRC component and position, exterior wall boundary.Tool For body, it is simply that because system installed by traditional GRC component is directly to use expansion bolt to be connected with wall face component, GRC Component belongs to fragile material, and during its construction and use, potential safety hazard is bigger;The present invention selects shape steel bracket as fixing body It is, and support uses with GRC component and is welded to connect, and improves reliability and the safety of installation, the simultaneously friendship to upper and lower opening Position, boundary carries out water-proofing treatment, reduces infiltration hidden danger.It addition, easy construction of the present invention, security reliability are strong, it is adaptable to high-rise Exterior wall GRC component is constructed.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art below will be to specifically In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not paying creative work Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
The structural representation of a kind of GRC component that Fig. 1 provides for the embodiment of the present invention 1;
The schematic diagram of a kind of GRC member installation structure that Fig. 2 provides for the embodiment of the present invention 2;
Fig. 3 is zoomed-in view at the A in Fig. 2;
Fig. 4 is zoomed-in view at the B in Fig. 2;
Fig. 5 is the C-C sectional view in Fig. 2;
Reference:
1-GRC component;2-body of wall;3-expansion bolt;
4-anticracking grout layer;The alkaline-resisting grid cloth of 5-glass;6-cement-based waterproof layer;
10-member bodies;11-support holding tank;12-installed surface;
13-heavy stand;20-support frame;21-installation portion;
31-connects wall stand;32-transverse strands;33-longitudinal direction frame;
34-bonds glue.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described, it is clear that described enforcement Example is a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertically ", Orientation or the position relationship of the instruction such as " level ", " interior ", " outward " they are based on orientation shown in the drawings or position relationship, merely to Be easy to describe the present invention and simplifying describe rather than instruction or the hint device of indication or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicate or hint relative importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " is installed ", " phase Even ", " connection " should be interpreted broadly, for example, it may be fixing connection, it is also possible to be to removably connect, or be integrally connected;Can To be mechanical connection, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, can understand that above-mentioned term is at this with concrete condition Concrete meaning in invention.
Embodiment 1
As it is shown in figure 1, a kind of GRC component 1 that the present embodiment provides, it includes member bodies 10, the horizontal stroke of member bodies 10 Cross section is U-shaped;
Longitudinal support holding tank 11 it is provided with in U-shaped member bodies 10;
Member bodies 10 is provided with installed surface 12 in U-shaped upper extremity;
Member bodies 10 is internal is embedded with support frame 20;
Support frame 20 is perpendicular with support holding tank 11, and two ends of support frame 20 are provided with installation portion 21, The installation portion 21 of support bone frame stretches out the installed surface 12 of member bodies.
Wherein, along being longitudinally arranged side by side multiple support frame 20 in member bodies 10.Support frame 20 is by U-shaped reinforcing bar system Become.
In order to strengthen the bonding strength of member bodies 10 longitudinal direction, member bodies 10 is provided with longitudinally disposed connecting framework (not shown), multiple support frames 20 are connected by connecting framework successively.
Being provided with heavy stand 13 at the opening's edge of support holding tank 11, the table top of this heavy stand 13 is installed surface 12;Support frame The installation portion 21 of 20 is arranged in heavy stand 13;The end of installation portion 21 does not extends out the left side opening's edge of heavy stand 13.
Wherein, support frame is preferably U-shaped reinforcing bar, a diameter of Ф 8mm of reinforcing bar;Transverse strands and described longitudinal frame are by type Steel is made;Preferably, transverse strands and longitudinal frame are made up of angle bar, and the specification of angle bar is preferably L50*50*5.
Compared with prior art, the GRC component of the present invention is provided with support holding tank, after installation, for by GRC component The installed part being fixed on body of wall is housed in this support holding tank, the most elegant in appearance and clean and tidy;Meanwhile, GRC structure The structure of part is close to channel-section steel, while rigidity is more excellent, greatly reduces own wt, thus reduces and want strength of wall body Ask, be more convenient for popularization and application.
Embodiment 2
As in figure 2 it is shown, the mounting structure of a kind of GRC component of the present embodiment offer, it includes even wall stand 31, transverse strands 32 And GRC component 1;
Even wall stand 31 abuts on body of wall 2, and is connected by expansion bolt 3 is fixing with body of wall 2;
Transverse strands 32 is fixed on by welding manner and connects in wall stand 31;
Transverse strands 32 is vertically arranged with the metope of body of wall 2;
GRC component 1 spiral-lock is in even wall stand 31 and transverse strands 32;
Even wall stand 31 and transverse strands 32 are arranged in the support holding tank 11 of GRC component 1;Transverse strands 32 is resisted against support and holds Receive the top medial surface of groove 11, and then hold GRC component 1;
The installation portion 21 of the support frame 20 of GRC component 1 is connected by welding manner is fixing with even wall stand 31.
The mounting structure of GRC component 1 also includes that longitudinal frame 33, longitudinal frame 33 are fixedly installed on transverse strands by welding manner 32 away from one end of body of wall 2, and the multiple transverse strands 32 being arranged side by side is connected.
Longitudinal frame 33 is resisted against the top medial surface of support holding tank 11, and then holds GRC component together with transverse strands 32 1。
Transverse strands 32, it is connected by bonding glue 34 between longitudinal frame 33 and the top medial surface of support holding tank 11.Should Bonding glue is preferably silicone adhesive or cloud stone glue.
By arranging heavy stand at the opening's edge of support holding tank, in installation portion this heavy stand completely set up of support frame, i.e. The end of installation portion does not extends out heavy stand opening's edge, and installation portion is fixed with stress support after being connected, and the installation portion of stress support is respectively provided with In this heavy stand, the end face of the U-shaped end of member bodies is close to metope, thus, hides all of fixing and mounting structure into propping up In frame holding tank, simple in construction, easy for installation while more attractive in appearance.
As it is shown on figure 3, the end face of GRC component 1 and body of wall 2 junction are provided with the cement-based waterproof layer 6 for sealing;? Before smearing cement-based waterproof layer 6, it usually needs use the end face of GRC component 1 to fill anticracking grout layer at body of wall 2 joint angle 4, then lay the alkaline-resisting grid cloth of glass 5, finally repaste and smear cement-based waterproof layer 6, thus, sealing effectiveness is more preferable, during with duration Between will not ftracture.
As shown in Figure 4, the bottom surface of GRC component 1 and body of wall 2 junction are provided with the anticracking grout layer 4 for sealing, cracking resistance The alkaline-resisting grid cloth of glass 5 it is embedded with in screed 4.
As it is shown in figure 5, transverse strands 32, longitudinal frame 33 and company's wall stand 31 all use the section bars such as angle steel to make.
Embodiment 3
Present embodiments providing the installation method of a kind of above-mentioned GRC component, it specifically comprises the following steps that
Step one: even wall stand is fixed on metope by expansion bolt;
Step 2: by transverse strands by welding or the company's of being bolted to wall stand;
Step 3: longitudinal frame by welding or is bolted to transverse strands one end away from body of wall;Longitudinal frame is by institute Some transverse strands link together;
Step 4: by described GRC component spiral-lock in transverse strands and longitudinal frame, GRC component held by transverse strands and longitudinal frame; The installation portion of GRC component is fixing with even wall stand to be connected;
Step 5: GRC component scratches cracking resistance sand at top seam blade coating cement-based waterproof layer, the lower joint of metope Alkaline-resisting grid cloth is laid in slurry, cement-based waterproof layer and anticracking grout.
Wherein, bonding glue, preferably bonded adhesives are filled between the top medial surface of transverse strands and described support holding tank Water is silicone adhesive.
Tradition GRC component and mounting structure and mounting process improves and have been innovated by the present invention, employing shaped steel group Conjunction support substitutes traditional single-point support method fixing GRC component against expansion bolt as the stress support of component, improves Stability that component is installed, durability, considerably reduce the risk that GRC component falls, simultaneously by GRC component, shaped steel The processing factory of sectional shelf-unit is prefabricated, it is achieved that assemblingization, factorial praluction, meet the theory of green construction.
1) the stress system improvement of component is shaped steel combination support, and intensity, stability are greatly improved;
2) component is directly connected with body of wall spot welding by former, changes GRC component into and connects with bolt, be aided with bonding way and shaped steel Double-plate keel is attached, and reduces mounting process difficulty, ensure that the intensity of connection;
3) stress form is " line support-uniform load-bearing " by " point support " improvement, can guarantee that after the breakage of component own not The phenomenon that large area comes off occurs;
4) material, shaped steel combination Os Draconis type selecting, factorial praluction, on-the-spot dress are carried out according to construction drawing moulding form Join, simple process, improve work efficiency;
5) it is double-plate keel supporting form due to stress system, shaped steel group can be carried out according to building different parts load-bearing size Closure bone type selecting, subjects to trample part such that it is able to be arranged on, ensures its fastness and stability.
It is to be noted that before carrying out step one, it should be ensured that wall face perpendicularity, flatness compliant requirement; Even wall stand is both needed to carry out antirust treatment;Expansion bolt anchorage length in body of wall should meet design requirement;Cement-based waterproof layer, Anticracking grout layer should smear into fillet.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a GRC component, it is characterised in that it includes member bodies, the cross section of member bodies is U-shaped;
Longitudinal support holding tank it is provided with in U-shaped member bodies;
Member bodies is provided with installed surface at a U-shaped end;
It is embedded with support frame inside U-shaped member bodies;
Support frame is provided with installation portion, and the installation portion of support frame stretches out the installed surface of member bodies.
GRC component the most according to claim 1, it is characterised in that described support frame is perpendicular with support holding tank, institute It has been arranged side by side multiple described support frame along longitudinal in stating member bodies;It is provided with longitudinally disposed in described member bodies Connecting framework, multiple described support frames are connected by described connecting framework successively.
GRC component the most according to claim 1, it is characterised in that the described support holding tank opening's edge in installed surface side Place is provided with heavy stand, and the table top of this heavy stand is described installed surface;The installation portion of described support frame is arranged in heavy stand;Install The height in portion is not more than the height of heavy stand.
4. the mounting structure using the arbitrary described GRC component of claim 1-3, it is characterised in that it includes stress support With described GRC component;
Stress support includes even wall stand and transverse strands;
Described even wall stand abuts on body of wall, and fixing with body of wall is connected;
Transverse strands is fixed in described even wall stand;
Described transverse strands is vertically arranged with the metope of body of wall;
Described GRC component spiral-lock is in described even wall stand and described transverse strands;
Described even wall stand and described transverse strands are arranged in the support holding tank of GRC component;
Described transverse strands is resisted against the top medial surface of support holding tank, and then holds described GRC component;
The installation portion of the support frame of described GRC component is fixing with even wall stand to be connected.
Mounting structure the most according to claim 4, it is characterised in that one end of described transverse strands is fixed with described even wall stand Connecting, the other end of transverse strands stretches out to the direction away from body of wall.
Mounting structure the most according to claim 4, it is characterised in that described stress support also includes longitudinal frame, described is subject to Power support includes more than two the described transverse strands being arranged side by side, and described longitudinal frame is fixedly installed on transverse strands away from the one of body of wall End, and multiple transverse strands are connected.
Mounting structure the most according to claim 6, it is characterised in that described longitudinal frame is resisted against described support holding tank Top medial surface, and then hold described GRC component.
Mounting structure the most according to claim 6, it is characterised in that described transverse strands and the top of described support holding tank Connected by bonding glue between medial surface;By bonding between the top medial surface of described longitudinal frame and described support holding tank Glue connects.
Mounting structure the most according to claim 4, it is characterised in that at the upper side of described GRC component and wall connecting It is provided with the cement-based waterproof layer for sealing;It is provided with for resisting of sealing at the bottom surface of described GRC component and wall connecting Split screed;The alkaline-resisting grid cloth of glass it is embedded with in described cement-based waterproof layer and anticracking grout layer.
10. the installation method of the arbitrary described GRC component of claim 1-9, it is characterised in that it specifically comprises the following steps that
Step one: even wall stand is fixed on metope by expansion bolt;
Step 2: by transverse strands by welding or the company's of being bolted to wall stand;
Step 3: longitudinal frame by welding or is bolted to transverse strands one end away from body of wall;Longitudinal frame is by all of Transverse strands links together;
Step 4: by described GRC component spiral-lock in transverse strands and longitudinal frame, GRC component held by transverse strands and longitudinal frame;GRC The installation portion of component is fixing with even wall stand to be connected;
Step 5: GRC component scratches anticracking grout at top seam blade coating cement-based waterproof layer, the lower joint of metope, Alkaline-resisting grid cloth is laid in cement-based waterproof layer and anticracking grout.
CN201610422816.2A 2016-06-13 2016-06-13 A kind of GRC component and its mounting structure and method Expired - Fee Related CN105952084B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610422816.2A CN105952084B (en) 2016-06-13 2016-06-13 A kind of GRC component and its mounting structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610422816.2A CN105952084B (en) 2016-06-13 2016-06-13 A kind of GRC component and its mounting structure and method

Publications (2)

Publication Number Publication Date
CN105952084A true CN105952084A (en) 2016-09-21
CN105952084B CN105952084B (en) 2019-01-08

Family

ID=56905746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610422816.2A Expired - Fee Related CN105952084B (en) 2016-06-13 2016-06-13 A kind of GRC component and its mounting structure and method

Country Status (1)

Country Link
CN (1) CN105952084B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431298A (en) * 2021-06-24 2021-09-24 中核华辰建筑工程有限公司 GRC component mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144494A (en) * 1994-11-25 1996-06-04 Kurabo Ind Ltd Installation structure for decorative girth
US6837020B1 (en) * 2000-11-16 2005-01-04 Alsco Metals Corporation Architectural trim product and method of mounting
CN202450688U (en) * 2012-01-17 2012-09-26 深圳海龙建筑制品有限公司 Prefabricated glass fiber reinforced plastic composite (GRC) component
CN102936963A (en) * 2012-12-06 2013-02-20 中国建筑第八工程局有限公司 GRC (Glass-fiber Reinforced Cement) member mounting method and mounting structure thereof
CN203462727U (en) * 2013-08-15 2014-03-05 浙江亚厦装饰股份有限公司 Integral molding
CN205712854U (en) * 2016-06-13 2016-11-23 中国建筑第二工程局有限公司 A kind of GRC component and mounting structure thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144494A (en) * 1994-11-25 1996-06-04 Kurabo Ind Ltd Installation structure for decorative girth
US6837020B1 (en) * 2000-11-16 2005-01-04 Alsco Metals Corporation Architectural trim product and method of mounting
CN202450688U (en) * 2012-01-17 2012-09-26 深圳海龙建筑制品有限公司 Prefabricated glass fiber reinforced plastic composite (GRC) component
CN102936963A (en) * 2012-12-06 2013-02-20 中国建筑第八工程局有限公司 GRC (Glass-fiber Reinforced Cement) member mounting method and mounting structure thereof
CN203462727U (en) * 2013-08-15 2014-03-05 浙江亚厦装饰股份有限公司 Integral molding
CN205712854U (en) * 2016-06-13 2016-11-23 中国建筑第二工程局有限公司 A kind of GRC component and mounting structure thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431298A (en) * 2021-06-24 2021-09-24 中核华辰建筑工程有限公司 GRC component mounting structure
CN113431298B (en) * 2021-06-24 2022-07-12 中核华辰建筑工程有限公司 GRC component mounting structure

Also Published As

Publication number Publication date
CN105952084B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN205712854U (en) A kind of GRC component and mounting structure thereof
CN202017346U (en) Late poured band hanging formwork structure
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN105625617B (en) A kind of component type curtain wall system suitable for dry construction
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN106149554A (en) A kind of prefabricated bridge expansion joint connecting elements, preparation method and construction method thereof
CN204126053U (en) Large span prestressed concrete T plate
CN107700852A (en) Drag-line and frame structure combination process construction technology in a kind of curtain wall construction
CN105952084A (en) GRC component and installing structure and method thereof
CN106812215B (en) A kind of prefabricated PC steel core concrete column column connection type
CN104805938A (en) Stone curtain wall and method for assembling and mounting stone curtain wall
CN208899928U (en) Stage building structure
CN209653187U (en) Double-layer combined curtain wall system
CN103437440A (en) Fixing device for thermal insulating prefabricated slab of building and construction method for thermal insulation of building by using reverse building method
CN214614809U (en) Self-heat-preservation system of cast-in-place concrete wall
CN108193778B (en) A kind of construction method of goose egg shape steel construction
CN109914849A (en) A kind of FRP wall reinforcement device and reinforcement means
CN205804724U (en) A kind of embedded glass curtain wall structure system
CN204001462U (en) The integrated insulation of a kind of composite material non-dismantling formwork
CN211058177U (en) Reusable tool for reserving separation seam of waterproof protective layer
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN207597638U (en) A kind of fast joint type heat-preserving wall component
CN204001548U (en) A kind of decoration composite plate
CN106049793B (en) A kind of clay brick stainless steel perforated support system
CN202483110U (en) Thin-type vacuum heat preservation/fireproofing/decorative outer wall composite stone plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108

Termination date: 20190613

CF01 Termination of patent right due to non-payment of annual fee